executive engineer kadodara division
Tender for for ARC for work of Providing & Fixing of Green HDPE pipe on Existing RSJ HT/LT Poles as per norms under all scheme for the year 2026-2027 for Kadodara-1 Sub division under Kadodara Division.
343361
DGVCLDKDD/0102/09/2026 Approved Date: 07-09-2026 SR.NO.03
Open
Electrical
Works
Surat
3 documents required · 3 mandatory
₹590
DAKSHIN GUJARAT VIJ COMPANY LTD.
₹5 L
28 Sept 2026
9 Sept 2026
29 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
(9) Earnest Money deposit (1% of the estimated cost) as indicated on the face
sheet should be paid by the tenderer along with the tender in cash or by
demand draft on any nationalized bank in favour of “Dakshin Gujarat Vij
Company Limited” in which case receipt shall be attached with tender
• Tender without earnest money will not be considered for acceptance.
Earnest Money Deposit will be forfeited incase the successful tenderer
after his tender has been accepted fails to paythe prescribed security
deposit and execute the contract agreemen to non-judicial stampof
Rs.300/-at his own cost and sign the contract booklet.
(10) Validity of Tenders:
All tenders shall be opened for acceptance by the Company for a period of 120 days
from the date of opening the tenders and may be further extended to 30 days, if
required and the tenders shall be bound to execute the work on acceptance of his
tender within the period.
(11) Acceptance of Tenders:
(a) The Company does not bind to accept the lowest or any tender with any
reason for the rejection. It is also not binding on the company to disclose
any analysis reports on the tender.
(b) Accepting authority reserves the right of rejection of any or all tenders
without assigning any reason thereof.
(c) Any tender who does not comply the above requirements is liable to be
(12) Security Deposit:
The lowest tender whose tender is accepted shall have to pay 5% security deposit of
thetendercost.Securitydepositcumperformanceguaranteeshallbepaidby
contractor/tenderer within 10 (Ten) days from date of letter of acceptance i.e. LOA /
LOI (Letter of Intent). If the performance guarantee i.e. BG (bank guarantee) is not
submitted within 10 (Ten) days after the receipt of the LOA / LOI, then in such case the
work order shall be out rightly cancelled at the risk and cost of the contractor/Tenderer
at the discretion of the DGVCL and without entering into any correspondence and this
shall be binding on the contractor/Tenderer.
(13) Solvency Certificate/Bank Guarantee:
The lowest tender whose tender is accepted shall have to produce within
days the solvency certificate from the collector of district within which he
resides or bankers certificate of his financial stability for the amount as deemed
fit by the undersigned. In case of partnership firm each individual partner will
have to produce solvency certificate as above. The solvency certificate will have
to be renewed every year or whenever asked for in the interim period.
Solvency Certificate / Bank Guarantee issued from any Nationalized Bank
amounting to sum equivalent to amount of 1/5th times (20%) of the tender
value. Tenderer can opt to submit it within 15 days if he is eligible as a lowest
tenderer, but the undertaking for same should be put up with the tender.
(14) Contract Documents:
The lowest tendered whose tender is accepted will have to execute a stamped
agreement in standard form with the company and will have to sign the
contract booklet viz Tender and contract for works at his own cost. In
caseofpartnershipfirms,necessarypartnershipdocuments,inoriginalalong with
its copy will have to be produced for verification along with authority to sign
the bills measurement and enter in to contract as well as correspondence with
the company. Wherever required necessary power of attorney will have to be
produced especially when the partnership deed is silent on the point of
authority to deal with the Company.
(15) In Case of Any Emergency order May be transfer in other subdivision under
jurisdiction of Kadodara Division.
(16) Latest income tax clearance certificate and PANNo.in the name of Tendered.
(17) Experience certificate of supervisioris required within last 1-year for erection
of HTLTline&T/Cand Earthing work by authorized officer of any Distribution
Company of Gujarat
(18) GroupInsurance: A copy of the insurance policy of the insured
laborers’underW.C.Act192
(19) The contractor will have to undertake responsibility of accidents etc.for his
persons working online and same will be on stamp paper of Rs. 300/- or of
the appropriate value (if revised by Govt.) The cost of stamp paper will be
borne by contractor
(20) List of the Tools & Tackles and safety equipment’s available with contractors
on his letterpad.
(21) Copy of the Electrical contractor licenseas and when required
(22) GST registration is required
(23) Similar Nature of Work: The bidder should have successfully
completed or substantially completed similar nature of work i.e.
Under Ground Cable Laying Work for 11kV and aboveclassand or
Erection of HT, LT line & T/C Replacement of O/H line conductor
with abc, dismantling of pole & transformer center, Maintenance of
old line & other miscellaneous workin last 7years ending last day of
month previous to the one in which bids are invited should be either
of the following:
BIDDER TO SATISFY THE ENTIRE FOLLOWING PRE-
QUALIFIYINGREQUIRE- MENT.
The bidder should produce evidence of experience of having successfully
com- pleted similar works during the last 7 years ending last day of month
previous to the one in which applications are invited should be either of the
following inGovt., /Semi Govt., along with certified copies of documentary
evidence, prefer- ably photo copy of orders secured from
DGVCL/MGVCL/UGVCL/PGVCL/GSECL/ GETCO/DISCOMs/GEB/
Central/State Government / Semi-Government and satis- factory completion
certificate from respective department thereof:-
(a) bidder should have (in last7 years) completed of similar typeworkof costing
notlessthan the amount equal to 80% of the estimated amount.
(b) bidder should have (in last 7 years) completed of two nos of similar
typeworkof costing not less than the amount equal to 50% of the estimated
(c) bidder should have (in last 7 years) completed of three nos of similar
typeworkof cost- ing not less than the amount equal to 40% of the
estimated amount.
The DGVCL may verify the above certificates / documents from respective department,
if ne- cessary.
The Bidder shall have requisite resources (enclose details) in terms of professional
compet- ency and financial soundness to complete the whole package within the
stipulated time period.
The Bidder shall have valid PF number.In absence of valid PFnumber,the bidder will
haveto apply for PF number prior to submission of tender and the same to be submitted
at the time of tender.
➢ PENALTY FOR DELAY:
The tenderer should note that the completion time allowed for carrying out the work
should be strictly observed. Any delay that may take place in supply & erection beyond
Contractual period stated shall be subject to the penalty at the rate of ½ % of the total
contract value per week or part thereof, with a ceiling of 10 % of the total contract
The penalty will be deducted from bills payable either against this contract or from any
Bank Guarantee or any other amount payable under any other contract with the DGVCL
Tenderer shall have to supply all materials to match with the erection activities.
If the Contractor fails to successfully complete the commissioning within the time fixed
under the Contract, the Contractor shall pay to the Owner as penalty a sum specified
for each spe- cified period of delay.
Equipment and materials will be deemed to have been delivered only when all its
compon- ents, parts are also delivered. If certain components are not delivered in time
the equipment and materials will be considered as delayed until such time the missing
parts are also de- livered.
For the purpose of penalty, contractual obligation shall be completion of all the supply
and erection contracts as per time schedule & value of these contracts shall be “total
contract value” ( Sum of two individual contract value) for the working of penalty in line
with above relevant cl. No.41.1
91.7.Work & Safety Regulations:
The contractor shall ensure proper safety of all the workmen, materials, plant and
equipment belonging to him or to DGVCL or to others, working at the site. The contractor
shall also be responsible for provision of all safety notices and safety equipment required
both by the rel- evant legislations and the engineer, as he may deem necessary.
All equipment used in construction and erection by contractor shall meet
Indian/International standards and where such standards do not exist, the contractor
shall ensure these to be ab- solutely safe. All equipment shall be strictly operated and
maintained by the contractor in ac- cordance with manufacturer's operation manual and
safety instructions and as per guidelines/rules of DGVCL in this regard.
The contractor shall provide suitable safety equipment of prescribed standard to all
employ- ees and workmen according to the need, as may be directed by the engineer
who will also have right to examine these safety equipment to determine their
suitability,reliability,accept- ability and adaptability.
The contractor shall not interfere or disturb electric fuses, wiring and other electrical
equip- ment belonging to DGVCL or other contractors under any circumstances,
whatsoever, unless expressly permitted in writing by DGVCL to handle such fuses, wiring
or electrical equipment.
No repair work shall be carried out on any live equipment. The equipment must be
declared safe by the engineer and a permit to work shall be issued by the engineer
before any repair work is carried out by the contractor. While working on electric
lines/equipment, whether live or dead, suitable type and sufficient quantity of tools will
have to he provided by the con- tractor to electricians/workmen/officers.
(24) It is mandatory for the contractor to observe during the executionof the
works,requirements of safety rules.
(25) The contractor shall follow and comply with the employer's safety rulesrelevant
applicablelawspertainingtothesafetyofworkmen,employees,plantandequipmentasmay
be prescribed from time to time without any demur, protest or contest or reservations.
In case of any discrepancy between statutory requirement and employer's safety rules
referred above, the latter shall be binding on the contractor unless the statutory
provisions are more stringent.
(26) If the contractor fails in providing safe working environment as per employer's safety
rules or continues the work even after being instructed to stop work by the engineer,
the contractor shall promptly pay to DGVCL,on demand by the employer,compensation
at the rate of Rs.5000/- per day of part there of till the instructions are complied with
and so certified by the engineer. However, in case of accident taking place, causing
injury to any individual.
(27) If the contractor does not take all safety precautions and/or fails to comply with the
safety rules as prescribed by DGVCL or under the applicable law for the safety of the
equipment and plant and for the safety or personnel and the contractor does not prevent
hazardous conditions which cause injury to his own employees or employees of other
contractors or DGVCL's employees of any other person who are at site or adjacent
thereto, the contractor shall be responsible for payment of compensation to DGVCL.
(28) Pipe Clamps Must be Of G.I.Material.
(29) Contractor will have to provide HDPE Pipe /GI Clamps as per instruction of Engineer In-
(30) Contractor will have to provide HDPE Pipe in all sub divisions under Kadoadar-2 / Any
Sdn (If Required ) under Kadodara Division irrespective of quantity within time limit
given by Engineer In-charge.
Executive Engineer
DGVCL,Kadodara Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
notice.pdf
Integrity Part -.pdf
DRAFT TENDER CONDITION.pdf
Schedule B ARC.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .