Loading…
Loading…
Tender Value
₹3.8 L
EMD Value
₹3,767
Closing Date
20 Apr 2026, 2:30 pmClosed
Municipal Corporation of Rajahmundry
Municipal Corporation, Rajahmundry
Repairs to the Sweeping machine AP16TJ 6743 in RMC.
920156
463/MCR/General/2025-26
OPEN - NCB
Civil Works
EAST GODAVARI
9 documents required · 5 mandatory · 4 optional
₹134
₹3,767
4 Apr 2026
4 Apr 2026
4 Apr 2026
Repairs and replace section up and down Cylinder gas kit right and left including of all materials and all labour charges etc. complete as directed by the Site Engineer. For Gas Kit Right Cylinder
Repairs and replace section up and down Cylinder gas kit right and left including of all materials and all labour charges etc. complete as directed by the Site Engineer. For Gas Kit Left Cylinder
Repairs and replace section up and down Cylinder gas kit right and left including of all materials and all labour charges etc. complete as directed by the Site Engineer. For Fabrication charges for gas kit replaced
Repairs and replace Brush up and down Cylinder gas kit including of material and all labour charges etc. complete as directed by the Site Engineer. For Gas Kit Right Cylinder
Repairs and replace Brush up and down Cylinder gas kit including of material and all labour charges etc. complete as directed by the Site Engineer. For Gas Kit Left Cylinder
Repairs and replace Brush up and down Cylinder gas kit including of material and all labour charges etc. complete as directed by the Site Engineer. For Fabrication charges for gas kit replaced
Fabrication work of Section wheel along with complete mounting assembly, including all required fittings (cutting, bending, welding, shaping, assembling materials) and all labour charges etc. complete as directed by the Site Engineer.
Bearings (section wheels mounting assembly).
Fabrication work of side brush plate etc. complete as directed by the Site Engineer.
New Central Brush fitting including cost and conveyance of all materials and labour charges etc.complete as directed by the Site Engineer.
Repairs to the all Hydraulic cooler fan checking and replacing including cost and conveyance of all materials and all labour charges etc. complete as directed by the Site Engineer.
Repairs to the Blower Fan belts checking and replace including cost and conveyance of all materials and all labour charges etc. complete as directed by the Site Engineer.
Checking alignment and adjustment of Blower Fan, including bearing repairs and replacement pully bearings etc. complete as directed by the Site Engineer.
Pully lathe work and welding, cutting & fitting including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of 12v Battery (110 Amps battery new) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 6mm air Pipe (Rolls)
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 8mm air Pipe (Rolls)
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 12mm air Pipe 70 mtrs
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 6mm air line joint Nipple.
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 6mm T air line Nipple
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Air Cylinder Adjustment 6mm air Nipple(Small)
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Air Cylinder Adjustment 6mm air Nipple(Big)
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Centre brush air cylinder Adjustment nipple (Big)
Protective Black Sleeve covering air line and wiring including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For 6mm (1 rolls)
Protective Black Sleeve covering air line and wiring including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For 10 mm (one rolls)
Protective Black Sleeve covering air line and wiring including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For 12mm air pipe 70m (one rolls)
Opening, cleaning and refitting of wall mounted air line control value and including all materials and labour charges and finished item of work etc. complete as directed by the Site Engineer.
Replacement and fitting of valves (Air control walls) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of alluminium preumatic Filter Regulator Lubricator (FRL) unit including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Checking and replacement of section up and down relay (new) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Brush rotation control replay (new) replacement including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Right side section up and down replacement relay (new) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of Hydraulic Brush motor (new) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of section wheel with bearings and also bolt (new) including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Section Wheel
Replacement and fitting of section wheel with bearings and also bolt (new) including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Bearings
Replacement and fitting of section wheel with bearings and also bolt (new) including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Bolt.
Replacement and fitting of section Cylinder Pin (new) Including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Fabrication work of Brush along with complete mounting assembles including all required fitting (cutting, bending, welding, shepping, assembling, materials (new) and including all labour charges etc. complete as directed by the Site Engineer.
For Bearing (Central Brush)
For Bolts and Nuts
For With Watchers
Dust bin cleaning and fitting of all filter girid - maintenance and including all labour charges and complete finished item of work.
Section rubber repairing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of Hydraulic pump belt including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of new side brush including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Engine oil filter
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Fuel filter
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Fuel filter
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Air filter
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Compressor Filter
General Electrical work including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Cleaningt and fitting of hydraulic control wall including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For White
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Red
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Yellow
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Siren light
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Installation charges
Changing all front Engine Filter including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Changing all Fuel Filter including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Changing all Air Filter including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of side mirrors including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Engine starting key (front Engine) including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Repairs of self motor including wiring checkings of all materials and all labour charges and complete finished item of work.
Service Engineer charges including cost and covneyance of labour charges etc. complete as directed by the Site Engineer.
Manpower of transportation charges including cost and conveyance of all charges etc. complete as directed by the Site Engineer.
Details of Maximum amount reimbursable to the Contractor.
1) Provision for GST @18%
2) Provision for NAC @ 0.10%
Repairs and replace section up and down Cylinder gas kit right and left including of all materials and all labour charges etc. complete as directed by the Site Engineer. For Gas Kit Right Cylinder
Repairs and replace section up and down Cylinder gas kit right and left including of all materials and all labour charges etc. complete as directed by the Site Engineer. For Gas Kit Left Cylinder
Repairs and replace section up and down Cylinder gas kit right and left including of all materials and all labour charges etc. complete as directed by the Site Engineer. For Fabrication charges for gas kit replaced
Repairs and replace Brush up and down Cylinder gas kit including of material and all labour charges etc. complete as directed by the Site Engineer. For Gas Kit Right Cylinder
Repairs and replace Brush up and down Cylinder gas kit including of material and all labour charges etc. complete as directed by the Site Engineer. For Gas Kit Left Cylinder
Repairs and replace Brush up and down Cylinder gas kit including of material and all labour charges etc. complete as directed by the Site Engineer. For Fabrication charges for gas kit replaced
Fabrication work of Section wheel along with complete mounting assembly, including all required fittings (cutting, bending, welding, shaping, assembling materials) and all labour charges etc. complete as directed by the Site Engineer.
Bearings (section wheels mounting assembly).
Fabrication work of side brush plate etc. complete as directed by the Site Engineer.
New Central Brush fitting including cost and conveyance of all materials and labour charges etc.complete as directed by the Site Engineer.
Repairs to the all Hydraulic cooler fan checking and replacing including cost and conveyance of all materials and all labour charges etc. complete as directed by the Site Engineer.
Repairs to the Blower Fan belts checking and replace including cost and conveyance of all materials and all labour charges etc. complete as directed by the Site Engineer.
Checking alignment and adjustment of Blower Fan, including bearing repairs and replacement pully bearings etc. complete as directed by the Site Engineer.
Pully lathe work and welding, cutting & fitting including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of 12v Battery (110 Amps battery new) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 6mm air Pipe (Rolls)
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 8mm air Pipe (Rolls)
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 12mm air Pipe 70 mtrs
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 6mm air line joint Nipple.
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For 6mm T air line Nipple
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Air Cylinder Adjustment 6mm air Nipple(Small)
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Air Cylinder Adjustment 6mm air Nipple(Big)
Repair and replacement of air line blocked / damaged and not working including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Centre brush air cylinder Adjustment nipple (Big)
Protective Black Sleeve covering air line and wiring including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For 6mm (1 rolls)
Protective Black Sleeve covering air line and wiring including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For 10 mm (one rolls)
Protective Black Sleeve covering air line and wiring including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For 12mm air pipe 70m (one rolls)
Opening, cleaning and refitting of wall mounted air line control value and including all materials and labour charges and finished item of work etc. complete as directed by the Site Engineer.
Replacement and fitting of valves (Air control walls) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of alluminium preumatic Filter Regulator Lubricator (FRL) unit including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Checking and replacement of section up and down relay (new) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Brush rotation control replay (new) replacement including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Right side section up and down replacement relay (new) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of Hydraulic Brush motor (new) including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of section wheel with bearings and also bolt (new) including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Section Wheel
Replacement and fitting of section wheel with bearings and also bolt (new) including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Bearings
Replacement and fitting of section wheel with bearings and also bolt (new) including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Bolt.
Replacement and fitting of section Cylinder Pin (new) Including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Fabrication work of Brush along with complete mounting assembles including all required fitting (cutting, bending, welding, shepping, assembling, materials (new) and including all labour charges etc. complete as directed by the Site Engineer.
For Bearing (Central Brush)
For Bolts and Nuts
For With Watchers
Dust bin cleaning and fitting of all filter girid - maintenance and including all labour charges and complete finished item of work.
Section rubber repairing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of Hydraulic pump belt including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of new side brush including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Engine oil filter
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Fuel filter
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Fuel filter
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Air filter
Back Engine oil filter changing including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Compressor Filter
General Electrical work including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Cleaningt and fitting of hydraulic control wall including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For White
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Red
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Yellow
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Siren light
Replacement and fitting of Indicator light including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Installation charges
Changing all front Engine Filter including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Changing all Fuel Filter including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Changing all Air Filter including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement and fitting of side mirrors including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Engine starting key (front Engine) including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Repairs of self motor including wiring checkings of all materials and all labour charges and complete finished item of work.
Service Engineer charges including cost and covneyance of labour charges etc. complete as directed by the Site Engineer.
Manpower of transportation charges including cost and conveyance of all charges etc. complete as directed by the Site Engineer.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Doc.doc
TENDER_DOCUMENT • 0.65 MB
Notice 2026.doc
TENDER_DOCUMENT • 0.10 MB
Print TS 197 Nit.xls
TENDER_DOCUMENT • 0.07 MB
BOQ TS 197 Nit.xlsx
TENDER_DOCUMENT • 0.10 MB
Contractor Information.pdf
TENDER_DOCUMENT • 0.09 MB
Download all tender documents and submit your bid