Executive Engineer, K.R.B.C. Division, Surat
Construction of a new Aqueduct on Surali khadi in place of existing Structure at Ch. 9050 mt of Ukai Right Bank Main Canal.
327176
06 of 2026-27
Open
Civil - All
Works
Surat
15 documents required · 15 mandatory
₹18,000
Executive Engineer, K.R.B.C. Division, Surat
₹12.7 L
24 Jul 2026
24 Jul 2026
24 Jul 2026
24 Aug 2026
24 Jul 2026
Name of Work :- Construction a New aqueduct on Surali khadi in place of Existing structure @ Ch. 9050 m of ukai Right bank main
Qty. Unit. Description of Items. Rate Per Amount
Item No.1 In Figure In words
6782.43 M3 Dismentalling the existing Stone masonry including sorting out and stacking the useful 757.40 Rupees Seven Hundred M3
materials and removing the debries and making good the damage etc. complete as Fifty Seven and Forty
directed. (b) In cement mortar
1579.40 M3 Dismentalling the existing foundation concrete including disposing the dismentalled 1310.80 Rupees One Thousand M3
stuff including sorting out and stacking the useful materials and removing the Three Hundred Ten
and Eighty Paise Only
debries and making good the damage etc. complete as directed. (c) R.C.C for super
5751.33 SqMt Removing of exiting disturbed C.C. Block lining including opening of joints, stacking 29.13 Rupees Twenty Nine SqMt
the same and disposing of stuff as directed etc. complete with all leads and lifts. and Thirteen Paise
20506.74 M3 Excavation for foundation in all sorts of soil including yellow, sandy, gravelly 81.50 Rupees Eighty One M3
soil, soft & hard murrum, etc. dry condition including depositing the and Fifty Paise Only
excavated stuff in uniform layers in banks or as directed etc. complete for lead uo to
1.0 Km and all lifts. (By
machinery) (a) Above water table.
Providing and laying plain/ reinforced Design Mix cement concrete of various grade
with cement, sand and coarse aggregates including centering, shuttering, batching,
mixing, transporting, placing, vibrating, smooth finishing, curing etc. complete
for all lead and lift.(Baching Plant Based, Including dewatering)
730.17 M3 (ii) M-10 grade 3836.00 Rupees Three M3
Hundred Thirty Six
(B) Piers, abutment, wingwalls, headwall, returnwall etc
6255.19 M3 (ii) M-15 grade 4499.60 Rupees Four M3
Hundred Ninety Nine
and Sixty Paise Only
(C) Raft, Bottom slab of barel, footing of columns,piers,
abutment and bottom slab of sump etc.
293.34 M3 (ii) M-20 grade 4796.10 Rupees Four M3
Hundred Ninety Six
(E) Roadway slab, approch salb, chute floor slab,kerb, pier cap, abutment
cap, hoisting platform,top slab of barrel etc.
127.73 M3 (iii) M-25 grade 5206.30 Rupees Five Thousand M3
Two Hundred Six and
Thirty Paise Only
(D) Raft, Bottom slab of barel, footing of columns,piers,
abutment and bottom slab of sump etc.
1572.22 M3 (iii) M-30 grade 4977.00 Rupees Four M3
Hundred Seventy
(F) Top Slab of bridge with main and cross girder of bridge etc
3028.48 M3 (iii) M-30 grade 6035.90 Rupees Six Thousand M3
Thirty Five and Ninety
5027.93 Qtl Providing and placing in position reinforcement bars including cutting, bending 7194.00 Rupees Seven Qtl
welding, joints where necessary, hooking etc. complete as per drawing for all lead Thousand One
Hundred Ninety Four
and lifts. (b) TMT
14760.00 M3 Excavation of canal/drain in all sorts of soils (including wet and slushy condition of 82.40 Rupees Eighty Two M3
soil) including depositing the excavated stuff in uniform layers in canal banks or in and Forty Paise Only
spoil banks or as and wheredirected including dressing the canal section up to lead of
50 mt. and lift including clearing the site etc. complete ( by Machinery for canal /
drain maintenance ) ( up to 1.5 cumecs capacity of canal / drain )
125580.00 M3 Excavation of canal/drain in all sorts of soils (dry condition of soil) including 67.30 Rupees Sixty Seven M3
depositing the excavated stuff in uniform layers in canal banks or in spoil banks or as and Thirty Paise Only
and wheredirected including dressing the canal section up to lead of 500 mt. and lift
including clearing the site etc. complete ( by Machinery for canal / drain maintenance )
( above 1.5 cumecs capacity of canal / drain ) (above water table)
927.72 SqMt Providing and fixing in position pre moulded asphalt or bitumin cork board of 1007.40 Rupees One Thousand SqMt
approved quality and specification as per design and drawing as directed. (D) 12mm Seven and Forty Paise
68.75 m Providing and fixing in position PVC heavy duty water stops in barrels, trough, 384.90 Rupees Three Hundred m
and wing wall with 25 mm wide expension joint as shown in drawing including Eighty Four and
Ninety Paise Only
filling the joints with asphalt pad or bitumins or cork board of approved quality.
(A) 225mm wide PVC water stop.
478.85 m Providing and filling the polysulphide joint selent of the approved make in the 533.00 Rupees Five Hundred m
expansion and contraction joints in the c.c. lining including clearing the joints with Thirty Three Only
1699.60 Rmt Providing and fixing in position 110 mm dia PVC pipe weep holes in abutment, wing 263.70 Rupees Two Hundred Rmt
wall, and laying training etc. complete Sixty Three and
Seventy Paise Only
14266.73 M3 Earthwork in embankment using soil, soft & hard murrum excavated from approved 67.00 Rupees Sixty Seven M3
borrow area/village tanks etc including breaking clods, dressing to the design section Only
with lead up to 1.00Km and all lifts. (By poclane machinary)
14266.73 M3 Compaction of selected soil/hard murrum/soft murrum in even thickness of 15 to 20 10.40 Rupees Ten and Forty M3
cms including watering rolling of suitable capacity etc. complete as directed. Paise Only
5751.33 SqMt Providing and laying plain / reinforced cement concrete lining of M-15 grade in bed, 659.40 Rupees Six Hundred SqMt
side slopes and curvature including batching, mixing, transporting placing, Fifty Nine and Forty
smoothfinishing, curing including dewatering where required. ( machinary based
without Paver) (c) 15 cm thick lining in Bed & slope.
2.00 No. Providing & fixing in position sign board of standard size of 1.20mx0.90m with 3011.30 Rupees Three No.
M.S angle 40mmx40mmx6mm with 3mm thick iron plate including fixing in Thousand Eleven and
Thirty Paise Only
1:5:10 prop. Concrete block size 40cmx40cmx75 cm including painting existing
data on the board etc. complete as directed.
471.89 M3 Supplying of graded stone aggregates of following size (for W.B.M. road ) (2) 306.78 Rupees Three Hundred M3
Hand Broken stone aggregates 40mm to 63 mm. Six and Seventy Eight
471.89 M3 Spreading the stone aggregate for rolling and W.B.M. including filling the 268.92 Rupees Two Hundred M3
interstices to required camber & gradient (excluding spreading of Blindage) (ii) 40 Sixty Eight and Ninety
mm to 63 mm size aggregates (H.B.)
1085.00 Nos. Supplying and laying flexible gabions of size 1m x 1m x 1m (mesh size 2558.00 Rupees Two Thousand Nos.
100mm x 100mm)of rope 9mm strad P.P. materials mesh filled with 10 to 40 Five Hundred Fifty
kg trap rubble stone (approximate weight 1.5 tonne) as per drawing
including packing, inter locking of stones and stiching, fusing top of
gabione and tying to each other and laying to the required line, level, slope with
all leads and lifts as directed etc. complete.
1396.00 Rmt Providing and Filling Asphalt of the approved make and sand in the expansion and 68.03 Rupees Sixty Eight Rmt
contraction joints in the C:C lining including clearing the joints with air water jet. and Three Paise Only
12.00 Nos Providing gauge plate of following size of material fibre glass reinforced plastic 14786.61 Rupees Fourteen Nos
with engraved bands width and figures with necessary clits and fastenersand fixing Thousand Seven
Hundred Eighty Six
the same at the site of work etc complete asdirected For 0.60 mt. x 1.0 mt. gauge patti.
and Sixty One Paise
4.00 Hrs Providing videogrphy on the occasion of function or for ongoing 1230.51 Rupees One Thousand Hrs
construction work including dubbing, titling etc.complete including cost of cassate/CD. Two Hundred Thirty
and Fifty One Paise
(b) up to 4.0 hours.
1693.31 M3 Providing rubble and sand layer including supplying of rubble & coarse clean 1155.9 Rupees One Thousand M3
sharp sand at site including spreading rubble & coarse sand materials in 25 cm layer One Hundred Fifty
Five and Ninety Paise
including filling in the gaps in rubble, and levelling etc.complete as directed (80%
rubble & 20% coarse sand) including consolidation, watering etc. complete.
336.14 M2 Providing and laying Non Woven Geo Fabric Filter over the excavated surface 86.40 Rupees Eighty Six and M2
as per specification including stitching with over lap to design profile as directed in Forty Paise Only
tidal range etc. complete.
123.69 M3 Quarrying, transporting and laying inclined or horizontal sand filter for earthen dam 443.8 Rupees Four Hundred M3
in layers of specified thickness as directed including watering, rolling etc. Forty Three and
Eighty Paise Only
complete with all leads and lifts.
227.90 Mt. Providing and Erecting a "W" metal beam CRASH BARRIER comprising of 3 mm 4864.70 Rupees Four Mt.
thick corrugated sheet metal beam rail, 70 cm above road/ground level fixed on ISMC Thousand Eight
Hundred Sixty Four
series channel vertical post,150 x 75 x 5 mm space 2.00 m centre to centre 1.80 m high
and Seventy Paise
1.10 m below ground/road level fixing at site shall be in C.C. M-20 block of size 50 x Only
50 x100 cms for each post. All steel parts and fitments to be galvanized by hot dip
process, all fitting to conform IS: 1367 and IS: 1364 metal beam rail to be fixed on the
vertical post with a spacer of section 150 x 75 x 5 mm 3.30 m long complete as per
MORTH Clause 810.Rates including providing and fixing 3 mm thick ACM type
reflactor 100 mm wide, type 4, class-B, High inensity grade sheeting between two 'W'
metal beam throught and reflactive unit at the top of vertical post as per IRC:67-2012
etc. complete as per detailed drawing and directed by engineer-in charge.(Metal beam
Rupees Twelve Crore Seventy lakh Forty Nine
Thousand Five Hundred Six and Seventy Two Paise
I/We am/are willing to carry out the work at _________________________________________________________________ % (percentage) above/below (Should be written
in figures and word) of the estimated rates mentioned above. Amount of my/our tender works out as under.-:
* Estimated Amount put to tender * Estimated Amount put to tender
*(Please strike out whichever is not applicable).
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer
Velachha Distry Sub Division
Signature of Contractor Executive Engineer
K.R.B.C. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD BOOK 9050 mt.pdf
2 work and site condition 9050 mt.pdf
3 Schedule-B 9050 mt.pdf
4 cement consumption 9050 mt.pdf
5 Steel consumption 9050 mt.pdf
6 Drawing.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].