Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29.9 LAccepted-AOC A 76 SURENDRA NAGAR ISMAILGANJ FAIZABAD ROAD LUCKNOW UTTAR PRADESH 226016 UDYAM UP 50 0018139 | LUCKNOW | UTTAR PRADESH | 226016 | 1 | Accepted-AOC Being L1 | |
| 2 | 2₹32.7 L+₹2.9 L (9.54%)Rejected-Finance 321 PATIL NAGAR BAWDHAN ROAD BAVDHAN BUDRUK PUNE MAHARASHTRA 411021 | PUNE | MAHARASHTRA | 411021 | 2 | Rejected-Finance Being L2 | |
| 3 | 3₹35.3 L+₹5.4 L (18.0%)Rejected-Finance VASANTASAKHA PLAZA NEAR NAVLE BRIDGE NEXT TO DANGAT CERAMIC HOUSE NARHE PUNE 411 041 | PUNE | MAHARASHTRA | 411041 | 3 | Rejected-Finance Being L3 | |
| 4 | 4₹35.6 L+₹5.7 L (19.1%)Rejected-Finance 8 3 253 3A PARAMESWARI ENCLAVE PARAMESWAIRI NAGAR SULLURUPETA SRI POTTI SRIRAMULU TIRUPATI DIST ANDHRA PRADESH 524121 | SPSR NELLORE | ANDHRA PRADESH | 524121 | 4 | Rejected-Finance Being L4 | |
| 5 | 5₹35.9 L+₹6.0 L (20.1%)Rejected-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | 5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | Prostarm Info Systems Limited L2 | SUN POWER CONVERSION PVT LTD L1 | vk sam engineering L5 | Awasthi Electric Works L6 | C R ELECTRICALS L4 | Virtus Techno L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installations, Testing & Commissioning of 40KVA UPS of online double conversion PWM IGBT based technology having parallel redundant type suitable to operate on 3 Phase input of 433V ± 10%, 50 Hz AC supply and provide 3 phase output of 415V±1% meeting the technical specifications of tender document. The work includes interconnection between UPS and battery bank, with in the UPS units for parallel operation with suitable size copper cable/wires of length as per site requirement by laying it in existing cable tray with saddles etc.The UPS should be capable of parallel operation with synchronization card,battery isolation breaker for each unit etc complete as required. (Note: Battery bank to be placed in the adjacent room) | 4 | Job | 4,00,000 ₹16,00,000 | 3,40,000 ₹13,60,000 Lowest | 3,96,492 ₹15,85,968 | 5,45,000 ₹21,80,000 | 3,95,600 ₹15,82,400 | 4,03,000 ₹16,12,000 |
| 2.00 | Supply, installation, testing and commissioning of the Battery Bank to provide uninterrupted power back up of atleast 30mins on full load (for each UPS mentioned in Item No.1) consisting of sufficient number of VRLA SMF batteried of suitable AH capacity (calculate as per OEM recommendations) along with all connections, interconnection as required as per the site requirement. The Battery bank is to be installed in the painted MS battery rack/stand of suitable stength for multiple layer storage of the battery bank as per available room size. (approx. 8 mtr X 4 mtr). | 4 | Job | 2,08,000 ₹8,32,000 Lowest | 2,60,000 ₹10,40,000 | 3,14,450 ₹12,57,800 | 2,90,000 ₹11,60,000 | 3,13,945 ₹12,55,780 | 2,95,800 ₹11,83,200 |
| 3.00 | Dismantling and transportation of the existing 4 x 40 KVA UPS system along with Battery bank and its accessories from the site, by carefully removing all interconnections without disturbing operations at Tirupati Airport. The dismantling of the UPS has to be carried out in close coordination with AAI so that existing operations are not disturbed.Transportation of the dismantled UPS to AAI store approximately 1 Km. Including Properly Loading and Unloading of the 4 x 40 KVA UPS sysytem along with bank and its accessories. | 1 | Job | 1,00,000 ₹1,00,000 | 20,526 ₹20,526 Lowest | 23,750 ₹23,750 | 50,000 ₹50,000 | 25,000 ₹25,000 | 42,000 ₹42,000 |
| 4.00 | Supplying and installing of following size of perforated Hot Dipped Galvansied iron cable tray with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with G.I. suspenders including G.I. bolts & nuts, etc as required.
600mm width X 50mm depth X 2mm thickness | 50 | Meter | 1,500 ₹75,000 | 1,050 ₹52,500 Lowest | 1,995 ₹99,750 | 1,700 ₹85,000 | 1,500 ₹75,000 | 1,872 ₹93,600 |
| 5.00 | Supply and fixing of class A electrical insulation mats confirming to IS 15652 of thickness minimum 2.0mm with shock proof under leakage current 10 mA of size 1mtr X 2mtrs (or as per site requirement) complete as required. | 50 | Sq.Mtr | 500 ₹25,000 Lowest | 600 ₹30,000 | 1,140 ₹57,000 | 1,100 ₹55,000 | 1,093 ₹54,650 | 720 ₹36,000 |
| 6.00 | SITC of 2.0 TR BEE-5 star rated Hi Wall Split inverter AC, complete with inverter compressor suitable for operation at 230V +/- 10% AC power supply, including requiste size suction and discharge Copper pipe and copper pipe insulation, PVC inuslated PVC sheathed multicore copper conductor power cable between from indoor to outdoor unit, drain pipe of length atleast 5 mtrs, installation of outdoor on suitable size MS stand as per site requirement etc., complete as required. Job also includes any minor civil works involved as a part of installation. | 2 | Jobs | 1,00,000 ₹2,00,000 | 55,000 ₹1,10,000 | 63,365 ₹1,26,730 | 46,500 ₹93,000 Lowest | 65,000 ₹1,30,000 | 56,850 ₹1,13,700 |
| 7.00 | All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ).
(a) 1st Year after DLP- (Prefixed percentage of 5% on item 1) | 4 | Job | 20,000 ₹80,000 | 17,000 ₹68,000 Lowest | 19,824.6 ₹79,298.4 | 27,250 ₹1,09,000 | 19,780 ₹79,120 | 20,150 ₹80,600 |
| 8.00 | All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ).
(b) 2nd Year after DLP-(Prefixed percentage,5% escalation on item 7) | 4 | Job | 21,000 ₹84,000 | 17,850 ₹71,400 Lowest | 20,816 ₹83,264 | 28,613 ₹1,14,452 | 20,769 ₹83,076 | 21,158 ₹84,632 |
| 9.00 | All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ).
(c) 3rd Year after DLP-(Prefixed percentage,5% escalation on item 8) | 4 | Job | 22,050 ₹88,200 | 18,743 ₹74,972 Lowest | 21,857 ₹87,428 | 30,044 ₹1,20,176 | 21,808 ₹87,232 | 22,216 ₹88,864 |
| 10.00 | All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ).
(d) 4th Year after DLP-(Prefixed percentage,5% escalation on item 9) | 4 | Job | 23,153 ₹92,612 | 19,681 ₹78,724 Lowest | 22,950 ₹91,800 | 31,547 ₹1,26,188 | 22,899 ₹91,596 | 23,327 ₹93,308 |
Tender Value
₹41.3 L
EMD Value
₹1.2 L
Closing Date
13 Jun 2025, 6:00 pmClosed
SM(E-E)-I
O/o Airport Director, Tirupati Airport, Renigunta-517520
Replacement of 4X40 KVA online UPS along with battery bank including Annual Comprehensive Maintenance of UPS for 5 years after DLP at Tirupati Airport
2025_AAI_236054_1
AAI/TPT/ENGG(E)/C-06/2024-25
Open Tender
Electrical Works
Item Rate
120 days
Tirupati
Please refer Tender documents.
14 documents required · 14 mandatory
₹1,180
₹1.2 L
2 Dec 2025
23 May 2025
16 Jun 2025
23 May 2025
13 Jun 2025
23 May 2025
23 May 2025 - 29 May 2025
Amount
Supply, Installations, Testing & Commissioning of 40KVA UPS of online double conversion PWM IGBT based technology having parallel redundant type suitable to operate on 3 Phase input of 433V ± 10%, 50 Hz AC supply and provide 3 phase output of 415V±1% meeting the technical specifications of tender document. The work includes interconnection between UPS and battery bank, with in the UPS units for parallel operation with suitable size copper cable/wires of length as per site requirement by laying it in existing cable tray with saddles etc.The UPS should be capable of parallel operation with synchronization card,battery isolation breaker for each unit etc complete as required. (Note: Battery bank to be placed in the adjacent room)
Supply, installation, testing and commissioning of the Battery Bank to provide uninterrupted power back up of atleast 30mins on full load (for each UPS mentioned in Item No.1) consisting of sufficient number of VRLA SMF batteried of suitable AH capacity (calculate as per OEM recommendations) along with all connections, interconnection as required as per the site requirement. The Battery bank is to be installed in the painted MS battery rack/stand of suitable stength for multiple layer storage of the battery bank as per available room size. (approx. 8 mtr X 4 mtr).
Dismantling and transportation of the existing 4 x 40 KVA UPS system along with Battery bank and its accessories from the site, by carefully removing all interconnections without disturbing operations at Tirupati Airport. The dismantling of the UPS has to be carried out in close coordination with AAI so that existing operations are not disturbed.Transportation of the dismantled UPS to AAI store approximately 1 Km. Including Properly Loading and Unloading of the 4 x 40 KVA UPS sysytem along with bank and its accessories.
Supplying and installing of following size of perforated Hot Dipped Galvansied iron cable tray with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with G.I. suspenders including G.I. bolts & nuts, etc as required. 600mm width X 50mm depth X 2mm thickness
Supply and fixing of class A electrical insulation mats confirming to IS 15652 of thickness minimum 2.0mm with shock proof under leakage current 10 mA of size 1mtr X 2mtrs (or as per site requirement) complete as required.
SITC of 2.0 TR BEE-5 star rated Hi Wall Split inverter AC, complete with inverter compressor suitable for operation at 230V +/- 10% AC power supply, including requiste size suction and discharge Copper pipe and copper pipe insulation, PVC inuslated PVC sheathed multicore copper conductor power cable between from indoor to outdoor unit, drain pipe of length atleast 5 mtrs, installation of outdoor on suitable size MS stand as per site requirement etc., complete as required. Job also includes any minor civil works involved as a part of installation.
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (a) 1st Year after DLP- (Prefixed percentage of 5% on item 1)
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (b) 2nd Year after DLP-(Prefixed percentage,5% escalation on item 7)
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (c) 3rd Year after DLP-(Prefixed percentage,5% escalation on item 8)
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (d) 4th Year after DLP-(Prefixed percentage,5% escalation on item 9)
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, inclduing carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (e) 5th Year after DLP-(Prefixed percentage,5% escalation on item 10)
Prostarm Info Systems Limited (BID ID -858660)
Virtus Techno (BID ID -861546)
C R ELECTRICALS (BID ID -861433)
vk sam engineering (BID ID -861491)
Awasthi Electric Works (BID ID -861679)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .