Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹2,851
Closing Date
14 May 2026, 2:30 pmClosed
Municipal Corporation of Rajahmundry
Rajahmundry
Maintenance and Repair to Ambedkar Sports Arena at Housing Board Colony Lalacheruvu of RMC.
928811
443/MCR/General/2025-26
OPEN - NCB
Similar Work
EAST GODAVARI
9 documents required · 5 mandatory · 4 optional
₹101
₹2,851
29 Apr 2026
29 Apr 2026
29 Apr 2026
Supply Transportation & Installation of 25mm - 19mm SBR Rubber Buffing + 6mm EPDM Rubber Granules some important foctors that one should consider whtile choosing EPDM are : Good Shock Absorbent & Resilient, Durable and easy to install, vibrant colours. UV Resistant and Eco Friendly, Anti Skid Surface Easy to Clean and maintain Allows playing year around. Absorbs sound while playing including cost and conveyance of all necessary materials to work spot and labour charges etc., complete finished item of work as per the directions of Engineer in charge.
Replacement of Fixing of the MS Pipes around the skating rink by removal of all the rusted components, joining new MS Pipes and welding as per the existing design including cost and conveyance of all materials to work spot and all operational, indidental charges labour charges etc., complete as directed by the site engineer.
Replacement and Fixing of Existing damaged play equipment, replacing damaged parts, refixing of damaged pipe and welding as per the existing design including cost and conveyance of all materials to work spot and all operational, indidental charges labour charges etc., complete as directed by the site engineer.
Repairs and Refixing of SBR Gym Rubber Tiles of 10mm thickness, 500 mm x 500mm Size each. Each Tile with 2.23KG Per Tile and Density of 0.90g/cc. Colours of Blue and Terracotta including cost and conveyance of all materials to work spot and all operational, indidental charges labour charges etc., complete as directed by the site engineer.
Collection and supply of 2.36mm to 5mm HBG Chipse/Quarry dust from approved quarry including cost and conveyance of all materials and spreading the same to irrespective thickness including sectioning, levelling ramming and watering etc. complete as per S.S. and as directed by the Site Engineer.
Repairs and Refixing of Existing damaged Name Boards including cost and conveyance of necessary materials to work spot and all operational, indidental charges labour charges etc., complete as directed by the site engineer.
Supply Transportation & Installation of 25mm - 19mm SBR Rubber Buffing + 6mm EPDM Rubber Granules some important foctors that one should consider whtile choosing EPDM are : Good Shock Absorbent & Resilient, Durable and easy to install, vibrant colours. UV Resistant and Eco Friendly, Anti Skid Surface Easy to Clean and maintain Allows playing year around. Absorbs sound while playing including cost and conveyance of all necessary materials to work spot and labour charges etc., complete finished item of work as per the directions of Engineer in charge.
Replacement of Fixing of the MS Pipes around the skating rink by removal of all the rusted components, joining new MS Pipes and welding as per the existing design including cost and conveyance of all materials to work spot and all operational, indidental charges labour charges etc., complete as directed by the site engineer.
Replacement and Fixing of Existing damaged play equipment, replacing damaged parts, refixing of damaged pipe and welding as per the existing design including cost and conveyance of all materials to work spot and all operational, indidental charges labour charges etc., complete as directed by the site engineer.
Repairs and Refixing of SBR Gym Rubber Tiles of 10mm thickness, 500 mm x 500mm Size each. Each Tile with 2.23KG Per Tile and Density of 0.90g/cc. Colours of Blue and Terracotta including cost and conveyance of all materials to work spot and all operational, indidental charges labour charges etc., complete as directed by the site engineer.
Collection and supply of 2.36mm to 5mm HBG Chipse/Quarry dust from approved quarry including cost and conveyance of all materials and spreading the same to irrespective thickness including sectioning, levelling ramming and watering etc. complete as per S.S. and as directed by the Site Engineer.
Repairs and Refixing of Existing damaged Name Boards including cost and conveyance of necessary materials to work spot and all operational, indidental charges labour charges etc., complete as directed by the site engineer.
Details of Maximum amount reimbursable to the Contractor.
1. Provision for GST @18%
2. Provision for NAC @0.10%
3. Provision for Seigniorage Charges
4. Provision for DMF 30% on Seigniorage Charges
5. Provision for Merit 2% on Seigniorage Charges
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ TS 296 NIT 443.xlsx
TENDER_DOCUMENT • 0.01 MB
Contractor Information.pdf
TENDER_DOCUMENT • 0.09 MB
DECLARATION 443.docx
TENDER_DOCUMENT • 0.02 MB
Doc.doc
TENDER_DOCUMENT • 0.65 MB
Notice 2025.doc
TENDER_DOCUMENT • 0.10 MB
PRINT TS 296 NIT 443.xls
TENDER_DOCUMENT • 0.03 MB
Download all tender documents and submit your bid