Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.6 LAccepted-AOC RALEY BUSTY RALEY EAST SIKKIM | RALEY | EAST SIKKIM | SIKKIM | L1 | Accepted-AOC L1 rates found reasonable | |
| 2 | L2₹99.7 L+₹1.2 L (1.18%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹1.2 Cr+₹22.4 L (22.7%)Rejected-Finance 4TH BUILDING LEFT 6TH BYE LANE MOTHER TERESA ROAD KAMRUP ASSAM 781024 | KAMRUP METRO | ASSAM | 781024 | L3 | Rejected-Finance L3 Bidder | |
| 4 | Not Admitted-Fee/PreQual/Technical LAL BAZAR SINGTAM EAST SIKKIM | SINGTAM | EAST SIKKIM | SIKKIM | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
Tender Value
₹92.3 L
EMD Value
₹1.9 L
Closing Date
3 Oct 2020, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (E), P and C Division, Teesta-V PS
DGM (E), P and C Division, Teesta-V PS
Running and maintenance works of operation and routine maintenance of HM component of Teesta-V Power Station.
2020_NHPC_580292_1
NH/TSV/Cont/RM-139/NIT-662
Open Tender
Miscellaneous Services
Works
730 days
Teesta-V PS, NHPC Ltd., Balutar, East Sikkim
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,120
Yes
NHPC LTD
₹1.9 L
Yes
9 Feb 2021
29 Aug 2020
8 Oct 2020
29 Aug 2020
3 Oct 2020
29 Aug 2020
29 Aug 2020 - 29 Sept 2020
120 days
Amount
Providing Manpower Assistance for day to day office work of HM Division. (Un-Skilled)
Providing Manpower Assistance for R&M works of operation and routine maintenance of HM Components and cleaning, sweeping of Dam Control Room and GOC SFT, GOC-DC and power pack Rooms and other HM gates area at Teesta-V Power station. (Semi-Skilled)
Providing Manpower Assistance for R&M works of operation and routine maintenance of HM Components and cleaning, sweeping of Dam Control Room and GOC SFT, GOC-DC and power pack Rooms and other HM gates area at Teesta-V Power station. (Skilled)
Providing Manpower Assistance for R&M works of operation and routine maintenance of HM Components and cleaning, sweeping of Dam Control Room and GOC SFT, GOC-DC and power pack Rooms and other HM gates area at Teesta-V Power station. (Highly-Skilled)
High structure wage for R&M works of operation and routine maintenance of HM Components and cleaning, sweeping of Dam Control Room and GOC SFT, GOC-DC and power pack Rooms and other HM gates area at Teesta-V Power station. (Semi-Skilled)
High structure wage for R&M works of operation and routine maintenance of HM Components and cleaning, sweeping of Dam Control Room and GOC SFT, GOC-DC and power pack Rooms and other HM gates area at Teesta-V Power station. (Skilled)
High rise structure wage for R&M works of operation and routine maintenance of HM Components and cleaning, sweeping of Dam Control Room and GOC SFT, GOC-DC and power pack Rooms and other HM gates area at Teesta-V Power station. (Highly-Skilled)
Providing Uniform/Dangri (Cloth + stiching) Two times in the contract period at an interval of Twelve (12) months to all persons deployed in operation and routine maintenance of HM works (First one - preferebly at the start of work).
Providing Safety Shoe (Hilson Miraje make) Two times in in the contract period at an interval of Twelve(12) months to all persons deployed in operation and routine maintenance of HM works (First pair - preferebly at the start of work).
Providing Rain Coat (Duck Back make) Two times in the contract period at an interval of Twelve(12) months to all persons deployed in operation and routine maintenance of HM works (First one-preferebly at the start of work).
Providing Gum Boot (Duck Back make) Two times in the contract period at an interval of Twelve(12) months to all persons deployed in operation and routine maintenance of HM works (First one -preferebly at the start of work).
Providing Safety Helmet (Karam make) Two times in the contract period at an interval of Twelve(12) months to all persons deployed in operation and routine maintenance of HM works (First one - preferebly at the start of work).
CHANDRANSHU CONSTRUCTION
Assam Petroleum Ltd
Bidder Name
CHANDRANSHU CONSTRUCTION
Assam Petroleum Ltd
Subash Khandal
stage.html
html • 0.05 MB
technical_609463.pdf
PDF • 0.73 MB
techsummary_609463.pdf
PDF • 3.17 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_609463.pdf
PDF • 2.94 MB
LOARM139.pdf
PDF • 4.87 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .