Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
31 Jul 2026, 4:00 pm5d left
Executive Engineer
Executive Engineer Central Division APHWCL
C/O T-II 04 Nos Quarter at Daporijo
2026_APP_3580_1
PH/EC/EE(CD)/E-NIT/2025-26/04
Open Tender
Civil Works
Item Rate
Daporijo
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,500
Executive Engineer Central Division
₹1.3 L
Executive Engineer Central Division APHWCL
24 Jul 2026
24 Jul 2026
4 Aug 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with
disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic
excavator of0.9 cum bucket capacity including cutting and loading in tippers,
trimming bottom and side slopes, in accordance with requirements of lines,
grades and cross sections, and transporting to the embankment location
within all lifts and lead upto 1000m) | 396.24 | Cum | 100 | ₹39,624 |
| 2 | Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal upto 1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including
cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 594.36 | Cum | 100 | ₹59,436 |
| 3 | 5 FOR HILL ROADSLoading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end
loader, dumping, turning for return trip, excluding time for haulage and return
trip. | 990.6 | Cum | 10 | ₹9,906 |
| 4 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 124.68 | Cum | 10 | ₹1,246.8 |
| 5 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 74.81 | Cum | 10 | ₹748.1 |
| 6 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 7.81 | Cum | 10 | ₹78.1 |
| 7 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in:b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level.(Wall) | 34.8 | Cum | 10 | ₹348 |
| 8 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone shingle 20 mm nominal size). | 12.76 | Cum | 10 | ₹127.6 |
| 9 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.b) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone shingle 20 mm nominal size). | 9.6 | Cum | 10 | ₹96 |
| 10 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone shingle 20 mm nominal size). | 31.3 | Cum | 10 | ₹313 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
SBD_T-II_Daporijo.pdf
Tender Documents • 3.01 MB
BOQ_3810.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].