| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC | L1 | Accepted-AOC aoc | |
| 2 | L2₹13.7 L+₹1.1 L (9.20%)Rejected-Finance FCA 560 BLB EAST CHAWLA COLONY SAURAJ SINGH YADAV BALLABGARH VILLAGE TOWN CHAWLA COLONY CITY FARIDABAD FARIDABAD HARYANA 121004 INDIA | FARIDABAD | HARYANA | 121004 | L2 | Rejected-Finance L1 being accepted | |
| 3 | L3₹13.5 L+₹99,000 (7.92%)Rejected-Finance | L3 | Rejected-Finance L1 being accepted | |
| 4 | L4₹16.6 L+₹4.1 L (32.6%)Rejected-Finance | L4 | Rejected-Finance L1 being accepted | |
| 5 | L5₹17.2 L+₹4.7 L (37.4%)Rejected-Finance | L5 | Rejected-Finance L1 being accepted |
Tender Value
₹18.2 L
EMD Value
₹36,400
Closing Date
15 Jun 2020, 6:00 pmClosed
CWE AF TRIVANDRUM
CWE AF TRIVANDRUM HQ SAC IAF COMPLEX AKKULAM THURUVIKKAL POST TRIVANDRUM 11
SOIL INVESTIGATION FOR THE WORKS OF PERIMETER WALL AND ALLIED SECURITY INFRASTRUCTURE AT NELLORE AND OTM ACCN FOR LLTR UNIT AT 401 AF STATION UNDER AGE I SURYALANKA
2020_MES_345960_1
CWE(AF)/TVM/SUR/82300
Open Tender
Civil Works
Lump-sum
60 days
Suryalanka
As per NIT
7 documents required · 7 mandatory
₹500
Yes
AGE I AF Suryalanka
₹36,400
Yes
27 Jun 2020
19 May 2020
17 Jun 2020
19 May 2020
15 Jun 2020
3 Jun 2020
19 May 2020 - 29 May 2020
Amount
SCHEDULE 'A'
LOCATION: SURYALANKA SOIL INVESTIGATION FOR THE WORK OF OTM ACCN FOR LLTR UNIT AT 401 AF STATION SURYALANKA
(a) Setting up site organisation including mobilisation & demobilisation of all equipment (rotary drilling rig machines including accessories) and personnel etc for commencement of work as required/directed by Engr-in-Charge. (b) Shifting of machine from one borehole to another borehole (15 Nos of Shift) (c) Boring 150mm dia bore holes upto 25 mtr depth through any type of soil/rock strata(16 bore holes) (d) Collection of undistributed soil sample at every alternate 1.50mtr intervals ( total 128 Nos each ) or at any change of strata in 150mm bore thin walled tube including waxing sealing, packing and transportation to the lab. (e) Carrying out standard penetration test (SPT) including collecting of disturbed soil samples in bore holes at every alternate 1.5m intervals ( total 128 Nos each ) of any change of strata and submit the report with all requisite data. (f) Carrying out various laboratory tests of UDS/SPT/DS samples at alternate depths (which ever applicable)(16 bore holes) (i) Sieve analysis (ii) Atterberg's limit (iii) F.M.C (iv) Wet and Dry density (v) Specific Gravity (vi) Soil particle size distribution including sieve/Hydrometer analysis (vii) Tri-axial shear test for cohesion & angle of shearing resistance (viii) F.S.I Test & swelling pressure if expansive soil is encountered(ix) Shrinkage limit (x) Consolidation test (xi) Compresive strength of rock samples (xii) Permeability test (xiii) Chemical analysis of ground water sample(min 2 sample) (xiv) Chemical analysis of soil (xv) Degree of saturation of soil (xvi) Depth of water table below GL (xvii) Identification and classification of soil
(g) Preparation and submission of final report (4 copy) giving complete and comprehensive record of investigations, laboratory test reports and calculations of SBC in approved format. (j) If weak soil with lesser N value as specified in table-1 of IS 1893 (Part-1) 2016 is encountered then evaluation of liquefaction potential shall be assessed and remedial actions to be adopted at site shall be specified in the report. (k) For open foundation , calculation of Net SBC at 1.5 m,2.0m, 2.5m, 3.0m from shear as well as settlement criteria. SBC value shall be calculated based on C-Phi analysis as well as SPT value. For calculations formulae given in IS : 6403 shall be used in the report. (l) If pile foundations are required then depth of piles shall be mentioned and pile capacity in compression, uplift & lateral loads shall be given for 300,400,450,500 dia for under reamed piles & for 450,500,550,600 mm dia for long piles as per IS code in the report. (o) Recommendations regarding type of foundation to be adopted & Net SBC pile capacities to be adopted at site shall be mentioned in report. (p) Bore hole position duly marked on plan and their distance from adjacent prominent reference points shall be provided in the report.
LOCATION: NELLORE SOIL INVESTIGATION FOR THE WORK OF PERIMETER WALL AND ALLIED SECURITY INFRASTRUCTURE
(a) Setting up site organisation including mobilisation & demobilisation of all equipment (rotary drilling rig machines including accessories) and personnel etc for commencement of work as required/directed by Engr-in-Charge. (b) Shifting of machine from one borehole to another borehole(08 nos of shift) (c) Boring 150mm dia bore holes upto 25 mtr depth through any type of soil / rock strata (1 bore holes) and Boring 150mm dia bore holes upto 15 mtr depth through any type of soil /rock strata (8 bore holes) (d) Collection of undistributed soil sample at every alternate 1.50mtr intervals ( total 48 nos each) or at any change of strata in 150mm bore thin walled tube including waxing sealing, packing and transportation to the lab. (e) Carrying out standard penetration test (SPT) including collecting of disturbed soil samples in bore holes at every alternate 1.5m intervals (total 48 Nos each) of any change of strata and submit the report with all requisite data. (f) Carrying out various laboratory tests of UDS/SPT/DS samples at alternate depths (which ever applicable)(for 9 bore holes) (i) Sieve analysis (ii) Atterberg's limit (iii) F.M.C (iv) Wet and Dry density (v) Specific Gravity (vi) Soil particle size distribution including sieve/Hydrometer analysis (vii) Tri-axial shear test for cohesion & angle of shearing resistance (viii) F.S.I Test (ix) Shrinkage limit (x) Consolidation test (xi) Compressive strength of rock samples (xii) Permeability test (xiii) Chemical analysis of ground water sample (min 2 sample) (xiv) Chemical analysis of soil (xv) Degree of saturation of soil (xvi) Depth of water table below GL (xvii) Identification and classification of soil
(g) Preparation and submission of final report (4 copy) giving complete and comprehensive record of investigations, laboratory test reports and calculations of SBC in approved format. (j) If weak soil with lesser N value as specified in table-1 of IS 1893 (Part-1) 2016 is encountered then evaluation of liquefaction potential shall be assessed and remedial actions to be adopted at site shall be specified in the report. (k) For open foundation , calculation of Net SBC at 1.5 m,2.0m, 2.5m, 3.0m from shear as well as settlement criteria. SBC value shall be calculated based on C-Phi analysis as well as SPT value. For calculations formulae given in IS : 6403 shall be used in the report. (l) If pile foundations are required then depth of piles shall be mentioned and pile capacity in compression, uplift & lateral loads shall be given for 300,400,450,500 dia for under reamed piles & for 450,500,550,600 mm dia for long piles as per IS code in the report. (o) Recommendations regarding type of foundation to be adopted & Net SBC pile capacities to be adopted at site shall be mentioned in report. (p) Bore hole position duly marked on plan and their distance from adjacent prominent reference points shall be provided in the report.
Total of Schedule 'A'
S K CONSULTANCY & LABORATORY
Shree Balaji Test House Pvt.Ltd.
Myrtle project and Consultancy Private Limited
Soigne Engineering Consultants
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .