Executive Engineer, Petlad Irrigation Division Petlad
Constructing New Pipe inlet in place of damaged pipe inlet at various chainage on limbali devataj Gada drain.
332862
05 of 2026-2027
Open
Miscellaneous Works
Works
Anand
13 documents required · 10 mandatory · 3 optional
₹1,500
Executive Engineer Petlad Irrigation Division Petlad
₹46,000
11 Aug 2026
11 Aug 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
Memorandum showing items of works to be carried out
NAME OF Constructing New Pipe inlet in place of damaged pipe inlet at various chainage on
WORK :- limbali devataj Gada drain.
I. accoarding to
but may Item of work Rs. in Unit
No. Rs. in figs. estimated
be more words quantities
Dismantling the existing R.C.C. Pipes including
sorting out and stacking of the useful materials
of the following diameters including refilling the Rs. Eight
trenches etc. complete as directed.600 mm. to Hundred Sixty
900 mm Six & Forty
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft &
hard murrum etc. in dry condition including Rs. One
depositing the excavated stuff in uniform layers Hundred
2 192.00 in banks or as and where directed etc. complete 107.80 Seven & CM
for lead up to 500m and all lift. (BY Eighty Paise
MACHINERY) Including Dewatering Only
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and
crushed aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks
centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc
complete Without Dewatering and excluding
cost of steel reinforcement.M15 MSA
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and
crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc
complete without dewatering and excluding the
cost of steel reinforcement. (B) For Pier and
Abutments / Wing wall / Head wall / Return
wall/ Dowel wall etc. (h)Concrete grade M-20
Providing and fixing in position ( different
diameter ) NP2 R.C.C. pipe with collar including
filling and caulking the joints with cement Rs. Two
mortar 1:1 proportion, finishing to design grade Thousand Two
5 68.000 and level curing etc. complete for all leads and 2200.80 Hundred & Rmt
lifts. NP-2 class 900 mm dia pipe. Eighty Paise
Providing & Placing in position reinforcement
bars including cutting, bending, welding joints Rs. Seven
where necessary, hooking etc. complete as per Thousand One
6 34.996 drawing for all lead and lifts.TMT 7194.00 Hundred QTL
Providing and laying in position 110 mm dia (6
kgf/sqcm) P.V.C. Pipe for weep holes with non Rs. Two
corroding jali in abutments, wing walls, Hundred Sixty
retaining walls etc. complete. Two & Fifty
Earth work in embankment using selected soil,
soft & hard murrum excavated from approved
borrow area / village tanks etc. Including
conveying, spreading in uniform layers,
breaking clods and dressing to the designed Rs. Ninety
8 280.00 canal section etc. with lead upto 500 m and all 98.60 Eight & Sixty RMT
lift .(For canals having capacity beyond 300 Paise Only
Cusec) ( By Machinery )Lead up to 2.0 Km
Providing temporary diversion suitable for
divertingwater during the construction period of Rs. Twenty
the structure including providing necessary Four
safty measures. Thousand
9 7.00 24905.830 Nine Hundred No
Providing drone videography on the occaion of
function or for before/on going/after completion
of construction work including dubbing , titeling Rs. Four
10 1.00 etc. complete including cost of cassette/CD 4000.00 Thousand
Rs. Forty Five Lac Eighty Nine Thousand Eight Hundred Twenty Five & Three Paise Only
1 The rate quoted in above schedule-B shall be considered for approved & present.
2 The qty. shown above may be adjusted more or less than est. quality keeping the cost of excavation of one tank
I / We am /are willing to carry out the work at ............ % above /below................................
.................................................( percent should written in figures and words )
of the estimated rate mentioned above.Amount of my / our tender work out as under.
Estimated Estimated amount
Deduct :- ____ % Below Rs. _______________ Add ____ % above Rs. ______
Net Tender amount Rs. ______________ Net Tender amount Rs.
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or as
directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be filled in
inkand total of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and hold
good for work under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under.
CM - Cubic Meter SM - Square Meter RMT - Running Meter
Deputy Executive Engineer
Drain Sub Division
Signature of contractor. Khambhat
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 05 of 2026-27 online.pdf
BOQ.pdf
1 Front Page.pdf
2. Notice Inviting online Tender hariyan.pdf
3.SBD-Documen gada.pdf
5.iteamwise specification gada.pdf
6.except item wise specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].