Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹37.8 L (16.3%)Accepted-AOC GALA NO 3 EDUJI ROAD CHARAI PAWAR INDUSTRIAL ESTATE THANE W THANE W THANE MAHARASHTRA 400601 | THANE | MAHARASHTRA | 400601 | ₹1.0 Cr+₹37.8 L (16.3%) Quoted ₹2.7 Cr | L2 | Accepted-AOC L2 |
| 3 | L3₹2.8 Cr+₹51.6 L (22.2%)Rejected-AOC FCI CHHAK BANARPAL KULAD KULAD VILLAGE TOWN KULAD CITY ANGUL ANGUL ODISHA 759145 INDIA | ANUGUL | ODISHA | 759145 | ₹2.8 Cr+₹51.6 L (22.2%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.9 Cr+₹55.3 L (23.8%)Rejected-AOC | ₹2.9 Cr+₹55.3 L (23.8%) | L4 | Rejected-AOC L4 |
| 5 | L5₹2.9 Cr+₹55.5 L (23.9%)Rejected-AOC | ₹2.9 Cr+₹55.5 L (23.9%) | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
15 Jun 2020, 5:00 pmClosed
Mr. Subhendu Ghosh, AGM (Mech.)
TnC Department, Smelter Plant, NALCO, Angul, Odisha-759145
Shifting and Loading of Aluminium Finished Products into Trucks and Wagons
2020_NALCO_558055_1
OMC-5207
Open Tender
Miscellaneous Services
Item Rate
730 days
Smelter Plant, NALCO, Angul
As per NIT Document
5 documents required · 5 mandatory
₹500
Yes
National Aluminium Company Limited
₹1.3 L
Yes
26 Nov 2020
6 May 2020
19 Jun 2020
12 May 2020
15 Jun 2020
12 May 2020
Amount
Shifting of Aluminium Finished Products from (CH)-A & (CH)-B & RP Unit:- Shifting like cast Ingots, Sow ingots, Wire rods, Billets, Cast Strips, Rolling Plant products having Cast number, Stack/Coil No., weight and grade from different locations of CH(A)& B to specified locations of ware-house area of CH(A)& CH-(B) yards and stacking them according to their grade as directed by Supervisor/ Officer-in-charge . It is to be ensured that each shifting slip contains the contractor code no. and the particulars of cast no./stack/coil no. weight and grade of the products shifted to specified locations and certified by supervisor/officer-in-charge on trip basis for billing purpose.
Loading of Aluminium finished products of Cast House-A & Cast House-B & RP Unit into Trucks:- Loading of Aluminium finished products like Cast Ingots, Alloy ingots, Sow ingots, Wire Rods, Billets, Cast Strips, Rolling Plant products having Cast No., Stack No., weight and grade into Trucks as per prepared Truck loading slips and /or If required the loading slip to be prepared as per direction of supervisor/ Officer in -Charge of NALCO. Contractor has to ensure correct no. of pieces to be loaded as per standardized stacking pattern/ loading slips prepared. In case of CH(A) Ingot stacks it should be 49 pieces in each stack and in case of CH(B) it should be 44 pieces in each stack. In case of alloy ingot (10 Kgs. weight) stack it should be 57 pieces in each stack. Bundle No. in each stack to be written neatly/sticker pasting in case of Export. If any weight difference Truck is detected in NALCO Weigh Bridge. While cross checking the weight then all the stacks are to be unloaded/ reweighed/ reloaded as per instruction of the officer in-charge. Each loading slip should contain contractor code no. & certified by Supervisor/Officer-in-Charge for billing purpose. Contractor Hydra should be available at loading point till the correct weight is confirmed by the weighbridge for all the trucks.
Loading of Aluminium finished products into Wagons:- Loading of Aluminium finished products like Cast Ingots, Alloy Ingots, Sow ingots, Wire rods, Billets, Cast strips, Rolled products having Cast No. stack no. , weight and grade into Wagons within a Vicinity of 100 meters from loading point as per prepared wagon loading slips and/or if required the loading slips to be prepared as per the direction of Supervisor/Officer-in-charge of NALCO. Bundle number in each stack to be written neatly / sticker pasting in case of Export. The Contractor has to be ensuring correct no. of pieces to be loaded as per standardized stacking pattern/loading slips prepared. In case of CH (A) ingot stacks it should be 49 pieces in each stack and in case of CH (B) it should be 44 pieces in each stack. The loading slips must be verified by loading security personnel/Supervisor /Officer immediately after completion of loading with loading contractor code no. for Invoice/Billing purpose. The stacking of all Aluminium finished products inside Wagon should be as per prescribed Railway. Rules/ satisfaction of the CISF .If any deviation is found in loading it should be unloaded and reloaded as per direction of Officer - in - Charge. Contractor HYDRA should be available at loading point till the loading is completed in all respect. .
ADR EXPRESS SERVICES PVT LTD
KAMALESH CONSTRUCTION PVT. LTD.
M/S.MANU ENTERPRISES
M/s. MAMA ENTERPRISES
M/s Ranjeet Construction
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .