Assistant Engineer
110kV Substation, Karunagappally
Construction of stackyard at 110KV Substation,Karunagappally.
2026_KSEB_863922_1
TENDER/2026-27/3541/6 dt. 03-08-2026
Open Tender
Civil Works - Others
Percentage
90 days
110kV Substation, Karunagappally
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,770
₹18,300
31 Aug 2026
3 Aug 2026
2 Sept 2026
3 Aug 2026
31 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DSR_2.28.1-2.28.1 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil (cost index(c) : 1.4445 included in Rate) | - | sq.m | 0.4 | - |
| 2 | DSR_2.6.1-2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil (cost index(c) : 1.4445 included in Rate) | - | cub.m | 0.24 | - |
| 3 | DSR_7.1.1-7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) (cost index(c) : 1.4445 included in Rate) | - | cub.m | 0.92 | - |
| 4 | DSR_50.2.26.1-50.2.26.1 Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-incharge. (cost index(c) : 1.4445 included in Rate) | - | cub.m | 0.36 | - |
| 5 | DSR_4.1.8-4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) (cost index(c) : 1.4445 included in Rate) | - | cub.m | 0.48 | - |
| 6 | DSR_13.7.1-13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) (cost index(c) : 1.4445 included in Rate) | - | sq.m | 0.16 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
tenderdoc.pdf
Tender Documents • 0.99 MB
BOQ_1461589.xls
BOQ • 0.26 MB
corrigendum.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].