| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.5 LAccepted-AOC | ₹12.5 L | 1 | Accepted-AOC AGREEMENT EXECUTED |
| 2 | 2₹12.7 L+₹25,414.90 (2.04%)Rejected-Finance | ₹12.7 L+₹25,414.90 (2.04%) | 2 | Rejected-Finance REJECTED |
| 3 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| 4 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
Tender Value
₹12.7 L
EMD Value
₹31,800
Closing Date
12 Feb 2024, 3:00 pmClosed
EXECUTIVE ENGINEER
KOCHI MUNICIPAL CORPORATION
S.547/24 RENOVATION OF SNEHABHAVAN KICHEN -DIVISION 12
2024_LSGD_654347_11
Kochi municipal CorporationCCPC4/44073/22(39)
Open Tender
Civil Works - Buildings
Item Rate
60 days
ERNAKULAM
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,950
₹31,800
7 Jun 2024
5 Feb 2024
14 Feb 2024
5 Feb 2024
12 Feb 2024
5 Feb 2024
Amount
Construction of kitchen
OD192448/2023-2024:Soil testing for building work including cost of mobilization and demobilization charge for men and machinery,machinery for shifting equipment from one to anther bore hole soil boring charges,various strata , lab test for report submission etc complete
15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet
15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.8.3:Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m ( stacks of cleaned bricks shall be measured )From brick work in cement mortar
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.13.2:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area beyond 3 sq. metres
15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,boltd, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
15.23.2:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles above 25 mm and up to 40 mm
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
FAIZAL A .U.
AJIT SASEENDRAN
RANI N K
Bidder Name
FAIZAL A .U.
AL AMEEN M.A.
AJIT SASEENDRAN
RANI N K
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .