Loading…
Loading…
Tender Value
₹9.8 L
EMD Value
₹9,800
Closing Date
15 Apr 2026, 6:00 pmClosed
Ahmedabad Municipal Corporation Central Zone
Const. R.C.C. Road at Raikhad area diff. Places under M.P., M.L.A., Muni. Councilor and Other Budget in Jamalpur Ward. (ARC)
293977
CENTRAL ZONE E-Tender Notice No.17/2025-2026 Tender No.571
Open
Civil Works - Others
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹9,800
6 Apr 2026
6 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
Name of work: -bægÍtul sbtjvwh Jtuzobtk htgFz rJM<thbtk ^thtmÇg©e <&t Bgwrl ftWLmejh©elt csux btk&e <&t yLg csux
bt&e yth.me.me htuz cltJJtlt ftb.(yu.yth.me).
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate sealed
tenders from interested contractors for the following work at different locations within the limit of A.M.C.
1 Name of work bægÍtul sbtjvwh Jtuzobtk htgFz rJM<thbtk ^thtmÇg©e <&t Bgwrl ftWLmejh©elt csux
btk&e <&t yLg csux bt&e yth.me.me htuz cltJJtlt ftb.(yu.yth.me).
2 Estimated Tender Amount Rs. 9,80,000/- (exclusive of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs.900.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
4 Time Limit 12 Months
5 Download of Tender Tenders from the website www.nprocure.com or shall be down
Documents loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “E2” class having in Road Works in PWD in Govt. R&B / CPWD
/ AMC or equivalent register with any other state Govt. or institutions.
7 Earnest Money Deposit Rs.9,800.00 (Demand Draft / pay order / Bank Guarantee in favour of
(Bid security) Municipal Commissioner, Ahmedabad is to be submitted as prescribed
(1 % of Estimate put to as below. Demand Draft/Bank Guarantee shall be from approved list of
AMC of banks and the issuing branch of bank guarantee shall be of
Ahmedabad city only and it should be valid for for 180 days. ( As
Per AMC finance Dept . Circular No. 5 Dt. 5/5/2007 & F.D.
Circular No. 29 Dt. 7/8/2010 & attched ANNEXURE - 1 finance
dept.circular No-40 Dt.05/11/2020. E.M.D. shall be submitted
physically along with the Physical Submission when applicable.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be
submitted to Assistant Manager- Central Zone, 3rd Floor, B – Wing,
Sardar Patel Bhavan, Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as
non responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on www.nprocure.com
website as per Schedule mentioned in Notice inviting
• Tender Fee, EMD, technical bid and other relevant PQ Documents
as per check list given in tender shall be submitted physically in
two copies (Original & duplicate) in sealed envelope as per
Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.
Tenders. The tenders received after latest schedule date and time will not
be entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
mentioning quoted rated, else it shall be considered as rejected.
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
Signature of Bidder Page 1 of
Ahmedabad Municipal Corporation
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft /
pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular.
and the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by Government.
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
18 GST condition This rate shall be without GST. As Per New slab GST 18% Deputy paid
when finally estimate approval. as per circular no.38 Dt.21.11.2022
• All the circulars which were published by Authorities of AMC time by time will be applicable on
said Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights
to reject any or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case
authorized signatory holding Power of Attorney and Digital Signatory are not the same, the bid
shall be considered non-responsive.
Seal and Signature of the Bidder Deputy City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Deputy City Engineer
Ahmedabad Municipal Corporation,
Name of Work:- bægÍtul sbtjvwh Jtuzobtk htgFz rJM<thbtk ^thtmÇg©e <&t Bgwrl ftWLmejh©elt csux btk&e <&t yLg csux
bt&e yth.me.me htuz cltJJtlt ftb.(yu.yth.me).
I/We the undersigned have carefully gone through and clearly understood the Tender documents
of above mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work,
Definition of terms, notes Instructions/Information to Bidder, Condition of Contract, special condition of
contract, Appendices, Specifications, Bill of Quantities, furnished by AHMEDABAD MUNICIPAL
I/We do hereby offer to execute and complete the whole of the work within the time specified all
in accordance with the specification, designs, drawing and instruction in writing referred to in the said
document and with such materials as mentioned for, at the respective rates which I/we have quoted in
the Price Bid or at such other rates as may be fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when
required, execute the contract, according to your form 1 of agreement as or in default where of I/we
bound myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by
AMC from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us
and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the
sum as mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to
commence the work specified. Otherwise the Employer shall retain the said sum, as on account of such
Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in accordance
with conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender,
which are received. I / We also understand & agree that Municipal Commissioner Reserves the right to
allot number of tenders to successful bidders at his sole discretion in case if I / We am/are lowest in more
than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of
opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in the
tender terms and conditions. I am also bound to submit all supporting Genuine Original documents as and
when asked and if any discrepancy found in such documents as well as in the executed Work with respect
to Quality/Quantity at any stage of work or even after completion of work, it will be solely my
Responsibility. I am bound to prove originality of all documents submitted by me and if any Documents
found false/fake then Municipal Commissioner/AMC has right to take any action/penalty/punishment
Signature of Bidder Page 3 of
Ahmedabad Municipal Corporation
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality and/or
the construction of road is found to be of an inferior quality under this contract than in such case
Municipal Commissioner/AMC has right to debar/ blacklist permanently.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi duties,
Royalty on material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on
such items on which the same are leviable and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder Page 4 of
Ahmedabad Municipal Corporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal
Corporation (referred to as Employer in these documents) invites sealed bids for the construction
of works (as defined in these documents and referred to as “the work”) detailed in the table given
in the Invitation for Bid (hereinafter called as IFB.) from competent bidder. The bidders may
submit bids for the works detailed in the table given in IFB.
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as defined in this
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the Clause-14.
An agency that has been engaged by the Employer to provide consulting services for the
preparation or supervision of the works, and any of its affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the firms those
are blacklisted/ debarred for specified period by AMC, Governement of Gujarat, Government of
India or any other entity controlled by it, would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register as per Notice Inviting Tender having in Road Works in PWD in
Govt. R&B / CPWD / AMC or equivalent register with any other state Govt. or institutions.
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject to be
disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and attachments
submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing the
contract, inordinate delays in completion, litigation history, or financial failures etc. or
debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the purpose
of restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and other
advisors in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his
commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets opened
before the due date of opening.
• The E.M.D. is not deposited in full and in the manner as specified in the clause of Earnest
Signature of Bidder Page 5 of
Ahmedabad Municipal Corporation
• The tender is in a language other than English or dose not contains its English Translation
in case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for
their misleading or false representations in the forms statements etc. for the period to be
decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid. Employer
will in no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and familiarize
himself with the site of Works and its surroundings including source of earth, water, road
aggregates etc. and obtain all information that may be necessary for preparing the Bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at the
Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby
total amount of work increases / decreases up to any extent.
total amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision whatsoever.
• If the items stipulated in the tender shall not be executed as per site condition/ requirements. No
claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle and no
claim shall be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if any)
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract, contract data,
forms, terms, technical specifications, forms, Annexes in the bid document. Failure to comply with
the requirements of bid documents shall be at the bidder’s own risk. Bids which are not
substantially responsive to the requirements of the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
Signature of Bidder Page 6 of
Ahmedabad Municipal Corporation
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents by
issuing addendum.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on website
www.nprocure.com The prospective bidder shall refer to website to check any addendum before
24 hours of opening of bids. AMC will not give any advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into account in
preparing their bids, the Employer may, at his desecration, extend as necessary the deadline for
submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so than also
the changes made through such addendum shall be applicable & bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents along with
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with these
Instructions to Bidders (ITB)
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and other
marked as “Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on the date of
physical submission of bid and addressed to the addressee given in the NIT duly super scribed
“Name of Work, Bid due date and time, Name and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the percentage
rate in the Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for any other
cause shall be included in the rates, prices and total Bid Price submitted by the Bidder, except
otherwise stated in the Bid document. Employer will not compensate the bidder (contractor)
for any change in duties, taxes and other levies payable by the contractor under the contract and
any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of
Work and shall not be subject to adjustment on any account, except where expressly specified,
otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made in Indian
Signature of Bidder Page 7 of
Ahmedabad Municipal Corporation
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid for a
shorter period shall be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer may
request that the bidders may extend the period of validity for a specified Deputy period. The
request and the bidders' responses shall be made in writing or by cable. A bidder may refuse the
request without forfeiting his bid security. A bidder agreeing to the request will not be required or
permitted to modify his bid, but will be required to extend the validity of his bid security for a
period of the extension.
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as part of his
bid, in the form of Demand Draft / pay order / Bank Guarantee in favour of Municipal
Commissioner, Ahmedabad valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City only.
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as non-
Signature of Bidder Page 8 of
Ahmedabad Municipal Corporation
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated as non-
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned
as promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest tenders, will be
returned when the successful bidder has furnished the required security deposit and
signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed the
Agreement and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of the bank
guarantee shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp papers of
requisite value in accordance with the stamp Act applicable to that particular state of Indian
Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly indicate
in (block letters) his name, designation, Power of Attorney No. / Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/initialed by the
executing officers and the last page shall be signed in full, indicating the particulars as aforesaid
under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate envelopes and
the three sealed envelopes shall be sealed in an outer envelope. The Bid envelopes shall be
marked as follows:-
• Complete Tender Document with all necessary qualification related documents (in two copy)
Above two envelopes shall be kept in one envelope and it should be marked as “Technical Bid”
and sealed. This Outer envelope should mention the name of firm of bidder, his address, contact
details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
Signature of Bidder Page 9 of
Ahmedabad Municipal Corporation
• If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by the
Employer at the address specified in bid information not later than the date indicated on the face
sheet of the document. In the event of the specified date for the submission of bids declared a
holiday for the Employer, the Bids will be received up to the appointed time on the next working
day. The Bidder is further required to submit Documents in Physical Form on or before the Bid
Due Date and before the time of submission as specified in NIT, at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n) procure e-
tendering portal on account of delay in submission at bidder's end. Bidder shall ensure that they
submit the bid well before the "Due Date & Time of Bid- Submission". AMC shall not be
responsible if bidder is not able to submit the bid on account of failure in network/internet
connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with respective Clause, in which case all rights and obligations of the Employer and
the bidders previously subject to the original deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment / corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected and
returned unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be returned unopened
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to
expiration of the Bid validity period by writing, facsimile or e-mail confirmed by registered letter.
This letter (hereinafter and in the Conditions of Contract called the “Letter of Acceptance” will
state the sum that the Employer will pay the Contractor in consideration of the execution,
completion, and maintenance of the Works by the Contractor as prescribed by the Contract
(hereinafter and in the Contract called the “Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to the
furnishing of a Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the Successful
Bidder. It will be signed by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within 28 days after
the successful bidder (hereinafter called the Contractor) receives the Letter of Acceptance, unless
they agree otherwise, subject to furnishing the security deposit before signing the Agreement with
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will promptly notify
the other Bidders that their Bids have been unsuccessful and release their Earnest Money Deposit
/ Bid Security.
22.0 SECURITY DEPOSIT
Signature of Bidder Page 10 of
Ahmedabad Municipal Corporation
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver to the
Employer a security deposit in the form of Bank Guarantee for an amount equivalent to 5% of the
Contract Price valid for the period of valid till 90 days beyond Date of completion of work. The
Security Deposit shall be payable in 10 days (for tenders upto Rs.10.0 Lacs) or 15 days (for tenders
of Rs.10.0 Lacs and above)from date of receipt of LOA failing which interest @ 4% per annum will
be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the Employer, from
Ahmedabad branch of any Banks mentioned in the clause no. 16.2 of these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre & post
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission of security
deposit or late renewal of bank guarantee for the number of days delayed for submission or
discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same verbatim as
per the format. Bank Guarantee shall be submitted on right value of stamp paper and for correct
value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 22.1 shall
constitute sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing value of the
contract the BG value shall be enhanced accordingly. Validity of BG shall be commercial terms and
conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the Employer under the
terms of this Contract or any other contract or on any other account whatsoever may be deducted
from Security Deposit. Also in the event of the Contractor's Security Deposit being reduced by
reasons of such deductions, as aforesaid, the Contractor shall, within 14 days of receipt of notice
of demand from the Engineer-in-Charge, make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of validities of Bank
Guarantees as may have been furnished by the Contractor from time to time, are required to be
extended/renewed, the Contractor shall get the validity periods of such guarantees
extended/renewed, and furnish these to the Engineer-in- Charge one month before the expiry
date of the aforesaid Guarantees originally furnished failing which the existing Bank Guarantees
shall be invoked by the Engineer – in – charge. Also in case of any deficit in securities on any
account as might occur or is noticed, the Contractor shall forthwith recoup/replace the same with
acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as per contract
are not completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the contractor after
days of completion date / Final Bill paid date which ever is later. No interest on the amount of
Security Deposit shall be paid to the Contractor at the time of release of Security Deposit as stated
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement at Employer’s
office within 15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall be final and
binding to the bidder.
Signature of Bidder Page 11 of
Ahmedabad Municipal Corporation
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration resulting from
Contractors completed or under execution by him over last five years. If the details of Litigation
History are hidden by the Bidder and later on it comes to the knowledge of the Employer, the
Bidder shall be disqualified for the proposed work and other appropriate actions shall be taken
against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employer Value of the Reasons/Details for Remarks showing
Year Name of Project (Rs.) litigation/arbitration Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the same shall be
treat as null and void.
A consistent history of arbitration awards? Judgments against the applicants or any partner of a
joint venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to knowledge of
the employer the bidder shall be disqualified for the proposed work and other appropriate actions
shall be taken against the bidder.
Seal and Signature of the Bidder Deputy City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 12 of
Ahmedabad Municipal Corporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit, the
Contractor shall pay penalty of 10% of amount of actual remaining work. The amount of work for
which the scope of contractor is reduced shall not be considered for the calculation of Liquidated
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date: 23/05/2017 and
all latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such retention money
shall be released in the final bill of the said work. AMC reserves right to deduct any amount to
compensate the poor performance of the contractor i.e. poor quality or abandoned / incomplete
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract any portion
of Work without the approval of the Employer’s Representative. Any subcontracting shall not
relieve the Contractor from any contractual obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the name of
the subcontractor and scope of works activities to be performed by him is already stated in the
contract or supply of material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred
to in the Bid document to carry out the functions stated in the Schedule or other personnel
approved by the Engineer. The Engineer will approve any proposed replacement of key personnel
only if their qualifications, abilities, and relevant experience are substantially equal to or better
than those of the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons thereof, for his
misconduct or inadequacy of technical skills and experience, who is a member of the Contractor’s
staff or his work force, the Contractor shall ensure that the person leaves the Site within seven
days and has no further connection with the work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be erected on
the site of work and contractor shall make his own arrangements to provide such
accommodations as per the rules of the local bodies. He shall make his own arrangements for
housing, stores, field office etc. He shall submit a site layout plan indicating the location of various
site facilities to be created by him at his cost for the execution of work. The Owner shall in no way
be responsible for any delay on this account and no claim on this account whatsoever shall be
entertained. All Basic amenities shall be provided by the Contractor to Labours as per the
prevailing labour Laws.
5.1 The Contractor shall have full regard throughout execution, completion and defects liability period
to following safety aspects and shall take all necessary steps to ensure that danger to safety is
avoided all the time in respect of,
Safety of the works
Signature of Bidder Page 13 of
Ahmedabad Municipal Corporation
• Safety of the Contractor’s employees and all the persons directly or indirectly engaged by
him for the works
• Safety of all the employees including persons working on other contracts of Employer at
the same site of the Employer and Engineers employees engaged at work site.
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning signs,
barricading, and cones; when and where necessary, or required by Engineer in Charge or by any
duly constituted authority for the protection of the works or for the safety and convenience of the
public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and off the site and
avoid damage or nuisance to persons or property of the public and others arising as a
consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution, completion, and
defects liability period. The contractor shall be responsible for and to make good all injuries,
damages and repairs, rendered necessary by fire, rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided by the
contractor. Nothing extra shall be payable on this account. It shall be provided strictly with double
scaffolding system with all the accessories etc. with adjustable suitable working platforms to
access the areas, with ease for working and inspection. It shall be designed to take all incidental
loads. It should cater to the safety features for workmen. It shall be ensured that no damage is
caused to any structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed during day as well
as night time by the contractor, wherever required and as directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection required, by him, shall
be made by the Contractor at his own cost and also necessary permissions directly from relevant
Owners shall be obtained by him under intimation to the Owner. Also all initial and running
charges and security deposit, if any in this regard shall be borne by him. The Contractor shall abide
by all the rules/ bye laws applicable in this regard and he shall be solely responsible for any
penalty on account of violation of any of the rules and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions, the same
shall be completely contractor’s responsibility. All the losses due to such accidents and expenses
of legal matters shall be borne by contractor.
5.9 The Contractor shall be responsible for maintenance and watch and ward of the complete
installation and shall also be responsible for any pilferage, theft, damage, penalty etc. in this
regard. The Contractor shall indemnify the Owner against any claim arising out of pilferage / theft,
damage, penalty etc. whatsoever on this account.
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work. Necessary
protective and safety equipments shall be provided to them by the Contractor at his own cost and
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage rubbish,
excess materials, temporary works no longer required will be removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials, rubbish,
temporary works of every kind.
Signature of Bidder Page 14 of
Ahmedabad Municipal Corporation
A. COST CONTROL
8.0 Bill of Quantities
a. The schedule-B shall contain Memorandum showing items for the construction, installation,
testing, and commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall be paid
only quantities calculated after taking measurements of executed work. The rate stated in the
schedule B for each item of work shall apply. The works shall be measured by the Contractor
jointly with the authorized representative of the Engineer and all particulars required by the
representative of the Engineer shall be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working space etc.
9.1 The Engineer in Charge shall have power to make any variation of form, quality or quantity of the
works or any part thereof that may, in his opinion, be necessary and for that purpose, or if for any
other reason it shall, in his opinion, be appropriate, he shall have the authority to instruct the
Contractor to do and the Contractor shall do any of the following:
Increase or decrease the quantity of any work up to any extent included in the contract,
Omit any such work,
Change the character or quality or kind of any such work,
Execute Deputy work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if any, of all
such variations shall be valued in accordance with the following sub clauses. Provided that where
the issue of an instruction to vary the Works is necessitated by some default or breach of contract
by contractor or for which he is responsible, any Deputy cost attributable to such default shall be
borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the Engineer. No
instruction is required for quantities varying from those provided for the items in the contract
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as follows in the
same order of priority.
a) Variations in the quantities of work in schedule of quantities shall not vitiate the contract.
b) The contractor shall be bound to execute extra items of work as directed by the Engineer-in-
c) Contract unit rates for individual items shall apply to varied quantities where there is a
quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by the
Contractor and he shall be paid at the rate fixed by Employer which shall be fixed as lowest of the
rates derived by rate analysis based on the following three methods. , the priority of the
documents forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year 2013-14, the
rate of extra item shall be that rate and premium (above or below) quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and equipment,
the cost of all temporary and incidental works, the overheads and the Contractors profit.
Signature of Bidder Page 15 of
Ahmedabad Municipal Corporation
The overheads shall be taken at 5 % of the sum of material costs, the labour costs, the cost
of use of all plant, machinery, and equipment, the cost of all temporary and incidental
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit shall be
taken at 10 % of the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as are, in his
opinion appropriate and shall notify the Contractor accordingly with a copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account payments to be
included in the Interim Payment Certificates, until rates and prices are agreed as final by the
Employer, the Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to Deputy payment for costs, which could have been avoided
by giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in
terms of the contract and taxes at source, as applicable under the law. The Employer shall pay the
Contractor the amounts certified by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to corrections in previous
certificates or as a result of an award from disputes review experts, Contractor shall be paid such
amount only. The Contractor shall not be paid any interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for by the
Employer and shall be deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and Local
Governing bodies prevailing on the date of award of the contract. The Contractor will have to pay
all such taxes and duties for the performance of this Contract. The Employer will deduct from the
Contractor’s monthly and other payments all taxes and duties, which he is bound to recover in
accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central & State and
local Governing bodies, all orders, decrees of bodies, tribunals having any jurisdiction or authority
which in any manner affect those engaged or employed, and anything related to carrying out the
work. All the bye-laws lay down by AMC/AUDA and any other local bodies while executing the
work shall be adhered to. All taxes of local bodies shall be borne by the contractor. The Contractor
shall arrange to give all notices required by any authority and to pay to such authority all the fees
that may have to be paid for the material, plants, equipments etc. The Contractor shall also
adhere to all traffic restrictions notified by the local authorities. He shall protect and indemnify the
Owner and its officials & employees against any claim or liability arising out of violations of any
such laws, ordinances, orders, decree, whether by himself or by his employees or his authorized
representatives. Nothing extra shall be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No. CWA/2004-1831-
M(3) dt. 9/12/05 issued by G.O.G. (non-refundable) shall be deducted from every bills which shall
be deposited to Govt. Labour Department for Labour welfare fund.
Signature of Bidder Page 16 of
Ahmedabad Municipal Corporation
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date
and the end of the Defects Correction periods shall be remedied by the Contractor at the
Contractor's cost if the loss or damage arises from the Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the Works and
the Engineer will do so upon deciding that the Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid after
receipt by him of a Notice to this effect from the Engineer/Employer after signing the
2. To proceed with the works, or any section thereof, within 28 days after received notice
3. Has failed to comply with a notice issued or an instruction issued within 28 days after
having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to continue
performance of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written
permission of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of the contract.
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration
order made against him, compounds with his creditors, or carries on business under
receive, trustee or manager for the benefit of his creditors, or if any act is done or event
occurs which (under applicable Laws) has a similar effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice to the
contractor, terminate the contract and expel the contractor from the site. However, in the case of
sub-paragraphs (h), the Employer may be notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights of the
Employer, under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other entities to
do so. The Employer and these entities may then use any goods, contractor’s documents and
other design documents made by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a
fundamental breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the current
Program and the stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other than for a
reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
Signature of Bidder Page 17 of
Ahmedabad Municipal Corporation
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of
Contract and the Contractor fails to correct it within a reasonable period of time determined
by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for which the
maximum amount of liquidated damages becomes payable as defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent
practices in competing for or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or
soliciting of anything of value to influence the action of a public official in the procurement
process or in contract execution. “Fraudulent practice” means a misrepresentation of facts in
order to influence a procurement process or the execution of a contract to the detriment of
the Borrower, and includes collusive practice among Bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause
other than those listed above, the Engineer shall decide whether the breach is fundamental or
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe and
secure and leave the Site as soon as reasonably possible and handover the site to the Employer
including all materials and plant and equipment existing there upon.
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy of the
same. He shall also be responsible for the correctness of the positions, levels, dimensions, and
alignment of all parts of the structures as per instructions given to him. If at any time any error
shall appear during the progress of any part of the work, the contractor shall at his own expense
rectify such error if called upon to the satisfaction of the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out of or under
this Contract against the contractor the same may be deducted by the Municipal Corporation from
any sum then due or which at any time thereafter may become due to the contractor under this
contract and failing that under any other contract with the Municipal Corporation or from any sum
due to the contractor with the Municipal Corporation (which may be available with Municipal
Corporation), or from his retention money, or he shall pay the claim on demand. The Municipal
Corporation reserves the right to carry out post payment audit and technical examination of the
final bill including all supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over payment
when detected notwithstanding the fact that the amount of the final bill may be included by the
20.3 If as a result of such audit and technical examination any over payment is discovered in respect of
any work done by the Contractor or alleged to have been done by him under the contract, it shall
be recovered by the Municipal Corporation from the contractor by way of all the means prescribed
above or if any under payment is discovered by the Municipal Corporation, any amount due to the
contractor under this contract or under payment may be adjusted against any amount then due or
which may at any time thereafter become due before payment is made to the contractor from him
to the Municipal Corporation on any other contract account whatsoever.
21.0 Materials obtain from dismantling
Signature of Bidder Page 18 of
Ahmedabad Municipal Corporation
If the contractor, in the course of execution of work is called upon to dismantle any part for
reasons other than on account of bad or imperfect work, the materials obtained from dismantling
will be the property of the A.M.C. and will be disposed of as per instruction of Engineer-in-charge in
the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following matters,
whether such disputes arise during the progress of the work or after the completion or
abandonment thereof, shall be referred an independent Arbitrator appointed by AMC as far
possible in consultation with the agency if it is necessary and such disputes shall be settled in
accordance with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or upon the
works of the site thereof or belonging to the contractor or procured by him and intended
to be used for execution of the work or any part thereof possession of which may have
been taken by the Engineer-in-charge under the said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the items of
works not accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the Deputy or
altered work carried out by the contractor in accordance with the instructions of the
Engineer-in-charge under clause 14 and the rates for which is to be determined under the
(iv) The rates of payment for materials already purchased or agreed to be purchased by the
contractor before receipt of notice given by the Engineer-in-charge under clause
and/or amount of compensation payable to the contractor under the said clause for loss
in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause
in the event of this failure to rectify, remove or reconstruct the work within the period
specified in the written intimation or the amount of expenses incurred by the Engineer-in-
charge under the said clause17 in rectifying, removing or re-executing the work or in
removing and replacing the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause 17 for the
inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates and
assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause 33 in
accordance with the instructions and the requirement of the Engineer-in-charge in case
where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and
calculations to every item of claims. The decision will have to be implemented by all the
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation
approaching on Court of Law. It shall be within the jurisdiction where the site of work is
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under clause 5 to
take possession of all or any tools, plants, materials and stores in or upon the works of site
thereof belonging to the contractor or procured by him and intended to be used for the
execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the contractor in any
work or from removing such materials to other places, during the period the work is stopped or
suspended in pursuance, of notice given to the contractor under clause
Signature of Bidder Page 19 of
Ahmedabad Municipal Corporation
iii) Progress of the work or the carrying out the Deputy or altered work in accordance with the
provisions of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by AMC. No
separate payment will be made to the contractor for this. . The contractor shall have to submit the
same in hard copy as well as soft copy as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except those
permitted under clause 59.1, shall be taken, or permitted to be taken by the Contractor or by any
of his employees or any employees of his sub-Contractors without the prior approval of the
Engineer in writing. No photographs/ videography shall be published or otherwise circulated
without the approval of the Engineer in writing.
Seal and Signature of the Bidder Deputy City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 20 of
Ahmedabad Municipal Corporation
yb>tJt> BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe >hJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt yb>tJt> BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle btLg gt>elt
ftuLx[fxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu yb>tJt> BGþrl.ftuvtuohuNlbtk btLg
ftuLx[tfxhtule gt>ebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt
mûtb ntug <ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb mk<tu»tfthf <ubs xtRb
jebexbtk ÃþY fhJt sYhe mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- yb>tJt> Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t
mexe.Rsluh mh¾gwjh,lk -17,<t.09/12/2012 bwsc yb>tJt> Bgwrlrmvj ftuvtuohuNlbtk
ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve ylu btv>kztu ægtlbtk htFe <u bwsc
ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo,
mkath ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu. xuLzhhu ftblu mtRx
ylu rcÕzekd(fu su ftb fhJt, ftb ÃþY fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs
xuLzhhu yt mtRxlt ftb btxu, rcÕzekd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle
hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
(h) yt ftble mbg bgto>t bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle >hufu >huf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt >M<tJus
vh< fhJtlt hnuNu.
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]<
fh<wk bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
Signature of Bidder Page 21 of
Ahmedabad Municipal Corporation
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt >huf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh >eM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt
>uuJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk jFtKbtk ftuR Cwj ntug <tu <ult
vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u
jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk >NtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw lrn ntug
<tu xuLzh ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu
ftuLx[tfxhtult btdo>Nol btxu mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuEvK fthK >NtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu Au.
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg dKJtbtk
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt
vîr< y&Jt rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu c>ÕGþ / c>Õgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk >huf Ctde>th y&Jt <u ykdulwk bwFðgthltbwk ^htJlth
Ôgrf< mne l fhu y&Jt xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk mne/mneytu Wvh ftuR
mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, h> fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu
rlKog ytFhe hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh
ftuRvK «fthltu lwfNtle fu J¤<hltu nff>tJtuu fhe NfNu lrn fu ftg>tfeg ftgoJtne yt ykdu
&R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve >uJtLþk Au <uJtu &R NfNu lrn.Nh<e xuLzh
MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< >NtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble ftuRvK
Cwjawf leault rlgbtu ylwmth mhCh fhJtbtk ytJNu.
Signature of Bidder Page 22 of
Ahmedabad Municipal Corporation
(1) xuLzh Chlthu >hlt Ftltbtk sKtJuj Nç>tu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk Nç>tuubtk
sKtJuj hfb btLg htFJtbtk ytJNu.
(2) yufb >h ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu >NtoJ<e CtJ vºtflt Ftltbtk&e
hfbbtk Cwj sKtg <tu yufb >h btLg htFJtbkt ytJNu ylu >hlt yt^thu dwKtfth mw^thJtbkt
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu lrn.
(10) y:- ftbltu «tud{um mbgbgto>t bwsc fhJtltu hnuNu. yt mbgbgot>t 10 jtF mw^elt ftb btxu
yuj.ytu.ytR. ytÃgt <theF&e 10 r>Jm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃg
<theF&e 15 r>Jm&e NY &guj dKJtbt ytJNu. <&t <u >hBgtl ftble 5% juFu zevtuÍex Che
fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt
CtJ dKJtbtk ytJNu. ylu <ubtk atjw ftb >hBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk
c:- mûtb m•tt îtht Yt.10,00,000.00 (>m jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ct>
(LOI) ytvJtbtk ytJNu ðgth ct> r>l - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu.
rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb ylwmth
ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgto>tbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem RLJtRxuz xuLzh)
btk sKtJuj «btKu bkswh &guj mbgbgto>t ct>lt FhuFh ctfe ftble hfblt bn•tb 10%
juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
z:- yu.yth.me. xuLzhbtk bkswh &guj sw>t sw>t yk>ts vifelt ftbtu Jfo ytuzoh b¤u&e NY fhJtlt
E:- yu.yth.me. xuLzhbtk yjd yjd ykkœtsle bkkswhe bégu&e btºt rmJej ftbdehelt ftb «btKu
yk>ts hfb Bþsc mbgbgto>t dKtNu.
(1) Yt.1,00,000.00 Mþ^elt ftbtu btxu 1 btm
(h) Yt.1,00,000.00 &e 3,00,000.00 Mþ^elt ftbtu btxu 2 btm
(3) Yt.3,00,000.00 &e 5,00,000.00 Mþ^elt ftbtu btxu 3 btm
(4) Yt.5,00,000.00 &e Wvhlt ftbtu btxu 12 btm
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt >h vwhtk &gujt ftb btxult Au ylu <ubtk
bswhe, vtjF, ÃjtLx, >uFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykNu
Signature of Bidder Page 23 of
Ahmedabad Municipal Corporation
<btb Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu
mbtJuN &Nu ylu xtkfujt CtJ fu >h fh<t J^thtle ftuR awfJKe ykdult <ublt ftuR >tJt
ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe<u
ctk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR >tJt>
hsw fhJt nf>th hnuNu lnek. <ublw xuLzh ChJt <&t <ubtk sw>t sw>t CtJ ylu >h ChJt btxu
sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u
y&Jt <ubtk&e WCt &<t ftuR stuFb fu sJtc>thebtk&e Axfe NfNu lnek. m>h ftbbtk ftuR vK
ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt
ytJNu. <&t Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu
ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt >huf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk
vubuLx + yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh<
ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc
ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e >M<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu
ce:- xuLzhbtk >NtoJuj ftb mkck^e >M<tJusbtk >NtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau >NotJuj
¢btlwmth >M<tJusbtk >NtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e >M<tJustu fhthlt
ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
(yu) yufb ylu f>:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk f>, ytfth, ytkfzt f>ta Ftuxt ntug <tu btvujt f>, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule ltuk^
bwfe yuze.mexe yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu <u bwsc
fhJtbkt ytJuj rlKog ykr<b dKJtbkt ytJNu.
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu
Rsluh Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
Signature of Bidder Page 24 of
Ahmedabad Municipal Corporation
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu
lwfNtl &Nu <tu <ule mkvwKo sJtc>the (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb
>hBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu lwfNtl &tg <ule sJtc>the ftuLx[tfxhle
hnuNu. vtujem Vrhgt> &tg <tu <ule sJtc>the vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule
sJtc>the vK vtujem Vrhgt>bt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu mjtb<elt
vdjt (suJt fu >tuhzwk ctk^e bswh Ftztbtk W<thJt, mtuhekd ylu Mx[xekd fhJt rJduhu) je^t Jdh
bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vrhgt>bt sJtc>th hnuNu ylu
Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxjwk mbSlu s xuLzh
ChJwk. bswhtultu rJbtu vK W<thJtu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt
hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu
rlgb ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< r>l 1btk vh< jR
sJtltu hnuNu. yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc
ve.yuV/juch yufx <&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftg>tlw vtjl fhJtlwk
hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf ytvJtLþk hnuNu.
(21) ftuRvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu
<ubs dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtc>the ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt >NtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc
jtJJtlt hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw
vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk mbtJuN l
ntug <uJe J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb
ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
(26) atjw ftb >hBgtl «tuxufNlle mkvwKo sJtc>the ftuLx[tfxhle hnuNu. subtk vevzt, >tuhzt
Cgmwaf ctuzo, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu ftuRvK
yfMbt< &Nu <tu <ule mkvwKo sJtc>the ftuLx[tfxhle hnuNu.
Signature of Bidder Page 25 of
Ahmedabad Municipal Corporation
(27) M&¤ Wvh atjw ftbdehe >hBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg
Ôgrf<lt yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele
sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk >hhtus fhuj
ftbdehe <&t yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk
ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu
ftuLx[tfxhlu vulÕxe fhJtle m•ttt yuze.mexe yuLSlehgh©elu hnuNu.
(29) >huf ytRxblt MvuNeVefuNl yb>tJt> Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj
MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk
yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu >hhtus J^thtltu
zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk
<&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e ftve juJtbtk
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg >hBgtl
ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the ytvJtbtk
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu
VhSgt< ytvJtlt hnuNu.
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu jd<tk
ftb btk ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs buLgwyj M¾{uJSkd
ykdule btdoœrNoft lwk vtjl fhJwk.
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<tlt mh¾gwjh lkk.38, <t.21/11/2022 <&t mûtb
m<tle b¤uj bkkswhe bwsc Syumxe rmJtg dK<hebtkk juJtbt ytJuj <&t «Jo<btl rlgb
bwsc Syumxe awfJJt vtºt &Nu. su ægtlu jR <btb rczomu xuLzhtu ChJtlt hunNu.
(35) mœh xuLzh ykk<od<olt ftb mkkjøl y.Bgw.ftuvtuo.btkk «Jo<btl <btb rlgbtu/mh¾gwjhtu jtdw
vzNu, <ubs JF<tu JF< <h mw^thtytu vK jtdw vzNu. suule ltuk^ jR xuLzhtu ChJtlt hunNu.
(36) mœh xuLzh yu.yth.me. «fthlw Au ytvlu mtukvJtbtkk yuxju fu ytv îtht ChJtbtkk ytJuj
ftbdehelt sÚ&t bwsc mbg bgtoœt lffe fhe su <u mûtbm<tle yjd yjd ykkœtsle bkkswhe
bégu&e Jfo ytuzoh ytvJtbtkk ytJNu ylu mbg bgtoœtbtkk ftbdehe vqKo fhJtlw awM< vKu vtjl
(37) mœhnw ftbbtkk Jtuzobtkk sYhegt< bwsc ytuAtbtkk ytuAe xuLzhle Nh< bwsc bkkswh <h xuLzh
vife yjd yjd ykkœtsle bkkswhe bu¤JJtbtkk ytJ<e ntuR, ytuAtbtkk ytuAe yuf mt&u œN
søgtyu sYhegt< bwsc ftbdehe NY fhJtle Nh<u ylu <u «btKu bulvtJh, bNelhe,
Signature of Bidder Page 26 of
Ahmedabad Municipal Corporation
bxehegÕm <ubs ltkkKtfeg studJtRle vwh<t «btKbtkk ÔgJM&t fhe su <u xuLzhhu xuLzh Cgto vqJuo
ytdtu<Y ytgtuslle <igthe mt&u ftbdehe fhJtle &tg Au.
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le
bwjtft< je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e
M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu
jd<t >M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb<
ftuLx[tfxhle mne ylu rmfft
Signature of Bidder Page 27 of
Ahmedabad Municipal Corporation
TECHNICAL SPECIFICATIONS:
Following technical specifications shall be applicable to the relevant items of BOQ
Item No. 01: Dismantling of any type of tiles/flooring work including striking of serviceable
material and is of unserviceable materials with all leads and lift.
Demolishing work shall be carried out as per instructions given by the Engineer in charge. Demolishing of
stone slab pavement or any other type of paving, proportion of cement or lime, sorting out materials,
carting them up to lead of 60 mts. & Stacking the different materials separately as directed by the
Engineer in charge of work. The work shall be done carefully.
The Mode of measurement and rate shall be given as per one square meter basis.
Item No. 02: Excavation for foundation upto 1.5 mt. depth including sorting out stacking of
useful material & disposing of excavated stuff upto 50 mt. lead loose or soft soil.
The land width required for the road way, gutter side slopes and catch water gutters shall
be cleared of all trees having a girth of 30 cms. and less loose, stones, vegetation, bushes, stumps
and all other objectionable materials. The roots of trees and stumps shall be removed to a depth of
30 cms below the grade formation and slopes and excavation filled up with excavated materials
and compacted. All the materials cleared will be the property of government. Useful materials
shall be arranged in convenient stacks along the road boundary or as directed at places within
mts. Lead, and handed over to the department in convenient sections. Unsuitable material shall be
burnt or otherwise disposed off by the contractor at his own cost without causing any nuisance,
inconvenience or damage to the work, property or people in the neighborhood. If the materials are
to be disposed off outside the road land, necessary permission from the private land owners shall
be taken by the contractor and royalty etc. If any paid by him without claiming compensations. In
all cases, the materials shall be disposed off in a neat manner.
1. After clearing the site, the alignment of the road shall be properly set out true to lines, curves
slopes, grades and sections as shown on the plans or directed by the Engineer-in-charge. The
contractor shall provide all labour and materials such as lime, strings, pegs, nails, bamboos, stones
mortar, concrete etc. required for setting out alignment establishing bench marks and giving
profiles. The contractor shall be responsible for maintaining the B. Ms. Profiles alignments and
other stakes and marks as long as they are required for the work in the opinion of the Engineer. If
the contractor defaults in this respect even after the direction by the Engineer within the specified
time, they may be restored by the Engineer at the levels etc. if there is any disagreement the
contractor shall inform of it in writing to the officer concerned with the specific reference to the
sections before starting further work. Once the work has started, no cognizance of any complaint
shall be taken. Merely not signing of the book shall not be deemed as disagreement.
2. Profiles of the section including the road side gutters to be excavated shall be laid at suitable
intervals of 10 m to 50 m or other intervals as directed by Engineer to conform to the curved or
straight alignment, sections, grades and side slopes. The line out shall be clearly marked and
profiles of embankments where excavated materials are to be used shall be set up with the toe
line marked on each side. The road way section shall first be excavated with vertical side for each
lift and the sides slopes for that lift shall be excavated in steps. These steps shall be smoothened
to the required slope when the excavation reaches the road formation. The contractor shall on no
account excavate beyond the slopes or below the specified grade unless so directed by the
Engineer in writing. If excavation is done below the specified level or outside the section, it shall
Signature of Bidder Page 28 of
Ahmedabad Municipal Corporation
not be paid for and the contractor shall be required to fill up at his own cost such extra excavation
in the road portion, with approved materials of the embankment grade in layers, watered and
fully compacted to attain maximum density laid down for the embankment in its relevant item.
The Engineer may require measurement ridges and dead man to be left at specified intervals or
places and kept intact till ordered to be removed for the purpose of check measurements. The
excavation shall be finished neatly, smoothly and evenly to the correct lines, curves, grades if
loose shall be scarified, watered and compacted to the same density as the embankment. The
section, side slopes and catch water gutter shall be maintained by the contractor at his own cost
in such a way that the formation and gutters will be drained by providing for necessary diversions
etc, and not damaged due to obstruction of any drainage. Necessary passage shall be provided for
leading away seepage, springs, surface respect, he shall make good the damage at his own cost. If
it is necessary in the execution of the work to interrupt existing surface drainage, irrigation
channels, sewers or under drainage, temporary arrangements shall be provided till such time as is
necessary. The contractor at his own cost shall make the existing works or work in hand caused as
a result of his operations or negligence shall be made good by the contractor at his own cost. Road
side gutters shall be excavated to the specified sections and shall be measured along with the
main cutting in cubic meters.
3. If slides occur in the cutting they shall be removed as ordered by the Engineer. If finished slopes
slide into the roadways before the final acceptance of the work, such slides shall be removed by
the contractor and shall be paid for at the contract rate for the class of excavation involved
provided the slides are not due to any negligence of the contractor. The classification of the
materials in slides shall conform to its conditions at the time of removal and payment made
accordingly regardless of its prior condition. Care shall be taken to see that excavation is arranged
in a safe way so that there will be no risk to the workmen by slides, falling materials, boulders and
collapsing sides etc.
4. If there is traffic nearby or if there are towns and villages in the neighborhood, barricades and or
traffic signals shall be provided day and night for the work in such a way as to prevent accidents.
Warning signals shall be displayed at 7 mt. from the danger point on both sides giving sufficient
warning. If necessary, signalers shall be stationed at each end to regulate traffic where it is heavy.
Measures shall be taken to see that the excavation does not affect or damage adjoining structures
or property. If there is damage to property, injury to workers, the members of the public, animals
etc., due to the negligence of the contractor, he will be responsible and liable to all the
consequence including compensation.
5. All the excavated materials shall be property of Government. When the useful excavated materials
are to be used in embankment within a lead of 200 meter and all lift, it shall be directly deposited
at the required location in specified layers. No handling or conveyance charges shall be paid if the
material is temporarily deposited elsewhere and subsequently conveyed to site of deposition. The
sequence of operations at convenient places, without interfering with the drainage in any way. If
no Government land is available but the excavated useful stuff is to be stacked temporarily before
use under the same agreement, the contractor shall make his own arrangements for the stacking
of this material not required for use on embankment or unsuitable materials may be used on his
own to uniformly widen embankment to flatten slopes and to fill low places in the road land, if so
permitted by the Engineer. Material not required for any use whatsoever may be disposed off by
the contractor within 3m from the top edge of slope or toe of the bank. The lead shall be
measured from the junction point of cutting and embankment up to 200 mt. on either side.
6. If the contractor does not wish to utilize the quantity of cutting within the specified lead for any
reason, then he may do the embankment work with the earth from other sources (except borrow
pits in the length of the road where cutting stuff is to be utilized) but in that case the full or part
quantity on acceptable quality stuff for which payment is made or to be made will be deducted
from the net quantity of the earth work in the embankment arrived at, which the chainage
measured as above.
Signature of Bidder Page 29 of
Ahmedabad Municipal Corporation
7. The Contract rate shall be a unit of one cubic meter for the start mentioned in the wording of the
item of excavation acceptably completed, limited to the dimensions shown on the plans or as
directed by the Engineer. Excavation shall be measured in its original positions by taking cross
sections before the work starts and after it is entirely completed. The quality shall be worked by
the average end area method. When the classification of the strata changes, the contractor shall
bring this to notice of the Engineer, who will then verify and if necessary take levels for the
changed strata for purpose of measurement.
(b) In Spoil Bank: Specification shall be as per Item 2(a) except that the excavated stuff
shall be deposited in spoil Bank instead of using same in road embankment.
The Mode of measurement and rate shall be given as per one cubic meter basis.
Item No. 03 Conveyance charges of lime, murrum, building, rubbish, manure or sludge and
excavated rock and fly ash.
All the surplus earth etc. shall be carried away immediately from the site of work to a place within
5km. distance or as directed and ordered by the Engineer, so as not to cause any inconvenience to the
public traffic finding which in view of public safety and traffic convenience. The corporation shall carry out
the work by any other agency at the contractor’s risk and cost. If the instructions are not completed within
7 days from the date of order to cart the surplus materials and clear the site, the said work shall be carried
out by the Municipal Corporation at the risk and cost of the contractor and no claim or dispute shall be
entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be
carried out by the contractor without asking any extra rate. The contractor shall have to cart the surplus
earth after the trenches we will watered and refilled with the sand. The rate of carting including carting of
brickbats, metal, rubble vegetable and garbage, if necessary to clear the road surface.
The Mode of measurement and rate shall be given as per one cubic meter basis..
ITEM NO.04: PROVIDING & LAYING CEMENT CONCRETE 1:4:8 (1 CEMENT : 4 COARSE SAND : 8 HAND BROKEN
STONE AGGREGATES 40 MM NOMINAL SIZE) AND CURING COMPLETE EXCLUDING COST OF FORM WORK IN
FOUNDATION AND PLINTH
W ATER SHALL CONFORM TO M-L. CEMENT SHALL CONFORM TO M-3. SAND SHALL CONFORM TO M-6. STONE
40 MM. NOMINAL SIZES SHALL CONFORM TO M-12.
RELEVANT SPECIFICATIONS OF ITEM NO. 15.3.2. SHALL BE FOLLOWED EXCEPT THAT CEMENT CONCRETE SHALL BE MIXED IN
THE PROPORTION OF 1 : 4 : 8 INSTEAD OF 1 : 3 : 6 BY VOLUME.
MODE OF MEASUREMENT AND PAYMENT:
THE CONCRETE SHALL BE MEASURED FOR ITS LENGTH, BREADTH AND DEPTH, LIMITING DIMENSIONS TO THOSE SPECIFIED ON
PLANS OR DIRECTED.
THE RATE SHALL BE FOR A UNIT OF ONE CUBIC METRE.
Item No. 05 Providing Form Work In Ordinary Timber Planking So As To Give A Rough Finish
Including Centering, Shuttering, Strutting And Propping Etc. Height Of Propping And Centering
Signature of Bidder Page 30 of
Ahmedabad Municipal Corporation
Below Supporting Floor To Celling Not Exceeding 4 M & Removal Of The Same For In Situ
Reinforced Or Plain Concrete Work In:- (A) Foundation, Footings, Bases Of Columns Etc. And
Mass Concrete..
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not
be less than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so
constructed as to remain sufficiently rigid during the placing and compacting of the concrete. Adequate
arrangements shall be made by the contractor to safe guard against any settlement of the form work
during the course of concreting and after concreting. The form work of shuttering, centering, scaffolding
bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form
before the concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly
wetted or treated. The surface shall be then coated with soap solution applied before concreting is done.
Soap solution for the purpose shall be prepared by dissolving yellow soap in water to get consistency of
paint. Alternatively a coat of raw linseed oil or form oil of approved manufacture may be applied in case
steel shuttering is used. Soap solution or raw linseed oil shall be applied after thoroughly cleaning the
surface. Care shall be taken that the coating does not get on construction joint surface and reinforcement
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of following
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced concrete
surface. Before the soffits form work and struts are removed, the soffits and the concrete surface shall be
exposed where necessary in order to ascertain that the concrete has sufficiently hardened.
Signature of Bidder Page 31 of
Ahmedabad Municipal Corporation
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute safely
of the form work and concrete work before, during and after pouring concrete. Watch should be kept to
see that behavior of centering and form work is satisfactory during concreting. Erection should also be
such that it would allow removal of forms in proper sequence without damaging either the concrete or
the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the
loads without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before
concreting. But this will not relieve the contractor of his responsibility for strength, adequacy and safety of
form work and centering. If there is a failure of form work or centering, contractor shall be responsible for
the damages to the work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be
provided and removed on completion work by contractor at his own expense. The scaffolding, hoisting
arrangements and ladders etc. shall be strong enough to with stand all live, dead and impact loads
expected to act and shall be subject to the approval of the Engineer-in-charge. However, contractor shall
be solely responsible for the safety of the scaffolding, hoisting arrangement, ladders, work and workman
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford
easy inspection.
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost of
materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering
propping, bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams,
columns and the like.
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Before re use all forms shall be inspected by Engineer-in-charge and their suitability ascertained. The
forms shall be scarred, cleaned, and joints gone over, repaired where required. Inside surface shall be
retreated to prevent adhesion of concrete.
The Mode of measurement and rate shall be given as per one sq. meter basis.
Item No. 06 Providing Thermo Mechanically Treated Bars(TMT Bars) reinforcement for R.C.C.
work including bending, binding and placing in position complete upto floor two level.
Signature of Bidder Page 32 of
Ahmedabad Municipal Corporation
The scope of work consists of providing and laying mild steel reinforcement and TMT CRS Fe-
500 reinforcement for RCC works of various components of the structure. This may be Tisco or
any other approved manufacturer branch and corrosion resistant steel bars approved by the
Engineer Incharge. This includes cuttings, bending, binding, placing, with all equipments and
labour required for the work as directed by the Engineer In-charge, Ahmedabad and all operations
covered within the intent and purpose of the specification.
Being of Reinforcement:
Reinforcing steel shall conform accurately to the dimensions shown on relevant drawings and
conforming to the relevant IS codes (latest revision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the Engineer In-
charge, AMC using a proper bar bender, operated by hand or power to attain proper radii of bends.
Bars shall not be bent or straightened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work; they shall
not be heated to facilitate bending.
The bending of the TMT bars shall be carried out as per the following:
Placing of Reinforcement:
All reinforcing bars shall be accurately placed in the exact position shown on the drawings/as per
instructed by Eng In-charge, and shall be securely held in position during placing of concrete by
annealed binding wire not less than 1 mm in size and conforming to IS:280 and by using stays
blocks or metal chairs, spacer, metal hangers, supporting wires or other approved devices at
sufficiently close intervals. Bars will not be allowed to sag between supports nor displaced during
concreting or any other operation over the work. All devices used for positioning shall be of non-
corrodible material. Wooden and metal supports will not extend to the surface of concrete, except
where shown on the drawings, placing bars on layers of freshly laid concrete as the work
progresses for adjusting bar spacing will not be allowed. Pieces of broken stone, brick or wooden
blocks shall not be used. Layers of bars shall be separated by spacer bars, precast mortar blocks or
other approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition until
completely embedded in concrete. Special care shall be exercised to prevent any displacement of
reinforcement in concrete already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as indicated on the
drawings/as per instructed by Eng In-charge. All bars protruding from concrete to which other bars
are to be spliced and which are likely to be exposed for an indefinite period shall be protected by a
thick coat of neat cement grout.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of size not
less than 1 mm and conforming to IS:280 in such a manner that they do not slip over each other at
the time of fixing and concreting. As far as possible, bars of full length shall be used. In case this is
not possible, overlapping of bars shall be done as directed by the Eng In-charge, AMC,
Ahmedabad. When practicable, overlapping bars shall not touch each other, but be kept apart by
25 mm or 1 ¼ times the maximum size of the coarse aggregates whichever is greater, by concrete
between them. Where this is not feasible, overlapping bars shall be bound with annealed steel wire,
not less than [1 mm thickness twisted tight in eight shape around the lapped bars. The overlaps
Signature of Bidder Page 33 of
Ahmedabad Municipal Corporation
shall be staggered for different bars and located at fixed locations only along the span where
neither shear nor being moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings/as per instructed by Eng In-
charge, joints of reinforcement bars shall be butt welded so as to transit their full strength. Welded
joints shall preferably be located at points where steel will not be subject to more than 75 percent
of the maximum permissible stresses and welds so staggered that at any one section, not more than
33 per cent of the rods are welded. No –pre-warning or post heat treatment is necessary. Interpass
temperature should be limited to 200º C with low heat input and equivalent strength low hydrogen
type electrode. Suitable means shall be provided for holding the bars securely in position during
welding. It must be ensured that no voids are left in welding and when welding is done in 2 or
stages, previous surface shall be cleaned property. Ends of the bars shall be cleaned of all loose
scale, rust, grease, paint and other foreign matter before welding. Only competent welders shall be
employed on the work.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from the actual site and
their number and frequency of tests shall be as directed by Eng In-charge, AMC, Ahmedabad.
The TMT bars shall be tested for any or all of the following tests as directed by the Engineer
Alternate immersion test
Salt spray test
Atmospheric exposure test
Sulphur dioxide test
Potentio dynamic test
The Mode of measurement and rate shall be given as per one kilogram basis.
Item No. 07 Providing and laying controlled cement concrete M.200 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass concrete (upto 10 ton)
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING
The Mode of measurement and rate shall be given as per Cmt. basis
Item No. 08 Providing & laying in position Ready Mixed concrete for reinforced cement
concrete works,using cement content as per approved design mix manufacture in fully
automatic batching plant and transpoprted to site of work in transit mixer for a lead up to
kms. having continuious agigateted mixer,manufactured as per mix design of specified grade
for reinforced cement concrete works including pumping of R.M.C. from transit mixer to site of
laying,exluding the cost of centreing,shuttering,finishing and reinforcement including the cost
of admixture in recommended proportion as per IS 9103 to accelrate/retard setting of concrete
, improve wokability without impepairing strength and durability as per direction of the
engineer in charge without flyash( minimum cement level as per latest IS 456 shall be
Signature of Bidder Page 34 of
Ahmedabad Municipal Corporation
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING
The Mode of measurement and rate shall be given as per Cmt. basis
Item No. 9 P/A Tremix With Dewartering Machine And Floater Machine On Constructed Cc
Work For Finishing The Surface As Per Requirement. The Rate Including All Machinaries, Labor,
Loading, Unloading, Transportaion Etc Complete As Per Direction Given By Engineer In Charge.
The process is equipment oriented. It required formwork in form of channels, internal vibrators,
double beam screed board vibrator for the full width, bull float, filter pads, vacuum pump, skim
floater and power trowel.
All concrete mix design shall meet the requirements of TRIMIX concrete mix design
recommendations.
Execution Tremix System
The work shall be planned and executed so that there is no delay between the placement, screeding,
dewatering and floating of the concrete. Concrete to be vacuum dewatered shall be handled and placed
so as to prevent segregation. The concrete shall be internally vibrated prior to screeding.
Immediately following placement, the concrete shall be levelled with a vibrating screeding running on a
true surface, set at the proper elevation required to provide the specified finished elevation. The concrete
surface shall be screeded high by 2% of the slab's thickness to compensation for the compaction caused by
the vacuum dewatering process. (Slabs to have an aggregate hardener shall have compensation made to
maintain elevation). The vibrating screed shall be moved forward as rapidly as proper consolidation
allows. The proper surcharge of concrete must be maintained in front of the leading edge of the screed.
Immediately after levelling, the concrete shall be covered with filter pads and suction mats in strict
accordance with the recommendation of the manufacturer to have the slab fully dewatered. The suction
mat shall extend 4 inches beyond the edge of the filter pad on all sides. The pads shall extend to within 4"
of the edge of concrete slab, and the mats shall cover entire slab. Before connecting the hose on the
suction mat to the vacuum pump, the edges of the mat shall be smoothed to enable an airtight seal to be
created. A vacuum shall then be applied to the mat. After a minute the gauge on the vacuum pump should
indicate a minimum vacuum of 0.70 atmospheres (24.0 in. Hg) and if not, the mat must be checked for
leakage. For concrete that dewaters readily the vacuum should then be maintained awt 0.70-0.80
atmospheres (24.0-25.5 in. Hg.) For concrete which dewaters less efficiently (e.g. air-entrained concrete)
the vacuum shall then be reduced to 0.50-0.60 atmospheres (15.0-18.0 in. Hg). After approximately
minutes the vacuum can then be increased to 0.80 atmospheres.
The vacuum shall be maintained for at least 3 minutes per inch of concrete thickness at 0.80 atmospheres.
(Where aggregate hardeners are specified, sufficient moisture shall be maintained to meet manufacturer's
requirements). The suction mats and filter pads shall then be removed and moved to the next section in
leapfrog manner.
Signature of Bidder Page 35 of
Ahmedabad Municipal Corporation
Stop the vacuum dewatering when light footprints only are left in the concrete when stepped upon.
Floating: Upon removal of the suction mats and filter pads the concrete surface shall be power-floated
without delay until all imprints from the vacuum process are removed. If crusting occurs, the floating
operation must be delayed till the concrete carries the machine.
The higher speed is recommended for the floading operation. Two passes with the floating disc should be
made in the junction of two mats in order to avoid risk for cracking.
The waiting time after the floating operation depends on concrete temperature and humidity and varies
from 10 minutes to 2 hours.
The trowelling operation cannot take place before the concrete has hardened enough to carry the
machine, i.e. the trowelling blades will not leave any marks on the concrete. Repeated trowelling with
intervals between the passes, which are adapted to the setting of the concrete, greatly improves the
surface characteristics. The surface will be more wear resistant and less dusty.
Vacuum dewatered concrete should be cured like any other quality concrete in order to achieve good final
result with ponding
The Mode of measurement and rate shall be given as per one square meter basis excluding cost of
concrete & steel. The cost of steel & concrete shall be measured & paid separately under relevant items.
ITEM NO.10 FILLING AVAILABLE EXCAVATED EARTH (EXCLUDING ROCK) IN TRENCHES, PLINTH, SIDES OF FOUNDATIONS ETC. IN
LAYERS NOT EXCEEDING 20 CM. IN DEPTH CONSOLIDATION EACH DEPOSITED LAYER BY RAMMING AND WATERING.
The Mode of measurement and rate shall be given as per Cmt. basis
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING
WORKS, SECTION. NO. 4.12, PAGE NO.
Item no-11 & 12 Providing and laying (to level or slopes) and jointing with stiff mixture of Cement Mortar
in proportion 1:1 Salt glazed stoneware pipes including testing of pipes and joints
complete.(a)100 mm dia. & (b)150 mm dia.
The pipes shall be of best quality stone ware pipes. The pipes shall be of approved quality
and make and shall be brought on site after approval. (The pipes shall be laid in grade as per
instruction) contractor shall have introduce bills for standard pipes.
The joints shall be done in cement prop. (1 : 1) (1 part cement : 1 part sand) using spun yarn
dispend in hot asphalt and caulking tools. The hydraulic pressured test shall be given be the
contractor for testing pipes and jointing. No. trenches shall be filed without the approval of the
Engineer in charge. The rate of the pipes work are inclusive of excavation and refilling. The
excavation etc. shall be done as follows :
The sewet trench shall be excavated to the alignment and gradient shown on the plan and
section. In all storts soil including oil masonary asphalt roads and wet. excavation . The sewer
excavation shall be commenced at the down stream end of the sewer and be continued upto the
Signature of Bidder Page 36 of
Ahmedabad Municipal Corporation
gradient as directed. The trench shall not open more than 60 meters in advace of the completed
sewer only when directed by the Engineer in charge looking to
The progress of the work in obtaining the formation of the bottom of the trenches the usual
methods of suing sight rails and bonning roads shall be adopted during the whole of the process.
The center line of uniform height shall be carried clearly on each rail. The depth of the excavation
and invert of the sewer shall be checked by means of bonning road of appropriate length and also
straight edge. The bed of the trench be shall well remmed before starting laying of sewer lines and
cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering
of shorting work looking to the nature of soil near big or important structures, the sides of the
trenchesshall be closely and securely timbered. If any settlement of the building is anticipated the
timbering shall be left in the ground. The various materials excavated shall be separately stacked so
that in refilling the may be relaid on the same order as before and least possible damage shall be
done carpet on the public roads and private properties. Surface covering consisting of asphalt
carpet shall be kept on one side and preserved for reinstatement. The excavated earth shall not
heaped near the trenchers so as to caused unnecessary obstruction along the pulling inspection,
trenches etc. shall be tunneled under only as necessary. The side of the trenches shall be nearly
vertical and plumb & red light shall be placed at each end at intervals as instructed and further
protested by rope fence. Necessary caution boards shall also be erected and diaced as directed by
the Engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not placed
nearer than 3 meters from the outer edge of the excavated trench. The utmost shall have to be
taken in refilling the trenches so that no damage may be done no sewer no lump shall be allowed to
be put around the sewer. The remming of the filling shall be done and well watered. The surplus
earth shall be removed directed within 30 meters lead. The measurement of the work shall be exact
length and width of the trench as specified or as per City Engineer instruction and depth shall be
measured vertical as per section upto invert or the pipe lind The City Engineer reserves the right of
extra excavation on either side if considers necessary for the safely of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directions
before any concrete in India. In case the excavation is done deeper than required no filling shall be
allowed to bring the formation to proper level but contractor shall have to lay cement or lime be
concrete of filling or other acceptable materials as directed by C.E. at contractor won cost so as to
come to proper information, in case bas formation are met with the work shall have be done as per
instruction of C.E. necessary arrangements for watering trenches must be provided be contractor
and without proper watering trenches will not be allowed to be tilled to further. Contractor shall
have to makearrangement for acees to invert of the sewer and for inspection of the ware as
ordered by the Engineer. If is required to shired or after the alignment section of diameter of the
pip the contractor shall carry or altered the alignment section or diameter of the pipe the
contractor shall carry out the altered work at the rates quoted by him for the original work for items
and contractor shall not claim any expenses due to the changes made.
In case no work shall be done at night or on Sundays & other holidays and during the recess
time except in and other holiday the case of bad grounds such as running sand where the work
must be executed various day night without intruption when so ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which do
not in theopinion of Engineer required to be charged in location shall be supported and protected
from injury by the contractor. The contractor shall be liable to pay all damages to water pipe, drains
electric and telephone cables and to private property during the execution of this contract and the
same will be recovered from the running bills or the deposit of work whenever it becomes
necessary in the opinion of the Engineer in charge location of any existing sewers drains etc. not
otherwise from in these specification the contractor shall do the work of making such change and
the work shall be paid for as extra work. All places of public utility etc. shall be kept accessible for
Signature of Bidder Page 37 of
Ahmedabad Municipal Corporation
use. No extra payment shall be made for land sides and side slopes done without prior approval of
the Engineer in charge. Wherever natural soil commends winder excavation the mentioned above
the same shall be given after approved C.E. The rate for excavation for easy jointing and caulking
nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable
of the lines are checked and approved of and order given by the Engineer in charge. The refilling
shall be accompanied by through watering the layers of 0.50 metrs. Further refilling shall be done
there after and process should be repeated till trenches are completely refilled. Temping and
ramming with rammers shall have to be done at all place of important work where ordered by
Engineer in charge. After the trench is give the trenches shall have to be refilled within 4 days with
complete watering. If the contractor fails to do watering satisfactory corporation shall get it done at
the risk and cost of the contractor with or without giving any notice and the expenses incurred in
doing so recovered from the contactor either in cost or from his payment through bills.
The Mode of measurement and rate shall be given as per Rmt. basis
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR
BUILDING WORKS, SECTION. NO. 24.1, PAGE NO.
Item no-13 roviding and fixing S.W. gully trap with C.I. grating brick masonry chamber and water tight C.I.
cover with frame of 300mm x 300mm size (inside) with standard weight.(i) Square mouth traps.
(A)100mm x 100mm size P type.
(1) Water shall conform to M-1. (2) Cement mortar of proportion 1 : 5 shall conform to to M-
11. (3) Burnt brick shall conform to M-15. (4) The S.W. Gulley trap of 100 mm. x 10-0 mm. size
shall conform to M-70.
Excavation for gulley trap shall be done true to dimensions and levels as indicated on plans
or as directed. The excavation work shall generally be done as per relevant specification of earth
The gulley trap shall be fixed over cement concrete 1 : 5 : 10 (1 cement : 5 sand : 10 graded
brick bats aggregate 40 mm. nominal size) foundation, 650 mm. square and 100 mm. thick. The
depth of top of concrete below the ground level shall be 675 mm. The jointing of gulley outlet to
the branch drain shall be done similar to jointing of S. W. pipe as described in item No. 24.1 (A).
Brick masonry chamber : After fixing and testing gulley and branch drain, a brick masonry
300 x 300 mm. inside with bricks in C. M. 1 : 5 (1 cement : 5 sand) shall be built be built with a
mm. brick work round the gully trap from the top of bed concrete upto ground level. The space
between the chamber walls and the trap shall be filled with cement concrete 1 : 5 : 10. The upper
portion of the chamber i.e. above the top level of the trap shall be plastered inside with cement
mortar 1 : 3 (1 cement : 3 sand) finished with floating coat of neat cement. The corners and bottom
of the chamber shall be rounded of so as to slope towards the grating.
Fixing FRC G.T. round cover with frame incl. fixing the same.
Signature of Bidder Page 38 of
Ahmedabad Municipal Corporation
Mode of measurements & payment :
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory
completion of this item as described above.The rate shall be for a unit of one number basis.
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR
BUILDING WORKS, SECTION. NO. 24.19, PAGE NO.
Item No. 14 (A) & (b) Providing, laying, spreading and compacting graded stone aggregate to
wet mix macadam specification including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in
sub- base / base course on well prepared surface and compacting with plate compactor to
achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting
with plate compactor to achieve the desired density
For detailed specification refer latest edition of MoRTH.
The Mode of measurement and rate shall be given as per one cubic meter basis..
Item No. 15 Extra Rate Over Item Of Excavation Of Earth For Excavation Of Asphalt Pavement /
RCC Of Thickness Upto 0.20 Meter Including Demolishing The Asphalt
Carpet,Metal,Soiling/Cutting Reinforcement Etc.Comp. With Stacking The Material As Directed.
A) Upto 0.20 Meter Thickness (By Manual).
Extra rate for excavation of asphalt payment / RCC of thickness upto 0.20 meter including
demolishing the asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking
the materials as directed. The road surface of asphalt shall carefully be opened to full width as
directed by the Engineer in charge so as to remove all cracks or other damaged portions of road
either manually or with the soiling shall be first be stripped off for the whole width of trenches. All
the materials shall be separately deposited in such places as may be determined by the Engineer-in-
charge. In case rubble not being so deposited or being mixed up with the excavated materials will
not be allowed for refilling. The cost of materials shall be charged from the contractor. The
decision of the C.E. shall be final and binding to the contractor.
The Mode of measurement and rate shall be given as per one square meter basis.
B) 0.20 Meter To 0.30 Meter Thickness (By Breaker Machine Including Cost Of Operator, Fuel, &
Transportaion Etc Complete.
Extra rate for excavation of asphalt payment / RCC of thickness from 0.20 meter to 0.30 meter
including demolishing the asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking
the materials as directed. For detailed specification refer item no.
Signature of Bidder Page 39 of
Ahmedabad Municipal Corporation
The Mode of measurement and rate shall be given as per one square meter basis.
C) 0.30 Meter & Above (By Breaker Machine Including Cost Of Operator, Fuel, & Transportaion
Extra rate for excavation of asphalt payment / RCC of thickness 0.30 meter & above including
demolishing the asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking the
materials as directed. For detailed specification refer item no.
The Mode of measurement and rate shall be given as per one square meter basis.
Item No. 16 P/F Name Board of 45X60 cm size showing grant detail with necessary painting &
writing letters as per given inst. & design etc comp.
This item includes providing, fabricating, and fixing a metal sheet(Patara) 60cm x 45cm size as per
the approved design and shall be painted with enamel paint. The necessary description shall be painted
with letters of appropriate fonts directed. Work in general shall be carried out as per instruction of
engineer in charge.
The Mode of measurement and rate shall be given as per number basis.
Item No: 17 Constructing Slab type Chamber of following size including excavation, refilling, BBCC
(1:5:10), for foundation, C.C.Channel (1:2:4) finished, 15 mm thick cement plaster inside &
outside in CM 1:3, finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps
cm c/c at 35 cm staggered masonary in CM 1:5, RCC Slab in CC 1:1.5:3, including Centering &
reinforcement but excluding the cost of chamber seat cover etc..completed.(a) A) 0.60 X
mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=150mm.
(B) 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=20 mm. (C)
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia <=230 mm
The inspection chamber shall be constructed as per plan and section approved by the city
engineer. The specification for different items are as under:
This shall be done as per specification in Item No.
(ii) Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B
Dept. booklet for General Technical Specification for building works , Page no. 31 , Section. No.
(iii) Brickwork(1:5): For detailed specification refer R & B Dept. booklet for General Technical
Specification for building works , Page no. 43 , Section. No. 6.12(B).
(iv) C.C. Channels : Cement concrete of the invert and channels of manholes shall consist on a part
1 part of cement 2 part of sand, 4 part of black trap metal or other approved material of size 1/4'
to 1' well grade as per instruction.
Signature of Bidder Page 40 of
Ahmedabad Municipal Corporation
The work shall be done as per P.W.D. hand book specification No. 20 and as per general
instruction of C.E. The rate includes all necessary materials mixing lifting placing ramming watering
etc. the expressed faces to be neatly of the channels shall be half round as per drawing and
instructions of the engineer in charge.
(V)Cement Plaster(1:3) :For detailed specification refer R & B Dept. booklet for General Technical
Specification for building works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of
the plaster shall be 15 mm instead of 10 mm.
FRC SEAT COVER:
Frame shall be fixed in cement concrete all around and finished with neat cement. The.
F.R.C (L.D.-25) chamber seat and cover shall be as per central store approved design. Cover [ 706 x
556 x 50 mm rectangular cover. 2.5 mt load design 50 x 2 mm MS flat all round. 12 mm ǿ plain
round bar for lifting the cover & should be fitted with plastic caps ] and frame [ 600 x 450 mm
clear opening, outer size 816x 666x100 mm.on the upper periphery of frame 25 x 3 mm wide M.S.
flat should be well embedded in concrete to protect the edge of frame ]etc.comp..
The M/s shall be on No. Basis.
Item No. 18 Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) In Cm 1:3, Finishing
With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm Staggered
Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)But Excluding The Cost Of
Manhole Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H. length should
be parallel to the flow) 0.75 X 1.00 meter (Inside Clear) & (a) Depth from 0.00 to 2.00 mt.
(b)Depth from 2.00 to 3.00 mt
The manholes shall be Dismantling of existing Arch type manhole up to Arch and then Const. Slab
type manhole as per plan and section approved by the Addl. C.E. The specifications for different
items of manholes are as under :
Excavation: This shall be done as per specification mentioned in item No. 2 Excavation.
Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B Dept.
booklet for General Technical Specification for building works , Page no. 31 , Section.No. 5.3.8(a)
Brickwork(1:5):
For detailed specification refer R & B Dept. booklet for General Technical Specification for
building works ,Page no. 43 , Section. No. 6.12(B).
C.C. Channels :
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement
parts of sand and 4 parts of aggregates of black trap metal of approved materials of sizes from
to 2.5 cm. well graded as per instructions.
The rate includes all necessary materials mixing, laying and ramming and watering. The exposed
faces to be finished with neat cement as per instructions. The channel shall be half round in lies
Signature of Bidder Page 41 of
Ahmedabad Municipal Corporation
with the dia of pipe as per drawing and instruction of the engineer in charge. Proper benching
shall be provided at both sides of the channel.
Cement Plaster(1:3) :
For detailed specification refer R & B Dept. booklet for General Technical Specification for
building works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of the plaster shall
be 15 mm instead of 10 mm.
4 mm dia M.S Steel HDPE coated steps 35 cm c/c at 35 cm staggered
For detailed specification refer R & B Dept. booklet for General Technical Specification for
building works , Page no. 159 , Section. No. 24.13 and fixation or any change at the site according
to the direction of Engineer-in-charge in charge
Carting of Surplus Earth :
The surplus earth which is left an site after refilling and proper watering of the trenches shall have
to be carted away upto a distance within 30 mts. & shall be spread at the site according to the
direction of Engineer-in-charge in charge.
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out in
accordance with latest version of IS 456 unless otherwise specified in this specification. The slab of
manhole shall be cast with shutters lined with plywood and shall be smooth finished. For avoiding
surface cracks due to variation in atmospheric temperature and exposure to direct sunlight, RCC
slab of manholes after casting shall be kept wet. M 20 grade of concrete used for construction of
RCC manholes shall have minimum cement content of 360 kg/cum of concrete. Bar bending
schedule for reinforcement shall be prepared by contractor and got approved from owner/
engineer before proceeding with the work. Minimum cover to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant and size etc. required for
satisfactory completion of this item as described above.& the drawing as per A.M.C Dr. S.O.R
shall be final. The rate shall be for a unit of one number basis.
Item no 19(a),(b),(c) & (d) Repairing damaged M.H. and rasing M.H. up to road level incl. removing
damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing
C.I. steps and existing MH sheet cover, removing the debris from MH and carting the same as
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and
existing MH sheet cover, removing the debris from MH and carting the same as directed. The M/s
shall be on No. basis.
Item no 20 Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the same as directed.
Signature of Bidder Page 42 of
Ahmedabad Municipal Corporation
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the same as directed.
The M/s shall be on No. basis.
Item no 21 F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø & 100 mm
thick circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar
for lifting the cover & should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer
size- 888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS flat should be well
embed in concrete to protect the edges of frame. FRC E.H.D.-35 manhole cover & frame
described as above
(a)FRC heavy duty cover size 730 mm. & 90 mm thick circular cover 20 M.T. design load and
frame size 560 mm clear opening size 890 x 890 x 120 mm.
(b) FRC medium duty cover size 670 mm dia & 70 mm thick 10 M.T. load design and frame
size 560 mm clear opening outer size 780 x 780 x 120 mm
© FRC medium duty Chamber seat cover (FRC) cover 706 x 556 x 50 mm rectangular cover frame
size 600 x 450 mm clear opening outer size 816 x 666 x 100 mm (MD-10)
(d)FRC light duty Chamber seat cover (FRC) cover with rectangular frame (LD-2.5)
Providing and Supplying Fiber reinforced concrete circular cover of following dia,thickness and
Load design, with minimum concrete grade M30 and minimum cement content shall be 360 kg /
m3, with maximum water cement ratio of 0.45, minimum reinforcement shall be 70 kg/cmt of
bars or with welded wire mesh, The minimum volume of fibers shall be 0.5 % of the volume of the
concrete. equivalent dia of fiber shall not be greater than 0.75 mm, the length to eq.dia ratio of
fiber shall be in range of 50 to 80, 2mm th M.S. flat of full thickness around periphery of cover
shall be provided, for lifting arrangement 16 or 12 mm dia plain bar should be fitted with G.I. or
plastic cup as per load design incl. loading carting unloading stacking etc. complete as per IS
The M/s shall be on NO basis.
Item no 22 Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be supplied byA.M.C.(from any store)
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to
match exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for
days etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from any store).
The M/s shall be on No. basis.
Item no 23 Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing EHD-
35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in line and level to match
exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge.
Signature of Bidder Page 43 of
Ahmedabad Municipal Corporation
Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for
existing EHD-35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in
line and level to match exisisting road level in C.C. 1:2:4 and finishing smooth, watering
and protecting for 7 days etc. complete as per instruction by engg. in charge.
The M/s shall be on No. basis.
Item no 24 Providing Kachha of Pakka Dummy in the following dia pipes and removing the same after
completion of the connection work as directed.
(A) 100 mm to 300 mm dia.(b) 350 mm to 600 mm dia & (c) 650 mm to 900 mm dia
Providing Kachcha or pakka dummy in the following dia. Pipes in such a way that there is no
seepage of water through it & and removing the same after the completing of the work as directed by
Engg. In charge of work.
The M/s shall be on No. basis.
Item no 25 Providing Dead Cantering using good quality Country Wood Planks, wall Plate of required
thickness and size including placing the nece. supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per standard engg. practice etc. comp. as directed..
Providing Dead Cantering using good quality Country Wood Planks, wall Plate of required thickness
and size including placing the nece. supports of reqd. size, nailing, fixing with mortar, levelling. All
specification for dead centring as per standard engg. practice etc. comp. as directed.
The M/s shall be on Smt. basis.
Item No. 26 Supplying, labour for break down repairing work for activities like excavation, disliting,
removing debris from trench back filling etc. comp. as directed by Eng.in charge.
Mazdoor at day /Night
Supplying, labour for excavation of all types of soil at any depth including excavation of
asphalt pavement of any thickness, demolition of brick work in CM of any proportion including
stacking of serviceable materials and disposal of unserviceable material etc. comp. as directed. no
labourer shall be of age 18 years or below. contractor is required not to supply any child lobour.
Supervisor or mukkadam shall be supplied as per the in struction of Engg in charge. M/s. shall be on
Item no 27 Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion & movement including cautionary board etc. Item
also includes for making temporary sufficient nos of lighting arrangement through out the work
with necessary required arrangement.
The same shall be removed after completion of work.
Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion & movement including cautionary board etc. Item also
Signature of Bidder Page 44 of
Ahmedabad Municipal Corporation
includes for making temporary sufficient nos of lighting arrangement through out the work with
necessary required arrangement.
The same shall be removed after completion of work.
The M/s shall be on Rmt. basis.
Item No. 28: Leveling Or Orientation Of Existing Gully Trap Chamber Incl. Nece. Masonry In Cm 1:6 And
Plaster In Cm 1:3 Etc. Using Old G.T.Stone And Cover Etc. Comp.
This is items pertains to leveling top RCC or stone leveling gully trap and top stone.
Existing top stone of gully trap is not required to be removed carefully by moving side paving.
Asphalt stacking the derbies as dire. For leveling the brick bats masonry should be either
demolished of raised as per requirement on site. So as to gear uniform. level after finished the
raising of level by masonry should be done in 1:2 CM. The work rising demolishing should be done
in such manner that gully trap piece should not be damaged by carelessness of contractor should
be placed at no extra cost. The top stone removed earlier should be placed on masonry with rich
c:m, pointing on all side incl. pointing payment masonry of gully trap. Stone is broken it should
replaced by new RCC process top stone available from cement concrete stores be paying receipt
amount in advance, the derbies should be removed each site and collected and than it should be
carted away with in a lead of 60 mt. from site of work in general work should be as per instruction
of egg. In charge of work, Necessary certificate should be obtained and list of gully trap leveled
should be submitted on demand the arrangement of collecting the signature of the house holder
or whose gutter is required shall be done by the contractor in verify.
The Mode of measurement and rate shall be given as per one number basis.
Item no 29: Providing and operation dewatering Pump including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for
non working condition of machinery )
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for
non working condition of machinery )
M/s. shall be on Shift. basis.
Item no 30 Providing & Supplying JCB Machine on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and laying work)
Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges and stacking of useful & non-useful materials
separately up to store. (No payment should be allowed for non working condition of machinery and
for pipe line excavation and laying work)
Signature of Bidder Page 45 of
Ahmedabad Municipal Corporation
M/s. shall be on Hour. basis.
Item no 31 Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and M.H. work. Allowed only for
break down work)
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site
by using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and M.H. work. Allowed only for
break down work)
M/s. shall be on Hour. basis.
ITEM NO :32 To provide Tractor with Hydraulic Trolley, driver with fuel, to carryout different works
during day/night for 12 Hrs. Shift. Work shall be carried out as per the instructions of
Engineer In-Charge. No extra charged shall be paid for night shift.
This item relates to provide Tractor with Hydraulic Trolley, driver with fuel, to carryout
different works during day/night for 12 Hrs. Shift. Work shall be carried out as per the
instructions of Engineer In-Charge. No extra charged shall be paid for night shift.
M/s. shall be on Shift. basis.
ITEM NO : 33 Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on
site by using Operator, fuel, power Supply etc. Complete as Directed. (No payment
should be allowed for non working condition of machinery and for pipe line excavation
and M.H. work. Allowed only for break down work)
This item relates to Supplying Electric Breaker Machine for RCC Slab or Asphalt
Demolishing Work on site by using Operator, fuel, power Supply etc. Complete as Directed.
(No payment should be allowed for non working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break down work)
M/s. shall be on Shift. basis.
All work should be done as per instruction of Engg. in charge.
REST OF THE ITEM SPECIFICATION AS PER SOP from Drainage SOR year-2016 Ahmedabad
municipal corporation or COMPETATIVE AUTHORITY OVER RULE BY CONDITION OF FORM B-1
ITEM NO :- 34 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to
1 mt including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and
mm thick cement plaster inside the catch pit in the proportion of CM (1:3) with out
jali etc. comp. as directed.
This item relates to Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth
up to 1 mt including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm
thick cement plaster inside the catch pit in the proportion of CM (1:3) with out jali etc.
comp. as directed.
Measurements shall be given on Nos.basis.
ITEM NO :- 35 P/Fcatch pit jali With Frame 600 mm x 600 mm Clear Opening etc.comp.as
dir. By Engg. In charge (A) FRCJali with seat
Signature of Bidder Page 46 of
Ahmedabad Municipal Corporation
P/Fcatch pit jali With Frame 600 mm x 600 mm Clear Opening etc.comp.as dir. By
Engg. In charge (A) FRCJali with seat
Measurements shall be given on Nos.basis.
Item no.36 Labour work for fixing any kind of paving with cement pointing in CM 1:2, including watering,
ramming etc comp. as dir.
Reinstatement of flooring to its original level with necessary BBSC/ and sand bedding etc. comp with
using old Nibhada stone/CC block in pointing with 1:2 cm as dire. The rate shall be for a unit
of one sq. Meter.
Item No.37: Supplying and fixing Nimbhada ladi 37 to 50 mm thick for walk-way, covering the
activity of excavation, ramming, Laying on sand bedding as per requirement to fix the Nibhada
Stone in Line & Level with cement pointing in cement mortar 1:2 etc complete as directed.
1.Nimbhada stone : The material shall conform to M-48 Page No.-16 except that the stone shall
be of ordinary nimbhada stone instead of rough kota stone .
2. Sand : As per buiding booklet M-6 Page No.4.
3.Cement : As per buiding booklet M-3 Page No.3.
The work man ship shall conform to buiding booklet section no. 14,-14.46 (A), 2.0 page no.-
except that the base shall be sand bedding of 5 cm thickness and cement pointing shall be in
Mode of measurment shall be on smt basis
Item No.38: P/L brickbats sand concrete (1:2) of one part of sand and two part of old brickbats
including spreading, laying, ramming, watering and consolidation etc complete as directed.
P/L brickbats sand concrete (1:2) of one part of sand and two part of old brickbats including
spreading, laying, ramming, watering and consolidation For detailed specification refer latest edition of
The Mode of measurement and rate shall be given as per one cubic meter basis.
Item No.39: Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 60mm
thick with grade of concrete M300 pnumatic compressed / vibrated mechanically and as per
approved design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling
the joint with sand in proper line and level as per guidlines of IRC : SP 63- 2018 etc. Complete
DETAILED GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS
Approved SOR 2023-2024
The Mode of measurement and rate shall be given as per Smt basis.
Signature of Bidder Page 47 of
Ahmedabad Municipal Corporation
ITEM NO:40 Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb block for
Central Verge in M-20 grade using 20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped with vibratory system for kerb
stones of approved design including curing, etc. complete, including the cost
of formwork etc. complete. The rate shall also include necessary cutting of
asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding
with necessary equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone
the sides of the kerb stone fixed with Bituminous concrete / C.C. mixed in
proper position to flush with the road surface as directed by Engineer in
change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production.
The scope of work includes manufacturing, supplying of pre-cast Rubber mould reflective paver
blocks. The work includes :
1.1 Manufacturing of Rubber mould reflective paver blocks in your plant as per
requirements of AMC's technical specification.
1.2 Supplying of Rubber mould reflective paver blocks at site, including handling at
1.3 Testing of Rubber mould reflective paver blocks through reputed Govt./Non
Govt. Test house and submission of test results as per requirements in Technical Specifications.
AMC reserves the right to carryout test at random. Cost for such tests to be borne by party incl.
carting of materials.
TECHNICAL SPECIFICATIONS :
I) Rubber mould reflective Paver Block Manufacturing Facilities:
The Rubber mould reflective Paver Block shall be made in factory with following minimum facilities
& shall be got approved before carting materials to site.
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Rubber mould reflective Paver
Blocks by obtaining high level of compaction by application of hydraulic compaction and also by
high intensity vibration to the moulds. The machine should have automatic control panel for
uniformity in strength.
1.2 Concrete Batching & Mixing
The concrete mix design should be followed for each batch of materials separately and
automatic batching plant is to be used to achieve uniformity in strength and quality.
The factory should have well designed curing area to ensure adequate curing of paver
1.4 Laboratory (Desirable but not essential):
The factory should have the following:
(i) Compression testing machine of adequate capacity.
(ii) Other tools and equipment for testing raw materials and paver blocks.
Signature of Bidder Page 48 of
Ahmedabad Municipal Corporation
(iii) (1). Systematic record of test results of various Rubber mould reflective
paver blocks manufactured in the factory.
(2). Concrete Mix Design for various grade of concrete used for making of
Rubber mould reflective paver blocks.
II) SPECIFICATIONS FOR COLOURED RUBBER MOULD REFLECTIVE PAVER BLOCKS:
Coloured concrete Rubber mould reflective paver blocks shall be manufactured as per
specifications using approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE
PIGMENTS” with minimum colour pigment of 3% by weight of cement. The colour shade shall be
as selected by AMC before commencement of the work. White cement shall be used for colored
pavers to obtain the desired colour shade.
The colour of the Rubber mould reflective paver block shall be guaranteed against fading of colour
for period of 3 months from the date of completion. Otherwise contractor shall have to replace it
without any cost.
All other technical specifications & Procedure for testing & sampling of coloured Rubber mould
reflective pavers shall be as per attachment.
III)RUBBER MOULD REFLECTIVE PAVER BLOCKS CHARACTERISTICS:
The concrete Rubber mould reflective pavers should have
perpendicularities after release from the mould and the
same should be retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type.
The Rubber mould reflective paver should have uniform chamfers to facilitate easy drainage
surface run off.
The Rubber mould reflective pavers should have uniform interlocking space of 2mm to 3mm to
ensure compacted sand filling after vibration on the paver Surface.
The Rubber mould reflective pavers shall be manufactured in single layer only.
The Rubber mould reflective pavers shall be of cement gray colour without any pigment & for
coloured Rubber mould reflective pavers refer “specifications for coloured Rubber mould reflective
IV) Rubber mould reflective Paver Block Dimensions :
Shape Uniregular (Uniform Shape with no
Hollow Or Creacks) Uni, I shape, tri hex
or directed by Addl .C.E.
Chamfer 4mm to 6mm along top edges
Colour a. Natural cement grey colour
without use of any pigment.
b. For coloured Rubber mould
reflective pavers refer “specifications for
coloured pavers”
Dimensional (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
Signature of Bidder Page 49 of
Ahmedabad Municipal Corporation
V) Testing of Rubber mould reflective Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Min. 20 N/Sqmm for
Strength 60mm thick
2. Flexural Strength Minimum 4.5 N/Sqmm
4. Water Absorption Maximum 5.80%
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR RUBBER MOULD REFLECTIVE PAVER
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A
2. Compressive Strength
Testing for compressive strength shall be undertaken in accordance with standard test as
suggested by AMC.
3. Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor
4. Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor
5. Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for
Concrete Masonry Units)
Sampling of Rubber mould reflective Paver blocks.
1. Method of sampling :
Before laying Rubber mould reflective paver blocks, each designated section comprising not more
than 50000 blocks, shall be divided into ten approximately equal groups. Three blocks shall be
drawn from each group.
Signature of Bidder Page 50 of
Ahmedabad Municipal Corporation
The mode of measurement shall be on Rmt. basis. (As laid on site)
ITEM NO 41 Providing and fixing pre-cast concrete kerb stone of gray cement based concrete
block 30cm length,30cm height and 15cm thick of M200 grade concret grade using
mm nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for pre-
cast blocks, reasonably exposed finish/ formwork , mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete,
including the cost of formwork etc. complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding
with necessary equipments and materials. The rate shall also include the flush pointing
in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb
stone fixed with Bituminous concrete Bituminous concrete / C.C. mixed in proper
position to flush with the road surface as directed by Engineer in change to form a
portable mixture.
Laying on 5 cm thick Sand Bedding
The curb shall be M-20 of size 300 x 150 x 380mm it shall be laid in proper line and camber and
jointing vata in C.M. 1:3 prop. Including the activities of excavation, ramming etc. comp.
Trenches of specified width and depth shall first be mode along the edges of the wering course of
the road of along the line of pave block flooring to receive the restraint block. The bed of the
trenches shall be compacted manually with steel rammers firm and even surface and then stones
shall be set in P.C.C. The edge restraint blocks shall be laid with their length running parallet to the
paving edge, true in line and gradient. The joints of blocks shall be not more than to mm and filled
with the CM 1:3 (1 cement: 3 fine sand) which shall be cured for 7 days.
The edge shall be restored and all surplus earth including rubbish etc. disposed off as directed by
the engineer in charges.
Length of the finished work shall be measured in running meter along the edge of the paving
correct to a cm.
The rate shall include the cost the materials and labour including stone of specified materials
involved in all the operation described above. Sampling for testing on kerb shall be done Sampling
for testing on kerb shall be done in accordance with appendix – A as per Item No. 13. Testing for
compressive strength relevant shall be undertaken in accordance with I.S. Code.
The Mode of measurement and rate shall be given as per one running meter basis.
Item No. 42: Supplying good quality River sand in Municipal Store. inclu.. Loading unloading As
dire. By engg. Incharge.Sand should be good qulity & free from all orgnanic & other impuntes.
The work in general is carried out as per inst. of engg. in charge.
Signature of Bidder Page 51 of
Ahmedabad Municipal Corporation
Supplying good quality River sand in Municipal Store. inclu.. Loading unloading As dire. By engg.
Sand shall be medium/coarse natural sand, clean, well graded, hard, strong, durable and gritty. Sand
particles should be free from injurious amounts of dust, clay, kankar nodules, soft or flaky particles of
shale, alkali, salts, organic matter loam, mica or other deleterious substances and shall be got approved
from the Engineer-in-charge. The sand shall not contain more than 8% of silt as determined by field test
and 3% by laboratory test , if necessary the sand shall be washed to make it clean. All sand to be used for
plaster, brickwork , concrete shall be strictly sieved by 4.75 mm seive.
Testing Standards :
A. Silt Content :
Sampling : Test shall be carried out for every 150 m3 of sand. The sample taken for testing shall
Results : Permissible content shall be 3% in laboratory test & 8 % in field Test.
B. Fineness Modulus :
Sampling : Sampling shall be as in A.
Fine sand : 2.2 to 2.6 shall be used as earth filling in plinth, zari, etc.
Medium sand : 2.6 to 2.9 shall be sued for Brickwork and plaster.
Coarse sand : 2.9 to 3.2 shall be used for concrete.
In general, the fineness modulus of sand shall not be less than 2.5 and shall not exceed 3.0. A sand
having a fineness modulus more than 3.2 will be unsuitable for making satisfactory concrete.
C. The sieve analysis of sand shall be as under
IS Sieve % By weight IS Sieve % By Weight
Designation Passive sieve Designation passive sieve
The Mode of measurement and rate shall be given as per one cubic meter basis.
Item No. 43:-Providing and supplying bag of 53 grade opc cement as in good condition to use purchase
from the market in amc store incl. loading, unloading and stacking as directed by engg. Incharge (market
Signature of Bidder Page 52 of
Ahmedabad Municipal Corporation
Providing and supplying bag of 53 grade ordinary portland cement like ultratech, jk laxmi, ambuja brand as
in good condition to use purchase from the market in amc store incl. loading, unloading and stacking as
directed by engg. Incharge and relevant other specification apporeved by R & B guide line
The Mode of measurement and rate shall be given as per one No. basis.
Item No. 44: Supplying grit size of 6.3 to 10 mm size at AMC Road Store incl.loading unloading
grit shall consist of crushed or broken stone and be hard strong dense,durable clean from dust
of proper gradation and free from skin on coating likely to preven proper adhension.
Supplying grit size of 6.3 to 10 mm size at AMC Road Store incl.loading unloading.
Grit shall consist of crushed or broken black trap stone and be hard, strong, dense, durable clean of proper
gradation and free from skin or coating likely to prevent proper adhesion of mortar. Grit shall generally be
cubical in shape and as far as possible flaky elongated pieces shall be avoided. It shall generally comply
with the provisions of IS : 383 Unless special stone of particular quarries is mentioned, grit shall be
obtained from the best black trap or
equivalent hard stone as approved by the Engineer-in-charge. The grit shall have no deleterious reaction
The grit shall conform to the following gradation as per sieve analysis:.
IS Sieve % By weight IS Sieve % By Weight
Designation Passive sieve Designation passive sieve
The crushing strength of grit will be such so as to allow the concrete in which it is used to build up the
specified strength of concrete.
The necessary tests for grit shall be carried out as per the requirements of IS : 2386 (parts I to VIII) , as per
instructions of the Engineer-in-charge. The necessity of test will be decided by the Engineer-in-charge.
The Mode of measurement and rate shall be given as per one cubic meter basis.
Seal and Signature of the Bidder Deputy City Engineer
Date: Ahmedabad Municipal Corporation
yb>tJt> BGþrlrmrvj ftuvtuohuNl
Signature of Bidder Page 53 of
Ahmedabad Municipal Corporation
bægÍtul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
"yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE
ytExbltu CtJ J^thtu ytvJtbtk ytJNu lrn. yuf s ftuLx[tfxhu yuf søgtyu <btb ftbdehe vtKe,
z[ulus, vuJ´d, heEMxuxbuLx rJ. <btb ftbdehe fhJtle Au. yBþf JF<u btºt vtKelt Ôgrf<d< flufNltu
s c>jJtlt «mkdtu WCt &Nu ylu yBþf JF< btºt bulntuj/ auBchlu Vh<u fta ltkFuÕþk ÃjtMxh fhJtLþk
&tg <uÔþk vK clNu. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu fu btºt ytMVtÕx htuz
d{tWxed - heEMxux fhJtltu &Nu. <uJe >huf ytExbbtk J^^x &tg fu ytExb yufÍefGþx l &tg <uÔþk vK
clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ J^thtu, vK ytvJtltu
&Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug
<ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl meÍl
fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe
NftNu lrn. yLg&t htuslt Yt. 250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu
ytJu <ulu je^u fhJtbtk ytJNu."
ftuLx[tfxhle mne zu.mexe.yuLSlegh
rm¬t ylu btuctEj lkch (bægÍtul)
Signature of Bidder Page 54 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (CENTRAL ZONE)
BILL OF QUANTITY
Qty. Item Description Rate per Amount
Dismentaling tiled of stone floors laid in mortar
including stacking of serviceable materilas and
1 490 disposal of unserviceable materials with all lead 47.250 Smt
lift (P.140 I.No.2005 Building S.O.R.2023-2024)
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
2 120.00 materials and disposing off the excavated stuff 201.810 Cmt
upto 50 Meter lead.(A) Loose or soft soil
(P.50 I.No.04B001A Building S.O.R.2023-2024)
Conveyance charges of lime, murrum, building,
rubbish, manure or sludge and excavated rock
3 and fly ash J. 5.00 km 326.730 Cmt
(P.6 Statement 5 I.No.030201A1 Building
Providing & laying cement concrete 1:4:8 (1
cement : 4 coarse sand : 8 hand broken stone
4 40.00 aggregates 40 mm nominal size) and curing 2634.11 Cmt
complete excluding cost of form work in
Foundation and plinth (P.52 I.No.05004A Building
Providing formwork of ordinary timber planking
as to give a rough finish including centering
shuttering strutting and propping etc. Height of
propping and centering below supporting floor to
5 4.00 ceiling not exceeding 4 M. and removal of the 171.680 Smt.
same for in situ reinforced concrete and plain
concrete work in. (A) Foundations Footings Bases
Columns etc. and Mass concrete. (P.78
I.No.09001AA Building S.O.R.2023-2024)
Signature of Bidder Page 55 of
Ahmedabad Municipal Corporation
Providing TMT Bar FE 415 reinforcement for R.C.C.
work including bending, binding and placing in
position complete upto floor two level (P.54
I.No.05014BA Building S.O.R.2023-2024)
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced
7 22.00 concrete work in (A) Foundations, footings, Base 3977.880 Cmt.
columns and Mass concrete(P.56 I.No.05024AA
Building S.O.R.2023-2024)
Providing and laying in position Ready Mixed M
200 grade concrete for reinforced cement
work , using cement content as per approved
Design Mix manufactured in fully automatic
batching plant and transported to site of work in
transit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced
concrete work including pumping of R.M.C. from
8 25.00 transit mixer to site of laying, excluding the cost 4793.100 Cmt.
centering shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate/ retard
setting of concrete, improve workability without
impairing strength and durability as per direction
the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be
maintained) (P.66 I.No5055 Building S.O.R.2023-
P/A Tremix With Dewartering Machine And
Floater Machine On Constructed Cc Work For
Finishing The Surface As Per Requirement. The
Rate Including All Machinaries, Labor, Loading,
Unloading, Transportaion Etc Complete As Per
Direction Given By Engineer In Charge.
Signature of Bidder Page 56 of
Ahmedabad Municipal Corporation
Filling available excavated earth (excluding rock)
in trenches. plinth, sides of foundations etc. in
layers not exceeding 20 cm. in depth
each disposited layer by ramming and watering.
(P.48 I.No.4006 Building S.O.R.2023-2024)
Providing and laying (to level or slopes) and
with stiff mixture of Cement Mortar in proportion
11 25.00 1:1 Salt glazed stoneware pipes including testing 211.050 Rmt
pipes and joints complete.(A) 100mm dia. (P.172
I.No.24001AA Building S.O.R.2023-2024)
Providing and laying (to level or slopes) and
with stiff mixture of Cement Mortar in proportion
12 10.00 1:1 Salt glazed stoneware pipes including testing 288.230 Rmt
pipes and joints complete.(B) 150mm dia. (P.172
I.No.24001BA Building S.O.R.2023-2024)
Providing and fixing S.W. gully trap with C.I.
brick masonry chamber and water tight C.I. cover
with frame of 300mm x 300mm size (inside) with
standard weight.(i) Square mouth traps. (A)
100mm x 100mm size P type. (P.173
I.No.24006AA Building S.O.R.2023-2024)
Providing, laying, spreading and compacting
aggregate to wet mix macadam specification
premixing the Material with water at OMC in
mix plant carriage of mixed Material by tipper to
14 0.00 site, laying
in uniform layers in sub- base / base course on
prepared surface and compacting with vibratory
achieve the desired density as per Codal
SOR -(Jan- 2021/22) Rate for Road Works
Signature of Bidder Page 57 of
Ahmedabad Municipal Corporation
(A) 5.00 (A) Production & Supply of WMM 1675.000 Cmt.
(B) 4.00 (B) Laying of WMM 35.000 Cmt.
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of
thickness upto 0.20 meter including demolishing
15 0.00 the asphalt carpet,metal,soiling/cutting
Reinforcement etc.comp. with stacking the
material as directed.SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line
a 80.00 a) upto 0.20 meter thickness (By Manual) 80.000 Smt
b) 0.20 meter to 0.30 meter (By Breaker Machine
b 120.00 including cost of operator, fuel, & transportaion 200.000 Smt
c) 0.30 meter & above (By Breaker Machine
c 195.00 including cost of operator, fuel, & transportaion 350.000 Smt
P/F Name Board of 45X60 cm size showing grant
16 5.00 detail with necessary painting & writing letters as 250.000 No
per given inst. & design etc comp.Sub:-
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement
slurry, Brick masonary in CM 1:5 & excluding the
cost of chamber seat cover etc..completed. SOR -
(Jan. 2016) Rates for work of Drainage / SWD pipe
0.60 X 0.45 mt. size Inside Clear, Depth from
0.0 to 0.90meter for pipe dia <=150 mm.
0.60 X 0.75 mt. size Inside Clear, Depth from
0.0 to 0.90meter for pipe dia <=20 mm.
0.75 X 0.75 mt. size (Inside Clear) Depth from
to 1.20 meter for pipe dia <=20 mm
Signature of Bidder Page 58 of
Ahmedabad Municipal Corporation
Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling, Brick
Bats Cement Concrete (1:5:10) of thickness
C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) In Cm 1:3, Finishing With
Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe
Coated Steps 35 Cm C/C At 35 Cm Staggered
Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of
thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c bothway
10 mm dia.)But Excluding The Cost Of Manhole
Seat Cover Etc..Completed Of Size 0.75 X
Meter (Inside Clear, M.H. length should be
parallel to the flow)SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line
1.00 to 2.00 meter depth, (Slab at Ground level)
(for pipe dia <=230 mm)
2.00 to 3.00 meter depth, (Slab at below 0.60 mt.
From G.L.) (for pipe dia <=300 mm)
Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster
19 0.00 in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and
carting the same as directed. SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
a 5.00 (A) up to 0.15 mt. (@ Two Coarse) 820.000 No.
b 5.00 (B) up to 0.35mt. (@ Four Coarse) 1300.000 No.
c 5.00 (C) up to 0.65 mt. (@ Seven Coarse) 2010.000 No.
d 4.00 (D) up to 0.90 mt. (@ Ten Coarse ) 2420.000 No.
Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and
20 3.00 fixing C.I. steps and existing chamber sheet cover, 450.000 No.
removing the debris from chamber and carting
the same as directed. SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line
Signature of Bidder Page 59 of
Ahmedabad Municipal Corporation
F.R.C. Extra Heavy Duty (EHD-35) Manhole
Covers & Frames Cover : 728mm ø & 100 mm
thick circular cover, 35.00 MT load design,
100x2mm MS flat allround, 16mm ø plain round
bar for lifting the cover & should be fitted with
plastic cups. Frame : 560 mm ø clear opening,
outer size- 888x888x175 mm. On the upper
periphery of frame 25 x 3 mm wide MS flat should
be well embed in concrete to protect the edges
of frame. FRC E.H.D.-35 manhole cover & frame
described as above SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line
FRC heavy duty cover size 730 mm. & 90 mm thick
circular cover 20 M.T. design load and frame size
a 3.00 560 mm clear opening size 890 x 890 x 120 1210.000 No.
mm.SOR - (Jan. 2016) Rates for work of Drainage /
FRC medium duty cover size 670 mm dia & 70 mm
thick 10 M.T. load design and frame size
b 3.00 mm clear opening outer size 780 x 780 x 120 mm 990.000 No.
SOR - (Jan. 2016) Rates for work of Drainage /
FRC medium duty Chamber seat cover (FRC) cover
706 x 556 x 50 mm rectangular cover frame size
c 2.00 600 x 450 mm clear opening outer size 816 x 666 990.000 No.
x 100 mm (MD-10) SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line
FRC light duty Chamber seat cover (FRC) cover
d 2.00 with rectangular frame (LD-2.5) SOR - (Jan. 2016) 990.000 No.
Rates for work of Drainage / SWD pipe line
Carting and Fixing M.H., Chamber or Catchpite
Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing
22 2.00 smooth, watering and protecting for 7 days etc. 840.000 No.
complete as directed. M.H. seat cover will be
supplied byA.M.C.(from any store) SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line
Signature of Bidder Page 60 of
Ahmedabad Municipal Corporation
Providing and fixing cast iron manhole frame of
weight 80 to 85 kg suitable for existing EHD-35
FRC MH cover, rate also incl. loading, unloading
and fixing the frame in line and level to match
23 2.00 exisisting road level in C.C. 1:2:4 and finishing 80.000
smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge.
SOR - (Jan. 2016) Rates for work of Drainage /
Providing Kachha of Pakka Dummy in the
following dia pipes and removing the same after
24 0.00 completion of the connection work as directed.
SOR - (Jan. 2016) Rates for work of Drainage /
b 5.00 (B) 350 mm to 600 mm dia 339.000 No.
c 5.00 (C) 650 mm to 900 mm dia 720.000 No.
Providing Dead Cantering using good quality
Country Wood Planks, wall Plate of required
thickness and size including placing the nece.
supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per
standard engg. practice etc. comp. as
directed.SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line
Supplying, labour for break down repairing work
for activities like excavation, disliting, removing
debris from trench back filling etc. comp. as
directed by Eng.in charge.
(A) 8.00 Labour charges - Mazdoor (Female) 450.000 No.
(B) 6.00 Labour charges - Mazdoor (male) 493.000 No.
Signature of Bidder Page 61 of
Ahmedabad Municipal Corporation
Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item
also includes for making temporary sufficient nos
of lighting arrangement through out the work
with necessary required arrangement...The same
shall be removed after completion of work. SOR -
(Jan. 2016) Rates for work of Drainage / SWD pipe
Levelling or orientation of existing gully trap
chamber incl. Nece. masonry in CM 1:6 and
28 5.00 plaster in CM 1:3 etc. using old G.T.stone and 80.000 No.
cover etc. comp. SOR - (Jan. 2016) Rates for work
of Drainage / SWD pipe line
Providing and operation dewatering Pump
including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For
29 1.00 Each Pump Set, No payment should be allowed 600.000 Shift
for non working condition of machinery ) SOR -
(Jan. 2016) Rates for work of Drainage / SWD pipe
Providing & Supplying JCB Machine on rental basis
in case of emergency situation and break down
type work & also during unavoidable condition as
per instruction of engg.incharge , rate includes all
nece. shifting, fuel and operating charges and
30 3.00 stacking of useful & non-useful materials 600.000 Hour
separately up to store. (No payment should be
allowed for non working condition of machinery
and for pipe line excavation and laying work) SOR
- (Jan. 2016) Rates for work of Drainage / SWD
Supplying Pneumatic Breaker Machine for RCC
Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for non
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
down work) SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line
Signature of Bidder Page 62 of
Ahmedabad Municipal Corporation
To provide Tractor with Hydraulic Trolley, driver
with fuel, to carryout different works during
32 2.00 day/night for 8 Hrs. Shift. Work shall be carried 2104.090 Shift
out as per the instructions of Engineer In-Charge.
No extra charged shall be paid for night shift.
Supplying Electric Breaker Machine for RCC Slab
or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for non
33 3.00 working condition of machinery and for pipe line 1200.000 Shift
excavation and M.H. work. Allowed only for break
down work) ( Based on Previously approved rate
by C E sir ) SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line
Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick
maso. wall in the prop. of CM (1:6) with 40 mm
34 5.00 thick IPS flooring in the prop M15 at bottom and 3500.000 No.
15 mm thick cement plaster inside the catch pit in
the proportion of CM (1:3) with out jali etc. comp.
as directed SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line
Cachpit jali Fixing P/F FRC Catchpit jali with frame
600 mm x 600 mm clear opaning etc.comp.As
directed by engi. In charge SOR - (Jan. 2016) Rates
for work of Drainage / SWD pipe line
Labour work for fixing any kind of paving with
cement pointing in CM 1:2, including watering,
36 0.00 ramming etc comp. as dir.For pavementSOR -
(Jan. -2016) for Central Verge / Footpath / Stone
I) Laying on Sand bedding as per requirement to
fix the C.C.Block / Nibhada Stone in Line & Level
Supplying and fixing Nimbhada ladi 37 to 50 mm
thick for walk-way, covering the activity of
excavation, ramming, Laying on sand bedding as
37 0.00 per requirement to fix the Nibhada Stone in Line
& Level with cement pointing in cement mortar
1:2 etc complete as directed.SOR - (Jan. -2016) for
Central Verge / Footpath / Stone Paving
Signature of Bidder Page 63 of
Ahmedabad Municipal Corporation
450 Nimbhada ladi paving (37 to 50 mm.) 265.000 smt.
P/L brickbats sand concrete (1:2) of one part of
sand and two part of old brickbats including
38 2.00 spreading, laying, ramming, watering and 350.000 cmt.
consolidation etc complete as directed.SOR - (Jan.
-2016) for Central Verge / Footpath / Stone Paving
Providing and fixing pre-cast Rubber Dye / steel
inter locking concrete block 60mm thick with
of concrete M300 pnumatic compressed /
mechanically and as per approved design
Confirming to IS 15658 : 2006 including 35 mm
layer for levelling and filling the joint with sand in
proper line and level as per guidlines of IRC : SP
2018 etc. Complete.(P.123 I.No14033 Building
Supplying and fixing of 380 mm H x 300 mm L x
200 mm B Kerb block for Central Verge in M-20
grade using 20 mm nominal size black trap
aggregate of Sevaliya/Timba or equivalent quality
for pre-cast blocks, reasonably exposed finish/
formwork, mould with well equipped with
vibratory system for kerb stones of approved
design including curing, etc. complete, including
the cost of formwork etc. complete. The rate shall
also include necessary cutting of asphalt, fixing
40 1.00 the Kerb stones in line and level on 5 cm thick 486.000 Rmt.
sand bedding with necessary equipments and
materials. The rate shall also
include the flush pointing in CM (1:3) for all joints
of the kerbstones. Filling of zari alone the sides of
the kerb stone fixed with Bituminous concrete /
C.C. mixed in proper position to flush with the
road surface as directed by Engineer in change to
form a portable mixture. In any case Gravel or
such type of materials shall not be allowed for
Signature of Bidder Page 64 of
Ahmedabad Municipal Corporation
Providing and fixing pre-cast concrete kerb stone
of gray cement based concrete block 30cm
length,30cm height and 15cm thick of M200
41 2.00 grade concret as per approved design and 376.43 Rmt.
including excavation for fixing in proper line and
level,filling the joint with C:M 1:3 (1cement:3fine
sand) etc complete.
Supplying good quality River sand free from
foreign materials, impurities etc comp as dire at
different store of khadiya ward with loading and
unloading etc comp
Providing and supplying bag of 53 grade opc
cement as in good condition to use purchase from
43 10 the market in amc store incl. loading, unloading 343.20 Bag
and stacking as directed by engg. Incharge
Supplying grit size of 6.3 to 10 mm size at all road
store ofjamalpur ward incl. loading unloading grit
shall consists of crushed or broken stone and be
hard strong dense, durable clean form dust of
proper gradation and free from skin on coating
likely to preven proper adhension of mortar
Seal and Signature of the Bidder Deputy City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 65 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.571.pdf
Download all tender documents and submit your bid