Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹60.9 L
EMD Value
₹61,000
Closing Date
27 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Officer Kadi nagarpalika
PROVIDING AND LAYING OF DI PIPE LINE FROM SARDAR BAUG TO DHARTICITY, TAMBOLIVAS TO SANGAM HOTEL TO VEGETABLE MARKET & ANMOL VILLA ESR TO BHAGIRATH SOCIETY FOR KADI NAGARPALIKA AT KADI. DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26 GRANT
364147
1313/2/2026-27
Open
Civil Works - Water Works
Works
Mehsana
12 documents required · 12 mandatory
₹2,832
Chief Officer Kadi nagarpalika
₹61,000
7 Nov 2026
7 Nov 2026
7 Nov 2026
27 Nov 2026
7 Nov 2026
120 days
NAME OF WORK : PROVIDING AND LAYING OF DI PIPE LINE FROM SARDAR BAUG TO DHARTICITY,
TAMBOLIVAS TO SANGAM HOTEL TO VEGETABLE MARKET & ANMOL VILLA ESR TO
BHAGIRATH SOCIETY FOR KADI NAGARPALIKA AT KADI. DIST. MAHESANA UNDER 15TH
FINANCE COMMISSION 2025-26 GRANT.
Schedule No Name of work Amount
Providing & Laying of DI Pipe line from Sardar Baug to Dharticity for Kadi
Nagarpalika, Kadi
Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable
Market for Kadi Nagarpalika, Kadi
Providing & Laying of DI Pipe line from Anmol Villa ESR to Bhagirath Society for
Kadi Nagarpalika, Kadi
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing
charges, after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted
from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
2) conditions, site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the
difference in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender.
However no extra payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix
design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details
4) of work and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be
5) paid by the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills
of the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of
7) the Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation
of equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST and department will not entertain any contractor
representation to reimburse any financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Sardar Baug to Dharticity for Kadi Nagarpalika, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 156.00 Excavation for pipeline trenches 102.35 Rupees One Hundred Two and Cum
Excavation for pipe line trenches for water supply, Thirty Five Paise
sewerage line, manhole etc. all with shoring and
struting if required as per required gradient and line
including safely provisions using the site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified up to 1.50 mt. depth
In all sorts of soil and soft murrum
2 117.00 -As above- 155.25 Rupees One Hundred Fifty Five Cum
In Hard Murrum, boulders incl. Macadam road. and Twenty Five Paise
3 117.00 -As above- 427.80 Rupees Four Hundred Twenty Cum
In Hard rock and / or in C.C. 1:2:4 or RCC with Seven and Eighty Paise
blasting , breaking, chiseling, or by chiseling/breaking
4 360.00 Providing and supplying D. I. K-7 grade pipes for 2466.00 Rupees Two Thousand Four Rmt
following nominal bore diameter with internal cement Hundred Sixty Six Only
mortar lining including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS 8329-
2000). Rate for DI pipe based on Wholesale Price
index of Pig Iron as 114.20 for the month of Febuaury-
5 360.00 Lowering, laying and jointing C.I. S & S Spun pipes 146.05 Rupees One Hundred Forty Six Rmt
suitable for Tyton joints / Mortar lined D. I. Pipes of and Five Paise
various classes with CI / MS specials of following
diameters in proper position, grade and alignment as
directed by Engineer-in-charge including hydraulic
testing etc. comp.
6 1800.00 Manufacture supply & delivery of Ductile iron flange 148.00 Rupees One Hundred Forty Eight Kgs.
socket spigot bends, tees, reducers or any other Only
specials as per BS-EN-545/1995 Class A series K12
series for use with D.I. Pipes manufactured as per
IS:8329/1994 delivery of specials is to be made to
GWSSB store or site of works any where in Gujarat
including all taxes, loading, unloading, carting,
stacking, insurance, inspection charges, octroi etc.
with external bitumen & Zinc coating & internal
cement mortar lining
Socket & Spigot Type
(1) 80 to 300mm dia
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Sardar Baug to Dharticity for Kadi Nagarpalika, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
7 1.00 Providing and supplying ISI mark CI D/F Sluice 17518.00 Rupees Seventeen Thousand Five Nos.
Valves as per IS:14846 (Latest Edition) of following Hundred Eighteen Only
class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete
(PN-1 with hand wheel / cap operated (Alt type long
8 1.00 Lowering, laying and jointing in position following C. 1087.90 Rupees One Thousand Eighty Nos.
I. / D/F Reflux valves, Butterfly valves,Sluice valves Seven and Ninety Paise
and Air valves including cost of all labour, jointing
material,including nut bolts and giving satisfactory
hydraulic testing, etc. complete.
9 1.00 Valve Chamber 8444.45 Rupees Eight Thousand Four Nos.
Construction of valves chambers in brick or bela stone Hundred Forty Four and Forty
masonry, locally available in C.M. 1:6 Foundation Five Paise
concrete 150 mm thick in CC 1:4:8 of trap metal size
25mm to 40mm thick, inside cement plaster in C.M.
1:3 and cement pointing outside in C.M. 1:3 and top
cover of precast RCC slab 100mm thick (with key hole
in two parts, each with handles or MS bar etc.
complete as given size) up to 1Mt. depth from G.L. to
pipe invert level incl. complete civil works but excl. of
excavation and refilling, with cast in situ RCC slab in
one single piece with fixing of CI-MH frame and
cover (excl. cost of CI-MH frame and cover) with
23mm thick brick masonry wall in C.M. 1:6
(c) Size of chamber
0.90 X 0.90 m and 1.0 mt. deep
(2) single peice 10cm with fixing M.H. cover
10 318.10 Refilling the pipeline trenches incl. ramming, 25.30 Rupees Twenty Five and Thirty Cum
watering, consolidating disposal of surplus stuff as Paise
directed within a radius of 3 km
11 360.00 Removing of Existing pipeline incl. removal of 26.26 Rupees Twenty Six and Twenty Rmt
specials, valves jointing material including carting and Six Paise
stacking of removed material from site of work to the
department store as directed excl. excavation and
(6) 250mm A.C. Pressure pipe
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Sardar Baug to Dharticity for Kadi Nagarpalika, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
12 2.00 Labour charges for repairing leakage in CI/DI pipeline 4668.22 Rupees Four Thousand Six Nos.
of following diameter at different places including Hundred Sixty Eight and Twenty
necessary excavation manually or by machinery, Two Paise
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including CID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
13 5.00 Labour charges for repairing leakage in PVC pipeline 987.78 Rupees Nine Hundred Eighty Nos.
of following diameter at different places including Seven and Seventy Eight Paise
necessary excavation manually or by machinery,
removing of mud, dewatering, cleaning of pipe and
leakage portion, cutting the pipeline & removing piece
of pipe from trench with inclusive of mechanical
devices JCB, Hydra/Crain if necessary & labours
required with providing material such couplers,
solution etc. complete. (Incl. all material but Exclu.
14 36.00 Providing and laying cement concrete 1:2:4 (1-cement 3587.13 Rupees Three Thousand Five Cum.
: 2- Coarse sand : 4-graded stone aggregates 20mm Hundred Eighty Seven and
nominal size) and curing complete excluding cost of Thirteen Paise
(A) Foundation and plinth
15 39.00 Providing and casting in situ ordinary cement concrete 4157.05 Rupees Four Thousand One Cum.
M-200 for average 150mm thick wearing coat lais as Hundred Fifty Seven and Five
directed including tamping, vibrating, finshing, curing Paise
and filling in joints with bitumen complete.
16 100.00 Refitting and refixing pre-cast Rubber Dye / steel Dye 395.92 Rupees Three Hundred Ninety Sqm.
inter locking concrete block 60mm thick available at Five and Ninety Two Paise
site including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and level as
per guidlines of IRC : SP 63-2018 etc. Complete. Also
replaced existing damaged or dismantled block with
new pre-cast Rubber Dye / steel Dye inter locking
concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically
and as per approved design Confirming to IS 15658 :
2006 wherever required.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Sardar Baug to Dharticity for Kadi Nagarpalika, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable Market for Kadi Nagarpalika, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 310.00 Excavation for pipeline trenches 102.35 Rupees One Hundred Two and Cum
Excavation for pipe line trenches for water supply, Thirty Five Paise
sewerage line, manhole etc. all with shoring and
struting if required as per required gradient and line
including safely provisions using the site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified up to 1.50 mt. depth
In all sorts of soil and soft murrum
2 233.00 -As above- 155.25 Rupees One Hundred Fifty Five Cum
In Hard Murrum, boulders incl. Macadam road. and Twenty Five Paise
3 233.00 -As above- 427.80 Rupees Four Hundred Twenty Cum
In Hard rock and / or in C.C. 1:2:4 or RCC with Seven and Eighty Paise
blasting , breaking, chiseling, or by chiseling/breaking
4 300.00 Providing and supplying D. I. K-7 grade pipes for 1880.00 Rupees One Thousand Eight Rmt
following nominal bore diameter with internal cement Hundred Eighty Only
mortar lining including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS 8329-
2000). Rate for DI pipe based on Wholesale Price
index of Pig Iron as 114.20 for the month of Febuaury-
5 400.00 Providing and supplying D. I. K-7 grade pipes for 2466.00 Rupees Two Thousand Four Rmt
following nominal bore diameter with internal cement Hundred Sixty Six Only
mortar lining including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS 8329-
2000). Rate for DI pipe based on Wholesale Price
index of Pig Iron as 114.20 for the month of Febuaury-
6 300.00 Lowering, laying and jointing C.I. S & S Spun pipes 113.85 Rupees One Hundred Thirteen Rmt
suitable for Tyton joints / Mortar lined D. I. Pipes of and Eighty Five Paise
various classes with CI / MS specials of following
diameters in proper position, grade and alignment as
directed by Engineer-in-charge including hydraulic
testing etc. comp.
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable Market for Kadi Nagarpalika, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
7 400.00 Lowering, laying and jointing C.I. S & S Spun pipes 146.05 Rupees One Hundred Forty Six Rmt
suitable for Tyton joints / Mortar lined D. I. Pipes of and Five Paise
various classes with CI / MS specials of following
diameters in proper position, grade and alignment as
directed by Engineer-in-charge including hydraulic
testing etc. comp.
8 1048.00 Manufacture supply & delivery of Ductile iron flange 148.00 Rupees One Hundred Forty Eight Kgs.
socket spigot bends, tees, reducers or any other Only
specials as per BS-EN-545/1995 Class A series K12
series for use with D.I. Pipes manufactured as per
IS:8329/1994 delivery of specials is to be made to
GWSSB store or site of works any where in Gujarat
including all taxes, loading, unloading, carting,
stacking, insurance, inspection charges, octroi etc.
with external bitumen & Zinc coating & internal
cement mortar lining
Socket & Spigot Type
(1) 80 to 300mm dia
9 4.00 Providing and supplying ISI mark CI D/F Sluice 2857.00 Rupees Two Thousand Eight Nos.
Valves as per IS:14846 (Latest Edition) of following Hundred Fifty Seven Only
class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete
(PN-1 with hand wheel / cap operated (Alt type long
10 4.00 Providing and supplying ISI mark CI D/F Sluice 3875.00 Rupees Three Thousand Eight Nos.
Valves as per IS:14846 (Latest Edition) of following Hundred Seventy Five Only
class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete
(PN-1 with hand wheel / cap operated (Alt type long
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable Market for Kadi Nagarpalika, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
11 3.00 Providing and supplying ISI mark CI D/F Sluice 6482.00 Rupees Six Thousand Four Nos.
Valves as per IS:14846 (Latest Edition) of following Hundred Eighty Two Only
class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete
(PN-1 with hand wheel / cap operated (Alt type long
12 4.00 Lowering, laying and jointing in position following C. 460.00 Rupees Four Hundred Sixty Only Nos.
I. / D/F Reflux valves, Butterfly valves,Sluice valves
and Air valves including cost of all labour, jointing
material,including nut bolts and giving satisfactory
hydraulic testing, etc. complete.
13 4.00 Lowering, laying and jointing in position following C. 504.85 Rupees Five Hundred Four and Nos.
I. / D/F Reflux valves, Butterfly valves,Sluice valves Eighty Five Paise
and Air valves including cost of all labour, jointing
material,including nut bolts and giving satisfactory
hydraulic testing, etc. complete.
14 3.00 Lowering, laying and jointing in position following C. 672.75 Rupees Six Hundred Seventy Two Nos.
I. / D/F Reflux valves, Butterfly valves,Sluice valves and Seventy Five Paise
and Air valves including cost of all labour, jointing
material,including nut bolts and giving satisfactory
hydraulic testing, etc. complete.
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable Market for Kadi Nagarpalika, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
15 3.00 Valve Chamber 8444.45 Rupees Eight Thousand Four Nos.
Construction of valves chambers in brick or bela stone Hundred Forty Four and Forty
masonry, locally available in C.M. 1:6 Foundation Five Paise
concrete 150 mm thick in CC 1:4:8 of trap metal size
25mm to 40mm thick, inside cement plaster in C.M.
1:3 and cement pointing outside in C.M. 1:3 and top
cover of precast RCC slab 100mm thick (with key hole
in two parts, each with handles or MS bar etc.
complete as given size) up to 1Mt. depth from G.L. to
pipe invert level incl. complete civil works but excl. of
excavation and refilling, with cast in situ RCC slab in
one single piece with fixing of CI-MH frame and
cover (excl. cost of CI-MH frame and cover) with
23mm thick brick masonry wall in C.M. 1:6
(c) Size of chamber
0.90 X 0.90 m and 1.0 mt. deep
(2) single peice 10cm with fixing M.H. cover
16 8.00 Valve Chamber 5908.70 Rupees Five Thousand Nine Nos.
Construction of valves chambers in brick or bela stone Hundred Eight and Seventy Paise
masonry, locally available in C.M. 1:6 Foundation
concrete 150 mm thick in CC 1:4:8 of trap metal size
25mm to 40mm thick, inside cement plaster in C.M.
1:3 and cement pointing outside in C.M. 1:3 and top
cover of precast RCC slab 100mm thick (with key hole
in two parts, each with handles or MS bar etc.
complete as given size) up to 1Mt. depth from G.L. to
pipe invert level incl. complete civil works but excl. of
excavation and refilling, with cast in situ RCC slab in
one single piece with fixing of CI-MH frame and
cover (excl. cost of CI-MH frame and cover) with
23mm thick brick masonry wall in C.M. 1:6
(D) Size of chamber
0.60 X 0.60 m and 1.0 mt. deep
(2) single peice 10cm with fixing M.H. cover
17 652.69 Refilling the pipeline trenches incl. ramming, 25.30 Rupees Twenty Five and Thirty Cum
watering, consolidating disposal of surplus stuff as Paise
directed within a radius of 3 km
18 300.00 Removing of Existing pipeline incl. removal of 21.21 Rupees Twenty One and Twenty Rmt
specials, valves jointing material including carting and One Paise
stacking of removed material from site of work to the
department store as directed excl. excavation and
(5) 200mm A.C. Pressure pipe
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable Market for Kadi Nagarpalika, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
19 400.00 Removing of Existing pipeline incl. removal of 26.26 Rupees Twenty Six and Twenty Rmt
specials, valves jointing material including carting and Six Paise
stacking of removed material from site of work to the
department store as directed excl. excavation and
(6) 250mm A.C. Pressure pipe
20 4.00 Labour charges for repairing leakage in CI/DI pipeline 1605.90 Rupees One Thousand Six Nos.
of following diameter at different places including Hundred Five and Ninety Paise
necessary excavation manually or by machinery,
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including DID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
(For Connection of existing pipeline)
21 4.00 Labour charges for repairing leakage in CI/DI pipeline 1816.99 Rupees One Thousand Eight Nos.
of following diameter at different places including Hundred Sixteen and Ninety Nine
necessary excavation manually or by machinery, Paise
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including DID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
(For Connection of existing pipeline)
22 3.00 Labour charges for repairing leakage in CI/DI pipeline 2520.96 Rupees Two Thousand Five Nos.
of following diameter at different places including Hundred Twenty and Ninety Six
necessary excavation manually or by machinery, Paise
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including DID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
(For Connection of existing pipeline)
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable Market for Kadi Nagarpalika, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
23 1.00 Labour charges for repairing leakage in CI/DI pipeline 3454.20 Rupees Three Thousand Four Nos.
of following diameter at different places including Hundred Fifty Four and Twenty
necessary excavation manually or by machinery, Paise
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including DID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
(For Connection of existing pipeline)
24 1.00 Labour charges for repairing leakage in CI/DI pipeline 4668.22 Rupees Four Thousand Six Nos.
of following diameter at different places including Hundred Sixty Eight and Twenty
necessary excavation manually or by machinery, Two Paise
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including DID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
(For Connection of existing pipeline)
25 10.00 Labour charges for repairing leakage in PVC pipeline 987.78 Rupees Nine Hundred Eighty Nos.
of following diameter at different places including Seven and Seventy Eight Paise
necessary excavation manually or by machinery,
removing of mud, dewatering, cleaning of pipe and
leakage portion, cutting the pipeline & removing piece
of pipe from trench with inclusive of mechanical
devices JCB, Hydra/Crain if necessary & labours
required with providing material such couplers,
solution etc. complete. (Incl. all material but Exclu.
26 50.00 Providing and laying cement concrete 1:2:4 (1-cement 3803.06 Rupees Three Thousand Eight Cum.
: 2- Coarse sand : 4-graded stone aggregates 20mm Hundred Three and Six Paise
nominal size) and curing complete excluding cost of
(A) Foundation and plinth
27 60.00 Providing and casting in situ ordinary cement concrete 4237.42 Rupees Four Thousand Two Cum.
M-200 for average 150mm thick wearing coat lais as Hundred Thirty Seven and Forty
directed including tamping, vibrating, finshing, curing Two Paise
and filling in joints with bitumen complete.
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable Market for Kadi Nagarpalika, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
28 100.00 Refitting and refixing pre-cast Rubber Dye / steel Dye 382.79 Rupees Three Hundred Eighty Sqm.
inter locking concrete block 60mm thick available at Two and Seventy Nine Paise
site including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and level as
per guidlines of IRC : SP 63-2018 etc. Complete. Also
replaced existing damaged or dismantled block with
new pre-cast Rubber Dye / steel Dye inter locking
concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically
and as per approved design Confirming to IS 15658 :
2006 wherever required.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Tambolivas to Sangam Hotel to Vegetable Market for Kadi Nagarpalika, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Anmol Villa ESR to Bhagirath Society for Kadi Nagarpalika, Kadi
SCHEDULE - "B-3"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 175.00 Excavation for pipeline trenches 102.35 Rupees One Hundred Two and Cum
Excavation for pipe line trenches for water supply, Thirty Five Paise
sewerage line, manhole etc. all with shoring and
struting if required as per required gradient and line
including safely provisions using the site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified up to 1.50 mt. depth
In all sorts of soil and soft murrum
2 131.00 -As above- 155.25 Rupees One Hundred Fifty Five Cum
In Hard Murrum, boulders incl. Macadam road. and Twenty Five Paise
3 131.00 -As above- 427.80 Rupees Four Hundred Twenty Cum
In Hard rock and / or in C.C. 1:2:4 or RCC with Seven and Eighty Paise
blasting , breaking, chiseling, or by chiseling/breaking
4 150.00 Providing and supplying D. I. K-7 grade pipes for 1880.00 Rupees One Thousand Eight Rmt
following nominal bore diameter with internal cement Hundred Eighty Only
mortar lining including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS 8329-
2000). Rate for DI pipe based on Wholesale Price
index of Pig Iron as 114.20 for the month of Febuaury-
5 250.00 Providing and supplying D. I. K-7 grade pipes for 2466.00 Rupees Two Thousand Four Rmt
following nominal bore diameter with internal cement Hundred Sixty Six Only
mortar lining including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS 8329-
2000). Rate for DI pipe based on Wholesale Price
index of Pig Iron as 114.20 for the month of Febuaury-
6 150.00 Lowering, laying and jointing C.I. S & S Spun pipes 113.85 Rupees One Hundred Thirteen Rmt
suitable for Tyton joints / Mortar lined D. I. Pipes of and Eighty Five Paise
various classes with CI / MS specials of following
diameters in proper position, grade and alignment as
directed by Engineer-in-charge including hydraulic
testing etc. comp.
7 250.00 Lowering, laying and jointing C.I. S & S Spun pipes 146.05 Rupees One Hundred Forty Six Rmt
suitable for Tyton joints / Mortar lined D. I. Pipes of and Five Paise
various classes with CI / MS specials of following
diameters in proper position, grade and alignment as
directed by Engineer-in-charge including hydraulic
testing etc. comp.
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Anmol Villa ESR to Bhagirath Society for Kadi Nagarpalika, Kadi
SCHEDULE - "B-3"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
8 1821.00 Manufacture supply & delivery of Ductile iron flange 148.00 Rupees One Hundred Forty Eight Kgs.
socket spigot bends, tees, reducers or any other Only
specials as per BS-EN-545/1995 Class A series K12
series for use with D.I. Pipes manufactured as per
IS:8329/1994 delivery of specials is to be made to
GWSSB store or site of works any where in Gujarat
including all taxes, loading, unloading, carting,
stacking, insurance, inspection charges, octroi etc.
with external bitumen & Zinc coating & internal
cement mortar lining
Socket & Spigot Type
(1) 80 to 300mm dia
9 1.00 Providing and supplying ISI mark CI D/F Sluice 10902.00 Rupees Ten Thousand Nine Nos.
Valves as per IS:14846 (Latest Edition) of following Hundred Two Only
class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete
(PN-1 with hand wheel / cap operated (Alt type long
10 1.00 Providing and supplying ISI mark CI D/F Sluice 17518.00 Rupees Seventeen Thousand Five Nos.
Valves as per IS:14846 (Latest Edition) of following Hundred Eighteen Only
class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete
(PN-1 with hand wheel / cap operated (Alt type long
11 1.00 Lowering, laying and jointing in position following C. 853.30 Rupees Eight Hundred Fifty Three Nos.
I. / D/F Reflux valves, Butterfly valves,Sluice valves and Thirty Paise
and Air valves including cost of all labour, jointing
material,including nut bolts and giving satisfactory
hydraulic testing, etc. complete.
12 1.00 Lowering, laying and jointing in position following C. 1087.90 Rupees One Thousand Eighty Nos.
I. / D/F Reflux valves, Butterfly valves,Sluice valves Seven and Ninety Paise
and Air valves including cost of all labour, jointing
material,including nut bolts and giving satisfactory
hydraulic testing, etc. complete.
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Anmol Villa ESR to Bhagirath Society for Kadi Nagarpalika, Kadi
SCHEDULE - "B-3"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
13 2.00 Valve Chamber 8444.45 Rupees Eight Thousand Four Nos.
Construction of valves chambers in brick or bela stone Hundred Forty Four and Forty
masonry, locally available in C.M. 1:6 Foundation Five Paise
concrete 150 mm thick in CC 1:4:8 of trap metal size
25mm to 40mm thick, inside cement plaster in C.M.
1:3 and cement pointing outside in C.M. 1:3 and top
cover of precast RCC slab 100mm thick (with key hole
in two parts, each with handles or MS bar etc.
complete as given size) up to 1Mt. depth from G.L. to
pipe invert level incl. complete civil works but excl. of
excavation and refilling, with cast in situ RCC slab in
one single piece with fixing of CI-MH frame and
cover (excl. cost of CI-MH frame and cover) with
23mm thick brick masonry wall in C.M. 1:6
(c) Size of chamber
0.90 X 0.90 m and 1.0 mt. deep
(2) single peice 10cm with fixing M.H. cover
14 366.93 Refilling the pipeline trenches incl. ramming, 25.30 Rupees Twenty Five and Thirty Cum
watering, consolidating disposal of surplus stuff as Paise
directed within a radius of 3 km
15 150.00 Removing of Existing pipeline incl. removal of 21.21 Rupees Twenty One and Twenty Rmt
specials, valves jointing material including carting and One Paise
stacking of removed material from site of work to the
department store as directed excl. excavation and
(5) 200mm A.C. Pressure pipe
16 250.00 Removing of Existing pipeline incl. removal of 26.26 Rupees Twenty Six and Twenty Rmt
specials, valves jointing material including carting and Six Paise
stacking of removed material from site of work to the
department store as directed excl. excavation and
(6) 250mm A.C. Pressure pipe
17 1.00 Labour charges for repairing leakage in CI/DI pipeline 3454.20 Rupees Three Thousand Four Nos.
of following diameter at different places including Hundred Fifty Four and Twenty
necessary excavation manually or by machinery, Paise
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including DID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
(For Connection of existing pipeline)
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Anmol Villa ESR to Bhagirath Society for Kadi Nagarpalika, Kadi
SCHEDULE - "B-3"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
18 1.00 Labour charges for repairing leakage in CI/DI pipeline 4668.22 Rupees Four Thousand Six Nos.
of following diameter at different places including Hundred Sixty Eight and Twenty
necessary excavation manually or by machinery, Two Paise
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including DID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
(For Connection of existing pipeline)
19 5.00 Labour charges for repairing leakage in PVC pipeline 987.78 Rupees Nine Hundred Eighty Nos.
of following diameter at different places including Seven and Seventy Eight Paise
necessary excavation manually or by machinery,
removing of mud, dewatering, cleaning of pipe and
leakage portion, cutting the pipeline & removing piece
of pipe from trench with inclusive of mechanical
devices JCB, Hydra/Crain if necessary & labours
required with providing material such couplers,
solution etc. complete. (Incl. all material but Exclu.
20 40.00 Providing and laying cement concrete 1:2:4 (1-cement 3803.06 Rupees Three Thousand Eight Cum.
: 2- Coarse sand : 4-graded stone aggregates 20mm Hundred Three and Six Paise
nominal size) and curing complete excluding cost of
(A) Foundation and plinth
21 37.50 Providing and casting in situ ordinary cement concrete 4237.42 Rupees Four Thousand Two Cum.
M-200 for average 150mm thick wearing coat lais as Hundred Thirty Seven and Forty
directed including tamping, vibrating, finshing, curing Two Paise
and filling in joints with bitumen complete.
22 150.00 Refitting and refixing pre-cast Rubber Dye / steel Dye 382.79 Rupees Three Hundred Eighty Sqm.
inter locking concrete block 60mm thick available at Two and Seventy Nine Paise
site including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and level as
per guidlines of IRC : SP 63-2018 etc. Complete. Also
replaced existing damaged or dismantled block with
new pre-cast Rubber Dye / steel Dye inter locking
concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically
and as per approved design Confirming to IS 15658 :
2006 wherever required.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
KADI NAGARPALIKA
NAME OF WORK : Providing & Laying of DI Pipe line from Anmol Villa ESR to Bhagirath Society for Kadi Nagarpalika, Kadi
SCHEDULE - "B-3"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00 TITLE Page.pdf
01. Tender Notice.pdf
02 Technical Bid (1).pdf
03. Form B1.pdf
09 MORTH Specification Book.pdf
10 Building-Specification.pdf
11 Road Specification.pdf
12 Test Require For Construction Material.pdf
17. Price bid.pdf
18.Schedule B DI LINE .pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .