Loading…
Loading…
Tender Value
₹18.7 L
EMD Value
₹18,721
Closing Date
20 Jun 2026, 4:00 pm
The Superintending Engineer
Bi-Annual Rate contract for hiring closed Body Petrol/Diesel driven AC SUV/MUV/ vehicle model not more than 3 years old as on the date of tender opening for the period of 24 months for 220kV Vapi Substation, for 24 hrs. per day service under Vapi AM Division for minimum 3000kMs per month. Head quarter 220kV Vapi S/S. (Seating Capacity 9)
309857
TCNS/TR/ET-20/2026-27
Open
Electrical
Navsari
24 documents required · 23 mandatory · 1 optional
₹1,180
GUJARAT ENERGY TRASMISSION CORPORATION LIMITED - NAVSARI
₹18,721
30 May 2026
30 May 2026
30 May 2026
20 Jun 2026
30 May 2026
(List of Documents to be submitted with technical Bid)
The bidder should satisfy following minimum technical requirements….
1) Bi-Annual Rate contract for hiring vehicle as per tender notice.
(Seating Capacity as mentioned in tender notice).
2) Copy of RC book Registration of Taxi/Maxi passing vehicle.
3) Copy of road (Contract carriage) permit of vehicle.
4) Copy of PUC certificate (regularly renewed as per RTO rules)
5) Copy of driving license of LMV cab & Badge. (Taxi base)
6) Copy of Taxi passing certificate minimum (as mentioned in tender notice) persons.
7) Copy of vehicle fitness certificate from RTO.
8) Valid Comprehensive Insurance certificate covering period up to date.
9) Quotation of new proposed vehicle as per tender requirement.
10) As per GOI gazette CG-DL-E-04032021-225641, Dtd:-03.03.2021 sub rule no (9),
vehicles manufactured on and after the 1st day of April, 2021 In the case of new
models, and 31st day of August, 2021, in the case of existing models, shall be fitted
with airbag for the person occupying the front seat, other than the driver and the
requirement for such airbag shall be as per AIS 145, as amended from time to
time, till the corresponding Bureau of India standards (BIS) specification are notified
under the Bureau of India Standards Act,
Note: All submitted Documents must be self-attested by party.
2). Financial Qualification requirement
1) Copy of PF registration compulsory.
2) Copy of PAN no.
3) Copy of GST Registration.
4) Copy of power of attorney as the case may be.
5) Copy of partnership deed if any / Power of attorney.
6) Copy of Road Tax,
7) Online payment of EMD & tender fee.
8) Valid licence of driver.
The bidders have to submit online attested copy of their tender documents along with
the necessary certificates as mentioned in above Technical & Financial Criteria.
Note :- Above technical criteria is for technical scrutiny after opening the technical bid.
However, the GETCO reserves the right to award the work to one or more bidders,
considering their technical and financial capacity OR to reject any or all tenders or
accept any tender without assigning any reason thereof.
Signature of Bidder Superintending Engineer (TR)
With rubber stamp Trans. Circle, NAVSARI.
Seal & Signature of Bidder
LIST OF DOCUMENTS SUBMISSION
Mandatory to upload on-line only (pdf file)
No. Particulars
1 Scan of Demand Draft of Tender Fee Amount / Online payment receipt
2 Scan of Demand Draft of EMD Amount / Online payment receipt
3 Provident Fund Code Number Documents
4 GST Registration Number Documents
5 Nature of Firm:
Partnership deed/Latest Form-G/ POA/Authorized Signatory Certificate for
Self-Affidavit/POA/Authorized Signatory Certificate for Proprietorship
6 PAN Number Document
7 Filling Annexure 1 to
8 Copy of RC book Registration of Taxi/Maxi passing vehicle
9 Road (Contract carriage) permit of vehicle
10 PUC certificate (regularly renewed as per RTO rules)
11 Driving license of LMV cab & Badge. (Taxi base)
12 Taxi passing certificate minimum (6+1) persons.
13 vehicle fitness certificate from RTO.
14 Comprehensive Insurance certificate covering period up to date.
Quotation of new proposed vehicle as per tender requirement.
Seal & Signature of Bidder
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE, NAVSARI
1) The Vehicle is to be hired for a maximum 3000 Km/Month.
2) Rates for excess Km travelled by hired vehicle beyond 3000Km’s per month is
admissible occasionally, with written permission of circle head.
3) Any excess travel of vehicle beyond 3000Km’s by the office in-charge of the vehicle shall
be under the written/verbal approval of circle head and the same shall be regularized by
an office note giving clear reasons for travelling beyond stipulated Km’s.
4) All road tolls/bridge tolls shall be reimbursed on production of proof of payment along
with monthly bills.
5) The vehicle to be offered for hiring shall be in up-to-date condition including the tubes,
tyres, engine as well as condition of outside body. The passenger vehicle (Sedan and
SUV/MUV/Nine seater) to be offered shall not have been registered before 3 years and
loading vehicle (Truck, pick up and utility) shall not have been registered before 5 years
on the date of tender opening. However, in case of a very poor response or to break off
the likely cartel, a relaxation can be granted for One year with the permission of circle
head. However, the officer placing the order will decide the condition of vehicle is tiptop.
6) The period of the contract shall be for Two years. The period further One year can be
extended for mutual agreed terms as per same rates, terms & conditions for maximum
two times. i.e. total Extension can be given of two years in two segments of one each
year, if required. However, in case of poor service provided by the contractor, circle head
shall be empowered to terminate the contract after one year.
7) The undersigned reserves right for extending contract by three months without obtaining
any confirmation and for a period of 12 months by obtaining confirmation / mutual
8) The contractor shall immunize company’s personal against any claim arising out of
accidents or misbehavior of the drivers. The vehicle shall be kept properly insured all the
time to cover the 3rd party risk and simultaneously immunized company on account of
likely claims from public, police dept. Etc.
9) The vehicle shall be utilized for survey of transmission lines, sub-stations etc. of GETCO
or other office work under GETCO Navsari or anywhere in GETCO in Gujarat. The
general use of vehicle is for monitoring, supervision, testing etc. work to transport man &
material, used on Kaccha/Pakka road/Cart track where vehicle approach is possible.
Seal & Signature of Bidder
10) The bills for travelling of the vehicle shall be paid on monthly basis.
11) Driver shall be preferably below the age of 40 yrs and never above 55 yrs. The lodging
and boarding of driver shall be borne by owner.
12) If the contractor fails to provide a vehicle, the deduction from his RA bill should be made
on prorate considering the monthly rate payable within 26 days per month.
13) If the contractor fails to provide a vehicle on any day, as per contract, penalty of
Rs.2000/- per day per vehicle will be recovered from current RA bill and also vehicle will
be hired from other agency, and if required by paying higher rate, in that case, difference
of rates will be recovered from contractor.
14) The driver should provide with enough money to cover the cost of Diesel/Patrol, repairs
and incidental expenditure while in journey. Driver should provide mobile phone facility
for communication. Driver should always keep all documents relating to vehicle such as
R.C.books, insurance, valid license and PUC certificate or any other important
documents in original copy with vehicle
15) Contractor should appoint a driver with valid license according to vehicle. Driver must not
be addicted of any habits. Changing of driver shall be intimated by contractor to concern
user of vehicle in prior.
16) If the contractor fails to execute the order successfully, the order will be got completed
through agency and if required to pay higher rates, in that case, difference will be
recovered from the contractor.
17) No price variation will be payable on cost of oil, tyres, tube etc. Only changes in price of
will be adjustable. Contractor must quote prices on the basis of prevailing 15 days before
the due date of tender. This basic rate shall be indicated in the offer.
18) For every ten paise increase in price of fuel, price of one paise per Km shall be payable
and for every ten paise decrease in prices of fuel, price of one paise per Km shall be
deductible. This will be applicable to the actual Km travelled during the month.
19) The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets,
technical Data Sheets and specified elsewhere.
20) The vehicle shall be utilized for any other official purpose of GETCO as per EIC.
21) If vehicle is released or used at or after 01.00 AM ie in mid night, it will be considered as
night halt and paid accordingly. And overtime charges will not be payable.
22) The contractor shall make his own arrangement of boarding and lodging of his drivers,
Agents and servents.
Seal & Signature of Bidder
23) Vehicle hired should be displayed board in paint with words “ON DUTY GETCO”. After
contract over than destroy/discard/re paint of white colour this displayed in short it,
display board is remove from your vehicle.
24) If the vehicle sent by the contractor is not as per the specification, charges will not be
paid though the vehicle is used because of emergency.
25) RTO rules, insurance rules & safety rules are to be complied by contractor and Driver.
Also labour and P.F. laws are to be strictly compiled.
26) Before starting journey, vehicle driver must be in the position to have the log book of
journey of the registered vehicle and it must be filled up the vehicle user officers by
mentioning opening and closing km of the journey
27) The starting and closing kilometres will be admissible from the point of starting and
closing of journey. This will be considered from Head quarter & back. No additional
Kilometres will be allowed for to and for journey from the head quarter i.e. mentioned in
tender notice Log book of the vehicle is also to be filled up day to by the user/officers
mentioning the place visited by him along with the duration of journey, travelled and duly
28) The contractor shall employ qualified and well behaving drivers having valid permanent
for driving vehicle as per RTO and insurance rules. This shall be subjected to scrutiny
and checks by the officer in charge handling the execution of the contract from time to
time. If any legal liability occurs on account of any lapse in this regards, the same will be
at contractor’s account. The driver should behave courteously and respectfully with
travelling officers. He should be free from habits of smoking/drinking intoxicant liquors.
The driver sent with the vehicle shall have valid license for driving and Taxi badge. No
any allowance shall be paid by GETCO to the driver. Any misbehaviour of the driver will
be reported to vehicle owner and if vehicle owner fails to provide new driver within
hrs. GETCO reserves the right to terminate the contract or hire vehicle from open market
at risk and cost of the contractor. Driver should wear a uniform supplied by contractor,
well-dressed driver having good manners with necessary tools and tackles and Contact
facility (Mobile-Phone) to meet the normal breakdown while on road. The lodging and
boarding of driver shall born by contractor.
29) The contractor shall provide standby vehicle to ensure prompt substitute arrangements
should any hired vehicle go off road.
30) The vehicle once inspected and approved by the Engineer for hire shall not be changed
or substituted by the contractor except on orders from the Engineer or on becoming
defective/off road due to accident, breakdown, etc. In such an event, the contractor shall
give immediate intimation to the Engineer. Where a change of vehicle is likely to last for
more than one-week prior approval of this Engineer shall have to be taken.
31) The vehicle to be deployed shall be inspected by authorized representative of GETCO at
any time During period of contract & if any defect is noticed, it should be rectified by the
contractor. GETCO shall have right to reject vehicle if condition of vehicle is not
Seal & Signature of Bidder
32) In case of breakdown of vehicle or in case of a vehicle not acceptable to GETCO the
contractor will immediately replace the same by good one within shortest time (say within
1 hour only). Failure to replace the vehicle will entitle GETCO to impose penalty
equivalent to the average daily hiring charges for that period or actual expenditure done
whichever is higher for the period, for which vehicle is under breakdown and not been
accepted by GETCO.
33) The speedometers recording the kilometres by the vehicle should always be maintained
in working conditions. If at any time, the speedometer goes out of order, the kilometre
travelled will be admissible according to route kilometres till the speedometer is brought
back in to working condition. No average shall be admissible based on the earlier
journeys to the same places.
34) Any change in driver and Vehicle due to unavoidable circumstances shall be
immediately intimated to in charge i.e. JE/DE/EE with reasons for the change.
35) The S.D. shall be refunded to successful contractor only after satisfactory completion of
the contract or on its termination by the GETCO due to its own reasons. The GETCO
reserves the rights to recover any dues, outstanding against the contractor from the S.D.
or towards any loss caused to the GETCO owing to negligence or default of the
contractor, his servants or agents. The refund shall be done only on production of No
Objection Certificate of all concerned officers.
36) The vehicle driver shall report to in charge officer of vehicle on daily basis. Non-reporting
of the Drivers shall be treated as absent and shall be liable for penalty.
37) The Vehicle must be on the name of the contractor.
38) The Gujarat Energy Transmission Corporation Ltd. shall have right to hire the vehicle
from other Agency at the risk and cost of the contractor, in case of default to provide
vehicle in time and as specified. in that case, difference of rates will be recovered from
the contractor’s current R.A. Bill over and above of penalty.
39) You have to comply with all the legal formalities of RTO Office pertaining to vehicle. You
have to submit copies of R.C. book, Comprehensive Insurance Policy for contract period,
Pollution Control Certificate, Taxi Passing Permit etc on acceptance of the order. PF
code number, Pan No. and Service Tax registration have to be submitted separately
40) In case of any dispute or any discrepancy as regard to the tender and the terms of
conditions of the contract, The Superintending Engineer, Navsari will be the final
authority and binding to the Tenderer.
41) Before the execution of the contact, the contractor shall be required to give the vehicle’s
Numbers, RC book copy, Taxi passing certificate, all RTO documents and the name of
Driver with copies of comprehensive Insurance of the Vehicle, photo copy of the License
of the driver, Insurance copy for the driver, contact number and address of the driver to
the officer of GETCO.
42) For participation in tender, the ownership of vehicle is not necessary. Contractor can
provide third party's vehicle. In such case, bidder shall have to execute the agreement
binding that the whole responsibility about any risks shall pertain to him & not to third
Seal & Signature of Bidder
party. The format of same is attached herewith. The provided third party vehicle shall be
same throughout the contract period. In special case, only one time change of vehicle
shall be allowed, meeting all the terms of contract & on taking prior approval of
competent authority.
Safety Air Bag for Vehicle_.pdf
Superintending Engineer
GETCO, Transmission Circle, Navsari.
We agree with all the terms and conditions of GETCO as mentioned in this tender.
Signature of Bidder with rubber stamp
Seal & Signature of Bidder
GENERAL INSTRUCTIONS TO THE BIDDERS
a) PART-I Technical and commercial bid. b) PART-II Price bid.
The Documents (Self attested as mention above in Qualification Requirement for
Bidders and price bid shall be submitted through n-Procure (ncode) only and price bid
will be opened of those tenderers who are considered technically acceptable.
The Tender will be downloaded from the site and can be submitted on or before due date
along with tender fee by Demand Draft payable at NAVSARI on any nationalized Bank and
same shall be kept in cover for EMD. The tender shall be ignore / rejected in case of
tender fee & EMD is not submitted.
The Tenders must be sent by Registered Post only so as to reach the office of Suptd.
Engineer, GETCO, Transmission Circle – Navsari on or before due date & time of physical
submission specified in tender notice. Due care should be taken to see that the tenders sent
are posted early enough to ensure their delivery by the prescribed date or even earlier.
No tender shall be accepted / opened in any case after due date and time of receipt of
tender irrespective of delay due to postal service or any other reasons and GETCO
shall not assume any responsibility for late receipt of tender.
First the EMD and Tender fee will be opened and if the payment by for EMD and tender fee
are found OK, then only Technical Bid Cover will be opened which may be noted. The
exemption in payment of EMD shall be considered in case of NSIC / SSI Unit has provided
valid certificate as documentary evidence regarding it. Tenders submitted without payment of
Earnest Money Deposit by the firm will be rejected without entering in to further
correspondence in this regard and no reference will also be made.
The Tenderers are forbidden from furnishing their own printed / typed commercial and other
terms and conditions.
The Tenderers shall specifically note that the Tenders are invited on percentage basis (FIRM
The Tenderers shall specifically note that the quantities not mentioned in the Tender and are
likely to vary as per the actual requirement. As such, the successful Tenderer shall have to
execute the work at the same rates of the order for the changed / increased quantities, if any,
without any extra compensation whatsoever.
The tenderers must ensure that all the Schedules are completely filled up in their tenders
and that complete information called for is given. Failure to furnish full and complete details
or furnishing vague information would make the tender liable for rejection.
The Tenderer shall be deemed to have satisfied himself with all the conditions and
circumstances affecting the prices and possibility of executing the work. The bidder shall fix
his prices taking into account the site and its surroundings, approach roads etc. No idling /
mobilizing / demobilizing / remobilizing or any other type of claim shall be admitted and paid
on any part of the work.
The tenderer should fill in all Schedules and submit all the details called for in this
specification in prescribed Performa only.
Seal & Signature of Bidder
The tenderer should submit attested copies of Corporation Resolution of firm / power of
attorney authorizing particular person or sign tender and related documents.
After downloading the tender from site, same should be submitted only physical documents
(not price bid) in envelope of sufficient size duly super scribed about details of tender and
signed and sealed by the tenderer.
The work shall be completed within the period stipulated in the contract. However, it may be
noted that drawings shall be released progressively & site clearance arranged accordingly to
the progress of work at site. Therefore, the contractor has to organize & coordinate the works
to suit these. In the event of any delay due to the above, or due to any other reason not
attributable to the contractor, reasonable extension in the completing the work may be given
at the discretion & as decided by the GETCO but no compensation or idle charges will be
paid to the contractor on this account under any circumstances.
The period of the contract shall be for 02 (Two) Year.
The tenderers must ensure that the bidding schedules enclosed herewith are completely
filled up in their Tenders and that complete information called for is given. Failure to furnish
full and complete details or furnish vague information would make the Tenderer liable for
The works covered by this specification shall be carried out in accordance with and shall be
governed by the (Tenderer and contractor for work) GETCO which is appended herewith.
Offer should be valid for a minimum period of 180 (One
Superintending Engineer
GETCO, Trans. Circle, Navsari.
I/We accept the above conditions…
Signature & Stamp of Tenderer/Bidder
Seal & Signature of Bidder
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
TRANSMISSION CIRCLE - NAVSARI
TERMS & CONDITION FOR VEHICLE HIRING
1) Type of vehicle:
Mentioned in Tender Notice
2) Area of Traveling:
Anywhere in Gujarat. (for 3000KM/Month).
3) ACCIDENT LIABILITY:
The contractor shall at all-time indemnifies GETCO and its officers, servants and
agent against all third party claims, what so ever (Including but not limited to)
property losses/ damages, personal accident, injury or death of persons of any sub-
contractor, and/or agents of the contractor and/or of GETCO, damage to the property of
GETCO, arising out by the Hired vehicle, the contractor shall bare at his own cost and
initiative at all times till the successful completion of the contract period. Contractor shall
have to maintain comprehensive insurance policy in respect of all insurable liabilities,
under Motor Vehicle Act, workman’s compensation act, Personal injuries act, Emergency
risk insurance act, Approved by Secretary/GETCO.
If due to any reason what so ever, the GETCO has to make any payment, for vehicle or
driver etc. the amount so paid by GETCO payable by the contractor to GETCO and all
such payment shall be recovered by GETCO from the dues payable to the contractor
and/or from the security deposit of the contractor. Balance amount if any is still payable by
contractor; it has to be paid immediately to GETCO.
It is the whole and sole responsibility of the Vehicle Owner during accident to pay
compensation or damages to the persons involved as per law or Govt. Act.
4) Parking charges/Toll tax:
The parking charges at the railway station, Airport or any public/private places for the
vehicle when utilized by GETCO would be admissible subject to the production of such
parking slips. These slips may be submitted along with the monthly bills for reimbursement
of these parking charges & same way, Toll taxes will be paid on production of documents
along with monthly bill.
5) MAINTAINING OF LOG BOOK:
The contractor will be required to Maintain Log Book as per the standard format which will
record the journeys performed by the GETCO officer. The Log book when closed or at the
end of the contract, should be handed over to the GETCO for its record.
If the contractor fails to provide a vehicle; the deduction from his RA bill should be made
on prorate + applicable GST considering the monthly rate payable within 26 days per
month. And if successful bidder provides another vehicle and the vehicle is not on road
worthy straight away, the vehicle will be sent back even though temporary arrangement is
done and penalty as mentioned here in above will be levied.
In case of failure on part of the contractor to provide vehicle, the GETCO will hire another
vehicle at contractor’s risk and cost. Amount spent will be adjusted at against a penalty to
be divided as brought out here in above and also vehicle will be hired from other agency
and if required by paying higher rate, in that case, difference of rates will be recovered
from the contractor’s current R.A. Bill.
Seal & Signature of Bidder
In case the party provides the vehicle which is not worthy and in good conditions. GETCO
reserves the right to use or not to use the vehicles depending upon circumstances.
7) TERMINATION OF THE CONTRACT:
i. In case of breach of any of the terms or the conditions of satisfactory service, the
GETCO without prejudice to other clauses of the contract may cancel the work order and
terminate the contract by giving a notice less than 15 days. In the event of termination of
the contract for any condition, or for any other reason the GETCO shall forfeit security
deposit and reserves the right for recovery of liquidated damages. The contractor shall
have not to claim of compensation for any loss whatsoever sustained by him.
ii. In the event of any dispute in the contract, the decision of the GETCO shall be final and
binding to the contractor.
8) VALIDITY OF TENDER:
i. The validity of tender shall be up to 180 days from the date of opening of
tender by the GETCO and they shall be legally bound to honour and commitment
relating to tenders during this period including accepting of work order and providing
vehicles on hire if so ordered by the GETCO.
ii. After the tender is accepted a work order will be placed to the party / contractor
who fulfills the terms and conditions mentioned in the tender.
iii. The parties submitting tenders must ensure that in the event of their tenders being
accepted, they will have to meet the requirement of vehicle for the category for which
tenders are submitted. In case they fail to provide vehicle as agreed will be considered
a breach of any of the terms or the conditions of satisfactory service or defaulter on the
part of the party. Their EMD will be forfeited.
iv. The vehicles ones inspected and approved by the Engineer in charge for hire,
shall not be changed or substitute by the contractor on becoming defective / off the road
due to accidental break down, etc. In such an event the contractor will give immediate
information to the Engineer in Charge of vehicle if it likely to take more than one-week
prior approval of the Engineer shall have to be taken.
9) CONTRACTOR’S UNDERTAKING:
The bidder shall give the undertaking under: “I/We have carefully read all the terms and
conditions contained in these specifications and agreeable to the same in token
therefore. I / We have laid our signature & seal hereunder of this tender copy.”
10) SAFETY REGULATION ACCIDENT AND DAMAGE:
i. The contractor shall be responsible at his own cost in and relative to performance of the
work and contract to observed and to ensure observance of the provisions of the safety
code as herein after appearing safety and security regulations as may be prescribed by
the GETCO from time to time and such other precautions measure as shall be
necessary during working time of which, minimize the disturbance and inconvenience to
the GETCO other contractors the public and the adjoining land and property owner and
occupies and shall indemnify and keep indemnified the GETCO from all against all
losses and damage and cost, charges and expenses and penalties actions claims,
demands and proceedings whatsoever suffered or incurred by or against the owner as
the case may be virtue of any loss, alteration or accidents to any works contractor shall
be exclusively responsible for any accident, loss, damages, alteration displacement
disturbance or destruction as afore said result directly or indirectly from any break by the
contractor or his obligations afore said or upon any operation act of commission act of
the contractor.
ii. The contractor’s liabilities under the contract shall remain unarmoured notwithstanding
the existence of any insurance covering any risk damage, loss or liabilities for which the
contractor is liable to the GETCO in terms of the foregoing clauses or otherwise and or in
respect of which the contractor as indemnify the GETCO with the intent that
Seal & Signature of Bidder
notwithstanding the existence of such instance the contractor shall be and remained fully
liable for all liabilities and obligations under the contractor and indemnities to the GETCO
and the GETCO shall not be oblige to seek recourse under such police in performance
to recourse against the contractor on otherwise to exhaust any other remedy in
performance to the remedies available to it under contract.
11) IDEMNITY AND INSURANCE:
i. The contractor shall act the times indemnify and keep indemnified the GETCO its officer
servants and agents from all party claims whatsoever (including but not limited to
property and image, personal accident, injury or death of / to property or person of the
contractor and / or the GETCO ) and the contractor shall at his own cost and initiative at
all times up to the successful compliance of the defect or liability for the period specified
in clause here of take out and maintain insurance policies in respect of all insurable
liabilities under this clause, including but not limited to their party insurance and liabilities
under the motor vehicle act.
ii. Workman’s compensation actual accident act, personal injuries, insurance act,
emergency risk insurance act, and / or other industrial legislation from the time to time in
force in India with insurance companies approved by the GETCO and such policy / (i.e.)
shall be of not less limit here under / above specified reference to the mater here under /
above specified.
iii. Workman’s compensation insurance / to the limit to which compensation may be
payable under the laws of the republic.
iv. Third party insurance – body injury and property damage to the limit of not less than Rs.
1,00,000/- (Rs. One Lac only) in each earth accident at each job site and to a limit than
Rs. 5,00,000/- (Rs. Five Lacs) for all accident death at all job site or during trips
movements from one place to another place. Provided that the limits specify above shall
operate only as a specification of minimum limits for insurance purpose, but shall not any
way limit the contractor’s liability in terms of this clause to the limit(s) specified.
v. Should be contractor fail to take out and slash over keep a foot insurance as provided
for in the fore going clause the GETCO shall be entitled (But without obligation to do so)
to take and / or keep a foot such insurance at the cost and expenses of the contractor
and without prejudice to any other rights or remedied of the GETCO this behalf to deduct
Incurred thereof from the dues of the contractor and recover from the properties or
assets situated anywhere in India without reference to the limit of jurisdiction for this
12) SAFETY CODE:
i. Contractor shall adhere to safe practices if any for vehicle and guard against hazardous
and unsafe working condition and shall comply with GETCO rules as set from the time to
ii. NO EXEMPTION: Notwithstanding the above there is nothing in this to exempt the
contractor from the operation or any other act or rules in force in the Republic of India
iii. In addition to the contractor shall abide by the safety code provision as per CPV/D safety
code framed from the time to time.
The Bidders must carefully read, and understand the clauses, terms and conditions
incorporate here to avoid any inconvenience later on to themselves and to this office.
Seal & Signature of Bidder
Superintending Engineer
GETCO, Trans. Circle, Navsari
We agree with all the terms and conditions of GETCO as mentioned in this tender.
Signature of Bidder
With rubber stamp
U]HZFT V[GHL" 8=Fg;DLXG SM5M"Z[XG ,LDL8[04
JT]"/ SR[ZL4 GJ;FZL
UF0L EF0[ ZFBJF DF8[GF lGIDM VG[ XZTMov
Seal & Signature of Bidder
s!f UF0L O[ZJJFG] SFI"1F[+ ;ÙD VlWSFZLGL ;}RGF VG];FZ U]HZFT EZDF\ SM.56 HuIFV[ ,. HJFGL ZC[X[P
H[YL UF0L 8[1FL 5F;L"U ;FY[ TYF ,FI;g; WZFJTF VG]EJL 0=F.JZ ;FY[ SMg8=FS p5Z EF0[ VF5JFGL
ZC[X[PUF0L !Z S,FS EF0[ VF5JFGL ZC[X[P
sZf VFZP8LPVMPGF lGIDMG];FZ VF5GL UF0L VMG ZM0 CMJL H~ZL K[P TYF T[G[ ,FUTF TDFD 8[1F4;JL";
8[1F4.g:IMZg;48[1FL q D[1FL 5ZDL8 JU[Z[ 5]ZF 8F.D GF EZ[,F CMJF HM.V[ T[DH 5M,L; BFTF DFZOTYL H[ S\.
SFI"JFCL YFI T[GL AWLH HJFANFZL 9[S[NFZ GF XLZ[ ZC[X[P
s#f VF5GF JFCGG]\ DM0, S\5GLV[ D]SZZ SZ[, JQF"G]\ CMJ]\ H~ZL K[P H]GF JFCG p5Z 8[g0Z D/L XSX[ GCLP
s$f JFCG GF ;\5}6" DZFDT GF BR"GL TDFD HJFANFZL 9[S[NFZ GF XLZ[ ZC[X[P
s5f S\5GLGF lGID VG];FZ T[DH lGI]ST SZ[, VlWS'T VlWSFZL GL ;}RGF VG];FZ JFCG 5FlS"U VYJF SFRF Z:TF 5Z
R,FJJFGL ZC[X[P T[DH T[DGL ;}RGF VG];FZ ZF+L ZMSF6 SZJFG]\ ZC[X[P
s&f S\5GLGF lGID VG];FZ lS,MDL8Z TYF SFDULZL V\U[GL ,MUA]S VF5[ OZHLIFT 56[ ZFBJFGL ZC[X[PH[ 9[S[NFZ GF
lA,GL R}SJ6L DF8[ VlWS'T Z[S0" U6FX[PT[ Z[S0" DF\ S\5GLG[ VlWS'T SZ[, VlWSFZLGL ;lC SZ[, CMJL H~ZL K[P
s*f VF5[ ZMS[, 0=F.JZGF 5UFZ4EyYF TYF ZC[JF4HDJFGL ;UJ0 H[ T[ 9[S[NFZ[ SZJFGL ZC[X[P
s(f SM.56 XZTJF/]\ S[ VW]Z] EZ[,]\ 8[g0Z :JLSFZJFDF\ VFJX[ GCL\P
s)f 9[S[NFZ[ T[G]\ UF0LEF0FG]\ 5FS]\ AL, (Invoice) NZ DlCG[ +6 GS,MDF\ GLR[GL lJUTM ;FY[ VF5JFG]\ ZC[X[PH[G]\
R]SJ6]\ AL, D?IF 5KL V[S DF;GL V\NZ RTGS YL SZJFDF\ VFJX[P
s!_f TDFZ[ +FlCT jIlSTGM ;\5}6" lJDM ,LWFGL GS, V[U|LD[g8 SZTL JBT[ ZH] SZJFGL ZC[X[P
s!!f ;NZ C]\ SMg8=FS8 DF8[GL ;DI DIF"NF 02 JQF"GL ZC[X[P5Z\T] H~Z 50I[ V[S ALHFGL ZFHLB]XLYL OZLYL V[H EFJ
VG[ XZTM DFgI ZBFX[ TM V[S JQF" DF8[ SMg8=FS8 ,\AFJL VF5JFDF\ VFJX[P
s!Zf VF5[ EZ[, 8M,8[1FqA|LH 8[1FGL V;, 5FJTL AL, ;FY[ AL0JL H~ZL K[PH[ ZSD VF5GF AL, ;FY[ 5ZT SZL XSFIP
s!#f VF5[ ZMS[, 0=F.JZGL p\DZ 55 JQF" SZTF\ JWFZ[ G CMJL HM.V[PT[DH C[JL ,FI;g; WZFJTM CMJM HM.V[P0=F.JZGL
p\DZ $_ JQF" SZTF\ VMKL .rKGLI K[P
s!$f 0Lh,q8FIZqVFSl:DS DZFDTq;lJ";L;qVS:DFTGF\ SFZ6;Z VF5G]\ JFCG ZMSFI[,]\ ZC[X[PTM T[GL VJ[HLDF\ VF5[
T[8,F lNJ;M DF8[ ALHL UF0L 5]ZL 5F0JFGL ZC[X[PT[D KTF\ HM T[D SZJFDF\ lGQO/ HFVM TM 5|tI[SlNG GF
~PZ__Zqv + GST 5|DF6[ AL,DF\YL SF5L ,[JFDF\ VFJX[ T[DH VJ[HL DF\ SZ[, ALHF JFCGG]\ EF0]\ A[DF\YL H[ JW]\
CX[ T[ J;], SZJFDF\ VFJX[P
s!5f ;NZC] SMg8=FS8 DF8[ VF5[ VF5G[ D/[, VM0"ZGF 5@ 5|DF6[ S\5GLDF\ ;LSI]ZL8L 0L5MhL8 5[8[ EZJFGF ZC[X[PHM
9[S[NFZ VWJrR[ SMg8=FS8 ZN SZLG[ RF<IF HX[ VYJF VgI XZTMGM E\U SZTF H6FX[ TM 0L5MhL8 H%T SZJFG[ 5F+
YX[ VG[ S\5GLG[ H[ JWFZFGM BR" YX[ T[ TOFJTGL ZSD J;], SZJFDF\ VFJX[P
s!&f S\5GL HIFZ[ 5MTFGL DF,LSLG]\ JFCG 5]Z]\ 5F0[ VYJF VF5GF JFCGGL H~ZLIFT pEL G YFI TM S\5GL SM.56 ;DI[
SM.56 HFTGL GM8L; VF%IF l;JFI VF5[, D]NT NZdIFG SMg8=FS8 ZN AFT, SZL XSX[P
s!*f ;FDFgI 5|`GMGF lGZFSZ6 DF8[GL ;TF GLR[ ;CL SZGFZ VlWSFZLzLGL ZC[XP[
s!(f SNFR SM. SFG]GL U]\R pEL YFI TM GJ;FZL SM8"GL CS]DT DFgI U6FX[P
s!)f 9[S[NFZ[ JFCG p5Z VFU/GF EFU[ ” .DZHg:FL 0I]8L H[8SM” RMbB]\ JF\RL XSFI T[ ZLT[ ,BJFG]\ ZC[X[PT[ p5ZF\T
UF0L ;FY[ :5[Z jCL, TYF ALHF TFtSF,LS DZFDT SZL XSFI T[JF ;FWGM UF0LDF\ ZFBJFGF\ ZC[X[P
sZ_f VF5GF JFCG DF8[ H~ZL 0Lh,4VM.,4:5[Z5F8"; S[ DZFDT DF8[GF ;3/F BR"GL HJFANFZL VF5JFGL ZC[X[P
sZ!f 9[S[NFZ[ V[DG]\ AL, DF.,M DL8Z D]HAGF SLPDLPGF VF\S 5|DF6[ R}SJJFGF VFJX[ SNFR HM DF.,M DL8Z A\W CX[
VYJF VIMuI ZLT[ OZT]\ H6FX[ TM T[ DF8[ SLPDLPGL IMuI U6TZL SZL GLR[ ;CL SZGFZ VlWSFZLGL ;]RGF D]HA
sZZf 9[S[NFZGF JFCGG[ ;\HMUMJ;FT HM SM.56 HFTGM 3FTS VYJF lAG3FTS VS:DFT YX[ TM T[GF J/TZGL ;3/L
HJFANFZL JFCG WZFJGFZ 9[S[NFZGF XLZ[ ZC[X[P
sZ#f SM.56 HFTGF SFZ6 VF%IF l;JFI V[SH VYJF AWFH 8[g0Z l:JSFZJF S[ G l:JSFZJF T[ AFATGM VlWSFZ GLR[
;lC SZGFZ VlWSFZLzLG[ VAFlWT ZC[X[ VF AFAT[ VF5GM SM. CSS NFJM DFgI ZBFX[ GlCP
sZ$f VF5[ ZMS[, 0=F.JZGL SFDULZL V\U[ SNFR SM. V;\TMQF VYJF SM.56 HFTGL OZLIFN pNEJX[ TM VlWSFZLGL
;]RGF D?I[YL 0=F.JZ G[ TFtSF,LS AN,JFGL jIJ:YF 9[S[NFZ[ SZJFGL ZC[X[P
sZ5f 8[g0Z ,[TL JBT[ H[ UF0LGF N:TFJ[HL 5]ZFJF VF%IF CX[ T[H UF0L VF5JFGL ZC[X[PSNFR ;\HMUMJ;FT UF0L
AN,JFGL H~ZLIFT pEL YFI TM GLR[ ;lC SZGFZ VlWSFZLGL H~ZL D\H]ZL D[/JJFGL ZC[X[P
Seal & Signature of Bidder
sZ&f VF5G]\ JFCG HIFZ[ D];FOZLDF\ CMI tIFZ[ 0Lh, BZLNJF ZL5[ZL\U SZFJJF TYF VgI BR" DF8[ VF5[ VF5GF 0=F.JZ
5F;[ 5]ZTF GF6F VF5JFGL jIJ:YF SZJFGL ZC[X[P
sZ*f HIFZ[ HIFZ[ 8FIZv8I]A VYJF VM.,DF\ EFJ JWFZM YX[ T[ DHZ[ VF5JFDF\ VFJX[ GlC 5Z\T] HIFZ[ ;ZSFZzL
TZOYL 0Lh,DF\ EFJ JWFZM / 38F0M SZ[, CX[ T[ TFZLB YL JWFZF / 38F0F GF ~FP_P!_ p5Z ~FP_P_! 5|DF6[ SZ[,
SLPDLPp5Z EFJ TOFJT VF5JF / SF5JF DF\ VFJX[ CF,GM 0Lh,GM A[h EFJ NXF"JJFGM ZC[X[P
sZ(f p5ZMST TDFD ;]RGFVMG]\ R]:T56[ 5F,G SZJFG]\ A\WGSTF" ZC[X[P
sZ)f ,[AZ SFINF VgJI[ 0=F.JZG[ JLS,LVMO VF5JFGM ZC[X[ VG[ VMO GF lNJ;[ VJ[H 0=F.JZ DMS,JFGM ZC[X[P
s#_f V9JF9LS ZÔ ;FDFgI ;\HMUMDF\ ZlJJFZ[ ZC[X[P H[DF\ O[ZOFZ SZJFGM VAFlWT VlWSFZ S\8|ŸM,L\U VMOL;ZGM ZC[X[P
SM>56 TC[JFZGL ZÔ ZC[X[ GCLP
s#!f 0=F.JZ 5F;[ DMAF., OMG CMJM .rKGLI K[P
s##f #___ s +6 CHFZ f lSPDLPp5ZF\T D];FOZL DF8[ 5|lT lSPDLP GM EFJ ~FP!_P5_ 5|DF6[ R]SJJFDF\ VFJX[P
s#$f UF0LDF\ .DZHg:FL ,F.8 T[DH 9\0F DLGZ, JM8Z HUGL jIJ:YF SZJFGL ZC[X[P
p5ZMST TDFD lGIDM VG[ ;}RGFVM D[\ wIFG 5}J" JF\R[, K[ VG[ T[ wIFGDF\ ZFBL D[\ DFZF EFJ EZ[, K[P
H[8SM4JT]"/ SR[ZL4 GJ;FZL
9[S[NFZG]\ GFD oPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
9[S[NFZGL ;lC oPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
5]Z]\ ;ZGFD]\ oPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
8[,LOMG G\AZ osVMf oPPPPPPPPPPPPPPPPPPPPPPPPPPPPPsZC[fPPPPPPPPPPPPPPPPPPPPPPPPP
DMAF., G\AZoPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE - NAVSARI
Seal & Signature of Bidder
COMMERCIAL TERMS & CONDITIONS
1) GENERAL TERMS AND SPECIFICATIONS:
The rates of said work quoted by the contractor will be valid for the period of six months
from the Date of opening of the tenders. (a) Rates quoted in the tender shall be
considered final; thereafter any change of rates quoted shall not be taken in to
consideration. (b) GST will be reimbursed on production of challan for amount paid to
concern department as proof on actual execution of work.
The rates may please be submitted as per Schedule-B. The rates shall be given both in
figures and words. There should not be any over writing and crossing. If any changes are
to be done crossing the original writing the same should be countersigned by the tenderer.
In case of difference between rates in figures and words the rates most favourable to the
GETCO shall be considered which have been quoted.
3) SIGNING OF AGREEMENT:
The contractor will have to sign agreement as per GETCO’s rules in the prescribed
proforma of the GETCO. The cost of the required stamp paper will have to be borne by the
4) INCOME TAX: Income tax as per government rules will be deducted from the all bills.
5) Arithmetical error will be rectified on the following basis:
a. If there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price
shall be corrected. If there is a discrepancy between the total bid amount and the sum
of total costs, the latter shall prevail and the total bid amount will be corrected
accordingly. If there is a discrepancy between work and figures, the amount
advantageous to the Owner will prevail. If the bidder does not accept the correction of
the errors as above, his bid will be rejected and the amount of EMD will be forfeited.
consistent with each other.
b. In the case of any inconsistency in the prices furnished in the specified prices
schedules to be identified in Bid Form, the Owner shall be entitled to consider the
highest price for the purpose of evaluation and for the purpose of award of Contract
use the lowest of the prices in these schedules.
c. Prior to the detailed evaluation, the Owner will determine the substantial
responsiveness of each bid to the Bidding Document. For purpose of these Clauses, a
substantially responsive bid is one which conforms to all the terms and conditions of
the Bidding Document without material deviations. A material deviation is one which
affects in any way the prices, quality, quantity or delivery period of the equipment,
completion of works or which limits in any way the responsibilities or liabilities of the
Bidder of any right of the Owner as required in these specifications and documents.
The Owner’s determination of a bid’s responsiveness shall be based on the contents of
the bid itself without resource to extrinsic evidence.
d. A bid determined as not substantially responsive will be rejected by the Owner and
may not subsequently be made responsive by the Bidder by correction of non-
6) PAYMENT OF SECURITY DEPOSIT:
Seal & Signature of Bidder
The contractor will have to pay the security deposit at 5% of the order Value on receipt the
LOI and will have to be paid in the form of demand Draft drawn in favour of GETCO within
10 days from the date of LOI issued by this Office.
The security deposit will be refunded only after the completion of execution period of
contract successfully.
7) PAYMENT OF BILLS: -
1. Payment will be made every month on actual work executed for which contractor has
to submit the bill with Invoice, Muster roll & PF Challan on monthly basis. The Bill
should be submitted along with copy of log book to Deputy Engineer (Testing)
Navsari., Payment will be done by The Superintending Engineer (TR) GETCO C.O.
2. Rs. 10.50 per km is fixed for every km above first 3000 km and Extra per hour Rate 100.00.
3. No advance for hiring of vehicle shall be paid.
8) Tender without payment of EMD & Tender Fee will be liable to be rejected.
10) STATUTORY VARIATION:
11) All legal complication or disputes are subject to NAVSARI jurisdiction only.
12) Contractor will abide by and fulfil all the terms and conditions and general terms and
condition of the contact for the service as mentioned in this tender.
13) All other general terms and conditions as prevailing in the GETCO shall be applicable to
14) The contractor offer shall be valid up to 180 days from the date opening of tender for
processing the work order.
15) The undersigned reserve rights to reject any or all the tenders without assign any
reasons thereof. Issuance of Blank Tender does not automatically qualify the tenders for
award of the contract.
16) The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the
lowest or any tender. The Superintending Engineer (TR) C.O. Navsari reserve the right
to reject any or all tender without signing any reasons whatsoever.
Superintending Engineer
GETCO, Transmission Circle,
I/We accept the all above terms & conditions…
Signature of Bidder
With rubber stamp
Seal & Signature of Bidder
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
To create environment where Business Confidence is built through Best Business Practice
and is fostered in an atmosphere of trust and respect between providers of goods and
services and their users for the ultimate benefit of society as the nation.
GETCO COMMITMENT
Seal & Signature
o To maintain the highest ethical (GETCO Authorized Signature)
standards in business and Name :
o Ensure maximum transparency to Designation:
the satisfaction of stakeholders.
o To ensure to fulfill the terms of
agreement / contract and to
consider objectively the viewpoint
of parties. o Not to bring pressure /
o To ensure regular and timely recommendations outside GETCO
release of payment on due dates to influence its decision.
for work done. o Not to use intimation, threat,
o To ensure that no improper inducement or Pressure of any kind
demand is made by employees or on GETCO or any of it’s employees
by anyone on our behalf. under any circumstances.
o To give maximum possible o To be prompt and reasonable in
assistance to all the Vendors / fulfilling the contract, agreement,
Suppliers / Service provider and legal obligations.
other to enable them to complete o To provide goods and / or services
the contract in time. timely as per agreed quantity and
o To provide all information to specifications at minimum cost of
suppliers / contractors relating to GETCO.
contract / Job which facilitate him o To abide by the general discipline
to complete the contract / job to be maintained in our dealings.
successfully in time. o To be true and honest in furnishing
o To ensure minimum hurdles to information including payment to
Vendors/ suppliers / contractors in agents / sub-agent.
complete of agreement / contract/ o Not to divulge any information
work order. business details available during
Seal & Signature of Bidder
the course of business relationship
to others without the written
consent of GETCO.
o Not to enter into carter / syndicate /
understanding whether formal /
non- formal so as to influence the
Seal & Signature
(Party’s Authorized Person)
Seal & Signature of Bidder
Fill the red color blanks with your details in below format
Format for LOI Letter of Acceptance
(To be submitted on firms letter-head. Duly stamped & signed)
Ref. No. Date :
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Navsari
Sub: Latter of acceptance of LOI
We hereby agree, admit and acknowledge the receipt of your above referred Acceptance of Tender for
________________________________________. We hereby further agree to all the terms and
conditions mentioned in the tender, LOI and A/T unconditionally.
Yours faithfully,
Seal & Signature of Bidder
CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
This Agreement is made at the___(DD)___ day of __(MM-YYYY)___ in the Christian Year Two
thousand fourteen between M/s. _____________________________________(name of company)
________________ (address of office) (hereinafter referred to as “THE CONTRACTOR” which
expression shall unless excluded by or repugnant to the contract include its successors or permitted
assigns) of the ONE PART and the Gujarat Energy Transmission Corporation Ltd, having their Head
office at Vidyut Bhavan, Race Course, Baroda 390 007 (hereinafter called “The GETCO” which
expression shall unless excluded by or repugnant to the context include its successors or assigns) of the
other part. WHEREAS the aforesaid GETCO has accepted the tender of the aforesaid contractors for
hereinafter called “the works” and more particularly described and enumerated or referred to in the
specification, terms and conditions prescribed in the order letter, covering letter and other letters and
schedule of price which for the purpose of identification have been signed by Shri
____________________________________ on behalf of the contractors and by Superintending
Engineer, Navsari on behalf of the GETCO, a list whereof is made out in the Schedule here under
written and all of which said documents are deemed to form part of this contract and included in the
expression “The works” wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned. AND WHEREAS THE GETCO has accepted the tender of contractors for the
construction of the said works for the sum of Rs. ________________________ Rupees
to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
1. The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein or there from respectively or are reasonably necessary for
the completion of the works as mentioned and at the times, in the manner and subject to the
terms and conditions and stipulations contained in this contract, and in consideration of the due
provision, executions, supply and completion of the works agreed to by the contractor as
aforesaid the Board doth hereby covenant with the contractor to pay all the sums of moneys as
and when they become due and payable to the contractors under the provisions of the contract.
Such payment to be made at such times and in such manner as is provided by the contract.
2. The conditions and covenants stipulated here-in-before in this contract are subject to and without
prejudice to the rights of the Board to enforce penalty for delays and / or any other rights
whatsoever including the right to reject and cancel on default or breach by the contractor of the
conditions and the covenants as stipulated in the general conditions, specifications, forms or
tender schedule etc. attached with GETCO’s Order No.
The contract value, extent of supply & erection works, delivery dates, specifications and other
relevant matters may be altered by mutual agreement and if so altered shall not be deemed or
construed to mean or apply to affect or alter other terms and conditions of the contract and the
general conditions and the contract so altered or revised shall be and shall always be deemed to
have been subject to and without prejudice to said stipulation.
List of documents forming part of the contract:
Seal & Signature of Bidder
1. GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated
2. GETCO order No. Dtd. _____ / ______/ 20__
3. Contractor’s acceptance of order vide letter no. _______________.
4. Contractor’s Partnership Deed Dtd. ________________.
5. Contractor’s Power of Attorney / Board Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties here to have set their hands and seals this day and month, year first
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and behalf of M/s. __________________ (Signature)
In the presence of (Full Name, Address and Signatures)
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and on behalf of Gujarat Energy Transmission Corporation Ltd., Navsari.
In the presence of name, Full address and Signature:
Seal & Signature of Bidder
UNDERTAKING CUM INDEMNITY BOND
(Non Judicial Stamp Paper of Rs. 300/-)
Know all men by these present that we, M/s (name
Know all men by these present that we, M/s Dhinoja Privet Limited bhaving principal
place of business at address 35,Sahaj Green 2, Somnath Road At & PO- Mehsana, Ta.
Mehsana Dist-Mehsana Mehsana-384001 (hereinafter called "the contractor" which
expression shall where the context so admits, include their heirs, executors,
administrators and legal representatives, successors etc.) through our authorized
representative Shri/ Mrs. hereby entered into a contract
with Gujarat Energy Transmission Corporation Ltd.,(hereinafter called "GETCO"
,which expression shall where the context so admits, include their executors,
administrators, legal representatives ,successors etc.) vide A/T No.
dated . with respect to hiring of vehicle for GETCO ,at on annual rate
contract basis, whose details are specified in the said A/T.
The Contractor through t h i s Undertaking cum Indemnity Bond indemnifies GETCO
against any responsibility toward loss/accidents, damages, to the contractor's
staff/equipment or any other person/vehicle, due to non-observance of safety measure
or non-compliance of any other statutory or non-statutory liabilities. The contractor
undertakes that in case he/she sub-lets the contract to any third party or provide the
vehicle to GETCO wherein he is not the owner of that vehicle/s, then also, the contractor
shall be responsible to comply all statutory/non-statutory liabilities, safety measures
& other liabilities of such third party owners of vehicle. The contractor o n behalf of
himself and also on behalf of third party ownership of vehicle, indemnifies GETCO that
incase of any financial or non-financial implications onto GETCO, then Contractor shall
make good for it and will bear all the implications, burdens (financial/non-financial
liabilities) to its effect, throughout the contract period.
Seal & Signature of Bidder
THIS BOND IS MADE AND EXECUTED ON THIS (DD) DAY OF (MM-YYYY)
AT (Name of Place) in presence of witness.
Witnesses: (Signature of Contractor/POA HOLDER)
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
Details of experience in last two years from the due date of tender
Nos. of Order Status
Order sub- Date of fully if order
Sr. Name of Order of
reference stations/f completi execute under
No. s/s value completi
no. & Date eeder on d executi
A Gujarat Energy Transmission Corporation Ltd.
B Other state electricity board
C Private Firms
List of work completion certificate submitted with technical bid
Name of the authority by
Sr.No. Name of work whom the work completion Reference No. & Date
certificate issued
Seal & Signature of Bidder
Details of the Firm
Name of the Firm
1 Address of registered office
2 Contact personnel
4 Residential Address
7 Telegraphic code
8 E-mail address
1 Address of WORK
2 Contact personnel
4 Residential Address
7 Telegraphic code
8 E-mail address
TENDERER’S DETAILS OF PERSONNEL (II-A)
Sr. Description Name Qualification Professional Remarks
No. &Details Experience
of position & details of
Seal & Signature of Bidder
Details of plant and equipment available on hand with the bidder for use on this
work. Name of the Bidder:
Sr. Name No. of Kind Capacity Age Present Remarks
No. of Units & & Location
Equipme mak Conditio
Signature of Authorised Representative
Company / Agency
NAME: _____ STATUS: Name of tendering c
Signature of Contractor Superintending Engineer GETCO, CO,
Seal & Signature of Bidder
Sr. No. Details Amount Rs. In lacs Remark
1 Annual turnover for last
2. Price of the biggest job
Signature of Authorised Representative
Company / Agency
Signature of Contractor Superintending Engineer GETCO,
Seal & Signature of Bidder
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr List of Documents
1 Registration with GETCO Class – Ref NO.___ valid up to
3 Partnership deed/Proprietor
(Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, Statement of
last three years.
6 Latest Solvency certificate. Rs. Lacs issued by Bank,
7 GST Registration No.
9 Electrical contractor license
10 Experience certificate – form 3A (As
Signature of Tenderer Company’s Round
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of
opening of the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the
case may be], along with address, telephone, fax no.
Contractor must fill up above details
Signature of Tenderer Company’s Round
Placing Vendors/Contractors for Purchase/Works in a Stop deal/Banned for business
dealing / blacklisting:
1.1. Stop deal / banned for business dealing / blacklist means debarment of parties from
participating in the tendering process.
1.1.1. Firm will mean Bidder / Licensor / Tendered / Consultant / Vendor /
1.1.2. Reasons for Putting a Firm on Stop deal / banned for business dealing /
Blacklisting is to protect the GUVNL and its subsidiary Companies from dealing
with an undesirable firm.
1.2. The list of indicative reasons for placing the firm in a Stop deal / banned for business
dealing / Blacklist are as under.
A Firm will be placed in a Stop deal / banned for business dealing / blacklist, if the Firm-
1.2.1. Has submitted fake, false or forged documents / certificates,
1.2.2. Has revised / withdrawn price bid after opening of Techno – commercial bid, until
and unless it is sought for,
1.2.3. Has tampered with the stipulated tendering procedure.
1.2.3. Has refused to accept letter of Acceptance / purchase Order / Work Order
after the same is issued by the Company within the validity period and as per
agreed terms and conditions,
1.2.5. Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
1.2.6. Has failed to provide suitable expertise for the work as per per-scheduled
1.2.7. Has failed to submit all the necessary tests reports / documents within time
schedule / as per company’s time limit, as mentioned in the LOI, if the letter of
Acceptance (LOA) is placed subject to submission of type reports / documents to
1.2.8. Has indulged in construction and erection of defective works.
1.2.9. Has supplied inferior quality / defective materials and refused to replace with
stipulated time frame, as specified by the company,
1.2.10. Has substituted materials in lieu of materials supplied by the company or has not
returned or has short returned or has unauthorisely disposed of materials / documents /
drawings / tools or plants or equipment supplied by the Company,
1.2.11. Has involved in malpractices such as bribery, corruption, fraud, canvassing and
1.2.12. Has unauthorisely obtained official company information or copies of documents,
in relation the tender / Contract.
1.2.13. Has failed to follow the stipulated mode of communication, if specified by the
endering authority / purchaser.
1.2.14. Has parted with, leaked or provided confidential / proprietary information of the
Company given to the firm only for its use (in discharge of its obligation against
an order) to any third party without prior consent of the Company,
1.2.15. Any other ground for which in opinion of the company makes it undesirable to
deal with the Firm
1.2.16. In case the State Government directs the Company to place a firm in stop
dealing / banned for business dealing / banned for business dealing / blacklisting.
1.3. Every bidder should at the time of submission of bid, give a declaration that bidder and /
or proprietor / partner / Director of the firm has not been placed on stop dealing / banned
for business dealing / blacklisting by GUVNL and It’s any subsidiary Companies as per
ANNEXURE-VIII (as per attached format).
(UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR BUSINESS
DEALING/BLACK LIST THEREOF)
Sub: Undertaking in regard to Stop Deal/Banned for Business dealing/Black list thereof.
(All bidders will have to furnish the following undertaking duly filled in, singed and
stamped for each quoted item of the tender along with the technical bid.)
signatory of M/s.
proprietor/any partner/any directors of the firm is not stop deal and/or banned for
business dealing and/or black listed by GUVNL and/or their any subsidiary company viz.
GSECL/GETCO/DGVCL/MGVCL/UGVCL/PGVCL.
Seal of the firm Signature of the tenderer
(On the letter pad of the company / Firm)
Declaration of Conflict of Interest
The Superintending Engineer,
1st Floor, Transmission Circle Office,
220kv Sub-Station Compound, GETCO
N. H. -48, Kabilpore
Ref: Tender Notice No…………………………………
With reference to above your tender Notice No……………………………………………..
For the work of………………………………………………………………
We do not have any conflict of interest with any other bidder who has submitted the bid in this tender.
Yours Faithfully,
(Signature of the Tenderer)
(On the letter pad of the company / Firm)
Declaration of Relationship with employee
The Superintending Engineer,
1st Floor, Transmission Circle Office,
220kv Sub-Station Compound, GETCO
N. H. -48, Kabilpore
Ref: Tender Notice No…………………………………
With reference to above your tender Notice No……………………………………………..
For the work of………………………………………………………………
We do not have any type of relationship with any current employees of GETCO.
Yours Faithfully,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Tender Notice.pdf
2. Technical bid with QR TCC and GCC.pdf
Download all tender documents and submit your bid