| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC KALAPPURACKAL H RAMAPURAM BAZAR P O KOTTAYAM 686576 | RAMAPURAM | KOTTAYAM | KERALA | 686576 | ₹6.3 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹6.5 L+₹15,803.56 (2.51%)Rejected-AOC | ₹6.5 L+₹15,803.56 (2.51%) | L2 | Rejected-AOC Higher |
Tender Value
₹6.3 L
EMD Value
₹15,800
Closing Date
28 May 2026, 3:30 pmClosed
ASSISTANT EXECUTIVE ENGINEER, ESD, RAMAPURAM
Electrical Sub Division Near 33 KV Substation KSEB Ltd. Ramapuram
Reconductoring of Kondadu Ramapuram Temple Transforme
2026_KSEB_851256_1
TENDER/2026-27/5249/6 DTD 15.05.2026
Open Tender
Electrical Works
Percentage
120 days
Electrical Sectio, Ramapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,534
₹15,800
16 Jun 2026
16 May 2026
30 May 2026
16 May 2026
28 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles | |||||
| 1.01 | Labour charges for loading LT PSC pole from the
stacking place and unloading the same at work site
(transportation by any vehicle). | 41 | Nos | 478.82 | ₹19,631.62 |
| 1.02 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of
all items except street light fitting etc. and conveyance of
all materials except pole. | 3 | Nos. | 3,500.18 | ₹10,500.54 |
| 1.03 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. | 3 | Nos. | 1,887.05 | ₹5,661.15 |
| 1.04 | Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance of
all materials. | 8 | Nos. | 1,191.82 | ₹9,534.56 |
| 1.05 | Insertion of one LT PSC pole in existing three phase OH
line including digging &back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of
poles | 5 | No | 2,371.09 | ₹11,855.45 |
| 1.06 | Providing Stay for LT poles including digging & back
filling pit in ordinary soil | 20 | Nos. | 938.82 | ₹18,776.4 |
| 1.07 | Reconductoring (changing) one km LT single phase 2
wire OH Copper/old AAC/ACSR conductor line with new ACSR Rabbit conductor including conveyance of materials to
and from the stacking place. | 4.37 | Km | 19,945.18 | ₹87,160.44 |
| 1.08 | Providing concrete muffing of size 0.45x0. 45x1.5m
(0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. | 1 | Nos | 4,028.29 | ₹4,028.29 |
| 1.09 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 8 | Km | 3,142.26 | ₹25,138.08 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1438326.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.29 MB
formoftender.pdf
Tender Documents • 0.15 MB
TandCeng.pdf
Tender Documents • 0.12 MB
declrtn.pdf
Other Document • 0.08 MB
perfrma.pdf
Other Document • 0.10 MB
cvrdetails.pdf
Tender Documents • 0.12 MB
BOQ_1438326.xls
BOQ • 0.31 MB
TandCmal.pdf
Tender Documents • 0.21 MB
kondaduTE.pdf
PDF • 0.35 MB
Timeextension.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .