| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.9 LAccepted-Finance R O VILLAGE KALYANA P O KANLOG TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹38.9 L | L1 | Accepted-Finance Being a L1 |
| 2 | L2₹39.0 L+₹15,345.81 (0.39%)Rejected-Finance VILLAGE AND PO SHIYAH TEHSIL BHUNTAR DISTT KULLU H P | ₹39.0 L+₹15,345.81 (0.39%) | L2 | Rejected-Finance Being a 2nd Lowest |
| 3 | L3₹40.7 L+₹1.9 L (4.79%)Rejected-Finance | ₹40.7 L+₹1.9 L (4.79%) | L3 | Rejected-Finance Being a L3 |
| 4 | L4₹46.0 L+₹7.1 L (18.4%)Rejected-Finance VPO PUID TEHSIL AND DISTT KULLU HP | ₹46.0 L+₹7.1 L (18.4%) | L4 | Rejected-Finance Being a L4 |
| 5 | L5₹46.0 L+₹7.2 L (18.4%)Rejected-Finance WARD NO 6 LOWER DHALPUR DISTT KULLU HP | ₹46.0 L+₹7.2 L (18.4%) | L5 | Rejected-Finance Being a L5 |
Tender Value
₹43.8 L
EMD Value
₹88,000
Closing Date
29 Aug 2026, 5:00 pmClosed
Er. B.C. Negi
Executive Engineer, Kullu Division, HP. PWD, Kullu
(SH- C/O Breast Wall at RDs 4/800 to 4/822 wire crated Breast wall at Rds 2/065 to 2/085, 8/740 to 8/765, 8/765 to 8/790, 8/920 to 8/945, 8/945 to 8/970, 14/300 to 14/330 and Retaining Wall at Rds 15/565 to 15/575 and 18/205 to 18/215)
2026_PWD_141798_1
PW/KD/TA/2026-27-6751-58 Dated-17.08.26
Open Tender
Civil Works - Roads
Percentage
60 days
Kullu
As refer to bid document
9 documents required · 9 mandatory
₹2,000
₹88,000
15 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
29 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of land slide,slips/ debris/ muck in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slops and disposal of cut materials upto any lead as per technical specification 302.3.5 and 1611 within all leads and lift of materials and as per direction of Engineer-in-charge. | 423.3 | Per Cubic metre | 148.45 | ₹62,838.88 |
| 2 | Excavation in hilly area in manual means including cutting and trimming of sides, slopes and disposal of excavated earth work with a lift upto 1.50 mtr (One point fifty metre) and lead up to 20 mtr (Twenty metre) as per drawing and technical specification clause 1603.1.1 within all kind of soil within all leads and lift of materials and as per direction of Engineer-in- charge. | 539.3 | Per Cubic metre | 296.55 | ₹1,59,929.41 |
| 3 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, any dressing removal of stumps and other deleterious material and disposal upto any lead of 50 mtr (Fifty metre) and lift complete including dressing of sides and bottom and backfilling in trenches with excavated material in ordinary soil within all leads and lift of materials and as per direction of Engineer-in-charge. | 193.52 | Per Cubic metre | 445.35 | ₹86,184.13 |
| 4 | Providing and laying concrete for plain/ reinforced concrete 1:6:12 (One cement :Six sand : Twelve graded stone aggregate in open foundations complete as per drawing and technical specification clause 802,803,1202 and 1203 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. | 11.5 | Per Cubic metre | 4,887.7 | ₹56,208.55 |
| 5 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803,1202 and 1203 PCC 1:4:8 (One cement : four sand : Eight graded stone aggregate ) within all leads and lift including carriage of materials in all respect and as per direction of Engineer-in- charge. | 259.9 | Per Cubic metre | 5,528.8 | ₹14,36,935.12 |
| 6 | Random rubble Stone masonry work in cement mortar for sub structure complete as per drawing and technical specifications clause 702,704,1202 and 1204 Random rubble masonry in cement mortar 1:6 (One cement : Six sand ) Random rubble masonry within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. | 93.96 | Per Cubic metre | 5,462.75 | ₹5,13,279.99 |
| 7 | Construction of dry ruble masonry for retaining walls, breast walls, revetment walls and parapets etc. for sub structure and super structure complete as per drawing and technical specification clause 704.6 & 1302.5 including hauling/carriage of all labour equipment and materials to various location through all modes of transportatin within all leads and lift of materials and as per direction of Engineer-in- charge. | 115.31 | Per Cubic metre | 3,145 | ₹3,62,649.95 |
| 8 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8 Granular material. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. | 22.5 | Per Cubic metre | 1,609.95 | ₹36,223.88 |
| 9 | Providing and laying of boulder apron laid in wire crates with 4 mm (Four millimetre) dia GI wire conforming to IS: 280 and IS: 4826 in 100 mm x 100 mm (One hundred x One hundred millmetre) mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25 kg (Twenty five kilogram) within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. | 514.8 | Per Cubic metre | 3,244.5 | ₹16,70,268.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.74 MB
sbd.pdf
Tender Documents • 2.40 MB
BOQ_210470.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .