| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance MAIN ROAD KUJJU RAMGARH JHARKHAND 825316 | KUJJU | RAMGARH | JHARKHAND | 825316 | L1 | Admitted-Finance | |
| 2 | L2₹2.8 L+₹4,520 (1.67%)Admitted-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | - | Rejected-Technical not submitted relevant asked shortfall documents |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L2 | NEW NATIONAL ELECTRICAL WORKS L1 |
|---|---|---|---|---|---|
| 2.00A):-Rewinding/Repairing of 250KVA,11KV/440V Transformer | |||||
| 3.00 | Cost of Copper wire/strip,13SWG | 200 | KG | 1,300 ₹2,60,000 | 1,280 ₹2,56,000 Lowest |
| 4.00 | Cost of insulating materials @15% of cost of copper wire | 1 | L/S | 39,000 ₹39,000 | 38,400 ₹38,400 Lowest |
| 5.00 | Labour Cost of @15% of cost of copper wire | 1 | L/S | 39,000 ₹39,000 | 38,400 ₹38,400 Lowest |
| 6.00 | Less Scrap value @ 60%@ cost of copper wire | 1 | L/S | 1,56,000 ₹-1,56,000 | 1,53,600 ₹-1,53,600 Lowest |
| 7.00B):-Rewinding/Repairing of 100KVA/440V Transformer | |||||
| 8.00 | Cost of Copper wire 11 SWG | 80 | KG | 1,300 ₹1,04,000 | 1,280 ₹1,02,400 Lowest |
| 9.00 | Cost of insulating materials @15% of cost of copper wire | 1 | L/S | 15,600 ₹15,600 | 15,360 ₹15,360 Lowest |
| 10.00 | Labour Cost @15% of cost of copper wire | 1 | L/S | 15,600 ₹15,600 | 15,360 ₹15,360 Lowest |
| 11.00 | Less Scrap value Sl No-1 @ 60% of cost of copper wire | 1 | L/S | 62,400 ₹-62,400 | 61,440 ₹-61,440 Lowest |
Tender Value
Refer Docs
EMD Value
₹3,800
Closing Date
3 Sept 2025, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Repairing/rewinding of 250KVA, 11KV/440V transformer and 100KVA,3.3KV/440V transformer at Topa Project under Kuju Area.
2025_CCL_342245_1
GM (K)/EnM/eTender/25-26/135
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹3,800
17 Oct 2025
23 Aug 2025
4 Sept 2025
23 Aug 2025
3 Sept 2025
23 Aug 2025
23 Aug 2025 - 30 Aug 2025
Amount
A):-Rewinding/Repairing of 250KVA,11KV/440V Transformer
Cost of Copper wire/strip,13SWG
Cost of insulating materials @15% of cost of copper wire
Labour Cost of @15% of cost of copper wire
Less Scrap value @ 60%@ cost of copper wire
B):-Rewinding/Repairing of 100KVA/440V Transformer
Cost of Copper wire 11 SWG
Cost of insulating materials @15% of cost of copper wire
Labour Cost @15% of cost of copper wire
Less Scrap value Sl No-1 @ 60% of cost of copper wire
Supply and fixing of HT Bushing with studs
Supply and fixing of LT Bushing with studs
Total impact of GST for the purpose of CTC
M/S ADITYA ENTERPRISES (BID ID -1179794)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .