Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC PALERI HOUSE OORAKAM P O YARAMPADI MALAPPURAM 676519 | MALAPPURAM | MALAPPURAM | KERALA | 676519 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.7 L+₹24,968.30 (4.58%)Rejected-AOC NULL | L2 | Rejected-AOC L2 |
Tender Value
₹5.7 L
EMD Value
₹14,339
Closing Date
23 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
O/o Assistant Executive Engineer PWD ,Bridges subdivision Palakkad
Retender-GENERAL-Investigation work for the Construction of Njettarakadavu bridge across Kunthi river connecting Karimbuzha panchayat in Ottappalam LAC and Kumaramputhur panchayat in Mannarkkad LAC in Palakkad Dt.-Investigation work
2024_PWD_665861_2
PWD/BR/TR/19102/2022_3_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
palakkad
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,265
Yes
₹14,339
Yes
18 Jul 2024
14 Mar 2024
27 Mar 2024
14 Mar 2024
23 Mar 2024
14 Mar 2024
Amount
Appendix 1
56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.14.a:Cross sectional details - River.
56.15.a:Hydraulic Velocity Calculation - River.
56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.5.b:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In Water
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.
OD147147/2022-2023:Conducting traffic survey at two station for seven days 24 hours continuously including charges of shed and furniture, labour charges of survey assistants. cost of stationaries etc.. complete and compiling the data data and submitting same in hard and soft copy etc..as directed by the departmental officers at site
OD147149/2022-2023:Testing charges for CBR test of soil samples collected from the site in the laboratory including the charges of labour engaged for conducting the test in the lab etc including the collection of subgrade soil sample carefully by excavating pit for laboratory test and refilling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
Appendix 2 MORTH ROAD
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
G S Infrastructure
Bidder Name
G S Infrastructure
ABU THAHIR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1042515.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .