| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | ₹5.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹5.3 L+₹29,468.38 (5.84%)Rejected-Finance VILL LAXMINARAYANPUR P O KAK KALINAGAR P S HARWOOD POINT COASTAL DIST SOUTH 24 PGS | 24 PARAGANAS SOUTH | WEST BENGAL | 700070 | ₹5.3 L+₹29,468.38 (5.84%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.4 L+₹37,733.07 (7.48%)Rejected-Finance | ₹5.4 L+₹37,733.07 (7.48%) | L3 | Rejected-Finance L3 |
| 4 | L4₹5.6 L+₹51,281.75 (10.2%)Rejected-Finance | ₹5.6 L+₹51,281.75 (10.2%) | L4 | Rejected-Finance L4 |
| 5 | L5₹5.6 L+₹56,294.77 (11.2%)Rejected-Finance | ₹5.6 L+₹56,294.77 (11.2%) | L5 | Rejected-Finance L5 |
Tender Value
₹6.8 L
EMD Value
₹13,549
Closing Date
18 Aug 2026, 3:00 pmClosed
Executive Engineer,KID
Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas, Pin-743347
Emergent Sluice 5 nos and ghoges ( 3 nos) repairing at Sundarban Embankment damaged due to full Moon Kotal on and from 30.07.2026 to 03.08.2026 in between ch 28.025 km to ch 28.050 Km and 29.310km to 29.420km at Mouza- Narayanpur, Budakhali,Rajnagar
2026_IWD_1038059_17
WBIW/EE/KIDIVISION/e-SNIT- 09 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
7 days
Namkhana
Please refer Tender documents.
6 documents required · 6 mandatory
₹13,549
Yes
3 Sept 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. dia. and upto 7.5 cm. dia.(Dia to be measured at mid length). | - | Metre | 34.56 | - |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary | 1 | Metre | 13.11 | ₹13.1 |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | - | Metre | 26.22 | - |
| 4 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB: Volume of earth/sand filled bags should not be less than 0.028 cum/bag. | - | Each | 8.34 | - |
| 6 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | - | Each | 3.58 | - |
| 7 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | - | Cum. | 96.54 | - |
| 8 | Extra rate over Item No 16 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. | - | Cum. | 42.9 | - |
| 9 | Extra rate over Item No16 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre. | 1 | Cum. | 14.3 | ₹14.29 |
| 10 | Fabrication , Supply, erection and commissioning of new Slide type vertical lift regulator service gates of Distributtories / Branch Canal / Minor Canal / Channel as per IS : 5620 - 2000 / Latest Revision consisting of skin plate, vertical and horizontal girder, stiffener etc. made of MS material consisting of angle, channel, beam, plate, flat etc. conforming to IS : 2062 - 2011 / Latest revision manufactured as per approved drawing and direction of Engineer - in - charge. The cost includes cost of Materials, Machinaries, manpower, cutting Aligning, drilling, Welding, Finishing, Consumables, Carriage and overheads with all leads and lifts complete as per specification (without painting). | - | Kg. | 154.93 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_2550111.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .