Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹65.4 Cr
EMD Value
₹12 L
Closing Date
9 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Additional Chief Engineer (P&C)
Supply, installation, testing & commissioning of conversion of (1) 66kV Tankara - Bhutkotda line, (2) 66kV Bhutkotda - Mitana Line, (3) 66kV Hadala - Kagdadi Line, (4) 66 kV Dhrol - Piyava Line, (5) 66KV Piyava - Latipar line (6) 66kV Morbi - Unchimandal 2 line (7) 66kV Unchimandal2 - Khareda line (8) 66kV Morbi - Vajepar tap Ameli line (9) 66kV Morbi-Morbi B line (now LILO at Vajepar ) (10) 66kV Wankaner - Mahika line no 1 (11) 66kV Hadamtala - Road Pipliya line with ACSR DOG conductor into equivalent HTLS Conductor (Equivalent weight of ACSR DOG conductor with Higher Ampacity) (Except Gap Type conductor) of Gondal Circle
363046
ACE(P&C)/Contracts/E-539/Uprating/66kV/S&E
Open
Electrical Works
Works
Vadodara
44 documents required · 36 mandatory · 8 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹12 L
17 Nov 2026
17 Nov 2026
17 Nov 2026
9 Dec 2026
17 Nov 2026
180 days
General 23.1 (a) The estimated cost for of 23.1 (a) The estimated cost of Tender is
Conditions of Tender is more than Rs. 100 lacs, the more than Rs. 100 lacs, the EMD is
Contract/ EMD is payable as under: payable as under:
and its sub- 50 % of EMD by DD in favor of 50 % of EMD by DD in favor of
clauses Gujarat Energy Transmission Gujarat Energy Transmission
Corporation Ltd. on any Corporation Ltd. on any
Scheduled Bank in Vadodara Scheduled Bank in Vadodara and
and Balance 50 % by Bank Balance 50 % by Bank Guarantee
Guarantee from any from any Nationalized Bank in the
Nationalized Bank in the format provided herein.
format provided herein.
(b) The estimated cost of tender is less
(b) The estimated cost of tender is than Rs.100 Lacs, the EMD is payable as
less than Rs.100 Lacs, the EMD is under: -
payable as under: -
100 % of EMD by DD in favor of
100 % of EMD by DD in favor Gujarat Energy Transmission
of Gujarat Energy Corporation Ltd. on any
Transmission Corporation Ltd. Scheduled Bank in Vadodara.
on any Scheduled Bank in
(c) Payment by Cheque / Coop Bank
(c) Payment by Cheque / Coop Bank Guarantee/ Company Guarantee is not
Guarantee/ Company Guarantee is permissible.
not permissible.
(d) Validity Period: - The offer should be
(d) Validity Period: - The offer should valid for a minimum period of 180 days
be valid for a minimum period of 180 from the date of opening of Technical bid.
days from the date of opening of
Technical bid. (e) Payment of EMD will be accepted
by RTGS / NEFT / online or Demand
Seal & Signature of Bidder
-- draft or Banker’s cheque or Pay order
or Bank Guarantee
23.2 The bid security is required to 23.2 The bid security is required to
protect the owner against the risk of protect the owner against the risk of
Bidder’s conduct, which would Bidder’s conduct, which would warrant
warrant the guarantee forfeiture, the guarantee forfeiture, pursuant to
pursuant to relevant paras elsewhere relevant paras elsewhere
The bid guarantee shall be made The bid guarantee shall be made payable
payable to the Owner without any to the Owner without any condition
condition whatsoever. whatsoever.
23.3.1 Any bid not secured in 23.3.1 Any bid not secured in
accordance with Para 23.1 above will accordance with Para 23.1 above will be
be rejected by the Owner as non- rejected by the Owner as non-
responsive. No exemptions are made responsive. No exemptions are made in
in the furnishing of the security. the furnishing of the security.
23.3.2 Unsuccessful Bidder’s bid 23.3.2 Unsuccessful Bidder’s bid
security/EMD will be security/EMD will be returned/refunded
returned/refunded on
forthwith on finalization of tender i.e.,
finalization of tender or three
months-from the date of once the award of contract, after opening
submission of tender of price bids. However, the Bid Security/
whichever is later. EMD of the bidder ranked next (L2) to the
bidder determined as the successful
bidder (L1) shall be retained by GETCO,
along with the Bid Security/ EMD of the
successful bidder. Bid Security/ EMD of
L2 bidder shall be returned immediately
after the Letter of Acceptance/ Award
(LOA) is issued by GETCO to the
successful bidder and acknowledged/
accepted by the successful bidder or the
Contract is signed with the successful
bidder, whichever event occurs earlier.
However, if there is a delay of 21 days or
more in aforesaid events reckoned from
the date of approval of award of contract
by the competent authority, as aforesaid,
the Bid Security/ EMD of the L2 bidder
shall be released immediately after the
said period of 21 days.
If the validity of the bid expires and any
bidder chooses not to extend the bid
validity, the Bid Security/ EMD of such
bidder shall be returned forthwith.
23.3.3 The successful bidders, Bid 23.3.3 The successful bidders, Bid
Security will be discharged Security will be discharged upon,
Seal & Signature of Bidder
upon, furnishing the contract furnishing the contract security deposit /
performance guarantee performance guarantee.
23.4 The bid guarantee may be 23.4 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid
a) If a Bidder withdraws its bid during the period of bid validity
during the period of bid validity specified by the bidder on the bid
specified by the bidder on the Form:
bid Form: b) If a bidder refuses to accept the
b) If a bidder refuses to accept contract or fails to commence the
the contract or fails to works (including supplies within
commence the works thirty days of letter of award of
(including supplies within thirty contract)
days of letter of award of
2. Part –I 86.0 Terms of Payment 86.0 Terms of Payment
General The payment for materials to be The payment for materials to be supplied
Conditions of supplied and erected shall be made and erected shall be made as under only
Contract/ as under only after execution of the after execution of the contract
Clause 86.0 contract documents/furnishing of documents/furnishing of Security Deposit
and its sub- Security Deposit and on execution of and on execution of transmission line
clauses transmission line work. work.
86.1 For supply
86.1 For Supply
86.1.1 Interest Bearing Advance
(i) Interest Bearing Advance
(Optional*): Ten percent (10%) of the
total Ex-works price component of
Tower / Tower Parts (including Bolts &
Nuts) and all other materials shall be
paid as an interest bearing initial
advance, at the rate of interest as per (ii)
below, after signing the Contract
Agreement and on submission of the
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance}], from a Public Sector Indian
bank/Scheduled, Commercial Bank in the
form attached herewith as Annexure-i
(The guarantee shall be initially valid up
to 90 days after the Time of Completion
and shall be reduced at the end of every
Quarter prorata to the advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
Provided further that the Proforma
Invoice(s) for advance payment along
Seal & Signature of Bidder
with all supporting documents is
submitted by the Contractor to the
Employer within 3 months from the date
of Letter/ Notification of Award. In case
the Contractor does not submit the
requisite documents including applicable
Bank Guarantee(s) /Security(ies) within
the aforesaid period, the advance shall
not be payable. The Contractor shall,
within 7 days from the date of receipt of
Advance, furnish an Advance Receipt
Voucher to the Employer, as prescribed
under the GST Law.
Note: * This payment is an optional
payment. The Contractor has the option
of taking the interest bearing initial
advance or otherwise. The option for
advance payment is to be indicated by
the bidder in its bid as per the format
attached herewith as Annexure–iii and
shall be deemed to be part of the bidding
scheduled referred as SCHEDULED-21
to be submitted by the bidder with
(ii) Interest rate applicable on advance
payment to the Contractor shall be at the
rate equal to one-year MCLR rate [One-
year Tenor rate p.a.] published by State
Bank of India prevailing as on the date of
drawl of advance. The said interest rate
shall remain fixed and shall be applicable
till the advance amount is fully repaid.
The interest will be charged considering
proportionate adjustment of advance
against progressive payment as per
86.1.2 below. The interest shall be
calculated on the daily progressive
balances outstanding as on the date of
recovery/adjustment. It is the Employer’s
understanding that as per extant
provisions, GST is not payable on
interest paid on the amount of Advance.
The Contractor is, however, advised to
check the position from their own
sources. If payable even at later stage,
the same shall be to the Contractor’s
account and Employer shall not
reimburse any GST on this account.
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior to
the scheduled Time of Completion, failing
Seal & Signature of Bidder
which the whole amount of advance
along with interest thereon shall be
recovered immediately from the
payments due to the Contractor.
The contractor may however, return / pay
to GETCO the unadjusted advance
amount at any stage during the execution
of the work along with the accrued
interest thereon till the time of return /
payment. Alternatively, the contractor
may also request GETCO for early
adjustment of the advance along with
accrued interest.
Further, the Contractor shall submit the
certificate of Tax Deduction at Source
(TDS) on interest within 3 months from
the end of the quarter in which
adjustment of advance has been made
for claiming refund from Employer. No
claim for refund will be entertained after
end of the aforesaid period of 3 months.
Further, while submitting the TDS
Certificate the details of Contract No,
Project, Region, Quarter etc to which the
TDS certificate pertains, shall also be
submitted tallying the amount with the
TDS Certificate.
In case, the Contractor opts not to take
interest bearing advance as above, it
would be mandatory for him to submit the
documents listed at Sl. No. (i) (c) above
within twenty-eight (28) days of issuance
of Letter/ Notification of Award.
86.1.2 Progressive Payments
(i) 80% of supply value for each (i) (a) 70 % of supply value for fabricated
consignment of material on tower parts & stubs and 80% of supply
submission of invoice along with value for all other line material, hardware
100% GST, duties, F & I shall be paid and accessories etc. if contractor opts to
within 30 days from the actual take interest bearing initial advance or
material receipt date mentioned in SR
Note after verifying the following (b) 80% of supply value instead of 70% of
documents by field office and duly supply value for fabricated tower parts &
recorded. stubs and 90% of supply value instead
of 80% of supply value for all other line
A. Tax invoice. material, hardware and accessories etc.,
B. Delivery challan. if contractor opts not to take interest
C. Endorsed RR / LR copy. bearing initial advance or has opted to
D. Dispatch clearance certificate / take interest bearing initial advance but
letter wherever applicable. the advance payment has become
Seal & Signature of Bidder
E. E Way Bill, if applicable inadmissible for each consignment of
material on submission of invoice along
with 100% GST, duties, F & I shall be
paid within 30 days from the actual
material receipt date mentioned in SR
Note after verifying the following
documents by field office and duly
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate / letter
wherever applicable.
E. E Way Bill, if applicable
(ii) 10% of the of supply value for
(ii) 10% payment out of balance 20% fabricated tower parts & stubs shall be
of supply value shall be paid on paid progressively on completion of
completion of erection & testing of the erection of complete tower (including tack
transmission line and completion welding and earthing) and furnishing of
certificate from Engineer-in-charge completion certificate from Engineer-in-
and Chief Engineer (Procurement & charge and Chief Engineer (Projects).
Contracts)) or equivalent.
(iii) Balance 10% of supply value shall be
(iii) Balance 10% of supply value shall paid on quarterly basis on erection
be paid on successful commissioning (including stringing) of transmission line
of transmission line against in stretches cumulatively not less than
completion certificate and only after 10% of original length of line in all
settlement of material account respects and rectification of
statement of items supplied, used, defects/deficiencies of corresponding
erected and successful stretch on progressive basis and on
commissioning is settled for complete completion certificate from Engineer-in-
lot and balance 10% will be release charge and Chief Engineer (Projects).
only after passing of final bill. No This payment shall be released on
extra payment will be released for submission along with the invoice for first
the tower materials and line such payment, of an unconditional &
materials which are not required for irrevocable Bank Guarantee of 10% of
completion of line if supplied contract price of supply portion, initially
excess during execution of work valid till 3 months beyond the scheduled
and recovery will be made in final date of completion of testing &
bill accordingly. commissioning of the transmission line
and its taking over by the GETCO and
shall be extended from time to time till the
actual date of successful completion of
testing & commissioning of line and its
taking over by the GETCO.
GETCO should accept the Tower and
line materials if excess as per
approved check survey only. No other
payment will be made and no other
material shall be accepted.
(iv) Welfare Cess
(iv) Welfare Cess The modality of payment/
reimbursement of welfare cess will be
Seal & Signature of Bidder
The modality of payment/ On receipt of A/T, the contractor /
reimbursement of welfare cess will be bidder will get them registered under
as under. Welfare Cess Act and submit the
documentary evidence to the concern
On receipt of A/T, the contractor / office.
bidder will get them registered under Before release of payment of first
Welfare Cess Act and submit the R.A.Bill, the contractor has to submit
documentary evidence to the the documentary evidence of
concern office. registration. Only thereafter, the bill will
Before release of payment of first be processed for payment.
R.A.Bill, the contractor has to submit Before release of payment of
the documentary evidence of subsequent R.A.Bills, the contractor
registration. Only thereafter, the bill has to submit the documentary
will be processed for payment. evidence of payment of welfare cess of
Before release of payment of previous R.A.Bill.
subsequent R.A.Bills, the contractor Before release of payment of Final Bill,
has to submit the documentary the contractor has to submit the
evidence of payment of welfare cess documentary evidence of payment of
of previous R.A.Bill. welfare cess of previous R.A.Bill as
Before release of payment of Final well as the final bill.
Bill, the contractor has to submit the If the R.A.Bill happens to be first and
documentary evidence of payment final bill, then before release of
of welfare cess of previous R.A.Bill payment, contractor has to submit
as well as the final bill. documentary evidence of registration
If the R.A.Bill happens to be first and under Welfare Cess Act and evidence
final bill, then before release of of payment of welfare cess.
payment, contractor has to submit The welfare cess shall be reimbursed
documentary evidence of to the contractor on submission of
registration under Welfare Cess Act copy of documentary evidence of
and evidence of payment of welfare payment by observing due
cess. formalities.
The welfare cess shall be
reimbursed to the contractor on
submission of copy of
documentary evidence of payment 86.2 For Erection works.
by observing due formalities.
86.2.1 A. Survey
Payment for survey shall be paid on pro-
86.2 For Erection works. rata basis on completion of survey and
approval of the same by the Employer.
86.2.1 B. Interest Bearing Initial
Advance (Optional ^^) Ten percent
(10%) at the rate of interest as per
86.2.1 B.1 1st Installment of 05% (Five)
of the total Installation price component
(excluding the price component for
survey) shall be paid on Establishment of
Contractor’s site offices, commencement
of stub setting work & certification by
Project Manager that satisfactory
mobilization for erection exists and on
submission of the following:
Seal & Signature of Bidder
(a) Proforma invoice,
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance} Plus {amount of GST
reimbursable on Advance as per the
Proforma invoice}] from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at the
end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
86.2.1. B.2 2nd Installment of 05%
(Five)^^ of the total Installation price
component (excluding the price
component for survey) shall be paid on
commencement of stringing activities &
certification of the same by Project
Manager and on submission of the
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance} Plus {amount of GST
reimbursable on Advance as per the
Proforma invoice}] from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at the
end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
(d) A declaration by the Contractor
stating that 1st Installation (5%) of
advance has been utilized against the
Seal & Signature of Bidder
mobilization works for the subject
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior to
the scheduled Time of Completion, failing
which the whole amount of advance
along with interest thereon shall be
recovered immediately from the
payments due to the Contractor.
The contractor may however, return / pay
to GETCO the unadjusted advance
amount at any stage during the execution
of the work along with the accrued
interest thereon till the time of return /
payment. Alternatively, the contractor
may also request GETCO for early
adjustment of the advance along with
accrued interest.
Note: ^^ This payment is an optional
payment. The Contractor has the option
of taking the interest bearing advance or
otherwise. The option for advance
payment is to be indicated by the bidder
in its bid as per the format attached
herewith as Annexure–iii and shall be
deemed to be part of the bidding
scheduled referred as SCHEDULE-21 to
be submitted by the bidder with Technical
Note: After release of various advances,
the rate of recovery of the advance shall
be re-adjusted.
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents as per
para B.1 and B.2 above is submitted by
the Contractor to the Employer within
months from the date of fulfillment of the
requisite activities, as per the L2 network.
In case the Contractor does not submit
the requisite documents including
applicable Bank Guarantee(s)/
Security(ies) within the aforesaid period,
the advance at B.1 & B.2 above shall not
Seal & Signature of Bidder
The Contractor, shall, within 7 days from
the date of receipt of Advance, furnish an
Advance Receipt Voucher to the
Employer, as prescribed under the GST
86.2.1 B3. Interest rate applicable on
advance payment to the Contractor shall
be at the rate equal to one year MCLR
rate [One-year Tenor rate p.a.] published
by State Bank of India prevailing as on
the date of drawl of advance. The said
interest rate shall remain fixed and shall
be applicable till the advance amount is
fully repaid. The interest will be charged
considering proportionate adjustment of
advance against progressive payment for
the work done as per 86.2.2 below. The
interest shall be calculated on the daily
progressive balances outstanding as on
the date of recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable on
Interest paid on the amount of Advance.
The Contractor may, however, advised to
check the position from their own
sources. If payable, the same shall be to
the Contractor’s account and Employer
shall not reimburse any GST on this
Further, the Contractor shall submit the
certificate of Tax Deduction at Source
(TDS) on interest within 3 months from
the end of the quarter in which
adjustment of advance has been made
for claiming refund from Employer. No
claim for refund will be entertained after
end of the aforesaid period of 3 months.
Further, while submitting the TDS
Certificate the details of Contract No,
Project, etc to which the TDS certificate
pertains, shall also be submitted tallying
the amount with the TDS Certificate.
In case, the Contractor opts not to take
interest bearing advance as above, it
would be mandatory for him to submit the
document listed at Sl. No. B1 (c) and,
B2(c) above within twenty-eight (28) days
Seal & Signature of Bidder
of issuance of Letter / Notification of
86.2.2 (i) (a) 70% payment if contractor
opts to take interest bearing mobilization
advance or (b) 80% payment instead of
(i) 90% payment of amount claimed 70% payment if contractor opts not to
covering various activities such as take interest bearing mobilization
excavation, foundation, tower advance or has opted to take interest
erection, earthing, tack welding bearing initial mobilization advance but
stringing of conductor and OPGW the advance payment has become
including insulator hoisting works
inadmissible, of amount claimed
against R.A. bills duly certified by EIC
within 30 days from the date of R.A. covering various activities such as
bill. excavation, foundation, tower erection,
earthing, tack welding stringing of
conductor and OPGW including insulator
hoisting works against R.A. bills duly
certified by EIC within 30 days from the
date of R.A. bill.
86.2.2 (ii) 10% of erection value shall be
paid in three equal parts, each on
physical construction and erection of
33% of line work including stringing of the
(ii) 10% of erection value shall be paid
Transmission Line, complete in all
against commissioning of
transmission line only after settlement respects, including rectification of
of material account statement of items defects/deficiencies on the line and
supplied, used, erected and certificate from Engineer-in-charge and
successful commissioning of Chief Engineer (Projects).
transmission line the same amount
will be release in final bill only and 86.2.3. Balance 10% of erection value
payment will be made only after shall be paid against commissioning of
passing of final bill. transmission line only after settlement of
material account statement of items
supplied, used, erected and successful
commissioning of transmission line. The
same amount will be released in final bill
only and payment will be made only after
passing of final bill.
Note: ROW is now proposed to be in the
scope of GETCO. Hence, this clause is
(iii) Payment of ROW compensation deleted.
amount will be given as below only
after submission of necessary
supporting documents.
1) 40% amount after completion
of foundation work
2) 40% amount after completion
of erection work
3) 20% amount after completion
of stringing work in all respects
Seal & Signature of Bidder
List of supporting documents:
1) Copy of form-7/12
2) Parishisht ‘A’ and ‘B’ of GoG
3) Document of Online Jantri
Rate of respective Survey No.
If online Jantri Rates are not
available, then land cost shall
be certified by competent
Revenue Authority.
4) Copy of APMC rate based on
which compensation is paid
towards damage of tree-crop
5) ‘Panchnama’ duly certified by
concern Sarpanch / Talati /
Mamlatdar or concern
Revenue Authority
6) Documents for the
compensation cost paid to
Govt. Trasurer as per GoG
Tharav for the line passing (iv) Welfare Cess
through Govt. Waste Land. /
Govt. Organization. The modality of payment/
reimbursement of welfare cess will be
(iv) Welfare Cess as under.
On receipt of A/T, the contractor /
The modality of payment/ bidder will get them registered under
reimbursement of welfare cess will Welfare Cess Act and submit the
be as under. documentary evidence to the concern
On receipt of A/T, the contractor / Before release of payment of first
bidder will get them registered under R.A.Bill, the contractor has to submit
Welfare Cess Act and submit the the documentary evidence of
documentary evidence to the registration. Only thereafter, the bill will
concern office. be processed for payment.
Before release of payment of first Before release of payment of
R.A.Bill, the contractor has to submit subsequent R.A.Bills, the contractor
the documentary evidence of has to submit the documentary
registration. Only thereafter, the bill evidence of payment of welfare cess of
will be processed for payment. previous R.A.Bill.
Before release of payment of Before release of payment of Final Bill,
subsequent R.A.Bills, the contractor the contractor has to submit the
has to submit the documentary documentary evidence of payment of
evidence of payment of welfare cess welfare cess of previous R.A.Bill as
of previous R.A.Bill. well as the final bill.
Before release of payment of Final If the R.A.Bill happens to be first and
Bill, the contractor has to submit the final bill, then before release of
documentary evidence of payment payment, contractor has to submit
of welfare cess of previous R.A.Bill documentary evidence of registration
as well as the final bill. under Welfare Cess Act and evidence
If the R.A.Bill happens to be first of payment of welfare cess.
and final bill, then before release of The welfare cess shall be reimbursed
payment, contractor has to submit to the contractor on submission of
documentary evidence of copy of documentary evidence of
registration under Welfare Cess Act payment by observing due formalities.
Seal & Signature of Bidder
and evidence of payment of welfare
The welfare cess shall be
reimbursed to the contractor on
submission of copy of documentary
evidence of payment by observing
due formalities.
3. Part –I 2.0 Tender Fee 2.0 Tender Fee
Special The tender fee plus GST as The tender fee plus GST as
Conditions of applicable specified in notice applicable specified in notice
Contract/ inviting tender is payable by inviting tender is payable by
Clause 2.0 Demand Draft (DD) at Demand Draft (DD) at Vadodara
Vadodara drawn on any drawn on any Scheduled Bank in
Scheduled Bank in favour of favour of Gujarat Energy
Gujarat Energy Transmission Transmission Corporation Ltd.
Corporation Ltd. The same will The same will be furnished in
be furnished in Cover-1 of Bid Cover-1 of Bid along with EMD
along with EMD (Bid Security). (Bid Security).
Payment of Tender fee
accepted by RTGS / NEFT /
5. Part –I 5.0 QUALIFYING REQUIREMENT a) QUALIFYING
(SCC)/ REQUIREMENT
Special [A] Technical Requirement:
Contract/ [A] Technical Requirement:
1.0 Individual Bidders
Clause 5.0 1.0 Individual Bidders
and its sub- a) The bidder shall be Original
Equipment Manufacturer a) The bidder shall be Original
(OEM). The offered high Equipment Manufacturer (OEM).
ampacity conductor/HTLS The offered high ampacity
conductor of equivalent size conductor/HTLS conductor of
and weight that of ACSR Dog equivalent size and weight that of
conductor suitable for ACSR Dog conductor suitable for
existing 66kV Towers & H-
existing 66kV Towers & H-frame
frame has to be designed,
has to be designed, manufactured
manufactured and tested as
per relevant IS/IEC/ANSI and tested as per relevant
with latest amendments. IS/IEC/ANSI with latest
b) The bidder shall have b) The bidder shall have supplied at
supplied at least 100km of least 100 km of proposed high
high ampacity ampacity conductor/HTLS
conductor/HTLS conductor of equivalent size and
conductor of equivalent weight that of ACSR Dog
size and weight that of
conductor or above size during the
ACSR Dog conductor or
last five years.
above size during the last
c) The bidder shall have carried out
c) The bidder shall have
stringing of 50 Route km of 66kV
carried out stringing of
Seal & Signature of Bidder
Route km of 66 kV & above & above voltage class
voltage class transmission transmission line on towers/H-
line on towers in any single Frame in any single year during
year during the last five the last five years. Sublet
years. experience also allowed subject to
provided Work order/PO copy of
original contract and Sub-
contractor, experience certificate
from main contractor and
statement of financial transaction
for the work order/PO are to be
submitted to ascertain experience
of line erection work of 66kV
and/or above class.
d) The proposed high ampacity
d) The proposed high
conductor/HTLS conductor of
ampacity conductor/HTLS
equivalent size and weight that of
conductor of equivalent
size and weight that of
ACSR Dog conductor of similar or
ACSR Dog conductor of higher ratings must be in service
similar or higher ratings for a minimum period of Two years
must be in service for a in India at the time of bid opening.
minimum period of one Supporting
year at the time of bid documents/Certificates of original
opening. Supporting customer to be submitted.
documents/Certificates of
original customer to be e) The bidder shall have in house
design and testing facility.
e) The bidder shall have in
house design and testing
f) The high ampacity
facility conductor/HTLS conductor of
equivalent size and weight that of
f) The high ampacity ACSR Dog conductor or above
conductor/HTLS size proposed to be supplied shall
conductor of equivalent have valid type test certificates
size and weight that of from any NABL accredited
ACSR Dog conductor or laboratory (National accreditation
above size proposed to be body of the country where
supplied shall have valid
laboratory is located) not older
type test certificates from
than 10 years & must be valid till
any NABL accredited
laboratory (National
the expiry of validity of offer
accreditation body of the considering on last date of
country where laboratory is submission of bid.
located) not older than
years & must be valid till However, Successful bidder has
the expiry of validity of to carry out all the type test as per
offer. relevant standard for the offered
Seal & Signature of Bidder
However, Successful bidder has to HTLS conductor without affecting
carry out all the type test as per delivery schedule.
relevant standard for the offered
HTLS conductor without affecting g) For experience of stringing, certificate
delivery schedule. issued by the state transmission
utilities/central transmission
g) For experience of utilities/joint Venture Company of
stringing, certificate issued Central utility / Transmission
by the state transmission Licensee from Private Sector of
utilities/central Indian Origin only shall be
transmission utilities/joint considered.
Venture Company of
Central utility / h) The bidder shall have valid Electrical
Transmission Licensee Contract License and should have
from Private Sector of GST registration, PF Registration
Indian Origin only shall be Certificate.
i) In case of bidder meet the above
h) The bidder shall have valid requirement at 1.0 (d) but not
Electrical Contract License supplied from Indian Manufacturing
and should have GST Unit, then the offered HTLS
registration, PF conductor of equivalent size and
Registration Certificate. weight that of ACSR DOG conductor
suitable for existing 66kV Towers & H
i) In case of bidder meet the
Frame shall be supplied from Indian
above requirement at
Manufacturing Unit only.
(d) but not supplied from
Indian Manufacturing Unit,
j) The bidder shall comply the public
then the offered HTLS
procurement guidelines of
conductor of equivalent
Government of India dated
size and weight that of
ACSR DOG conductor
suitable for existing 66kV
2. In case the bidder does not meet
Towers & H Frame shall be
supplied from Indian technical experience specified at
Manufacturing Unit only. 1.0 above at its own, the bidder
should associate with firm(s) to
j) The bidder shall comply form a JV/Consortium and the
the public procurement JV/Consortium shall collectively
guidelines of Government meet the requirement as per
of India dated 04.06.2020 above.
3. However, in respect of supply
2.0 In case the bidder does not
qualifications for supply
meet technical experience
specified at 1.0 above at its requirement as per 1(b) & 1(d) &
own, the bidder should 1(f), the Indian Licensee /Licensor
associate with firm(s) to form a arrangement is permitted provided
JV/Consortium and the Licensor meeting the requirement
JV/Consortium shall of 1(b) ,1(d) & 1(f) stated herein
collectively meet the above and shall also meet the
requirement as per 1.0 above. following conditions;
Seal & Signature of Bidder
3.0 However, in respect of supply I. Manufacturer / Licensee
qualifications for supply shall have adequate design
requirement as per 1(b) & 1(d) infrastructure and
& 1(f), the Indian Licensee / manufacturing facility and
Licensor arrangement is capacity and procedures
permitted provided Licensor including quality control.
meeting the requirement of
1(b) ,1(d) & 1(f) stated herein II. A qualified Licensee of a
above and shall also meet the qualified manufacturer /
following conditions; Licensor shall comply with all
the following requirements
I. Manufacturer / Licensee
shall have adequate design and furnish a Joint
infrastructure and Undertaking by the Licensor
manufacturing facility and along with the bidder in its bid
capacity and procedures as per the Performa
including quality control. enclosed at ANNEXURE-I.
II. A qualified Licensee of a a) Any design undertaken
qualified manufacturer / by the Licensee shall be
Licensor shall comply with approved by the
all the following
requirements and furnish a
Joint Undertaking by the b) Manufacturing by the
Licensor along with the Licensee shall be done
bidder in its bid as per the with the approval of the
Performa enclosed at Licensor and Employer
ANNEXURE-I. under a quality
a) Any design undertaken by the assurance programme
Licensee shall be approved by the approved and monitored
Licensor. by the Licensor.
c) Licensee must furnish
b) Manufacturing by the Licensee back-up guarantee from
shall be done with the approval of the Licensor for
the Licensor and Employer under individual and overall
a quality assurance programme performance of all
approved and monitored by the materials supplied under
Licensor. the contract.
d) Licensor must guarantee
sequential and timely
c) Licensee must furnish back-up supply of materials and
guarantee from the Licensor for submission of technical
individual and overall performance information and
of all materials supplied under the
e) The agreement between
Licensee and Licensor
(copy to be submitted
along with the bid) shall
be valid for a period of at
least five (5) years after
Seal & Signature of Bidder
d) Licensor must guarantee the guarantee period of
sequential and timely supply of equipment and materials
materials and submission of under supply is over.
technical information and data as
desired by the Employer so as to 4. Bidders under Manufacturer
meet the overall construction Authorization: -
Bidders who are not OEMs
are also eligible to quote
under manufacturer’s
e) The agreement between Licensee authorization from Indian
and Licensor (copy to be conductor manufacturer who
submitted along with the bid) shall meets the qualifying
be valid for a period of at least five requirement as per 1.0 (a, b,
(5) years after the guarantee d, e, f, i & j) and the bidder
period of equipment and materials shall satisfy all other
under supply is over. requirement as per clause
It is also mandatory for such
4.0 Bidders under Manufacturer bidders to provide the
Authorization: - manufacturer’s authorization
Bidders who are not OEMs are also as per attached Annexure –
eligible to quote under manufacturer’s I.A
authorization from Indian conductor
manufacturer who meets the Bidders quoting under
qualifying requirement as per 1.0 as manufacture’s authorization
above and the bidder shall satisfy must have valid Electrical
other requirement of 1.0. Contractor License,
It is also mandatory for such bidders registered under GST Act and
to provide the manufacturer’s should have PF Registration
authorization as per attached Certificate.
5. New bidders with proposed
Bidders quoting under manufacture’s manufacturing facilities in
authorization must have valid India:
Electrical Contractor License,
registered under GST Act and should New bidders with proposed
have PF Registration Certificate. manufacturing facilities in India
shall be eligible to bid provided
the Technical criteria as per [A]
1.0 and financial criteria as per
[B] are to be fully met jointly
with their principal as under: -
5.0 New bidders with
proposed manufacturing
(i) It should be established
facilities in India:
through authenticated
documents like land, Board of
directors of the company,
Seal & Signature of Bidder
New bidders with proposed company registration,
manufacturing facilities in collaboration documents etc,
India shall be eligible to bid that Indian unit is at the
provided the Technical criteria matured stage of construction
as per [A] 1.0 and financial
with required machinery. This
criteria as per [B] are to be
will be verified by GETCO as a
fully met jointly with their
principal as under: -
part of technical bid evaluation
prior to price bid opening. The
(i) It should be established decision of GETCO to qualify
through authenticated or not to qualify will be final and
documents like land, binding.
Board of directors of the (ii) 100% HTLS conductor
company, company offered by bidder shall be
registration, collaboration supplied from Indian
documents etc., that Manufacturing Unit only.
Indian unit is at the
(iii) The new bidder shall carry
matured stage of
out type test report as per
construction with required
machinery. This will be
technical specification before
verified by GETCO as a commencement of supply and
part of technical bid without affecting delivery
bid opening. The decision
of GETCO to qualify or [B] Financial Requirement
not to qualify will be final
and binding. 1. Bidder’s Minimum Average Annual
Turnover (MAAT) for best three
(ii) 100% HTLS conductor
years out of last five financial years
offered by bidder shall be
shall not be less than the 50% of
supplied from Indian
Manufacturing Unit only
estimated amount of this tender.
(iii) The new bidder shall carry Minimum Average Annual
out type test report as per Turnover (MAAT) of the
technical specification consortium/ Joint Venture (JV)
before commencement of company added together for best
supply and without three individual years out of last
affecting delivery five financial years shall not be
schedule. less than the 50% of the estimated
cost. However Minimum Average
[B] Financial Requirement
Annual Turnover (MAAT) for best
1. Minimum Annual Turnover (MAT) three individual years out of last
for best three individual years five financial years of the lead
out of last five financial years partner shall be at least 25% of the
shall not be less than the estimated cost & for each other
estimated cost. (For individual partners shall be at least 17% of
bidders) the estimated cost.
2. Minimum Average Annual
Turnover (MAAT) of the
Seal & Signature of Bidder
consortium/ Joint Venture (JV) Note: - For the purpose of arriving
company added together for at MAAT, revenue from operation
best three individual years out of shall be considered only excluding
last five financial years shall not non-recurring income / other
be less than the estimated cost.
income / interest income etc.
However Minimum Average
Annual Turnover (MAAT) for
best three individual years out of
2. Last financial year liquid assets
last five financial years of the should not be less than 20% of
lead partner shall be at least estimated amount of this tender.
50% & for each other partners
shall be at least 50 % of the Last financial year liquid asset of
estimated cost. the consortium/ Joint Venture (JV)
company added together should
3. If the bid is submitted for supply
not be less than 20% of estimated
portion under Licensee /
amount of offered quantities as on
Licenser agreement, then the
financial criteria under [B] 2 is to invitation of tender. However, last
be satisfied considering Licenser financial year Liquid assets of the
as one of the JV partner lead partner shall be 10% of
(Condition 3 (II) of [A] shall be estimated Cost as on invitation of
applicable). tender and for each other partners
shall be at least 7% of estimated
4. Further, in case of the bid to be cost as on invitation of tender.
furnish as a JV/Consortium
partners then each
Note: For the purpose of arriving at
JV/Consortium partners has to
furnish 5% of the overall tender
LA current assets less inventories
cost towards the B.G. in addition shall be considered.
to the 10% of the Bank
Guarantee to be submitted by 3. Bidder’s/ all the partner of
the lead partner (as security consortium/joint venture net worth
deposit). The terms, conditions for last financial years should be
& validity of all such BG’s shall positive.
5. Bidders quoting under
manufacture’s authorization will
Net worth means paid up share
have to furnish 5% of the overall capital, Share Application Money
order value towards the B.G. in pending allotment* and reserves#
addition to the 10% of the Bank less accumulated losses and
guarantee (as security deposit). deferred expenditure to the extent
The terms, conditions & validity not written off.
of all such BG’s shall be the # Reserves to be considered for
same. the purpose of net worth shall be
all reserves created out of the
6. New Bidders with proposed
profits and securities premium
manufacturing facilities in India
account but shall not include
will have to furnish 5% of the
overall order value towards the
reserves created out of revaluation
B.G. in addition to the 10% of the of assets, write back of
Bank guarantee (as security depreciation and amalgamation
Seal & Signature of Bidder
deposit). The terms, conditions * Share application money pending
& validity of all such BG’s shall allotment will be considered only in
be the same. respect of share to be allotted.
4. The bidder / all the partner of
consortium/joint venture should
not have been referred to NCLT
under insolvency & bankruptcy
code (IRP has been appointed or
liquidation proceedings have been
initiated under IBC).
Bidder to evidence the meeting of
financial criteria shall submit:
(i) CA Certificate with valid UDIN
Number failing which certificate
shall not be considered for the
purpose of evaluation and
(ii) Audited balance sheet and profit
& loss account along with the
schedules referred therein and the
auditor’s Report for the preceding
five financial years, in line with one
of the following
(a) In case last financial year’s
closing date was within 6 months
prior to bid due date and audited
Balance Sheet and Profit & Loss
account of last financial year are
not available, bidder has the option
to submit the financial details of
five previous years immediately
prior to the last financial year. For
example, in case bid due date is up
to 30th September and financial
details of immediate preceding
financial years (year ending 31st
March of same year) are not
available, the financial details of
the five previous years
immediately prior to the last
financial year may be submitted.
(b) Otherwise it is compulsory to
submit the financial details of
immediate preceding five financial
Seal & Signature of Bidder
Note: The Performance Certificate /
Certificate of Satisfactory Completion
submitted against the qualifying work
experience shall be issued by the
competent authority of the
organization for which the work was
executed, as under:
1. For works executed for
GETCO: The Performance
Certificate / Certificate of
Satisfactory Completion shall
be issued and signed by the
Chief Engineer of the
concerned/related
department of GETCO under
The owner may assess the capacity & whose jurisdiction the work
capability of the bidders, to was executed.
successfully execute the scope of 2. For works executed for other
work covered under the work with in Government Departments /
stipulated completion period. This Government Organizations /
assessment shall inter-alia include. PSUs / Boards /
Corporations / Local
1) Document verification Authorities or other
organizations: The
2) Bidders work/manufacturing Performance Certificate /
facilities visit Certificate of Satisfactory
Completion shall be issued
3) Manufacturing capacity,
and signed by the Order
details of work executed, Placing Authority of the
works in hand, anticipated in concerned organization, or by
an officer duly authorized by
future & the balance capacity the Order Placing Authority to
available for the present scope issue such certificate.
of work 3. The certificate shall clearly
indicate, at minimum, the
4) Details of testing facilities, name of the work, Work
manpower and financial Order/Contract No. and date,
name of the contractor,
scope/nature of work,
5) Details of quality system in contract value, actual
place executed value, date of
commencement, date of
6) Past experience & completion and
performance performance/completion
status of the work.
7) Customer feed back 4. Certificates issued by any
8) Banker’s feed back other officer/authority not
meeting the above
requirements shall not be
Details as per qualifying requirement considered for establishing
to be submitted along-with offer, in a the requisite qualifying
separate cover.
experience, unless
specifically accepted under the
Seal & Signature of Bidder
CA certificate to be attached for provisions of the tender. For
MAT. (This is must) Civil Works, the certificate
Supply/Order executed details for shall also indicate the
offered items with name of amount of penalty /
purchaser, date and location to be Liquidated Damages (LD), if
mentioned. any, levied/recovered for
Performance certificate for
extension of time/delay in
satisfactory operation/working for
period as per qualifying
completion of the work.
requirement attached with Further, the certificate shall
specification. (This is must for indicate the actual quantum
getting the offer qualified) of major works executed,
such as Concrete/RCC,
Reinforcement, Pile
Diameter, number of piles,
total pile length/depth and
other major/specialized
items relevant to the
qualifying criteria
prescribed in the tender.
5. The Tender inviting authority
reserves the right to verify the
authenticity of the
Performance Certificate /
Certificate of Satisfactory
Completion and the
particulars stated therein
from the concerned client
6. Also if required, work placing
authority may ask the supply
documents from the bidder like
work order, work completion
certificate etc.
Details as per qualifying requirement
to be uploaded along-with offer.
CA certificate to be attached
for MAAT, Liquid Assets and
Net-worth. (This is must).
Under taking in respect of
reference to NCLT under
Insolvency & Bankruptcy
Code. The undertaking is to be
furnish by the bidder in its bid
as per the format attached
herewith as Annexure–iv and
shall be deemed to be part of
the bidding scheduled referred
as Annexure–4 to be
uploaded by the bidder with
Supply/Order executed details
for offered items with name of
Seal & Signature of Bidder
purchaser, date and location to
Performance certificate for
satisfactory operation/working
for period as per qualifying
requirement attached with
specification. (This is must for
getting the offer qualified)
4. Part –I 5.0 Additional Documents: 5.0 Additional Documents:
Special Apart from various documents to be Apart from various documents to be
Conditions of furnished along with the Bid as furnished along with the Bid as required
Contract/ required in the GCC and ECC, the in the GCC and ECC, the following
Clause 5.0 following documents/details are to be documents/details are to be furnished by
and its sub- furnished by the Bidder: the Bidder:
clauses 1. GST Registration No. and 1. GST Registration No. and date
date 2. Registration. No. under Shops &
2. Registration. No. under Establishment Act/ issuing
Shops & Establishment Act/ authority
issuing authority 3. Details of Partners/Directors of
3. Details of Partners/Directors the Firm/Company.
of the Firm/Company.
4. Experience Record and 4. Experience Record and details of
details of orders pending / orders pending / executed for
executed for various utilities various utilities
5. Last five years Audited 5. Last five years Audited Accounts
Accounts 6. Detail of Manufacturing/
6. Detail of Fabrication facilities along with list
Manufacturing/Fabrication of Testing Equipment calibrated
facilities along with list of up to date. The detail for the same
Testing Equipment may be submitted.
calibrated up to date. The 7. Factory Registration / License
detail for the same may be details
8. P.F registration
7. Factory Registration /
License details
8. Solvency certificate from
Bank (20 % of Bid value).
9. P.F registration
5. Part –I 10.0 PENALTY FOR DELAY: 10.0 LIQUIDATED DAMAGES (LD)
(SCC)/ FOR DELAY:
Conditions of 10.1 The tenderer should note that the 10.1 The tenderer should note that the
Contract/ completion time allowed for carrying completion time allowed for carrying out
Clause 10.0 out the work should be strictly the work should be strictly observed. Any
and its sub- observed. Any delay that may take
delay that may take place in achieving
clauses place in supply and erection beyond
Contractual cut-off date stated as per Completion of the works beyond
stipulated delivery period shall be Contractual Time of Completion in the
subject to the penalty at the rate of ½ Contract shall be subject to Liquidated
% of the contract value per week plus Damages (LD), and not by way of
GST as applicable on delayed work penalty, at the rate of ½ % of the Contract
(supply and erection work) with a Price plus GST as applicable, per week
or part thereof of the delay subject to a
Seal & Signature of Bidder
ceiling of 10% of the total contract ceiling of 10% (ten percent) of the
value plus GST as applicable. Contract Price plus GST as applicable.
10.2 In cases where the Completion of
10.2 In event of failure of the the works/ along with supplies extend
Contractor to pay the amount of beyond the contractual completion
Penalty as demanded, the Owner period, without prejudice to any other
shall be entitled to deduct the right that it may have under the Contract
amount of Penalty for delay from or in law, the Owner shall be entitled to
the amounts payable to the deduct the amount of LD from the
Contractors under any bills raised
amounts payable to the Contractors
under this contract or any other
amount payable under any other under any bills raised under this
contract with the GUVNL and its Contract or any other amount payable
Subsidiary companies i.e. GETCO, under any other contract with the
GUVNL, GSECL, MGVCL, DGVCL, GUVNL and its Subsidiary companies
PGVCL, UGCVL. It is permissible for i.e. GETCO, GUVNL, GSECL, MGVCL,
the Owner to adjust the amount of DGVCL, PGVCL, UGCVL. It is
Penalty of delay against any Bank
permissible for the Owner to adjust the
Guarantee furnished by the
Contractor under this contract or any amount of LD against any Bank
other contract with GUVNL and/or its Guarantee furnished by the Contractor
subsidiary companies. under this contract or any other contract
with GUVNL and/or its subsidiary
10.3 Notwithstanding the provision of
10.3 Tenderer shall have to supply Clause 10.2, if so requested by the
all materials to match with the erection Contractor, amount from the RA bills,
activities. pending settlement of Liquidated
Damages (LD), shall not be withheld/
retained by the Owner, if adequate
retention payment [over and above
security deposit/ Contract Performance
Guarantee (CPG)] remains to be
released as per Contract. In case, it is not
so, it shall be examined by the Owner
whether BGs/other securities (excluding
CPG/Security Deposit) furnished by the
Contractor are available with GETCO,
which have partly or fully served their
purpose, and can therefore be utilized by
GETCO to recover LD, if finally levied. If
available, it will be further checked
whether the contractor is willing to furnish
a suitable undertaking authorizing
GETCO to retain those BGs/security (for
such value which along with retention
payments remaining with GETCO is
considered to be sufficient to take care of
maximum leviable LD) to be kept valid till
6 months beyond the anticipated
completion of the works/ supplies under
the Contract. If the Contractor requests
Seal & Signature of Bidder
and gives the undertaking as above and
validity of BG is suitably extended
wherever required, amount from RA bills,
pending settlement of LD, shall not be
withheld/ retained on account of LD.
10.4 Tenderer shall have to supply all
materials to match with the erection
Seal & Signature of Bidder
BANK GUARANTEE FORM FOR ADVANCE PAYMENT
(For the purpose of verification/confirmation of this Bank Guarantee by the GETCO, the Bank
shall indicate 2 official email ids of the authorized signatories from Issuing Branch and also of
the designated higher office (Corporate Office, Zonal Office etc) in the covering letter of the Bank
forwarding the Bank Guarantee.)
Bank Guarantee No. …………………… Date...................
…………..[Name of Contract]…………………….
To: [Name and address of the Employer/ Owner]
Dear Ladies and/or Gentlemen,
We refer to the Contract ("the Contract") vide Letter of Award issued on ............ (insert date of the letter
of award)….by you (the Employer/ Owner) to M/s ................. (Name of Contractor) ..................,
signed on ..............(insert date of the Contract)…..... between you and M/s ................. (Name of
Contractor) ..................,
having its Principal place of business at ………....(Address of Contractor) ............................... and
Registered Office at ………....(Registered address of Contractor)
…….................….. (Indicate brief scope of work) ............................... for the complete execution of the
…… (insert name of Package along with name of the Project)……..
Whereas, in accordance with the terms of the said Contract, the Employer has agreed to pay or cause
to be paid to the Contractor an interest bearing Advance Payment against furnishing of an irrevocable
bank guarantee for an amount of ………………………..(Amount in figures and words) ……………which
is equal to [{110% (one hundred ten percent) of the amount of Advance} Plus {amount of GST
reimbursable on Advance as per the Proforma invoice, if applicable}].
By this letter we, the undersigned, ………(insert name & address of the issuing bank) ………, a Bank
(which expression shall include its successors, administrators, executors and assigns) organized under
the laws of .................................... and having its Registered/Head Office at …..…….(insert address of
registered office of the bank)……..... do hereby irrevocably guarantee repayment of ………….(Amount
of the bank guarantee in figures and words)…………… upon the first demand of the Employer without
cavil or argument in the event that the Contractor fails to commence or fulfill its obligations under the
terms of the said Contract for reasons whatsoever.
Provided always that the Bank's obligation shall be limited to the amount of this Bank guarantee or an
amount equal to the outstanding balance of the Advance Payment and the accrued interest on the
Advance Payment, taking into account such amounts, which have been repaid by the Contractor from
time to time in accordance with the terms of payment of the said Contract, as certified by you.
This Guarantee shall remain in full force from the date upon which the said Advance Payment is received
by the Contractor up to ninety (90) days beyond the date on which the entire Advance Payment along
with the accrued interest if any due thereon has been fully adjusted in terms of the Contract i.e., up to
ninety (90) days beyond the date of Completion of the Facilities under the Contract. This Guarantee may
be extended from time to time, as may be desired by M/s. ……………………….. on whose behalf this
Guarantee has been issued.
Seal & Signature of Bidder
Any claims to be made under this Guarantee must be received by the Bank during its period of validity,
i.e. upto ninety (90) days beyond the date of Completion of the Facilities by the Employer i.e. upto and
inclusive of ……………. (dd/mm/yy).
Notwithstanding anything contained herein:
1. Our liability under this Bank Guarantee shall not exceed _________ (value in
2. This Bank Guarantee shall be valid upto ________(validity date)__________.
3. We are liable to pay the guaranteed amount or any part thereof under this Bank Guarantee
only & only if we receive a written claim or demand on or before ________ (validity date)
For and on behalf of the Bank
[Signature of the authorised signatory(ies)]
Designation_______________________
Contact Number(s): Tel.______________Mobile______________
Common Seal of the Bank______________________
Contact Number(s): Tel.______________Mobile______________
1. For the purpose of executing the Bank Guarantee, the non-judicial stamp papers of appropriate
value shall be purchased in the name of Bank who issues the ‘Bank Guarantee’.
2. The Bank Guarantee shall be signed on all the pages by the Bank Authorities indicating their
POA nos. and should invariably be witnessed.
3. The Bank Guarantee should be in accordance with the proforma as provided. However, in
case the issuing bank insists for additional paragraph regarding applicability of ICC
publication No: 758, the following may be added at the end of the proforma of the Bank
Guarantee [i.e., end paragraph of the Bank Guarantee preceding the signature(s) of the
issuing authority(ies) of the Bank Guarantee]:
“This Guarantee is subject to Uniform Rules for Demand Guarantee, ICC publication No.
758 except that article 15(a) is hereby excluded.”
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contracts/E-539/Uprating/66kV/S&E
Sub: Supply, installation, testing & commissioning of conversion of (1) 66kV Tankara -
Bhutkotda line, (2) 66kV Bhutkotda - Mitana Line, (3) 66kV Hadala - Kagdadi Line, (4)
kV Dhrol - Piyava Line, (5) 66KV Piyava - Latipar line (6) 66kV Morbi - Unchimandal 2 line
(7) 66kV Unchimandal2 - Khareda line (8) 66kV Morbi - Vajepar tap Ameli line (9) 66kV
Morbi-Morbi B line (now LILO at Vajepar ) (10) 66kV Wankaner - Mahika line no 1 (11) 66kV
Hadamtala - Road Pipliya line with ACSR DOG conductor into equivalent HTLS Conductor
(Equivalent weight of ACSR DOG conductor with Higher Ampacity) (Except Gap Type
conductor) of Gondal Circle.
Option for Initial Advance (either Interest Bearing Initial Advance of No Initial Advance or No Initial
Addl. Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Co. Ltd.,
Corporate office,
I. We have read the provision in the Bidding Documents regarding furnishing the option for
advance payment. Accordingly, as per clause GCC 86.1.1 (For Supply) and GCC 86.2.1 (b)
(For Erection) provided in Amendment-I of the Bidding Documents, we hereby confirm to opt
Interest Bearing Initial Advance:
Supply Portion: (Ref GCC 86.1.1) *
Erection Portion: (Ref GCC 86.2.1 (b)) *
* ‘Yes’ or ‘No’ to be filled up by the Bidder. ‘Yes” shall mean that Bidder has opted for the Interest
Bearing Advance and ‘No’ shall mean that Bidder has not opted for the Interest Bearing Advance.
If nothing is mentioned, it shall mean that Bidder has not opted for the Interest Bearing Advance.
(Name of Authorized Signatory of Bidder)
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contracts/E-539/Uprating/66kV/S&E
Sub: Supply, installation, testing & commissioning of conversion of (1) 66kV Tankara -
Bhutkotda line, (2) 66kV Bhutkotda - Mitana Line, (3) 66kV Hadala - Kagdadi Line, (4)
kV Dhrol - Piyava Line, (5) 66KV Piyava - Latipar line (6) 66kV Morbi - Unchimandal 2 line
(7) 66kV Unchimandal2 - Khareda line (8) 66kV Morbi - Vajepar tap Ameli line (9) 66kV
Morbi-Morbi B line (now LILO at Vajepar ) (10) 66kV Wankaner - Mahika line no 1 (11) 66kV
Hadamtala - Road Pipliya line with ACSR DOG conductor into equivalent HTLS Conductor
(Equivalent weight of ACSR DOG conductor with Higher Ampacity) (Except Gap Type
conductor) of Gondal Circle.
In connection with above subject, I / we confirm that our firm is not declared in NCLT under
Insolvency & Bankruptcy Code. Further, I / we also agree that, if any found NCLT under
Insolvency & Bankruptcy Code, the offer shall be out rightly rejected without assigning any
reason thereof.
Signature of Authorized
Representative of Company/Agency
Name of bidder Company
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
8. EMD BG Format.pdf
2. Amendment -I Part-I Tender Specifications_Gondal E-539.pdf
3. L2 Schedule E-539.pdf
6.R1_66KV_HTLS_specs.pdf
6.1 Addendum for core.pdf
7. Annexure I and IA.pdf
8. EMD BG Format.pdf
9. Form for Networth and Annual turnover.pdf
10. ONLINE SCHEDULE_TECH - E-539.pdf
11. Online Schedule-QR-E-539.pdf
12. Public Procurement Circular of GOI.pdf
13. Tower Schedule for 66kV Tankara - Bhutkotda Line.pdf
14. Tower Schedule for 66kV Bhutkotda - Mitana Line.pdf
15. Tower Schedule for 66kV Hadala - Kagdadi Line.pdf
16. Tower Schedule for 66kV Dhrol - Piyava Line.pdf
17. Tower Schedule for 66kV Morbi Unchimandal-2 line.pdf
18. Tower Schedule for 66kV Piyava - Latipar Line.pdf
19. Tower Schedule for 66kV Unchimandal2-Khareda.pdf
20. Tower Schedule for Morbi-Vajepar line.pdf
21. Tower Schedule for 66kv Morbi-Morbi B line (vajepar LILO).pdf
22. Tower Schedule for 66kV Wankaner - Mahika Line no 1.pdf
23. Tower Schedule of 66 kV Hadamtala - Road Pipliya Line.pdf
24. SD cum PBG Format.pdf
25. Form of LD undertaking 1A.pdf
26. Form of LD undertaking 1B.pdf
1. Part-I Tender Spe. - Uprating of 66kV lines_Gondal E-539.pdf
4. Tender Notice E-539_Gondal.pdf
5. PB Part-III Gondal Circle E-539.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .