16 Feb 2026, 3:00 pmClosed
Bhavnagar Division- Group work for elimination of 17 Nos. Level Crossings by provision of Road Under Bridges/Limited Height Subways at LC No. 43, 46, 50, 51, 57, 78, 85, 86, 89, 94, 99, 101 (Dhasa-Rajula section), LC No. 112X (Rajula- Mahuva section), LC No. 10, 13 (Rajula-Pipavav section), LC No. 07 (Dhasa-Jetalsar section), and LC No.29 (Rajkot-Jetalsar section) under Sr.DEN(Central) Jurisdiction.
257-2025-26~WR
257-2025-26
Open
Works - General
18 Months
Bhavnagar, Gujarat
₹0
₹67.3 L
16 Feb 2026
23 Jan 2026
2 Feb 2026
5 Feb 2026
Item Breakup - 1-DSR-2023
nominal size derived from natural sources) 4.1.4 1:2:4 (1 Cement : 2 coarse sand (zone- cum 330 7780.3 2567499 III) derived from natural sources: 4 10 graded stone aggregate 40 mm nominal size derived from natural sources) BHAVNAGAR DIVISION-ENGG/WESTERN RLY 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone- cum 2895 7294.7 21118156.5 III) derived from natural sources : 6 11 graded stone aggregate 20 mm nominal size derived from natural sources) 4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone- cum 285 6812 1941420 III) derived from natural sources : 8 12 graded stone aggregate 40 mm nominal size derived from natural sources) Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing 4.2 courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 4.2.2 1:1 1/2:3 (1 cement : 1 1/2 coarse sand cum 480 10357.55 4971624 (zone-III) derived from natural sources :
nominal size derived from natural sources). Centering and shuttering including 4.3 strutting, propping etc. and removal of form work for : 4.3.1 Foundations, footings, bases for Sqm 16720 392.15 6556748 14 columns 4.3.2 Retaining walls, return walls, walls (any Sqm 2880 842.5 2426400 thickness) including attached pilasters, 15 buttresses, plinth and string courses fillets, kerbs and steps etc. 4.3.3 Columns, piers, abutments, pillars, Sqm 8360 961.3 8036468 16 posts and struts 4.10S DAMP-PROOF COURSE 4.10 Providing and laying damp-proof course Sqm 1670.25 410.85 686222.21 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) 17 derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) 5.0 REINFORCEMENT CEMENT CONCRETE 5.9S FORM WORK Centering and shuttering including 5.9 strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of Sqm 1665.1 392.15 652968.97 18 columns, etc. for mass concrete 5.9.2 Walls (any thickness) including attached Sqm 15162 842.5 12773985 19 pilasters, buttresses, plinth and string courses etc. 5.9.3 Suspended floors, roofs, landings, Sqm 2958 927.25 2742805.5 20 balconies and access platform 5.9.5 Lintels, beams, plinth beams, girders, Sqm 2489.48 736.4 1833253.07 21 bressummers and cantilevers 5.9.6 Columns, Pillars, Piers, Abutments, Sqm 1394 961.3 1340052.2 22 Posts and Struts 5.22S STEEL REINFORCEMENT Steel reinforcement for R.C.C. work including straightening, cutting, 5.22 bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of Kg 726124.74 107.85 78312553.21 23 grade Fe-500D or more. BHAVNAGAR DIVISION-ENGG/WESTERN RLY Steel reinforcement for R.C.C. work including straightening, cutting, 5.22A bending, placing in position and binding all complete above plinth level. 5.22A.6 Thermo-Mechanically Treated bars of Kg 118559.7 107.85 12786663.65 24 grade Fe-500D or more. 5.33S DESIGN MIX CONCRETE Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to 5.33 accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, c u r i n g , carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in- charge , for the following grades of concrete.: 5.33.1 All works upto plinth level 5.33.1.1 Concrete of M25 grade with minimum cum 2374.56 9504.75 22569599.16 25 cement content of 330 kg /cum 5.33.1.2 Concrete of M30 grade with minimum cum 510 9655.7 4924407 26 cement content of 350 kg /cum All works above plinth level upto floor V 5.33.2 level 5.33.2.1 Concrete of M25 grade with minimum cum 672.18 9860.4 6627963.67 27 cement content of 330 kg /cum 5.35 Add for using extra cement in the items Quintal 4788.73 733.5 3512533.46 28 of design mix over and above the specified cement content therein. 8.0 CLADDING WORK 8.20S STONE WORK DRY CLADDING 8.31 Providing and fixing Ist quality ceramic Sqm 850 1267.95 1077757.5 glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of 29 steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. 9.0 WOOD AND P.V.C. WORK 9.1S FRAMES AND TRUSSES Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in 9.1 position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). 30 9.1.2 Sal wood cum 5.1 116520.3 594253.53 BHAVNAGAR DIVISION-ENGG/WESTERN RLY Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 9.21 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters: 9.21.1 35 mm thick including ISI marked Sqm 204 2392.65 488100.6 31 Stainless Steel butt hinges with necessary screws 10.0 STEEL WORK 10.1S General 10.2 Structural steel work riveted, bolted or Kg 280950 133.7 37563015 welded in built up sections, trusses and framed work, including cutting, hoisting, 32 fixing in position and applying a priming coat of approved steel primer all complete. 11.0 FLOORING 11.1S General Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat 11.3 of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size Sqm 272 614.2 167062.4 33 stone aggregate 11.41S VITRIFIED FLOOR TILES Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 11.41 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. 34 11.41.3 Size of Tile 800x800 mm Sqm 510 1885.5 961605 12.0 ROOFING 12.37S RAIN WATER SPOUT AND PIPE Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, 12.41 including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 35 12.41.1 75 mm diameter Metre 510 248.8 126888 13.0 FINISHING 13.1S CEMENT PLASTER (IN FINE SAND) 13.1 12 mm cement plaster of mix : 36 13.1.2 1:6 (1 cement: 6 fine sand) Sqm 986 333.35 328683.1 13.44S EXTERIOR FINISHING Finishing with Deluxe Multi surface paint system for interiors and exteriors using 13.48 Primer as per manufacturers specifications : BHAVNAGAR DIVISION-ENGG/WESTERN RLY 13.48.1 Two or more coats applied on walls @ Sqm 2380 193.7 461006 1.25 ltr/10 sqm over and including one 37 coat of Special primer applied @ 0.75 ltr /10 sqm Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's 13.52 specifications including appropriate priming coat, preparation of surface, etc. complete. 38 13.52.2 On concrete work Sqm 39123.88 235.15 9199980.38 Painting with synthetic enamel paint of 13.61 approved brand and manufacture to give an even shade : 39 13.61.1 Two or more coats on new work Sqm 13600 155.9 2120240 16.0 ROAD WORK 16.1S ROADS 16.1 Preparation and consolidation of sub Sqm 36825 218.9 8060992.5 grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing 40 to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. 16.3 Supplying and stacking at site. 41 16.3.1 90 mm to 45 mm size stone aggregate cum 9982.75 2098.4 20947802.6 16.3.3 53 mm to 22.4 mm size stone cum 3685.71 1842.3 6790183.53 42 aggregate 43 16.3.10 Moorum cum 3189.86 768.25 2450609.95 16.4 Laying, spreading and compacting cum 16593.32 1046.95 17372376.37 stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 44 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . 16.42S CONCRETE PAVEMENTS BHAVNAGAR DIVISION-ENGG/WESTERN RLY Providing and laying design mix cement concrete of M-30 grade, in roads/taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved and specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling 16.43 to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction and longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). 16.43.1 Cement concrete prepared with batch cum 5505 10529.35 57964071.75 45 mixing machine 16.49S MISCELLANEOUS 16.50 Providing and fixing Glow studs of size Each 1700 206.3 350710 100x20 mm made of heavy duty body shall be moulded ASA (Acrylic styrene Acrylonitrile ) or HIP (High impact polystyrene) or ABS having electronically welded micro- prismatic lens with abrasion resistant coating as approved by Engineer in charge. The glow stud shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective surface shall be 35 (+/-5) degress to 46 base .The reflective panels on both sides with at least 12 cm of reflective area up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM I: 809 as recommended in BS: 873 part 4 : 1973. The studs shall be fixed to the Road surface using the adhesive conforming to IS, as per procedure recommended by the manufacturer complete and as per direction of Engineer-in-charge. 16.62 Providing and applying 2.5 mm thick Sqm 850 747.8 635630 road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane 47 tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. BHAVNAGAR DIVISION-ENGG/WESTERN RLY 16.81 Providing and erecting 2.00 metre high Metre 1700 3439.5 5847150 temporary barricading at site; each panel of size 2.50mx2.00m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube posts/horizontal members/bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m. MS channel ISLC 75 @ 5.70 kg/m, 50cm long shall be provided at the bottom having oval shaped holes of size 50x25mm at both ends with 50cm long MS angle 40x40x6mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250mm long expansion fasteners at both ends. The work shall 48 be executed as per drawing/direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously including shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in- Charge.. 18.0 WATER SUPPLY 18.7S C.P.V.C. PIPES Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing 18.9 of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 49 18.9.9 100 mm nominal dia Pipes Metre 3400 3271.7 11123780 Providing and fixing G.I. pipes complete 18.12 with G.I. fittings including trenching and refilling etc. External work 50 18.12.1 15 mm dia nominal bore Metre 370 322.15 119195.5 51 18.12.2 20 mm dia nominal bore Metre 710 368.6 261706 52 18.12.3 25 mm dia nominal bore Metre 1080 467.75 505170 53 18.12.6 50 mm dia nominal bore Metre 1420 762.15 1082253 19.0 DRAINAGE 19.1S STONE WARE PIPES AND FITTINGS BHAVNAGAR DIVISION-ENGG/WESTERN RLY Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of 19.6 cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 54 19.6.7 600 mm dia. R.C.C. pipe Metre 1700 2243.4 3813780 Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size),foundation concrete 1:4:8 mix (1 cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 19.7 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design : Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, 19.7.1 total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) : 19.7.1.1 With common burnt clay F.P.S. (non Each 170 12770.55 2170993.5 55 modular) bricks of class designation 7.5 Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff 19.35 mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 56 19.35.2 600 mm dia RCC pipes. Metre 3900 3401.25 13264875 57 19.35.3 900 mm dia RCC pipes. Metre 8300 5377.25 44631175 26.0 NEW TECHNOLOGIES AND MATERIALS 26.41S NEW TECHNOLOGY ITEMS Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of 26.68 C&D waste from approved manufacturer in foundation and plinth in: 26.68.1 Cement mortar 1:6 (1 cement : 6 coarse cum 289 7387.25 2134915.25 58 sand) Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of 26.69 C&D waste from approved manufacturer in superstructure above plinth level up to floor V level 26.69.1 Cement mortar 1:6 (1 cement : 6 coarse cum 391 9844.65 3849258.15 59 sand) Total 471765959.88
Item Breakup - 2-USSOR-2021
12750.00 material by using only hard and durable stone crushed in mechanical crusher to different gradations, wet mixing of the same in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material is mechanically manufactured by crushing of hard and durable stone into desired gradation of designed proportion. Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
cum Providing and laying in position Plain cement concrete of specified Nominal M i x f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
1116.73 (zone-III) : 3 graded stone aggregate 20 mm nominal size)
1054.00 III) : 4 graded stone aggregate 20 mm nominal size) BHAVNAGAR DIVISION-ENGG/WESTERN RLY Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
3869.85 Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer.
2550.00 Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. BHAVNAGAR DIVISION-ENGG/WESTERN RLY
11704.34 machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in-Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item.
139681.12 tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
163798.49 pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
25192.67 slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level. Supply and using Cement at Worksite
20422.86 approved brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
5573961.67 grade Fe-500D or more of approved brands/makes. BHAVNAGAR DIVISION-ENGG/WESTERN RLY
14703.00 RCC box of all sizes with or without common web section including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Box pushing technique" as per approved drawings/scheme, with or without surcharge in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental works to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer-in-Charge. Note: 1. The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. 2. In case Drag Sheet and/or Rail Cluster are to be used as per approved scheme and design, the same shall be paid extra under relevant item. 3. The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
MT-Km BHAVNAGAR DIVISION-ENGG/WESTERN RLY Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved QAP and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20%
Girder/Semi Girder/Composite Girder (Steel Work)
7837.42 dia and any length with suitable nuts including DTI washers conforming to IRS-B1-2001 f o r bridges and steel structures with contractors labour, tools and plants and lead and lift etc., complete. Metallizing of steel work of girders with sprayed aluminium after surface preparation by Sand/grit blasting, followed by one coat of etch primer (IS:5666) & one coat of Zinc Chrome primer (IS:104) and two coats of aluminium paint (IS:2339) with all labour, T&P and material as a complete job duly conforming to all relevant specifications and process given under Clause 39 of IRS-B1-2001. Note: Nominal Thickness of sprayed Aluminium coating shall be 150 microns. DFT of Zinc chrome primer shall be 25-30 microns and DFT of each coat of Aluminium paint shall be 12-14 microns.
Sqm BHAVNAGAR DIVISION-ENGG/WESTERN RLY
278.80 120587.99 welded and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per s p e c ifi c a t io n and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only.
6460.00 including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra).
467.50 consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines.
782.00 sand (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant. BHAVNAGAR DIVISION-ENGG/WESTERN RLY
1139.00 wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra.
51000.00 water from any location. Payment to be Hour done for Horse power of pump multiplied by pumping hours. Recoupment of ballast in running line with railway's stone ballast from existing stacks available along alignment either on top of cutting or on cess or at toe of bank by head leads or by any other means and spreading to make up deficiency in the required profile with contractor's labour, tools & plants, as directed by Engineer-in- charge. Note: Payment shall be made based on ballast stack measurement.
6400.00 to 5m Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS- GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
6400.00 more than 50 km and up to 100 km BHAVNAGAR DIVISION-ENGG/WESTERN RLY 25mm gap 'in-situ' welding during traffic block and finishing of weld to m e e t the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding shall be carried out only by trained welder having valid competency certificate using RDSO approved Alumino Thermit Welding Portions, 3 piece prefabricated mould (ZIRCON WASHED) manually pressed, Single shot crucible fitted with auto tapping thimble and Compressed Air Petrol/LPG preheating technique as per RDSO Specification No IRST/19-2020 with latest amendment. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Only required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. All other items required shall be supplied by the Contractor.
Each First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
2210.00 Density of 1540 BHAVNAGAR DIVISION-ENGG/WESTERN RLY De-stressing of LWR/CWR track of any density under traffic line block with contractor's labours, tools, equipments and consumables inclusive of all lead & lift. Activities include cutting of LWR/CWR into convenient panels of specified length, removal of ERCs, liners, greasing of ERCs and liner contact area, lifting rails and keeping them on rollers provided at every 15 sleepers, working out elongation of rail ends depending on prevailing site conditions, pulling rails with the help of Hydraulic Tensor to achieve the desired elongation, cutting rails, as required, removing rollers and placing rail in position, re-fixing ERCs & liners and adjustment of gap at SEJs : Note: (1) Welding of rail joints will be paid separately. (2) Rail cutting and Hole drilling shall be paid separately. (3) Opening and closing of LC if required will be paid separately. (4) As per procedure prescribed in latest edition of IRPWM & CE's Circulars for destressing of LWR/CWR, if any.
TRM Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020)
Each Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991.
34.00 carefully and stacking the released material in countable manner, free from any infringements as directed by Engineer in-Charge including removal of cement concrete foundation and making surface clean. BHAVNAGAR DIVISION-ENGG/WESTERN RLY
17.00 with winch assembly and other components like boom, fringes, locking arrangements, pedestal, boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base and other materials connected with functioning of lifting barrier, removing engineering indicators on track and level crossing road signages without any damage including demolishing concrete base of existing structures, filling, ramming and levelling the ground disturbed during demolition, clearing debris and stacking all released material in a neat and countable manner and clear of infringements, as directed. Note: Barriers on both sides of level crossing constitute one set.
13.60 fixed adjoining running lines of track, duly excavating and levelling the foundation by hand compaction, removing connections and carting the released material up to a lead of 250m by suitable means and stacking the same, as directed by engineer in- charge. Note: The released materials shall be handed over duly stacking the same in measurable fashion. Insertion of temporary girder in place of formation involving dismantling of track, removal of ballast and neatly stacking for future use, excavation & installation of CC crib or wooden crib at both ends as per approved design in one or more traffic blocks, excavation for creating space for insertion of girder as required, placement of girder by contractor's Crane, tools & plants, filling of earth/sand filled bags at different stages as required, linking of track and connecting with the approaches, ballasting, boxing and packing approach sleepers to make track fit for 20 kmph to the satisfaction of Engineer in-charge. Note: 1. The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. 2. Transportation of Temporary Girder to site shall be paid separately under relevant item. 3. The charges for wooden sleepers/blocks required for matting and bearing as per approved design shall be paid extra as per relevant item. 4. In case bridge timber / channel sleepers are required to be laid on girder, the same shall be paid separately under relevant item.
17.00 196044.19 16.3m and up to 26.00 using Road crane capacity of 80 MT BHAVNAGAR DIVISION-ENGG/WESTERN RLY Removal of temporary girder, crib on both ends and placing temporary girder on crib / cess away from Railway track as directed by engineer at site under traffic block; filling of Railway's earth by ramming, pulling ballast from stack / adjoining track / same track, laying track, linking with approach track and packing of ballast for opening track at 20 kmph speed, boxing & dressing of cess, ballast profiling etc. Note: If earth is to be brought by contractor from outside, the same will be paid separately.
17.00 210296.23 16.3m and up to 26.00 using Road crane capacity of 80 MT
8.10 144458.62 Channel Sleepers made from ISMC 150mm x 75mm / 175mm x 75mm / 200mm x 75mm standard rolled section conforming to IS:2062 as per RDSO approved drawing No 1636/R1/R2 with latest correction slips complete and as directed by Engineer In charge. Note: Cost of Steel fittings and GRSP shall be paid separately
90.00 Grooved Rubber Pads as per drg. No. RDSO/T-5199 & RDSO's Spec. no. IRS-T- 47-2006 (Prov.) from RDSO approved sources with all contractor's lead, lift, labour, tools, plant and transportation etc. complete as instructed by Engineer in-charge. Note: One set constitutes two nos.
90.00 Pads 25mm / 30mm thick as per RDSO drawing No. B/1636/I/R2 to suit Insulated steel channel sleepers from RDSO approved sources with all contractor's material, lead, lift, labour, tools, plant and transportation etc. complete and as instructed by Engineer in-charge. Note: One set constitutes two nos.
and Galvanised MS Inner and Outer Clips for Steel Channel Sleeper (RDSO Drg. No. T-6150 & T-6151) from RDSO approved sources. Note: One set constitutes two inner & two outer clips. Hiring of machinery for minor miscellaneous works for short duration i n c l u d i n g operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
7610.00 with minimum 1.10 cum bucket capacity
with transportation or other misc. works. BHAVNAGAR DIVISION-ENGG/WESTERN RLY
18700.00 cement polythene bags with Rly. Ballast/moorum/earth/Sand/quarry dust etc. placing the filled bags on the high banks /bridge approaches/nominated place etc. dumping and spreading at the nominated locations to profile under block period with all contractor's labour, tools, plants, loading, unloading, filling, spreading including all lead/lift etc. complete and as directed by the Engineer in charge at site including crossing of track where necessary. Total 1488394935.61
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .