Loading…
Loading…
Tender Value
₹72 L
EMD Value
₹72,000
Closing Date
7 Sept 2026, 6:00 pm
DEPUTY CITY ENGINEER-3 SOUTH ZONE
Construction of a new RCC wall at various locations under Kankaria Lake Front and Kankaria Zoo in Maninagar Ward along with ancillary works as required ARC
338403
Tender Notice No 05 Tender No 367
Open
Miscellaneous Works
Works
Ahmedabad
₹2,400
Municipal Commissioner, Ahmedabad
₹72,000
24 Aug 2026
24 Aug 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
2 Excavation for foundation including sorting out stacking of
useful material & disposing of excavated stuff upto 50 mt. lead.
Loose & Soft soil.Excexuted With Mechanical Effort
a 550 up to 1.5 mt. depth item no-0(Code -04B001A) 201.81 Cu.M.
b 250 1.5 to 3.0 mt. depth. item no-0(Code -04B002A) 222.72 Cu.M.
3 100.00 Provdg. & laying cement concrete 1:4:8 (1 cement : 4 coarse 2653.67 Cu.M.
sand : 8 hand broken stone aggregates 40 mm nominal
size) and curing complete excluding cost of form work in
foundation& plinth.(Item No-5.3.3 ) (Code-05004A)
4 200 Filling available excavated earth (excluding rock) in 128.1 Cu.M.
trenches, plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidation each
deposited layer by ramming and watering.
5 1500 Conveyance charges of earth lime, murrum, building 235.5 CMT
rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregate of any kind etc. comp. ( Code-1229)
6 Brick work using common burnt clay building bricks
having crushing strength not less than 35 kg/Sq. cm. in
cement mortar 1:6 (1 cement : 6 fine sand)
conventional brick
a 30.00 (a) in foundation & Plinth (Item No- 6.13) ( Code-06002BA) 3981.21 Cu.M.
b 30.00 Super structure Upto Floor Two Level (Item No- 6.19) ( Code- 4253.46 Cu.M.
7 I.Half brick masonry in common burnt clay building bricks
having crushing strength note less than 35 Kg/Sq. Cm. in
cement mortar 1:4 (1 cement : 4 coarse sand) using
conventional brick in Super structure upto floor Four level
a 30.00 All Floor Level 646.7 Sq.M.
8 Providing and laying controlled cement concrete of M-
25 Grade and curing complete, Excluding the cost of form
work, Scaffolding, cost of reinforcement for reinforced
concrete work For any Height up to any FloorLevel.
a 200.00 Foundations,Raft,Footings,Mass concrete (Item No- 5.8.3) ( 4238.04 Cu.M.
b 300.00 RCC Retaining wall at All Floor (Item No- 5.8.3) ( Code- 4519.88 Cu.M.
c 10.00 Tie-Beam, Lintel , Beam- Bracket, Stair Case & Landing, 4496.07 Cu.M.
Coping ,Slab, balcony, weather shed, loft , any cantilever
etc All Floor (Item No- 5.8.3) ( Code-05025CA)
d 10.00 Columns,Pillars, posts and struts at All Floor 4593.91 Cu.M.
(Item No- 5.8.3) ( Code-05025DA)
9 Providing form work in ordinary timber planking so as to
give a rough finish including centering, shuttering,
strutting and propping etc. height of propping and
centering below supporting floor to celling not exceeding 4 M
& removal of the same for in situ reinforced or plain concrete
a 130.00 (A) Foundation, footings, bases of columns etc. and 171.68 Smt
mass concrete. (Item No- 9.1) ( Code-09001AA)
b 15.00 (B) Flat surface such as soffits of slabs, landing and the like 252.00 Smt
(Item No- 9.1) ( Code-09001B1A)
c 1400.00 (C) Vertical surfaces such as walls (any thickness) partitions. 229.95 Smt
(Item No- 9.1) ( Code-09001CA)
10 Providing T.M.T Fe 500D bar reinforcement for
R.C.C. work including bending, binding and placing in
position complete up to any floor level..(Item No- 5.4.11) (
a 34650.0 All Floor Level 75.46 Kg.
11 1250.00 Providing 20 mm th. sand faced/Mala cement plaster on 297.68 Sq.M.
walls upto height 10 metres above ground level consisting of
12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and
8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc.
complete. (Item No- 17.95) ( Code17009)
12 550.00 Providing & Fixing M.S.grill, gate,stair / balcony railing , 100.17 Kg.
elevation element of Decorative pattern with M.S. Channel
,flat,medium grade m.s. pipe, square or round bars with round
heanded bolts, nuts, or by screw. etc. comp. (Item No- 10.1)
13 100.00 Applying priming coat over new steel and other metel surface 34.34 Sqmt
after and including preparing the surface by throughly
cleaning, oil, grease, dirt and other foreign matter and scoured
with brushes fine steel
wood, scrapers and sand paper with ready mixed priming paint
brushing red lead.(Item No- 19.2) ( Code19001)
14 100.00 Painting two coats (excluding priming coat) on new steel 86.94 Sqmt
and other metal surface with enamel paint, brushing, interior
to give an even shade including cleaning the surface an even
shade including cleaning the surface of all dirt, dust and
other foreign matter.(Item No- 19.7) ( Code19002)
15 81.43 Provdg. And fixing to wall ,ceiling and floor10.00 kg. 332.91 Rmt
F/Sq.Cm2 working pressure polythelene pipes of the
following outside diameter, low, density, complete with
special flange compression type fittings, wall clips etc.
making good wall ceiling and floor. For Weep Holes (Item
16 30.00 Providing & Supplying JCB Machine on rental basis in case of 600.00 Hour
emergency situation and break down type work & also during
unavoidable condition as per instruction of engg. in charge,
rate includes all nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to
store. (No payment should be allowed for non working
condition of machinery and for pipe line excavation and laying
17 30.00 Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt 600.00 HR.
Demolishing Work on site by using Operator, fuel, power
Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe
line excavation and M.H. work. Allowed only for break down
18 150.00 Barricading the entire excavated area on rental basis using 79.99 Rmt
wooden ballies / M.S. angles at max. 2.00 meter centre to
centre, C.G.I. Sheet, reflective paint / Board outside to avoid
accident & for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making temporary
sufficient nos of lighting arrangement throughout the work
with necessary required arrangement. The same shall be
removed after completion of work. (As per previous ARC
19 200.00 Creating Weep Holes by Providing &Laying 110 mm Dia. PVC 140.00 No.
Pipe 6 kg/cm2 Up to 600 mm long in Stone / Brick Wall
including all Necessary Work as per dir. Of eng. In charge.
20 250.00 Filling in foundation and plinth with murrum or selected soil in 286.20 Cmt
layers of 20cm.
thickness including watering,(Item No- 0) ( Code 04008A)
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors for the
work mentioned below.
Construction of a new R.C.C. wall at various locations under
1 Name of work Kankaria Lake Front and Kankaria Zoo in Maninagar Ward,
along with ancillary works as required (ARC).
2 Time Limit 12Months
3 Tender Validity Period 120 days from the date of submission of the tender
Register “D” class in PWD in Govt. R&B/CPWD/AMC or
4 Eligibility Criteria
equivalent registration with any other state Govt. Or institutions.
Estimated Cost put to
Earnest Money Deposit Rs.72,000/- Demand Draft Or Bank Guarantee in favor of Municipal
Commissioner, Ahmedabad to be submitted as prescribed in tender.
5 % of the Tender Amount in form of Bank Guarantee / Demand
7 Security Deposit Draft in favor of Municipal Commissioner, Ahmedabad to be
submitted as prescribed in tender.
Tender fees Rs.2400/-Demand Draft in favor of Municipal Commissioner,
(Non refundable) Ahmedabad)
In separate sealed cover each for EMD and Tender Fees along with
Submission of EMD and
Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded
from AS PER TENDER NOTICE INVITED
As per Notice inviting Tender / Addendum / Corrigendum.The
Last date of receiving
11 tenders received after latest schedule date and time will not be
entertained under any circumstances.
As per Notice inviting Tender / Addendum / Corrigendum to
Date of Opening
12 Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South Zone
Office, Opp. Fire Station, Maninagar, Ahmedabad-380008
Document shall be submitted in sealed envelope systems By
Mode of sending the RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (
Tender Documents One Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
The contractor shall be responsible to make good and remedy at this
own expenses any defect which may developed or may be noticed
before the period mentioned here under from the certified date of
15 Defect &Liability Period completion, The within 15 days of receipts of the notice. In the case
of failure on the part of the contractor, the Engineer in charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer in charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards they
expenses, If any, incurred by him in rectification, removal or re-
execution. The defect liability period shall be as under (a) for all
works costing up to Rs. 50,000 (amount put to tender), the period
shall be three months from the certified date of completion. (b) for
all works costing more than Rs. 50,000 and up to Rs. 1 crore
(Amount put to tender) ,the period shall be six (6) month from the
certified date of completion or one monsoon , which ever letter.(c)
the major project costing more than Rs. 1 crore , the period shall be
12 months from the certified date of completion which should
include one monsoon.(d) For building works , the period specified in
(a) ,(b) & (c) above or elapse of monsoon period following certified
date of completion, whichever is letter . For the purpose of deciding
the monsoon period, the 30 September may be treated as the last
0.1% per day delay of remaining work after the completion date but
16 Compensation for Delay
not more than 10% of cost of remaining works.
Water, Electricity Contractor shall have to make his own arrangements for water and
electricity for the purpose of work at site at his own expense
Terms, Condition, & All general condition of contract of Form B1 condition of contract
Specification shall be applicable.
Deduction of Retention Retention @ 2% of the value of work done will be deducted from
19 Money from each RA each RA bill. It will be released along with release of payment of
Bill Final Bill.
Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
20 Addendum/Corrigendum
Of Tender And The Same As to be Attached Along With The
Tender Document.
As per Account department circular no.37, date-09/08/2018 &
21 For ESIC & EPFO Act.
Circular no.27, date-07/01/2026
As per AMC Finance Department Circular No. 38 dated 21-11-2022.
22 GST The Rates are Exclusive of GST. Prevailing GST will be paid
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to
reject any or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Add. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEER DEPARTMENT
TECHNICAL SPECIFICATION
Name of Work : Construction of a new R.C.C. wall at various locations under Kankaria
Lake Front and Kankaria Zoo in Maninagar Ward, along with ancillary
works as required (ARC).
Demolition incl. stacking of serviceable materials & disposal of unserviceable materials with all lead and lift.
(B) Brick work in cement
(D) Tiles or Stone flooring
(E) Sheet roofing (G.I or A.C)
(F) Doors ,Windows
ventilators (wood/steel)
1.0 Mode of measurements &payment :
1.1 The unserviceable materials shall be disposed of at all leads and lifts. The rate excludes scraping straightening of
reinforcement but includes cutting of reinforcement.
1.2 The rate shall be for a unit of one cubic metre
(b) Brick work in cement mortar
1.0 Workmanship :
1.1 The demolition shall consist of demolition of one or more parts of the building as specified or shown in the
drawings. Demolition implies taking up or down or breaking up. This shall consist of demolishing whole or part
of work including all relevant item as specified or shown in the drawings.
1.2 The demolition shall always be planned before hand and shall be done in reverse order of the one in which the
structure was constructed. This scheme shall be got approved from the Engineer-in-charge before starting the
work. This however will not absolve the contractor from the responsibility of proper and safe demolition.
1.3 Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or
property, which is to be left intact, before dismantling and demolishing is taken up and the work shall be
carried out in such a way that no damages is caused to the adjoining property.
1.4 Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions shall be
taken to keep the dust nuisance down as and where necessary.
1.5 Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged by
dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled first. The dismantled
articles shall be properly stacked as directed.
1.6 All materials obtained from demolition shall be the property of Government unless otherwise specified and
shall be kept in safe custody until handed over to the Engineer-in-charge.
1.7 Any serviceable materials, obtained during dismantling or demolition shall be separated out and stacked
properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b stacked as directed by
the Engineer-in-charge.
1.8 On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
1.9 The relevant specifications of shall be Above followed except that demolition of R.C.C. work is to be done.
2.0 Mode of measurements & payment :
2.1 Measurements of all work except hidden work shall be taken before demolition dismantling and no allowance
for increase in bulk shall be allowed. The demolition of lime concrete shall be measured under this item.
Specification for deduction for voids, openings etc. shall be on same basis as that employed for construction of
2.2 All work shall be measured in decimal system as fixed in its place subject to the following limits, unless
otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall be
worked out to the nearest 0.01 sq. mt. (c) Cubical connection shall be worked out to the nearest 0.01 Cu.m.
2.3 the rate shall include cost of all labour involved and tools used in demolishing and dismantling including
scaffolding. The rate shall also include the charges for separating out and stacking the serviceable materials
properly and disposing the unserviceable materials with all lead and lift. The rate also includes for temporary
storing for the safety of the portion not required to be pulled down or of adjoining property and providing
temporary enclosures or partitions where considered necessary.
2.4 The relevant specification of above shall be followed except that the demolition of reinforced concrete
structure. The unserviceable materials shall be disposed of at all leads and lifts. The rate excludes scraping
straightening of reinforcement but includes cutting of reinforcement.
The rate shall be for a unit of one cubic metre.
(d) tiles or stone flooring
(e) Sheet roofing (G.I OR A.C)
1.00 Mode of measurement &Payment :
1.01 The rate shall include stacking the unserviceable materials as directed will lead and lift.
1.02 The rate shall be for a unit of one sq. meatier
(f) Doors ,Windows ventilators (wood/steel)
1.00 Mode of measurement &Payment :
1.01 The rate shall include stacking the unserviceable materials as directed will lead and lift.
1.02 The rate shall be for a unit of one No.
Excavation for foundation in any types of soil including sorting out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead and required left
(a) 0 to 1.5 mtr depth
(b)1.5 to 3.0 mt. depth.
(c)3.0 to 5.0 mt. depth
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary
excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and
rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained shall be
property of the Government and be conveyed and stacked as directed. within 100 M. lead. The roots of the
trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
Setting Out :After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume
full responsibility for alignment, elevation and dimension of each and all parts of the work. Contractor shall
supply laborers, materials, etc. required for setting out the reference marks and bench marks and shall
maintain them as long as required and directed.
Excavation :The excavation in foundation shall be carried out in true line and level and shall have the width and depth
as shown in the drawings or as directed. The contractor shall do the necessary shoring and shutting or
providing necessary slopes to a safe angle, at his own-cost. The payment for such precautionary measures shall
be paid separately if not specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be allowed for bringing it
to level, if mistake or any other reason excavation is made. deeper or wider that shown on the plan or directed.
The extra depth or width shall be made up with concrete of same proportion as specified for the foundation
concrete at the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in
layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work to a place as
directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches
shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for
surplus excavation made in excess of above requirements or due to slopping and sloping back as found
necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Provdg. & laying cement concrete 1:4:8 (1 cement : 4 Coarse Sand : 8 Hand broken stone aggregates 40mm nominal
size) and curing complete, excluding cost of form work in Foundation and plinth
Providing and laying Cement Concrete (1:4:8) in foundation and plinth consisting of 1 part cement, 4 parts
coarse sand and 8 parts hand broken stone aggregates of 40 mm nominal size, including batching, mixing,
laying, ramming, compacting, finishing and curing complete, with all materials, labour, tools & plants, leads and
lifts complete as directed by the Engineer-in-Charge. Excluding cost of formwork/shuttering.
The measurement shall be given in one cum basis
Filling Available Excavated Earth (Excluding Rock) In Trenches,Plinth,Sides Of Foundations Etc.In
Layers Not Exceeding 20 Cm.In Depth Consolidation Each Deposited Layer By Ramming And
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and water
thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids
remain there. In general the work shall be carried out in the best manner so that no hollow voids
remain after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Conveyance charges of earth lime, murrum, building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregate of any kind etc. comp. ( Code-1229)
All the surplus earth and debries remaining on site after sufficient watering shall be carried away
immediately from site of work to the place within 5 km distance as directed by the Eng. In Charge, so as
not to cause any inconvenience to the public or traffic.
If the instruction of the Eng. In Charge of work are not followed within 7 days from the site, the
work shall be carried out by the Municipal Corporation at the risk and cost of the contractor and any
claim / dispute will not be entertained in the respect.
If the filling in the trenches after subsidence of the earth filled in is to be done the same shall be
carried out at contractor’s risk and cost. No extra payment shall be made for the such work.
The contractor shall take care of the surplus earth after the trenches are well watered and
refilled with earth.
If required the carting shall be carried out during night also without any extra cost.
All work shall be carried out as directed by Engineer-in-Charge.
Mode of measurement
Payment shall be as per cubic meter. Rate including cost of all materials, labour, machinery, and
equipment as directed.
Brick work using common burnt clay building bricks having crushing strength not less than
35 kg/Sq. cm. in cement mortar 1:6 (1 cement : 6 fine sand) conventional brick (A) in
foundation & Plinth (Item No- 6.13) ( Code-06002BA) (B)Super structure Upto Floor Two Level (Item
Providing and constructing brick masonry with approved quality common burnt clay
bricks conforming to relevant IS specifications and having minimum crushing strength of 35 kg/sq.cm.
Bricks shall be well burnt, uniform in size, shape and colour, free from cracks, flaws and other defects.
Bricks shall be soaked in clean water for at least one hour before laying.
Mortar shall consist of cement and fine sand in the proportion of 1:6 and shall be mixed
in approved manner. Bricks shall be laid in English bond or approved bond with frogs facing upward, on
full beds of mortar. All horizontal and vertical joints shall be properly filled with mortar and joint
thickness shall not exceed 10 mm.
The brick masonry shall be carried out true to line, level and plumb, maintaining proper
alignment and bond. Necessary cutting of bricks shall be done neatly without excessive breaking.
Brickwork shall be raised uniformly and no portion shall be raised more than 1.0 metre above the
adjacent work at one time.
The work shall include providing proper scaffolding, raking out joints where required,
making openings, embedding fixtures, cutting chases, and all incidental works necessary for completion
of masonry work. The masonry shall be cured continuously with water for a minimum period of 10 days.
The item includes supply of all materials, labour, tools and plants, transportation, loading,
unloading, royalty, taxes, leads and lifts, water charges, curing and all incidental charges complete as
directed by the Engineer-in-Charge.
The measurement shall be given in one cum. basis
Half Brick Masonry In Common Burnt Clay Building Bricks Having Crushing Strength Note Less Than
35 Kg/Sq. Cm. In Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) Using conventional brick in super
structure upto floor four level.(a) all floor level
The masonry shall be laid in cement mortar 1:4 (1 cement : 4 coarse sand) using approved quality
cement and clean coarse sand. Mortar shall be prepared in approved proportions and used within the
prescribed time. Bricks shall be laid true to line, level and plumb with proper alignment and uniform
courses. All horizontal and vertical joints shall be completely filled with mortar and joint thickness shall
not exceed 10 mm.
Half brick masonry shall be reinforced with approved galvanized hoop iron, brick reinforcement or
mm dia bars at every third course wherever specified or directed by the Engineer-in-Charge. The work
shall be carried out in superstructure up to fourth floor level including all lifts. Necessary scaffolding,
staging and safety arrangements shall be provided by the contractor.
The work shall include cutting and fitting of bricks around openings, junctions, embedded fixtures,
conduits, pipes and other services. Joints shall be properly finished and masonry shall be cured
continuously with water for a minimum period of 10 days.
The item includes supply of all materials, labour, tools and plants, loading, unloading, transportation,
scaffolding, curing, leads and lifts, taxes, royalties and all incidental works complete as directed by the
Engineer-in-Charge and as per relevant specifications.
The measurement shall be given in one sqm basis
Providing and laying controlled cement concrete of M-25 Grade and curing complete,
Excluding the cost of form work, Scaffolding, cost of reinforcement for reinforced concrete
work For any Height up to any FloorLevel. (a)Foundations,Raft,Footings,Mass concrete(b) RCC
Retaining wall at All Floor(c) Tie-Beam, Lintel , Beam- Bracket, Stair Case & Landing, Coping ,Slab,
balcony, weather shed, loft , any cantilever etc All Floor(d) Columns,Pillars, posts and struts at
The work shall consist of providing and laying Design Mix M-25 Grade RCC in the
specified structural members as per approved drawings, specifications and directions of the Engineer-
in-Charge.Cement shall conform to relevant IS specifications. Fine aggregate shall be clean coarse sand
and coarse aggregate shall be hard broken stone of approved quality conforming to IS:383.
Concrete shall be produced from approved design mix and shall achieve a characteristic
compressive strength of 25 N/mm² at 28 days.Batching shall be carried out by weight and mixing shall
be done in approved mechanical mixer/batching plant to ensure uniformity and consistency of
Concrete shall be transported, placed and compacted without segregation. Mechanical
vibrators shall be used for proper compaction and to obtain dense concrete free from
honeycombing.Concrete shall be laid to the required lines, levels, slopes and dimensions as shown in
the drawings.Necessary construction joints shall be provided only at approved locations and treated as
per specifications.
All exposed surfaces shall be finished smooth, true and even. Defective concrete shall be
repaired or replaced as directed by the Engineer-in-Charge.Curing shall be carried out continuously with
water for a minimum period specified in relevant IS Codes to achieve the required strength and
durability.Cube tests, slump tests and other quality control tests shall be conducted as directed by the
Engineer-in-Charge. Concrete not conforming to specifications shall be rejected.The item includes cost
of all materials, labour, machinery, mixing, conveying, placing, vibrating, finishing, curing, testing, water
charges, tools and plants and all incidental works necessary for completion.
The rate excludes:
Reinforcement steel and its fabrication.
Centering, shuttering and formwork.
Any item measured and paid separately.
The rate shall be for a unit of one cum.
As per Item and instructed by engineer incharge
Providing form work in ordinary timber planking so as to give a rough finish including
centering, shuttering, strutting and propping etc. height of propping and centering below
supporting floor to celling not exceeding 4 M & removal of the same for in situ reinforced or plain
concrete work in
(A) Foundation, footings, bases of columns etc. and mass concrete. (Item No- 9.1)
( Code-09001AA)(B) Flat surface such as soffits of slabs, landing and the like (Item No- 9.1) ( Code-
09001B1A)(C) Vertical surfaces such as walls (any thickness) partitions.(Item No- 9.1) ( Code-
The work shall comprise providing, erecting, maintaining and dismantling formwork made of ordinary
timber planking to obtain the required shape, line, level and dimensions of concrete members. The rate
shall include all labour, materials, tools and plants required for centering, shuttering, strutting,
propping, bracing, tightening, alignment, cleaning, oiling of shutter surfaces and removal of formwork
after concrete has attained sufficient strength.
Ordinary timber planks, battens, runners and supports.Props, wedges, clamps, ties, nails, bolts and all
necessary accessories.Approved shutter oil or releasing agent.
Formwork shall be rigid, true to line, level and dimensions shown in drawings.Joints shall be sufficiently
tight to prevent leakage of cement slurry.Adequate supports and bracing shall be provided to withstand
dead load, live load and vibration during concreting.Formwork surfaces in contact with concrete shall be
cleaned and coated with approved releasing agent before placing concrete.Formwork shall be removed
carefully without damaging the concrete surface.
As per Item and instructed by engineer incharge
The measurement shall be given in one smt basis
Providing T.M.T Fe 500D bar reinforcement for R.C.C. work including bending, binding
and placing in position complete up to any floor level..(Item No- 5.4.11) ( Code-05014C)(a)All Floor
The work shall include:
Supplying Fe 500D T.M.T. steel bars of approved make and specified diameters conforming to relevant IS
specifications.Straightening, cutting, bending and shaping reinforcement bars as per approved structural
drawings, bar bending schedule (BBS) and Engineer-in-Charge's instructions.
Placing reinforcement in correct position with proper alignment, spacing, laps, hooks, bends,
cranks and anchorage lengths.Binding reinforcement bars securely with 16 to 18 gauge annealed binding
wire at all intersections.Providing and fixing necessary cover blocks/chairs/spacers to maintain the
specified concrete cover.
Reinforcement shall be properly supported and secured to prevent displacement during
concreting.Removal of rust, oil, grease, loose mill scale and other foreign materials from reinforcement
before placing concrete.All laps, development lengths and bending dimensions shall be as per structural
drawings and relevant IS codes.
Measurement shall be based on the actual weight of reinforcement fixed in position, including
authorized laps, hooks, bends and chairs as per approved drawings.The rate shall include cost of
materials, labour, cutting, bending, binding, placing in position, handling, transportation, wastage, tools
and tackles, scaffolding and all incidental charges complete.
As per Item and instructed by engineer incharge
The measurement shall be given in one kg basis
Providing 20 mm th. sand faced/Mala cement plaster on walls upto height 10 metres above ground
level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat
of C.M. 1:1 (1-cement : 1-sand) etc. complete. (Item No- 17.95) ( Code17009)
Plaster thickness shall be maintained uniformly at 20 mm.
Mortar shall be machine mixed or hand mixed in approved proportion.
Finished surface shall be free from cracks, waviness, blistering and other defects.
Surface shall have a uniform sand faced appearance throughout. As per Item and instructed by engineer
The measurement shall be given in one Sqm basis
Providing & Fixing M.S.grill, gate,stair / balcony railing , elevation element of Decorative
pattern with M.S. Channel ,flat,medium grade m.s. pipe, square or round bars with round heanded
bolts, nuts, or by screw. etc. comp. (Item No- 10.1) ( Code10025AA)
Providing and fixing M.S. grill, gate, stair railing, balcony railing and decorative elevation
elements made from M.S. channel, flat, medium grade M.S. pipe, square bars, round bars and other
required sections as per approved design and drawings. The work shall include cutting, bending, welding,
drilling, grinding, fabrication, fixing in position with round headed bolts, nuts, screws or welding,
including all fittings, holdfasts, supports, labour, tools and plants, transportation, one coat of approved
metal primer and all incidental charges complete as directed by the Engineer-in-Charge.
As per Item and instructed by engineer incharge
The measurement shall be given in one kg basis
Applying priming coat over new steel and other metel surface after and including preparing the
surface by throughly cleaning, oil, grease, dirt and other foreign matter and scoured with
brushes fine steel
wood, scrapers and sand paper with ready mixed priming paint brushing red lead. (Item No-
The work shall consist of applying one coat of approved ready mixed red lead priming paint on new
steel and other metal surfaces after thoroughly cleaning and preparing the surface by removing
rust, oil, grease, dirt and all foreign matter with wire brushes, steel wool, scrapers and sand
paper. The primer shall be evenly applied by brush to obtain a uniform coating over the entire
surface, including all materials, labour, tools and plants, scaffolding and all incidental charges
As per Item and instructed by engineer incharge
The measurement shall be given in one sqm basis
Painting two coats (excluding priming coat) on new steel and other metal surface with
enamel paint, brushing, interior to give an even shade including cleaning the surface an even
shade including cleaning the surface of all dirt, dust and other foreign matter.(Item No-
Applying two coats of approved quality synthetic enamel paint over previously primed new steel
and other metal surfaces to obtain a smooth, durable, uniform and aesthetically pleasing finish.
The surface shall be thoroughly cleaned and prepared by removing all dust, dirt, loose particles
and other foreign matter before application of paint.
The work shall include cleaning of the surface, rubbing down irregularities, filling
minor surface defects if required, stirring and preparing paint, and applying two uniform coats of
enamel paint by brush to achieve an even shade and smooth finish. Each coat shall be allowed to
dry properly before applying the subsequent coat.
The paint shall be applied evenly without brush marks, sags, runs, wrinkles or
other defects. All corners, edges, joints, welds and inaccessible portions shall receive complete
and uniform coverage. The finished surface shall be of approved colour and from streaks, patches
'e and shall be free visible defects.
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Provdg. And fixing to wall ,ceiling and floor10.00 kg. F/Sq.Cm2 working pressure
polythelene pipes of the following outside diameter, low, density, complete with special
flange compression type fittings, wall clips etc. making good wall ceiling and floor. For
Weep Holes (Item No- 23.8) ( Code 23004G)
Providing and fixing approved quality 10.00 kg/sq.cm working pressure Low Density Polyethylene
(LDPE) pipe of specified outside diameter for weep holes, fixed to wall, ceiling and floor as
directed by the Engineer-in-Charge, including supplying and fixing all necessary special
flange/compression type fittings, couplers, bends, tees, sockets, clamps, wall clips, supports and
accessories, complete. The work shall include drilling/chasing in masonry or concrete, fixing the
pipe in proper line and level, making openings wherever required, and making good all damaged
portions of wall, ceiling, floor, plaster and finishes after installation. The item shall also include
testing for proper flow, removal of debris, cleaning of site and all labour, materials, tools and
plants, transportation, loading, unloading and incidental charges complete, ensuring proper
drainage through weep holes as per specifications.
The rate shall be for a unit of one Rmt.
As per Item and instructed by engineer incharge
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg.
supplying JCB Machine on rental basis for carrying out excavation, earthwork,
debris removal, dismantling and other allied works during emergency situations, breakdown
maintenance works and unavoidable circumstances as directed by the Engineer-in-Charge. The
item shall include deployment of JCB machine with experienced operator, fuel, lubricants,
maintenance, transportation to and from site, standby arrangements, all tools and accessories
required for efficient operation and completion of work. The machine shall be made available at
site as and when required and shall perform the assigned work satisfactorily as per instructions of
the Engineer-in-Charge. The rate shall include all labour, equipment, operational charges, taxes,
leads, lifts and incidental expenses complete for execution of the work.
Mode of payment shall be in Hour basis
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed
for non working condition of machinery and for pipe line excavation and M.H. work. Allowed
only for break down work)
supplying Pneumatic Breaker Machine at site for dismantling and breaking of
RCC slabs, RCC structures, cement concrete, asphalt/bituminous road surfaces and similar hard
materials, complete with skilled operator, fuel, lubricants, air compressor, power supply and all
necessary accessories required for efficient operation. The machine shall be deployed exclusively
for emergency breakdown and repair works as directed by the Engineer-in-Charge. The item
includes transportation of machinery to and from the work site, operation, maintenance and all
incidental charges complete. No payment shall be made for idle time, non-working condition,
breakdown of machinery, excavation of pipelines, manhole works or any work other than
approved breakdown dismantling operations. The work shall be carried out safely and
satisfactorily as per specifications and instructions of the Engineer-in-Charge, complete in all
Mode of payment shall be in Hour basis
Barricading the entire excavated area on rental basis using wooden ballies / M.S. angles at
max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board outside to avoid
accident & for smooth traffic diversion & movement including cautionary board etc. Item also
includes for making temporary sufficient nos of lighting arrangement throughout the work with
necessary required arrangement. The same shall be removed after completion of work. (As per
previous ARC tender rates)
The work shall consist of providing, erecting, maintaining and removing temporary
barricading around the entire excavation area for safety of pedestrians, vehicular traffic,
adjoining properties and workmen during execution of work.
Wooden Ballies or M.S. Angles of adequate strength and section.
Corrugated Galvanized Iron (C.G.I.) Sheets of approved quality.
Reflective paint, reflective tapes, safety stickers and traffic diversion signs.
Caution boards, danger boards, work-in-progress boards and other safety signages.
Temporary lighting arrangements including lamps, bulbs, flood lights, cables, switches and
Any other material required for ensuring safety and smooth traffic movement.
Barricading shall be erected along the full length and width of the excavation/work area as
directed by the Engineer-in-Charge.Supporting wooden ballies or M.S. angles shall be fixed at
maximum 2.00 m center-to-center spacing and firmly embedded to withstand wind load and
traffic disturbances.C.G.I. sheets shall be securely fixed to the supports to provide continuous
protection around the excavation area.
Barricades shall be painted with reflective paint and provided with reflective tapes/markings for
night visibility.
Necessary traffic diversion signs, caution boards, warning signs and safety instructions shall be
displayed prominently at suitable locations.Adequate temporary lighting arrangements shall be
provided throughout the work period during night hours to ensure safety of road users and
workers.The contractor shall maintain the barricading, signages and lighting arrangements in
good condition during the entire execution period.
Any damaged, displaced or stolen barricading material shall be immediately replaced by the
contractor at his own cost.Proper access shall be maintained for emergency services, pedestrians
and traffic as instructed by the Engineer-in-Charge.After completion of work, the entire
barricading system, sign boards, lighting arrangements and all associated materials shall be
dismantled and removed from the site, restoring the area to its original condition.
Supply, transportation, loading, unloading and stacking of all materials.
Erection, maintenance and removal of barricading.
Providing and maintaining reflective paint, tapes, caution boards and traffic diversion
Temporary lighting arrangements including electricity charges, cables, fittings and maintenance.
Labour, tools, tackles, equipment and all incidental charges.
The rate shall be for a unit of one running metre.
As per Item and instructed by engineer incharge
Creating Weep Holes by Providing &Laying 110 mm Dia. PVC Pipe 6 kg/cm2 Up to 600 mm
long in Stone / Brick Wall including all Necessary Work as per dir. Of eng. In charge.
Laying approved quality 110 mm dia PVC Pipe (6 kg/cm² pressure class) up to 600 mm
length for creating weep holes in stone masonry or brick masonry walls at the locations and
levels shown on drawings or as directed by the Engineer-in-Charge. The work shall include cutting
and preparing openings in masonry, supplying, cutting, placing and fixing PVC pipe with proper
outward slope for drainage, sealing the pipe all around with cement mortar, finishing the surface,
keeping the weep holes free from obstruction, and carrying out all labour, materials, tools,
tackles, scaffolding and incidental works required for complete installation. The rate shall include
supply, transportation, fixing, alignment, sealing, testing and all necessary operations complete
as directed by the Engineer-in-Charge.
The rate shall be for a unit of one no.
As per Item and instructed by engineer incharge.
Filling in foundation and plinth with murrum or selected soil in layers of 20cm.
thickness including watering,(Item No- 0) ( Code 04008A)
1. Scope of Work
The work shall consist of providing and filling approved quality murrum or selected soil in
foundation trenches, plinth areas, and around foundations in layers not exceeding 20 cm
compacted thickness, including spreading, watering, ramming, consolidation, dressing, and all
labour, tools, tackles, transportation, leads and lifts required for completing the work as directed
by the Engineer-in-Charge.
Murrum shall be clean, well graded, of good binding quality and obtained from approved quarries
or borrow areas.
Selected soil shall be free from organic matter, roots, rubbish, salts, black cotton soil, and other
deleterious materials.
The material shall consist of disintegrated rock containing siliceous material and natural clay
Size of murrum particles shall generally not exceed 20 mm.
After completion of foundation work, all excavated areas shall be cleared of debris, brickbats,
mortar droppings, loose materials and water.
The surface shall be properly dressed and prepared before commencing filling operations.
Filling shall be carried out in uniform layers not exceeding 20 cm in loose thickness.
Each layer shall be evenly spread, watered to the required moisture content, and compacted
thoroughly by approved hand rammers, mechanical compactors, or other approved means.
Subsequent layers shall not be placed until the previous layer has been properly compacted and
Filling shall be continued up to the required level, line, and grade.
The finished surface shall be properly dressed and maintained to the required slopes and levels.
Adequate watering shall be done for achieving proper compaction.
Each layer shall be compacted to obtain a dense and stable fill free from settlement.
In case of large areas, mechanical compaction equipment may be used as directed by the
Engineer-in-Charge.
Measurement shall be made in cubic metres (m³)
Contractor’s Signature Add.City Engineer
Material&TechnicalS pecifications
Standardnormsforqualitycontrol
Sr Test Frequencyoftests AcceptanceCriteria
a) Settingtimeinitial 50-100T-2 sample Notlessthan30 minutes
final 100-200T-3sample Notmorethan600minutes
200-300T-4sample
500-800T-6 sample
b) Finenessby Sieve 1in5samples 90%passedfrom90micron sieve
c) Consistency Onesample Above30 percent
d) Compressivestrength One sample 160kg /cm forOPC&PPConthirdday
220kg/cm forOPC&PPConseventhday
310kg/cm forOPC&PPContwentyeightday
e) Finenesstestthrough 1 in 5 samples 2250kg/Cm andaboveforOPCFORPPC3000kg/Cm
Specific surface
f) ChemicalAnalysis 1 in5samples Mgo less than 6 percent
IS 4032-986 SO3lessthan2.75percent
lessonignitionupto5percent
a) SiltContent 1sampleof10 kg Upto3percent
b) Finenessmodulus - Do- Specificationasperspecifiedstandard.Nosandof
fourthzoneshallbeused.
3 Kapachi-Gritfor
Bituminous work
a) Gradation 1/200 m3
b) Flakinessindex 1/200 m3 Max30%
c) Impact 1/100 m3 Max30%
d) Abrasion 1/100 m3 Max35%
e) Bit.Extraction 100 MT- 1 0.80to 4%
f) Bitumin(penetration 100MT-1
g) Strippingvalue 50-100m3onetest Max.25 %
3 Kapachi-Gritfor
AsperIS183-1970standards
a) Gradation 2 test/ Season Asperrelevantspecificationsprovision
b) Impact 2 test/Season wearing surface overlaidsurface(IS18.5-1972)
c) Abrasion 2 test/Season 30 % 5%
d) Soundness 2 test/Season Losswith Losswith
a) Efflorescence 20bricksout of Moderate
b) Waterabsorption -DO- Lessthan20Percent
c) Compressivestrength -DO- Minimumaverage35Kg/cm &individualresultmay
fallbelowupto20 percent
5 Cement Concrete
flooring/Mosaic
a) Waterabsorption 6tiles/2000tiles Maximum10 percent
b) Transversestrength 12tiles/2000tiles Wet Dry
c) Abrasion 6tiles/2000tiles Averagewearshallnotexceed3.5mm
6 Water Chemical Onceforapproval
b) Chlorides " 2000mg/L(PCC)&500mg/LforRCC
c) Organic(matter) " 200mg/LMax.
d) Inorganic(matter) " 3000mg/LMax.
e) Sulphate(mg/L) " 500mg/LMax.
f) TDS " 2000mg/LMax.
7 Cement Concrete AsperIS456-2000 Grade Specifiedcharacteristiccube
cubes ordinary and designation compressive strength.
controlled concrete
work m No. of M10
51m &ab 4+one M35
addsampleforeach M40
50m partthereof
ordinary and suces/60m3eachfor Average compressive strength of each day should
controlled notbe less than specified strengths subject to that 20%
7 and 28 daysfurther
concretefor cubes per day (i.e.) 1 per 5 may fall below specified
that everyday for
roadbridge strength up to its 85 percent.
daysthere after.
a) TMTbars 1test/40MT Fe-500 Quenched and Tempered (TMT) bars of
different diameters satisfying IS : 1786, with Yield
stress>500N/mm Tensilestrength>545N/mm
Andelongationmorethan12%
b) steel for general Gr.AFe410WS 410N/mm2
structural purpose
specificationIS 2062-
c) steel wires for 8.0 140Kg/mm2
prestressedconseteIS
1785 part-1 19 lab
85%theminimumspecifictensiledstrength
9 Teakwood AsperLOT
e) Moisturecement
10 AllOther Material As suggested by
Consultant/EIC/ TPI
asperrelevantIS
1) TestsasmaybedirectedbyEngineerinchargeasshownaboveshallhave to be conducted.
2) Above mentioned all the tests of the materials and others shall be carried
outforconstructionofeachandeverydifferentlotinGovernmentApproved laboratory.
3) AMC / PMC / TPI may ask Contractor to Carry Out Additional
LaboratoryTestforanyoftheAboveItemsifRequired.TheCostofsuch testing shall be borne
by the Contractor.
Signature/Stamp of Contractor AdditionalCityEngineer,
GENERAL MATERI AL SPECIFICATIONS FOR BRAND NAM ES TO BE USE D FORTH E
EXECUTION WORK S
SCHEDULE OF MAKE FOR CIVI LWORK
CEMENT (OPC /PPC) -53Grade:As perISI ando fmajor planthaving10LacsM.T.
production of single plant per annum. Samples of
cement arranged by the Contractor shal l be taken by
theEnginee r-in- Charge and got tested in accordance
with provisio ns of t he relevant BIS codes. In case test
results i ndi cate that the cement a rrange d by t he
Contracto r does no t conform to t he rel evant BIS
codes, the same sha llstand rejected and shal l be
rem oved from the site by the Co ntractor a t his own
cost withi n three days.
TMT REIN FORC EDMENT : As perIS-1786:1985(reaffirm ed2004).Reinforcem ent
bars shal l be High Yie ld St reng th Deform (TMT) Fe 500D
barsfromtheprimarymanufacturesconfirm ing toIS
Re-rolle d steel shall not be used in the work. The
Contracto rshall have toobtain an d furnish test
certificatestotheE ng ineer-in-
Chargeinrespe ctofal lsuppliesof
steelbroughtbyhim tothesiteofwork.Sam ple sshall also be
taken and got tested by the Engi neer-in- Char ge asper
the provisions i n this re gar d i n the relevant
BIScodes.Incasethetestresultsindicatethat thesteelarr an g
edby the Contractor does not confo rm to BIS codes, the
sameshal l sta nd rejected and shal l be removed from the
site of work within t hr ee days.
Str uctur al St eel :Jindal, TAT A, Sa il, Asian A s A ppro ved by Engg. In Charg e.
BRICK :Compr essive strength Avg.35KG.Persq.CM.
SAND : As per Mix design for concrete work or zone-II. For
Masonry and plaster work zone – III
COARSEAGGREGATE :Seval iya,S athamba, Ankod iya,S ayla RegionQuarryor
Ot herSourceAsApprovedbyEng g.InCha rge .
FINISHING/PAINT:
ACRYLICEMULSIONPAINT :ASIAN, BURGER, NER OLAC,JOTU N,ICIAs
Approved by E ngg.InCharge.
EXTERIORPAINT :ASIA N,BURGER,NEROLAC, JOTUN,ICIAs
Approved by Engg.InChar ge.
SYNTHETICEN EMAL :AS IAN,BURG ER,NEROLA C,JOT UNAsApprovedby
Engg.InCharge .
Note:Al l the Mate ria l to be approved by the Competent Authority and tested i f needed a s per
latest re levant IS, prio r to execution. Work Material If not mentioned i n a bove listsho uld
confirm to latest relevant IS revision & to be Approved by E ng g.in Charge /Consulta nt.
Signature/Stamp of Contractor AdditionalCityEngineer, South ZONE
13. કો ાકટર ારા ESIC અને EPFO ર શન ગેના અ. .ુ કોપ . નાણાં ખાતા સર લ
ુ ર નં- ૨૭, તા ૦૭/૦૧/૨૦૨૬ ુ બ ESIC અને EPFO
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
FOR BANK GUARANTEE
Seal and Signature of the Bidder Add. City Engineer (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on
the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible for
all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for
use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 15 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
QUALIFICATION INFORMATION
1. The information to be filled in by the Bidder in these statements & supporting documents submitted
in physical form will be used for the purpose of pre qualification.
2. All statements given here under shall be submitted by bidders on their original letter pads only with
stamp of firm of bidder and sign of the bidder.
3. Photocopy of any statements shall not be considered as valid document.
4. Information / Details to be submitted by the Bidders in the Performa mentioned under Statement.
All the documents submitted in the support of these statements shall be duly attested and certified true
1. I/We hereby declared that I/We am/are not partner(s) blacklisted or connected with firm blacklisted
by AMC,Government of Gujarat,Ministry of Road Transport & Highways/NHAI.
2. The I / We also hereby certifies that our firm M/s ________________________________has
neither abandon any work in India nor rescinded any contract awarded to us during last five years prior to
the date of this bid.
3. At present I/We am/are registered as approved contractor (s), firms in any state, CPWD / MES /
4. We, the partners/owners of this firm, hereby give an undertaking that we are jointly and severally
responsible to meet all the liabilities ever and above the business of this firm and make good the above
financial loss sustained by the Amdavad Municipal Corporation as a result of our abandoning the works
entrusted to us.
5. I /We hereby certify that all the statements made in the required attachments are true and correct.
6. The I / We undersigned hereby authorise(s) and request(s) any bank, person, firm or corporation
to furnish pertinent information deemed necessary and requested by the Department to verify this
statement or regarding my (our) competence and general reputation.
7. I /We hereby declare that I / We understand and agree that further qualifying information may be
requested, and I / We also agree to furnish any such information at the request of the AMC within the
prescribed time.
8. I / We further declare that my / our near relatives are not working in AMC as an Addl. C.E., Dy.
C.E., A.C.E., A.E., and T.S. as on today.
(Signed by an Authorized Representative of the Firm)
Name of the Representative
1. I / We hereby declare that I / we have visited the site and fully acquainted myself / ourselves with
the local situations regarding materials, labour and other factors pertaining to the work before submitting
this tender. I/We certify that I/We have inspected the location of the proposed work before quoting my/our
2. I/We have also inspected the quarries and borrow areas and satisfied myself/ourselves regarding
the quality, quantity, availability, and transport facilities for earth, stone, bricks, and, cement etc. through
the network of available roads and path ways required for the work.
3. I / We hereby declare that I / we have carefully studied all the terms and conditions of contract,
specifications mentioned in the tender documents and I / we do agree for compliance with the same
4. I/We shall execute the contract agreement with the AMC after award of work and before start of
(Signed by an Authorized Representative of the Firm)
Name of the Representative
APPLICABILITY OF PROVIDEND FUND AND MISCELLANEOUS PROVISIONS ACT
Successful bidder i.e. the agency whose tender is accepted by the AMC shall have to comply the
necessary formalities under the employees provided fund and Miscellaneous Provisions Act, 1952 as
Contributory Provident Fund Scheme is applicable to laborers engaged in construction activity and shall
have to submit proofs regarding deduction of provident fund and other dues and depositing the same with
government department under the act and the scheme regularly on monthly basis failing which no running
/ final bill payment will be made by the AMC to the contractor in any circumstances.
A certificate to the above effect has to be given by the contractor as under.
Declaration of Depositing Provident Fund contribution
This to certify that we have deducted the employees’ P.F. and deposited the same along with
employer’s contribution towards provident fund on labour charges / wages paid by us to the laborers
with Provident Fund Authority under our Provident Fund Code No.___________
We produce herewith the copies of the challans for the provident fund deduction and contribution
deposited as mentioned above.
(Signed by an Authorized Representative of the Firm)
Name of the Representative
To be notarized by Notary
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal Corporation,
A'bad specified up to his first written demand, without demur without delay and without the necessity of a
previous of judicial or administrative procedures and without the necessity to prove to the Bank the
defects or short comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender) we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of the
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted and
intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: - Construction of a new R.C.C. wall at various locations under Kankaria
Lake Front and Kankaria Zoo in Maninagar Ward, along with ancillary works as required
I/We the undersigned have carefully gone through and clearly understood the Tender documents
for the above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.
I/We have visited site & fully acquainted with local situations regarding materials, labours & others
factors pertaining to work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all
in accordance with the specification, designs, drawing and instruction in writing referred to in the said
document and with such materials as are provided for, at the respective rates which I/we have quoted in
the schedule-B or at such other rates as maybe fixed under the provisions of these conditions. In the event
of this tender being accepted I/We agree to enter into an agreement and when required and execute the
contract, according to your fom1 of agreement as or in default where of I/we bind myself/ ourselves to
forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC
from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take
necessary action as deemed fit.
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for the
sum as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer If
I/We fail to commence the work specified. Otherwise the said sum shall be retained, by the Employer as
on account of such. Security) ' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
with Conditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of
opening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroi duties and other prevailing Government taxes/charges on such items on which the same are leviable
and therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR. ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex
Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs ðgth ctœ Jfo ytuzoh R~gw &gu&e mbtg bgtoœt NY
&guje dKtNu. <&t <u mt&u fhthvºt fhJtltu hnuNu. ylu <u bwsc ftb NÁ fhJtle <theF
dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -15 fh<tk
J^w rJjkc ltk rfMmt btk <ubs Jfo ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh
xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk rJrNÐ rfMmt btk
atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t
aftme zu.Bgw.frb©h (œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe
fhJuht ChJtle sJtc>the ftuLx[tfxhle hnuNu.
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u
bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e
ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu
y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su
BGþrl.ftuvtuohuNl Juc mtEx www.ahmedabadcity.gov.in Wvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu
rlKog ytFhe hnuNu.
14. œhuf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl
MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht ^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu
rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ WvtzJtbtk lrn
ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk
ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s
c<tJuj søgtyu fhJwk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl
lu LþfNtl &Nu <tu <ule mkÃËKo sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh
ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg <ule sJtcœthe
ftuLx[tfxhle hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz
^me l vzu <ule sJtc>the vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu
mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt
rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu
ylu BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s
xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu <ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015 bwsc <btb
juch / bsqhtulwk dwsht< rcÕzekd yuLz y^h fLMx[[fNl Jfombtkk VhSgt< hSMx[uNl fhtJJt
ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu. juch yufx «btKu
ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu <ulu vubuLx
ytvJtbtk ytJNu lrn <ubs ct¤ bswhtulu ftb Wvh htFe NftNu lrn. <ubs JF<tu JF< Bgw.
frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu ftuLx[[tfxhlu ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu
LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn.
xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl
VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u
ykdu ftuLx[tfxh îtht ftuEvK «fthle J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb
ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE
sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule
LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt< &tg <tu <ule vtujem ftgoJtnele fu juch
yufx bwscle ftgoJtnele sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu
lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k btuò rJduhu
ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu
VhSgt< hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj
hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt< &tg <tu <ule vtujem ftgoJtnele fu juch
yufx bwscle ftgoJtnele sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu
lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k btuò rJduhu
ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu
VhSgt< hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj
hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc
yLþmhJtltk hnuNu. Mt>h ÃþM<eft øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21,
dtk^eldh&e b¤e hnuNu. su Juc mtEx www.ahmedabadcity.gov.in Wvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt
hnuNu. yt ykdultu mkÃËKo Fao <&t Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e
jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu
<ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb
atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo >ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu
<u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e ftuBÃGþxhbtk
Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu
J¤<hle btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult
jtJJtlt hnuNu. sgtk ftuE atuFJx l &E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk
<&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb NY fhtJJtLþk
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu
òu yum.ytu.yth.btk ytExb l ntug <tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t
<hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu. J^tht le
ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt,
CgMËaf ctuzo, jtj xul , cuhefuxekd xuv, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu
mtaJJtLþk hnuNu. ylu ftuEvK yfMbt< &Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus
ytme.mexe yuLSlegh©ele <ubtk mne juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt,
fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj ntug <tu <uLþk
ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu
ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe
BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf< <btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtKÍtul)
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au ylu
ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
" ybœtJtœ BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt œhuf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ J^thtu
ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe œhuf ytExbbtk J^^x &tg fu
ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ
J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t
ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, rœJt¤e, jøl meÍl fu yLg
<nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt
Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu.”
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the
works. Progress of work should be in proportion to time limit. The details of reinforcement
of R.C.C. work shall be as per design and instructions of Add. City Engineer and his order
will be considered final.
The contractor shall have to maintain account of steel, cement and other materials
that may be brought by him on site. This account shall be regularly maintained and kept
open for inspection by Municipal Staff. Watering of all the items shall be as per
instructions otherwise no payment shall be made to contractors. Mixing of concrete shall
be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C. works if
required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any
accident. The contractor shall arrange for barricading at night and arrangement of Pagi at
night to direct the traffic. He shall be responsible for any damage to public. If any incident
happen, during the execution of work. In case of dispute for unseen or overlooked items
the decision of the Dy. City Engineer shall be final. The contractor shall have to give site
clean of all rubbish during the work and at the time of completion of work and hand over
the site with final finishing of the work as directed. All the rejected materials shall be
removed from site within 24 hours by contractor at this risk and cost. Debris shall have to
cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose
contractor shall have to prepare through of bigger size and mix the mortar in the required
proportion. In on case he shall be allowed to mix the mortar either on floor or any finished
surfaces. The contractor shall have to make his own arrangement for water required for the
If any extra item crops up during the progress of work the same shall be carried out
by the contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis
based on latest SOR or if item is not available in SOR than based on current market rates.
In case of extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the
design of the propose work the contractor shall carry out the same at his quoted rates
without charges any extra and the contractor will have to carry out the works and he will
be paid at the rate quoted by him. No claim for extra rate for subsequent changes in site
and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the
contractors shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work.
Contractor will be fully responsible for compliance of the various provisions under
contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of
opening of the tenders for this work and that the tenderer shall not be allowed to withdraw
on modify the offer on his own during the period. If any tenderer withdraw or makes any
modifications or addition in the terms and conditions of his tender not acceptable to the
Municipal Corporation the Municipal Corporation shall without prejudice to any right or
remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of
order to start the work the penalty of the 0.01% tender Amount per day of delay of start
shall be recovered separately from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted
in form of demand draft.
iv) Condition of Form - B1 only Standard Specification of material & code of practice
will be applicable. Form B1 can be is available in website. Specification shall be as
per ' R & B Dept. - Govt. of Gujarat booklets of Building Works & and Road
Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
Other techinical condition will be applicable as per tender condition only.
Contractor's signature & Stamp ADD CITY ENGINEER
Mobile No.:- (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No.367 R.C.C.Wall.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].