Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.7 L
EMD Value
₹31,767
Closing Date
12 Oct 2026, 6:55 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ASSISTANT EXECUTIVE ENGINEER
Office of the Executive Engineer, LID and EW Division, Malappuram, civil station, Malappuram District Panchayath Building, Malappuram, 676505
Annual Plan-Malappuram DP (2026-27), Project No 175-27 -Fiber Shatter at Puthichira Peedikapadi at Angadippuram-General Civil Work
2026_LSGD_875300_5
DB1/TN/AEE/20/26-27
Open Tender
Civil Works - Canal
Item Rate
365 days
MALAPPURAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹31,767
Yes
5 Oct 2026
5 Oct 2026
14 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Fibre shutter | |||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 0.6 | cum | - | - |
| 1.002 | OD146459/2026-2027:(Od from 60.63.1) FRP CHANNELS- Supplying and fixing FRP Channels of suitable profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental officers. | 40 | metre | - | - |
| 1.003 | OD146474/2026-2027:(Od from 60.63.2) FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental officers. | 50.88 | sqm | - | - |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.95 | cum | - | - |
| 1.005 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 3.78 | sqm | - | - |
| 1.006 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 22.98 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_1486691.xls
BOQ • 0.30 MB
PRELIMINARY AGREEMENT.pdf
Tender Documents • 0.15 MB
E-PAYMENT.pdf
Tender Documents • 0.01 MB
FORM OF TENDER.pdf
Tender Documents • 0.18 MB
INTEGRITY PACT.pdf
Tender Documents • 0.05 MB
AFFIDAVIT.pdf
Tender Documents • 0.35 MB
05NIT.pdf
Tender Documents • 0.02 MB
05SBD.pdf
Tender Documents • 1.63 MB
05.pdf
Tender Documents • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .