Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance GHUMARWIN DIVISION HP PWD GHUMARWIN | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Tender fees and fdr not submitted |
| 5 | Rejected-Technical BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | Rejected-Technical Tender fees and fdr not submitted |
Tender Value
₹8.7 L
EMD Value
₹21,680
Closing Date
18 Jul 2022, 11:00 amClosed
Executive Officer
Municipal Council Paonta Sahib
Construction of proposed stage lower ground level in playground, Paonta Sahib ( SH Columns, roof beams and slab , sleeve truss, prepainted sheets)
2022_UDDHP_62272_5
JEMCB/0622/1
Open Tender
Civil Works
Item Rate
60 days
Paonta Sahib
Please refer detailed tender notice
3 documents required · 3 mandatory
₹500
Executive Officer
₹21,680
2 Aug 2022
29 Jun 2022
18 Jul 2022
29 Jun 2022
18 Jul 2022
29 Jun 2022
Amount
Earth work in ecxcavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains 9not exceeding 1.5m in width or10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kind of soil.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns,etc. for mass concrete.
Suspended floors, roofs, landings, balconies and access platform
Lintels, beams, plinth beams, girders, bressumers and cantilevers with water proof ply 12mm thcik.
Columns, Pillars, Piers, Abutments, Posts and struts.
Stairs, (excluding landings) except spiral staircases
Providing and laying in position cement of sprcified grade excluding the cost of centering and shuttering- all work up to plinth level: 1:5:10 (1 cement : 5 sand : 10 graded stone aggregate 40 mm nominal size) plinth including carriage of material in all leads & lifts.
Providing and laying in position cement of sprcified grade excluding the cost of centering and shuttering- all work up to plinth level: 1:4:8 (1 cement : 4 sand : 8 graded stone aggregate 40 mm nominal size) plinth including carriage of material in all leads & lifts.
Providing & laying cement concrete having strength of M-20 mixed design aggregate mechanically mixed and vibrated and curing complete excluding cost of form work and reinforcement for reinforced concrete works including carriage of material in all leads & lifts. Foundations, footings, bases of column and the like and mass concrete.
Column, pillars, posts and struts upto all heights.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
mehboob hassanb
JAGJEET SINGH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .