| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC COURT ROAD UTTARKASHI | ₹2.1 Cr | L1 | Accepted-AOC qualified |
| 2 | L2₹2.1 Cr+₹89,283.65 (0.42%)Rejected-Finance HARIDWAR | ₹2.1 Cr+₹89,283.65 (0.42%) | L2 | Rejected-Finance not qualified |
| 3 | L3₹2.2 Cr+₹5.8 L (2.73%)Rejected-Finance 37 MOHAN VATIIKA ACHIEVERS HOME PUBLIC SCHOOL WALI GALI JAGJEETPUR KANKHAL HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | ₹2.2 Cr+₹5.8 L (2.73%) | L3 | Rejected-Finance not qualified |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
19 Sept 2024, 12:00 pmClosed
SE EDC Srinagar Garhwal
SE EDC Srinagar Garhwal
Replacement of 11 KV Jalsansthan Sumari feeder Srinagar ACSR Rabbit Conductor to ACS 52 88 sq mm AL-59 insulated covered conductor under EDD Srinagar on Semi Turnkey Basis
2024_UPCL4_75146_1
E-Tender no.32/EDC(s)/2024-25
Open Tender
Electrical Works
Turn-key
180 days
Srinagar
Replacement of 11 KV
Jalsansthan Sumari feeder
Srinagar ACSR Rabbit
Conductor to ACS 52 88
sq mm AL-59 insulated
covered conductor under EDD
Srinagar on Semi Turnkey
Basis
3 documents required · 3 mandatory
₹11,800
EE ETD Srinagar Garhwal
₹3.8 L
4 Jan 2025
30 Aug 2024
20 Sept 2024
30 Aug 2024
19 Sept 2024
30 Aug 2024
Amount
Material
Holding Clamp for SP-33/55 with N&B.
11 KV ACS AL-59 Equivalent 52.88 sqmm Covered Conductor (SS4240813 & SS4240814) EN 50397-1:2006 by Electron beam radiation process
MVCC Accessories as per EN 50397-2.
Tension Clamp & Ball
11 KV Suspension ties on every Pin Insulator.
11 Kv IPC for CC to CC Connection in every section Pole.
11 Kv IPC for CC to Bare Connection at both end and Tapping.
11 KV Mid Span Jointing Kit at every 500mt. Cable drum.
Supply IPC with Aluminium bail for earthing
Labour
Cartage of SP-55/33 Poles from store centre to nearest road site with loading, unloading at both points. (Loading, unloading plus carriage per pole) (0 to 50 km).
ST Pole SP-55
ST Pole SP 33
Cartage of other material by vehicle from store centre to nearest road site including loading and unloading at both ends. (0 to 20 km).
Head load of SP-55/33 Poles from store centre to nearest road site with loading, unloading at both points. (Loading, unloading plus carriage per pole) (0 to 1 km).
ST Pole SP-55
ST Pole sp-33 (Bottom Portion Hot dip)
Head load cartage of small material by vehicle from store centre to nearest road site including loading and unloading at both ends. (0 to 1 km).
Excavation of earth for pole pit of size 0.9X0.9X1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
Grouting of pole in size 0.45X0.45X1/9 of the support in CC ratio 1:4:8 (1 cement:4graded stone 20mm nominal size:8coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction manual.
Erection of following Single support pole in proper level and alignment alongwith fixing of all accessories (STP SP-33).
Erection of following Single support pole in proper level and alignment alongwith fixing of all accessories (STP SP-55).
Proper Alignment of Tilted Poles
T/f Jumpering and connection of Covered Conductor
Jumpering and connection of Section Pole
painting of Poles with angle and channel and all steel part by one coat red oxide primer and two coats of aluminium paint and two strip of flourescent alternate red and white paint 30 Cm wide and 1.5 Mtrs from ground level
Fabrication of MS Chanel and angle
Removing of old conductor with opening of binding,jumpering,and making of bundle with carriage from pit site to JE store including loading/unloading Complete work.
Rabbit Conductor
Laying,Spreading, Stringing and sagging of 11 KV Line in 3-phase of the following wire as phase wire including proper sagging l with binding and jumpering as per user manual and sagging chart. As per EN 50397 Part3.
11 KV ACS AL-59 Covered Conductor (120sqmm)
Fixing of MVCC Accessories
33KV 90 KN Tension clamp with Bail and IPC.
33KV Suspension ties.
33Kv IPC for CC to CC Connection.
33Kv IPC for CC to Bare Connection.
33KV Mid Span Jointing Kit.
Fixing of IPC with Aluminium bail for earthing .
Head load cartage of small material by vehicle from store centre to nearest road site including loading and unloading at both ends. (0 to 1 km).
safe cartage of weasel/rabbit conductor scrap from road side to store Srinagar
Sagar Engineering Company
M/s S S ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .