Executive Engineer, Petlad Irrigation Division Petlad
Constructing New Canal Syphone In Place of Existing Pipe Syphon @ Ch 1415 m Pij Minor (Nadiad Petlad Highway)
277523
19 of 2025-26
Open
Miscellaneous Works
Works
Anand
8 documents required · 7 mandatory · 1 optional
₹2,400
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹66,000
Yes
19 Feb 2026
19 Feb 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
BILL OF QUANTITIES
Name of work :- CONSTRUCTING NEW CANAL SYPHON IN PLACE OF EXISTING PIPE
SYPHON @ CH.1415M. PIJ MINOR (NADIAD PETLAD HIGHWAY)
Estimated Rate without Total Amount
Estimated Rate without Total Amount
Sr.No Quntity Item Unit Without GST Rs.
In figures In World
Dismanting the existing R.C.C Pipes Err:508
including sorting out and stacking of
the useful materials of the following
diameters including refilling the
trenches etc. complete as directed.NP-
2 class 1200 mm dia. Pipe.
Dismantling the existing brick Err:508
masonary including sorting out and
stacking the usefull material and
2 16.50 removing the debris and making good CM 750.90
the damages etc complete as directed
In Cement Mortar
Dismantling the RCC work and Err:508
disposing off the stuff including
stacking of the usefull materials etc
3 5.534 complete as directed. (a) Light CM 1732.80
Reinforcement (Main Bar upto 16mm
Dismantling the existing foundation Err:508
concrete including sorting out the
dismentalled stuff and stacking the
useful material, removing the debries
and making good the damages etc.
complete as and where directed.
Cement Concrete
Dismantling the C.C lining including Err:508
diposing off the dismantalled materials
5 397.20 as directed etc. complete. (A) 7.50 CM SM 86.50
Excavation for foundation in all
sorts of soil including yellow sandy
gravelly soils, soft & hard murrum
etc in dry condition including
773.00 depositing the excavated stuff in CM 107.80
uniform layers in banks or as and
where directed etc complete for
lead upto 500m and all lift (BY
MACHINERY)-Including Dewatering
Providing & Laying in position
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI"
including necessary formwork,
centering, scaffolding, compaction by
vibrator, curing as directed with all
lead & lift etc complete without
dewatering and excluding the cost of
steel reinforcement.
(A)For Footing of Column / Err:508
Abutment / Pier / Bottom Slab of
(A) 263.000 Barrel / Plinth Course / Coping / CM 4190.00
Approach Slab etc.C. C. M-15 and
(C)For Footing of Column / Err:508
Abutment / Pier / Bottom Slab of
(B) 94.000 Barrel / Plinth Course / Coping / CM 4651.00
Approach Slab etc..(e) Concrete Grade
M-25 and MSA-20mm
(E) For Column / Beam / Solid Slab of Err:508
Road Bridge / Barrel / Cutoff wall etc..
(C ) 168.000 (q) Concrete Grade M-25 and MSA- CM 5642.00
Providing & Laying in position Err:508
"NOMINAL MIX" cement concrete using
cement, sand and crushed aggregate
by mass and machine mix for
C.C./R.C.C work incl. necessary
formworks centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc
8 249.00 complete Without Dewatering and RM 3346.00
excluding cost of steel reinforcement.
(A) For Foundation concrete / General
purpose(F)For Lean Concrete Below
Barrel/Well Concrete Grade M-10 and
Providing & Placing in position Err:508
reinforcement bars including cutting,
bending, welding joints where
10 27.12 necessary, hooking etc. complete as MT 82019.00
per drawing for all lead and lifts. (B)
TMT / CRS (FE 500D)
Back filling the foundation trenches Err:508
around the structures etc with selected
excavated stuff including watering,
11 73.00 ramming, compacting etc. complete. CM 36.90
Providing and Fixing in Position PVC Err:508
Heacy Duty Water Stops in barrels,
troughs and wing walls with 25mm
wide expansion joint as shown in
drawing including filling the joints with
12 9.04 asphalt pad or bitumen cork board of m 587.70
approved quality (Asphalt Pad or
Bitumen Cork Board Will Be Paid
Separately) (A) 225 mm WIDE PVC
Providing and Filling the
polysulphide joint sealent of the
approved make in the expansion
and contraction joints in the CC
Lining including clearing the joints
with air water jet
Providing rubble and sand layer Err:508
including supplying of rubble & coarse
clean sharp sand at site including
spreading rubble & coarse sand
materials in 25 cm layer including
14 90.00 filling in the gaps in rubble, and CM 1155.90
levelling etc. complete as directed(80%
rubble & 20% coarse sand) including
consolidation, watering etc. complete.
Providing and fixing in position Err:508
( different diameter ) NP2 R.C.C. pipe
with collar including filling and
caulking the joints with cement mortar
15 30.00 1:1 proportion, finishing to design Rmt 1020.20
grade and level curing etc. complete for
all leads and lifts.(a)NP-2 class
Carrying out "Structure Plate load Err:508
Test" as per GERI -Vadodara's SOR for
16 2.00 the Year 2025-26 (SOR available on Kg. 43912.00
Providing temporary all weather and Err:508
fair weather diversion suitable for
traffic during the construction period
of the structure including providing
17 66.00 necessary drain diversion and all safty Rmt 7720.00
measures including red lamps/ signals
at night for traffic etc. comp.
Total Rs…(Without GST)
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of
Division or as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule
should be filled in inkand total of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all
respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. KM= Kilo metre, Kg= Kilo gram MT -
Metric Tonne Rmt = Running metre, CM= Cubic metre, SM= Square metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs.5483.37/M.T. (Rate as per
CGWRD SOR 2023-24
Deputy Executive Engineer Divisional Account Officer
Sojitra Irrigation Sub Division Petlad Irrigation Division
Executive Engineer
Petlad Irrigation Division
Percentage Calculation Percentage Calculation
Name of work :- CONSTRUCTING NEW CANAL SYPHON IN PLACE OF EXISTING PIPE SYPHON @ CH.1415M. PIJ MINOR (NADIAD PETLAD HIGHWAY)
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL Machinery Total Other Total Other TOTAL Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL Machinery Total Other Total Other TOTAL Total Item Cost Total %
Sr. Estimated but according to Per Unit Cost Per Unit Cost Unit Cost Per Unit Bitumen Unit cost Per Unit Machinery Comodity Comodity Cost cost per
No. may be more estimated Rs. Cost Cost Per Unit Unit
Dismanting the existing R.C.C Pipes
including sorting out and stacking of
the useful materials of the following
diameters including refilling the
class 1200 mm dia. Pipe.
Dismantling the existing brick
masonary including sorting out and
stacking the usefull material and
the damages etc complete as directed In
Dismantling the RCC work and
disposing off the stuff including
stacking of the usefull materials etc
Reinforcement (Main Bar upto 16mm
Dismantling the existing foundation
concrete including sorting out the
dismentalled stuff and stacking the
useful material, removing the debries
and making good the damages etc.
complete as and where directed.
Cement Concrete
Dismantling the C.C lining including
diposing off the dismantalled materials
Percentage Calculation Percentage Calculation
Name of work :- CONSTRUCTING NEW CANAL SYPHON IN PLACE OF EXISTING PIPE SYPHON @ CH.1415M. PIJ MINOR (NADIAD PETLAD HIGHWAY)
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL Machinery Total Other Total Other TOTAL Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL Machinery Total Other Total Other TOTAL Total Item Cost Total %
Sr. Estimated but according to Per Unit Cost Per Unit Cost Unit Cost Per Unit Bitumen Unit cost Per Unit Machinery Comodity Comodity Cost cost per
No. may be more estimated Rs. Cost Cost Per Unit Unit
Excavation for foundation in all sorts of
soil including yellow sandy gravelly
soils, soft & hard murrum etc in dry
condition including depositing the
excavated stuff in uniform layers in
complete for lead upto 500m and all lift
(BY MACHINERY)-Including Dewatering
Providing & Laying in position "DESIGN
MIX" cement concrete using cement
sand and crushed aggregate for C.C./
R.C.C work by "FLORI" including
necessary formwork, centering,
scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc
complete without dewatering and
excluding the cost of steel
(A)For Footing of Column / Abutment /
Pier / Bottom Slab of Barrel / Plinth
C. M-15 and MSA-20 mm
(C)For Footing of Column / Abutment /
Pier / Bottom Slab of Barrel / Plinth
(e) Concrete Grade M-25 and MSA-
(E) For Column / Beam / Solid Slab of
Road Bridge / Barrel / Cutoff wall etc..
Providing & Laying in position
"NOMINAL MIX" cement concrete using
cement, sand and crushed aggregate by
mass and machine mix for C.C./R.C.C
work incl. necessary formworks
centering, scaffolding, compaction by
vibrator, curing as directed with all lead
& lift etc complete Without Dewatering
reinforcement. (A) For Foundation
concrete / General purpose(F)For Lean
Concrete Below Barrel/Well Concrete
Grade M-10 and MSA-40 mm
Providing & Placing in position
reinforcement bars including cutting,
bending, welding joints where
drawing for all lead and lifts. (B) TMT /
Back filling the foundation trenches
around the structures etc with selected
ramming, compacting etc. complete. (By
Percentage Calculation Percentage Calculation
Name of work :- CONSTRUCTING NEW CANAL SYPHON IN PLACE OF EXISTING PIPE SYPHON @ CH.1415M. PIJ MINOR (NADIAD PETLAD HIGHWAY)
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL Machinery Total Other Total Other TOTAL Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL Machinery Total Other Total Other TOTAL Total Item Cost Total %
Sr. Estimated but according to Per Unit Cost Per Unit Cost Unit Cost Per Unit Bitumen Unit cost Per Unit Machinery Comodity Comodity Cost cost per
No. may be more estimated Rs. Cost Cost Per Unit Unit
Providing and Fixing in Position PVC
Heacy Duty Water Stops in barrels,
troughs and wing walls with 25mm
wide expansion joint as shown in
drawing including filling the joints with
approved quality (Asphalt Pad or
Bitumen Cork Board Will Be Paid
Separately) (A) 225 mm WIDE PVC
Providing and Filling the polysulphide
joint sealent of the approved make in
the CC Lining including clearing the
joints with air water jet
Providing rubble and sand layer
including supplying of rubble & coarse
clean sharp sand at site including
spreading rubble & coarse sand
materials in 25 cm layer including
levelling etc. complete as directed(80%
rubble & 20% coarse sand) including
consolidation, watering etc. complete.
Providing and fixing in position
( different diameter ) NP2 R.C.C. pipe
with collar including filling and
caulking the joints with cement mortar
and level curing etc. complete for all
leads and lifts.(a)NP-2 class 450 mm dia
Carrying out "Structure Plate load Test"
as per GERI -Vadodara's SOR for the
Providing temporary all weather and fair
weather diversion suitable for traffic
during the construction period of the
structure including providing necessary
drain diversion and all safty measures
including red lamps/ signals at night
for traffic etc. comp.
Signature of Contractor Deputy Executive Engineer Executive Engineer
Sojitra Irrigation sub Division Petlad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 19 of 2025-26 online (1).pdf
1 Front Page Pij 1415 m.pdf
2 Notice Inviting online Tender.pdf
NEW SBD BOOK.pdf
Sec 5A Material Specifications.pdf
Sec 5B Itemwise specification.pdf
Sec 5C General Condition.pdf
Sec 5D Work and Site Condition.pdf
Sec 5E Special Condition.pdf
Sec 7 BOQ and POL.pdf
Section 10 Testing Norms.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .