Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
31 Jul 2026, 6:30 pm
HOD (Procurement)
Direct Assessment (DA) study of operational natural gas pipelines.
314001
GTL/PROC/2026/05/O/491
Open
Pipes and Pipe related activities
Gandhinagar
₹5,000
GSPL TRANSMISSION LIMITED
₹5.8 L
7 Jul 2026
7 Jul 2026
7 Jul 2026
31 Jul 2026
7 Jul 2026
Tender: Direct Assessment (DA) study of operational natural gas pipelines Tender no.: GTL/PROC/2026/05/O/491 [(n)Procure Tender ID: 314001]
Section-VIII PRICE BID FORMAT
(Amount in INR)
SN GTL Base location Pipeline Section Dia. (inches) Length (KM) Scope Unit Quoted Amount excl. GST Rate of GST incl. Cess (in %age) Quoted Amount incl. GST Cross-verification
1 Ahmedabad Suzuki Connectivity (TEE at 50 KM of 12" MBPL) 6" 0.247 All 3 Assessments- 1) ECDA 2) ICDA 3) SCCDA LS 0
2 Ahmedabad Honda Connectivity (TEE at 36 KM of 12" MBPL) 6" 2.63 LS 0
3 Ahmedabad Simplot Connectivity (TEE at 24 KM of 12" MBPL) 6" 3.178 LS 0
4 Ahmedabad Mandali-Becharaji 12" 51.44 LS 0
5 Rajkot Bhodighodi Ambardi 12" 46.984 LS 0
6 Bharuch Amboli Dahej 24" 38.6 Only ECDA LS 0
7 Bharuch Paguthan Baroda 24" 64.064 LS 0
8 Bharuch Bhadbhut Gana 30" 108.206 LS 0
Total Amount: 0 0 0 0
1 Given Schedule of Rates (SOR) to be treated in conjunction with scope of work/services/supply & terms and conditions given along with enquiry documents. Owner shall have right to cancel any pipeline ILI/ line item as per the suitability of operational gas grid and same shall not be tenable to the bidder/ contractor.
2 The above prices is for the complete scope of wok /services/ supplies as defined in the bid/enquiry document. Any materials, works/services required for completion of the work as per scope but not defined in the SOR (schedule of rates), the same is deemed to be included in the quoted price as above.
3 The bidder shall quote the prices strictly as per the price bid format. Any bid not conforming to the price bid format shall be rejected.
4 The bidder shall have to quote the rates for each material/service items else bid shall be treated as non-responsive and shall not be evaluated further.
5 Rates quoted by the bidder shall remain firm and fixed till the successful completion of work and shall not be revised on any account whatsoever.
6 The bid shall be evaluated on the basis of total cost to the company.
7 If the price bid submitted by bidder elsewhere other than Price bid (SOR) stage, the bid shall not be considered for further bid evaluation and treated as rejected.
8 After price bid opening and evaluation, Reverse Auction amongst qualified bidders after eliminating H1 bidder (if 3 or less bidders qualified for RA, all bidders shall be allowed for RA) shall be carried out through e-auction portal.
9 Withholding tax shall be applicable on the entire contract value as per the prevailing rate.
10 Owner reserves the right to cancel and/or alter bidding process at any stage without assigning any reason. Owner also reserves the right to reject any or all of the bids received at its discretion, without assigning any reasons whatsoever.
11 GTL reserves the right to reject any or all bid without giving any reason whatsoever.
12 In case of mixed supply, composite supply and works contract a single rate of GST shall be applicable.
SECTION-XI Pre-bid Queries form for the tender "Direct Assessment (DA) study of operational natural gas pipelines". Tender no.: GTL/PROC/2026/05/O/491 (n)Procure Tender ID: 314001
Sr. No. Bid Reference Bidder’s Queries/ Observation/Comments GTL's Response
Section Clause No. Clause heading Page no. Original Clause as per Tender doc.
Name of Bidder:
For ex. Section-II 10.0 Language of bid 16 The Bid, as well as all correspondence and documents relating to the bid exchanged by the Bidder and Owner, shall be English Only. abc xyz
Note: Queries must be submitted in this format only through e-mail on GTL's contact details before deadline of query submission date as provided in RFP/ Amendments/ updated during pre-bid meeting.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
RFP DA T.pdf
Anx-2.1 Guideline for HSE Planning at site.PDF
Anx-2.2 Guideline for HSE Violation recovery.PDF
Section-VII (F and P) DA.doc
DOC
Section-VIII SOR DA.xlsx
XLSX
Section-XI (Pre bid queries form) DA.xlsx
XLSX
Download all tender documents and submit your bid