| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.9 CrAdmitted-Finance | -40.86% | ₹24.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹30.1 Cr+₹5.2 Cr (20.9%)Admitted-Finance C 20A METAL COLONY AMBABARI JAIPUR DIST JAIPUR RAJSTHAN PIN 302023 | JAIPUR | RAJASTHAN | 302023 | -28.51% | ₹30.1 Cr+₹5.2 Cr (20.9%) | L2 | Admitted-Finance |
| 3 | L3₹30.8 Cr+₹5.9 Cr (23.8%)Admitted-Finance BEHIND KRUSHI VAIBHAV LAWN BALAJI NAGAR DONGAON ROAD MEHKAR TQ MEHKAR DIST BULDHANA | -26.81% | ₹30.8 Cr+₹5.9 Cr (23.8%) | L3 | Admitted-Finance |
| 4 | L4₹31.4 Cr+₹6.5 Cr (26.1%)Admitted-Finance FLAT NO 202 RAHUL ENCLAVES S NO 116 7 1 PLOT NO A WARJE PUNE 411058 | PUNE | MAHARASHTRA | 411058 | -25.45% | ₹31.4 Cr+₹6.5 Cr (26.1%) | L4 | Admitted-Finance |
| 5 | L5₹32.8 Cr+₹7.9 Cr (31.9%)Admitted-Finance | -21.99% | ₹32.8 Cr+₹7.9 Cr (31.9%) | L5 | Admitted-Finance |
Tender Value
₹42.1 Cr
EMD Value
₹42.1 L
Closing Date
17 Jan 2025, 5:30 pmClosed
Chief Engineer NH (PW) Konkan bhavan Navi Mumbai
Chief Engineer NH (PW) Konkan bhavan Navi Mumbai
Performance based Maintenance Contracts (PBMC) for Mehkar Chikhli section of NH548CC (Design km. 0.00 to km 39.700) to Two Lane with Paved shoulders Configuration of NH548CC in the state of Maharashtra for 5 year Maintenance Period.
2024_MoRTH_830553_1
15/EENH/AKL/2024-25 Dt.11/10/2024
Open Tender
Civil Works - Highways
Percentage
1825 days
Mehkar
Please refer tender documents
5 documents required · 5 mandatory
₹11,800
Executive Engineer NH Dn Akola
₹42.1 L
Chief Engineer NH (PW) Konkan bhavan Navi Mumbai
30 Apr 2025
14 Oct 2024
20 Jan 2025
14 Oct 2024
17 Jan 2025
14 Oct 2024
1 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | ROUTINE MAINTENANCE ( Lumpsum)
( For Toal Length 60 Months ) | 1 | Lumpsum | 10,53,19,000 | ₹10,53,19,000 |
| 1.2 | INITAL RECTIFICATION WORKS ( Lumpsum)
(To be completed within 06 months from the notice to proceed) | 1 | LumpSum | 4,20,50,000 | ₹4,20,50,000 |
| 1.3 | PERIODICAL MAINTENANCE WORKS (LumpSum)
(To be completed as decided by the Engineer but overlay of Highway to be completed within 24 Months ( as the case may be) from the date of notice to proceed) | 1 | LumpSum | 24,00,47,000 | ₹24,00,47,000 |
| 1.4 | Emergency Works ( Unit Rates) | 1 | LumpSum | 1,12,14,000 | ₹1,12,14,000 |
| 1.5 | Incident Management System (Ambulance) | 1 | LumpSum | 1,50,00,000 | ₹1,50,00,000 |
| 1.6 | Electrical Charges and Maintenance | 1 | LumpSum | 74,40,000 | ₹74,40,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.28 MB
Tenderdocument.rar
Tender Documents • 2.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .