Loading…
Loading…
| Sl No | Description | Qty | Unit | sasikumar L2 | BAIJU S L1 |
|---|---|---|---|---|---|
| 1.00BULIDING MAINTANANCE | |||||
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 0.48 | cum | 800 ₹386.4 | 728.74 ₹351.98 Lowest |
| 1.00 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 1.09 | cum | 7,000 ₹7,658 | 6,831.14 ₹7,473.27 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.58 | cum | 9,500 ₹43,472 | 9,235.97 ₹42,263.8 Lowest |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 11.97 | sqm | 970 ₹11,610.9 | 961.24 ₹11,506.04 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 19.5 | sqm | 800 ₹15,600 | 762.88 ₹14,876.16 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 59.85 | kilogram | 150 ₹8,977.5 | 112.43 ₹6,728.94 Lowest |
| 1.01 | 10.5.1:Providing and fixing 1 mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using M.S. angels 40x40x6 mm for diagonal braces | 3.78 | sqm | 6,000 ₹22,680 | 5,995.63 ₹22,663.48 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 545 | kg | 200 ₹1,09,000 | 178.42 ₹97,238.9 Lowest |
| 1.01 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 150 | kg | 200 ₹30,000 | 194.27 ₹29,140.5 Lowest |
Tender Value
₹6.8 L
EMD Value
₹16,949
Closing Date
16 Oct 2025, 5:00 pmClosed
Assistant Engineer
Office of the Assistant Engineer LID EW Section,Perumat
2025-26 PR NO 138 HOMEO DISPENSARY MAINTENANCE IN PERUMATTY GP
2025_LSGD_805693_5
2AELID/EW/PRTY/2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
PERUMATTY
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,495
₹16,949
22 Nov 2025
7 Oct 2025
18 Oct 2025
7 Oct 2025
16 Oct 2025
7 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1342148.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .