Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L Quoted ₹5.5 L | L1 | Accepted-AOC due to L1 |
| 2 | L2₹7.0 L+₹1.5 L (27.5%)Rejected-Finance | ₹7.0 L+₹1.5 L (27.5%) | L2 | Rejected-Finance Rates are not justified |
| 3 | L3₹7.8 L+₹2.4 L (43.1%)Rejected-Finance | ₹7.8 L+₹2.4 L (43.1%) | L3 | Rejected-Finance Rates are not justified |
| Sl No | Description | Qty | Unit | HimTop Construction L1 | C AND E CONSULTANCY L3 | Shamoo Kumar L2 |
|---|---|---|---|---|---|---|
| 1.00 | Preparation of detailed project report for improvement of drinking water facilites in varous panchyats / PC habitations of rural water supply scheme as per norms of CPHEEO and NRDWP Guidelines, suitable to NDB /Bricks/NABARD funding projects including site plan, marking of proposal, preparation of L-section of rising main and distribution system etc. The map shall showing administrative boundaries of village and project area, The drawing shall be prepared on autocad, marking of geographical co-ordinate ete, and nicely binded in four copy of DPR shall be supplied in hard and 1 no copy in soft format complete in all resnects as ner direction of Engineer-in-Charge. | 1 | No. | 1,50,000 ₹1,50,000 Lowest | 2,00,000 ₹2,00,000 | 1,90,000 ₹1,90,000 |
| 1.01Preparation of detailed project report | ||||||
| 1.02i) Basic Planning consideration , design period, population, forcast, available water source and water supply scenario, indentification of water sources, site selection of pump house, water treatment plant and other structures and alignment of distribution system as per prescribed standards and norms, | ||||||
| 2.00Design work | ||||||
| 2.01 | i) Rising Main I/C Classifaction of R/Main , Design of Pumping Machinery ). | 5 | No. | 13,000 ₹65,000 Lowest | 19,000 ₹95,000 | 18,000 ₹90,000 |
| 2.02 | i) Gravity Main | 30 | No. | 9,000 ₹2,70,000 Lowest | 13,000 ₹3,90,000 | 11,000 ₹3,30,000 |
| 2.03 | C) Detail Designing of MST, SST & Estimation of WTP . | 5 | No. | 12,000 ₹60,000 Lowest | 19,000 ₹95,000 | 17,000 ₹85,000 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
12 Jun 2025, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Baijnath District Kangra HP
Consultancy service for preparation of Detailed Project report
2025_HPIPH_106627_1
1453-1502 dated 31-05-2025
Open Tender
Civil Works - Others
Item Rate
90 days
Baijnath
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer
₹6,000
14 Oct 2025
31 May 2025
13 Jun 2025
31 May 2025
12 Jun 2025
31 May 2025
Amount
Preparation of detailed project report for improvement of drinking water facilites in varous panchyats / PC habitations of rural water supply scheme as per norms of CPHEEO and NRDWP Guidelines, suitable to NDB /Bricks/NABARD funding projects including site plan, marking of proposal, preparation of L-section of rising main and distribution system etc. The map shall showing administrative boundaries of village and project area, The drawing shall be prepared on autocad, marking of geographical co-ordinate ete, and nicely binded in four copy of DPR shall be supplied in hard and 1 no copy in soft format complete in all resnects as ner direction of Engineer-in-Charge.
Preparation of detailed project report
Design work
i) Rising Main I/C Classifaction of R/Main , Design of Pumping Machinery ).
i) Gravity Main
C) Detail Designing of MST, SST & Estimation of WTP .
Shamoo Kumar (BID ID -522308)
C AND E CONSULTANCY (BID ID -524054)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .