Loading…
Loading…
Tender Value
₹10.4 L
EMD Value
₹20,800
Closing Date
27 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
TRD
9 conditions · 3 needing a document upload
The tenderers are required to submit scanned copy of cancelled cheque and NEFT mandate form alongwith the offer.
The bidder should submit PAN/ADHAR alongwith the offer.
All the bidders / tenderers should ensure that they are GST compliant and their quoted tax structure / rates are as per GST law.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tender Earnest money deposit: -All the tenderers / Contractors have to deposit full tender earnest money deposit as stipulated in the tender document through online modes only. Other option of deposition of EMD will not be accepted and will not be consider for tendering process.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
If the e-tenderer/s deliberately give/s wrong information in his/their e-tender or creates/create circumstances for the acceptance of his/their e-tender, Railway reserves the right to reject such e-tender at any stage.
Railway reserves the right to either cancel the e-tender or reject any or all the e-tenders without assigning any reason thereof.
In addition to Indian Railway General Conditions of Contract 2022, as amended upto date, special conditions as per tender document shall also apply.
Conducing preliminary survey & inspection and preparation of 'Feasibility Report' in connection with strengthening/repairment/re-construction work at Bridge No. 531 of DDU Division of EC Railway.
TRD-OT-12-Br-Survey-25-26~ECR
TRD-OT-12-Br-Survey-25-26
Open
Works - General
6 Months
Chandauli, Uttar Pradesh
₹0
₹20,800
27 Jan 2026
3 Jan 2026
13 Jan 2026
15 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 10,38,400 | ||
| — | 40.00 | — | — | ||
| Geotechnical Investigation: Conduct borehole drilling, standard penetration tests (SPT), and laboratory soil testing for foundation design at pier location. | — | — | — | 2,59,600 | |
| — | 1.00 | — | — | ||
| General Arrangement Drawing (GAD): Preparation of detailed GAD for pier location including coordinates, elevation levels, foundation outline, OHE mast positioning. | — | — | — | 59,000 | |
| — | 1.00 | — | — | ||
| Design and Drawing of Foundation and Substructure: Engineering design, detailing and drawing of RCC portal foundations and piers to support OHE portals at the identified location. Includes reinforcement detailing. | — | — | — | 3,06,800 | |
| — | 1.00 | — | — | ||
| Proof-Checked Design Submission: Submission of complete structural and foundation design drawings verified and certified by a government recognized technical institute such as NIT/IIT. Includes stability checks, load combinations and compliance with RDSO/IRC/IS codes. | — | — | — | 2,36,000 | |
| — | 1.00 | — | — | ||
| As-Built Drawings: Preparation and submission of detailed as built drawings reflecting final executed dimensions, levels, structure location, reinforcement details and material specifications after completion of the work. | — | — | — | 59,000 | |
| — | 1.00 | — | — | ||
| Feasibility Study and Cost Estimation: Preparation of a technical feasibility report including site survey findings, constructability challenges, risk identification and a detailed item-wise cost estimation of the complete scope of work. | — | — | — | 59,000 | |
| — | 1.00 | — | — | ||
| Hydrological Study: Submission of a comprehensive hydrological report for the site including catchment analysis, rainfall data, water table considerations, drainage recommendations and flood risk assessment to ensure long -term structural safety. | — | — | — | 59,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocBrSurvey.pdf
ATTACHMENT
AnnexureV.pdf
ATTACHMENT
GCC-2022.pdf
ATTACHMENT
GCCamendwithCslip.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .