| 1 | L1₹6.8 LAccepted-Finance | ₹6.8 L | L1 | Accepted-Finance ACCEPT |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | sainulabid L1 | MUHAMMED SHIHAS KP L2 |
|---|---|---|---|---|---|
| 1.00special repairs works to main building | |||||
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 82.05 | sqm | 57.09 ₹4,684.23 | 60 ₹4,923 |
| 1.00 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | 300 | sqm | 132.55 ₹39,765 | 132.55 ₹39,765 |
| 1.00 | 26.29.1:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter | 3,600 | metre | 8.44 ₹30,384 | 8.44 ₹30,384 |
| 1.00 | 13.50.3:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works | 90.43 | sqm | 70.33 ₹6,360.08 | 70.33 ₹6,360.08 |
| 1.00 | 13.50.4:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat) | 90.43 | sqm | 37.69 ₹3,408.38 | 37.69 ₹3,408.38 |
| 1.01 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | 300 | sqm | 494.7 ₹1,48,410 | 494.7 ₹1,48,410 |
| 1.01 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 180 | sqm | 361.09 ₹64,996.2 | 361.09 ₹64,996.2 |
| 1.01 | 26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified
Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with
polymer minimum 2% by wt. of cement used) as per specifications and
directions of Engineer-in-charge.
Note: Measurement and payment: The pre-measurement of thickness shall be
done just after the surface preparation is completed and Payment under this
item shall be made only after proper wet curing has been done and surface
has been satisfactorily evaluated by sounding / tapping with a blunt metal
instrument and/or the 75mm size cube crushing strength at the end of 28 days
to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers. | 300 | sqm | 646.78 ₹1,94,034 | 646.78 ₹1,94,034 |
| 1.01 | 50.18.9.19.2:Providing and fixing PVC pipes including fixing the pipe with clamps/clips at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 m dia 4 Kgf/cm2 - External work - Exposed on wall | 28 | metre | 377.04 ₹10,557.12 | 377.04 ₹10,557.12 |
Tender Value
₹6.2 L
EMD Value
₹15,466
Closing Date
10 Mar 2026, 2:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PWD BUILDINGS SUBDIVISION, PERINTHALMANNA
G E N E R A L - Urgent repair works to concrete spalling at verandah, toilets and sunshade ceiling of Main building, Government Poly technnic college,Perinthalmanna in Mankada LAC, Malappuram dt.-General Civil Work
2026_PWD_842476_1
18704/2025-2026
Open Tender
Civil Works - Buildings
180 days
ANGADIPPURAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,365
₹15,466
2 Jul 2026
2 Mar 2026
12 Mar 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1special repairs works to main building | |||||
| 1.001 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1 | sqm | - | - |
| 1.002 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | - | sqm | - | - |
| 1.003 | 26.29.1:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter | - | metre | - | - |
| 1.004 | 13.50.3:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works | 0.8 | sqm | - | - |
| 1.005 | 13.50.4:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat) | 0.8 | sqm | - | - |
| 1.006 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | - | sqm | - | - |
| 1.007 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | sqm | - | - |
| 1.008 | 26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified
Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with
polymer minimum 2% by wt. of cement used) as per specifications and
directions of Engineer-in-charge.
Note: Measurement and payment: The pre-measurement of thickness shall be
done just after the surface preparation is completed and Payment under this
item shall be made only after proper wet curing has been done and surface
has been satisfactorily evaluated by sounding / tapping with a blunt metal
instrument and/or the 75mm size cube crushing strength at the end of 28 days
to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers. | - | sqm | - | - |
| 1.009 | 50.18.9.19.2:Providing and fixing PVC pipes including fixing the pipe with clamps/clips at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 m dia 4 Kgf/cm2 - External work - Exposed on wall | - | metre | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 1.64 MB
BOQ_1421476.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid