Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC JATANBARI KARBOK GOMATI TRIPURA | L1 | Accepted-AOC L1 Bidder |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
3 Oct 2018, 5:00 pmClosed
General Manager (Technical), Corporate Office,
O/O General Manager (Technical), Corporate Office, Bidyut Bhavan, Agartala
Survey, Design Engineering, Supply, Erection, Testing and Commissioning of UG Cable Line with Installation of 100KVA DT on Partial Turnkey basis in Amarpur andUdaipur Town
2018_POWER_1665_1
49/GM(Tech)/IPDS/PT/GOMATI CIRCLE /TSECL
Open Tender
Electrical Works
Works
420 days
GOMATI ELECTRICAL CIRCLE
As per BID
6 documents required · 6 mandatory
₹25,000
Tripura State Electricity Corporation Ltd
₹2.4 L
O/O General Manager (Technical), Corporate Office,
11 Sept 2019
15 Sept 2018
4 Oct 2018
15 Sept 2018
3 Oct 2018
28 Sept 2018
15 Sept 2018 - 24 Sept 2018
25 Sept 2018
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .