Executive Engineer Medium Irrigation Project Division, Ankleshwar
Construction of Dajipura Checkdam across Amaravati River near village Dajipura, Taluka Valiya, District Bharuch
355277
8 of 2026-27
Open
Civil Works
Works
Bharuch
13 documents required · 12 mandatory · 1 optional
₹3,600
Executive Engineer, Medium Irrigation Project Division, Ankleshwar
₹1.5 L
15 Oct 2026
15 Oct 2026
15 Oct 2026
5 Nov 2026
15 Oct 2026
Name of work :- Construction of Dajipura Checkdam across Amaravati River near village Dajipura, Taluka:-Valiya, District:- Bharuch
Item No. Quantities estimated Item of Work Estimated Unit Total Amount
Item No. Quantities estimated Item of Work Estimated Unit Total Amount
but may be more or In Figure in according to
less Rs. estimated
1 Job Care and diversion of river including required dewatering during construction of Checkdam and allied works
as prescribed and directed etc. complete.
2 4077.00 Excavation for foundation in all sorts of soil including yellow, sandy,gravelly soil ,soft &hard murrum ,etc.dry
condition including depositing the excavated stuff in uniform layer in banks or as directed etc.complete for lead 81.50 Cum.
up to 1.0 Km and all lift(By machinery) (a) above water table
3 208.00 Excavation for foundation in soft rock including depositing the excavated stuff as and where directed etc.
complete for lead upto 1.0 Km and all lifts.(By machinery) (a) above water table 154.10 Cum.
4 2219.000 Providing and Laying plain / reinforced ordinary Portland cement concrete of various grade with
cement, sand and course aggregate including centering, shuttering, batching, mixing, transporting, placing,
vibrating, smooth finishing, curing etc. complete for all lead & lift. (Batching Plant Based, including 4499.60 Cum.
dewatering) C) Piers, Abutment, Wingwall, Headwall, Returnwall (ii) Concrete M-15 grade
5 201.96 Providing and placing in position reinforcement bars including cutting, bending, welding, joints where
necessary, hooking etc. complete as per drawing for all lead and lift. (b) TMT
6 819.00 Back fiing the foundation trenches around the structures etc. with selected excavated stuff including watering,
ramming, compacting etc. complete. (By machinary) 19.50 Cum.
7 376.00 providing and laying dry rubble for apron having minimum dimension of 300 mm and weight not less than 40 kg
including packing filling interstice with quarry sparry etc.complete 916.00 Cum.
8 315.00 Providing and supplying mechnically double twisted highly galvanized with (PVC) Polyvinyl Chloride coating gabions
made of mesh size 10 x 12 cm woven wire (3.00mm dia), tying with lacing wire of dia 2.2mm, as per ASTM A975-97,
size of gabion, including providing and laying stones in the gabions and arranging them in a required manner in the
section or such other structure with arranging in required layer thickness and arranging gabions , with the crane if 1126.00 No
required (if required as per drawings or as directed ) with all material , labour , tools, lead and lift etc. comp.
(C) 1 m x 1 m x 0.30 m Size (Stone Weight 10 to 40kg)
9 136.00 Providing and laying graded filter of specified materials in uniform layer as per design incl. Watering etc.complete as
directed . 1943.60 Cum.
10 123.00 Providing and fixing in position 110mm dia PVC pipe weep holes in abutment, wing wall, and laying training etc.
complete. 263.70 Rmt.
11 57.00 Providing & fixing in position PVC heavy duty water stops in barrels, trough and wing wall with 25 mm
wide expension joint as shown in drawing including filling the joints with asphalt pad or bitumins or cork board of
approved quality.
(B) 300 mm wide PVC water stop.
12 720.00 Supplying & Laying mechanically woven double twisted hexagonal Zn+PVC coated box G.I wire mash gabion size
1.0x1.0x1.0mt. filed with 15 to 40 kg trap rubble stone (approximate up 1.65 tone) with mesh size 10x12cm including
packing, interlocking of stones and fushing the top of gabions and tying to each other & laying to required line, level
slope with all leads and lifts as directed etc. complete.
13 300.00 Providing and laying Non Woven Geo Fabric Filter (weight more than 235 gm/Sq.m) over the excavated surface as
per specification including stitching with overlap to design profile as directed in tidal range etc. complete. 86.40 Sq.m
14 36.00 Providing & fixing in position Marble Plate of 2 cm thickness including engraving and filling paint for letters
as directed etc complete 250.60
Rupees One Crore Forty Eight Lakh(s) Fifty Nine Thousand Two Hundred Four And Paise Fourty Only
I am/we are willing to carry out the work at % below/above percent (Should be written in figures and words) of the estimated rates mentioned above. Amount of My/Our tender
works out as under:
Estimated Amount Put to Tender RS. 14859204.44 Estimated Amount Put to Tender RS.
Deduct ______% Below RS. _________________ Deduct ______% Below RS. _____
Net RS. Net RS.
(1) The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
(2) The labour cess will be deducted as per prevailing rules i.e.1% of the work done
(3) GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: MIS102010/17/K-1 Dt.30/07/2018 as stated in S.O.R. therefore in R.C.C.
(4) items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other levies except GST payable by the contractor under the contract. The labour cess will be
deducted as per prevailing rules i.e.1% of the work done
Deputy Executive Engineer Executive Engineer
Irrigation Project Sub Division No 17 Medium Irrigation Project Division
Ankleshwar Ankleshwar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Dajpura BoQ.pdf
Dajpura DRG.pdf
Dajpura merged.pdf
Dajpura SBD.pdf
Dajpura Special condition.pdf
Dajpura Technical Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .