Loading…
Loading…
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
23 Jun 2026, 6:00 pm
Executive Engineer Rew Baramulla
REW BARAMULLA
Const. Of RCC wall NHO Ashfaq Khan, Muneer Khan,Ajlal Ahmad and Rameez Pathan ward 4 Daragutliyan under CDF for year 202627, Panchyat Halqa Daragutliyan, Block Parenpillan
2026_RDPR_311390_5
e- NIT No. 36/Xen/Rew/Bla/2026-27 Dated 02-06-2026
Open Tender
Civil Works
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹4,000
2 Jun 2026
2 Jun 2026
24 Jun 2026
2 Jun 2026
23 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations,drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil | 7.93 | cum | - | - |
| 2 | Providing/Laying Stone soling hand packed on level in foundation trenches including carriages of Stones. | 0.74 | cum | - | - |
| 3 | Providing and laying in position Reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1.5:3 including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | 1.27 | cum | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 114 | kg | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | 16.77 | cum | - | - |
| 6 | RANDOM RUBBLE MASONRY
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) incl carraige of material | 2.27 | cum | - | - |
| 7 | Dry random rubble masonry with hard stone in foundation and plinth:With bond stone incl carraige of material | 9.06 | cum | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for foundation | 18.58 | sqm | - | - |
| 9 | 12mm thick cement sand plaster in 1:6 mix | 18.58 | sqm | - | - |
| 10 | Carraige of sand bajri for all leads by M.T and H.L | 13 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1008318.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid