Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83,018.31Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹84,714.18+₹1,695.87 (2.04%)Rejected-Finance CHOLAKKAPARAMBAN | ERNAKULAM | KERALA | 680667 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K ABDUL AZEEZ L1 | KUNHIMOIDEEN CHOLAKKAPARAMBAN L2 |
|---|---|---|---|---|---|
| 1.00HAND RAIL CONSTRUCTION | |||||
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 8.96 | sqm | 347.6 ₹3,114.5 Lowest | 354.69 ₹3,178.02 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.45 | cum | 8,313.74 ₹3,724.56 Lowest | 8,483.41 ₹3,800.57 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 411.58 | kg | 168.37 ₹69,297.05 Lowest | 171.81 ₹70,712.87 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 46.38 | sqm | 148.4 ₹6,882.2 Lowest | 151.43 ₹7,022.72 |
Tender Value
₹84,714
EMD Value
₹2,118
Closing Date
7 Mar 2026, 10:00 amClosed
MANJU G
LID EW SECTION PERUMANNA KLARI GP
Annual Plan-Perumanna Klari GP-P.no 301/26 KLARI THODU HANDRAIL CONSTRUCTION General Civil Work RETENDER
2026_LSGD_841490_6
08/AE/PMKY/ET8/2025-26
Open Tender
Civil Works - Others
Item Rate
180 days
PERUMANNA KLARI GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,118
Yes
13 Jul 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1HAND RAIL CONSTRUCTION | |||||
| 1.001 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.002 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.4 | kg | - | - |
| 1.004 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 1 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1419474.xls
BOQ • 0.30 MB
ALL.pdf
Tender Documents • 0.73 MB
SBD.pdf
Tender Documents • 1.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .