Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
5 Sept 2026, 6:00 pm
Additional City Engineer (Ele/Mech)
RFP for Supply, Installation, Testing, Commissioning of GPS Vehicle Tracking Device with Fuel Level Sensor combo including Operation and Maintenance of vehicle tracking & Fuel Monitoring system software and Hardware for the period of 05 years.
337053
ACE/Workshop/06/2026-2027,Work No.02
Open
Supply,erection and Commissioning
Works
Surat
3 documents required · 3 mandatory
₹7,080
Commissioner, Surat Municipal Corporation
₹3.5 L
20 Aug 2026
20 Aug 2026
20 Aug 2026
5 Sept 2026
20 Aug 2026
2. BoQ Bill of Quantity
3. CPU Central Processing Unit
4. GST Goods & Service Tax
5. DD Demand Draft
6. EMD Earnest Money Deposit
7. IT Information Technology
8. LoI Letter of Intent
9. SLA Service Level Agreement
10. SMC Surat Municipal Corporation
11. SP Service Provider
12. OEM Original Equipment Manufacturer
13. RFP Request For Proposal
14. WO Work Order
15. NDA Non-Disclosure Agreement
16. GIS Geographical Information System
17. GPS Global Positioning System
18. VTMS Vehicle Tracking & Monitoring System
19. ICCC Integrated Command & Control Center
20. UAT User Acceptance Test
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Notice for Inviting Tender
Tender (Online) Invitation Notice:
Notice:ACE/Workshop/06/2026--2027
The Tender for are invited online on https://smctender.nprocure.com as per
ing details and schedule.
Wo. Name of Work 1. Estimated Amount (Rs.)
3. Tender Fee(Rs.)
4. Class of Contractor
01 RFP for Supply, Installation, Testing, 1. 3,51,00,000/-
Commissioning of GPS Vehicle Tracking Device 2. 3,51,000/--
with Fuel Level Sensor combo including
Operation and Maintenance of vehicle tracking 7080/-
& Fuel Monitoring system software and As mentioned in the tender.
Hardware for the period of 05 years.
Schedule of Tendering:
Downloading of Tender document From14/08/2026 to 05/09/2026
On line submission (Last Date) Up to 05/09/2026 till 18:00 Hour.
Submission of Technical Bid, Tender fee, From 07/09/2026 to 14/0
EMD, and other documents etc. in hard To, Chief Accountant, SMC Tapi bhavan,
copy. Muglisara, Surat by RPAD / Speed Post only.
Probable Opening of Tender – 05/09/2026 18.01 hrs. onwards
Pre Bid Email Query Upto 29/08/20265/12/2025
Email ID:[email protected]
Bidders shall have to mention th
thee name and address of Tenderer, tender notice number,
name of work and last date of submission on the main cover of hard copy submitted. Surat
Municipal Corporation shall not be responsible for any postal delay.
Bidders have to submit price bid in electron
ic format only on
https://smctender.nprocure.com website till the last date & time for submission.
Price bid in physical form shall not be accepted in any case.
The Surat Municipal Corporation (S.M.C) reserves the right to accept or reject any or all the
tender to be received without assigning any reasons thereof.
Any clarifications or if training required for participating in online tender, they can visit the
https://smctender.nprocure.com which is a website of “(n) Code solutions- A division
Tender Notice Details are on website www.suratmunicipal.gov.in/tenders of Surat
Municipal Corporation.
Add. City Engineer
Surat Municipal Corporation
Municipal Workshop
Workshop(Surat Municipal Corporation)
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Important information of tender:
1. Tender Notice (On line) No. ACE/Workshop/06/2026--2027
3. Estimated Cost of tender Rs. 3,51,00,000/-
4. Name of work RFP for Supply, Installation,
Installatio Testing, Commissioning
of GPS Vehicle Tracking Device with FuelFue Level
Sensor combo including Operation and
Maintenance of vehicle tracking & Fuel Monitoring
system software and Hardware for the period of
5. Tender documents fees per set Rs.7080/-with GST
6. Tender documents fees per set is In the form of Cross Demand Draft / Pay order of
payable Nationalized Bank / Schedule bank (As per bank list
mentioned in Annexure--VIII of this tender only)
drawn in favor of the “Commissioner, Surat
Municipal Corporation” payable at Surat.
7. Tender Fees and EMD in Hard copy to The Chief Accountant, Accounts Department,
be submitted to SURAT MUNICIPAL CORPORATION,
TapiBhavanMugalisara,Surat.
8. By: Speed Post/Registered Post only
9. Tender Cover to be sup
superscribed with: Tender Notice No., Due Date, Name of Work,
Name of Tenderer with Address.
10. Tender guarantee [Earnest Money Rs.3,51,000.00
Executive Engineer,
Municipal Workshop,
Surat Municipal Corporation.
Seal and Signature of Bidder
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop
Workshop(Surat Municipal Corporation)
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Important notes for on line tender submission:
PRICE BID shall be submitted in electronic format only
Price bid in physical form shall not be accepted in any case. In ccase
ase of submitting price bid
in physical condition or in case of providing any type of indication of quoted price, the
bidder shall get disqualified.
Soft copy of technical bid as per IT
IT-05 and IT-06
06 shall also be submitted online only.
Submission of technical
ical bid in hard copy shall lead the bidder to disqualification.
However, bidders should fill all required details mentioned in technical bid before
Further, all other supportive and qualifying documents shall also be submitted online in
soft copies. Affidavits and Undertaking are required to be submitted in hard copy as well
as upload online.
Only E.M.D., Tender fees, affidavit and Undertaking
ndertaking are required to be submitted in sealed
cover within the stipulated time limit. Indicate on the sealed envelope Tender Notice no.,
Name of the Work, Name of the Department, Name and Address of the tenderer and last
date of submission.
Primary assessment of the tenders shall be carried on the basis of the qualifying and other
supportive documents submitted by the bidder online.
Acceptance of the tender shall rest with the Competent Authority, who does not bind
himself to accept the lowest and reserves the right to reject any or all quotations /
tenders, and noreasonsshall be given for acceptance or rejection thereof. The Tenderer,
whose tender is accepted, shall have to enter into regular Contract and abide by all the
conditions of the tender.
Surat Municipal Corporation shall not be responsible for any postal delay in submission of
hard copy of tender or slo
sloww working of the website for online submission. Hence, bidders
are advised to fill tender well in time.
Executive Engineer,
Municipal Workshop,
Surat Municipal Corporation.
Seal & Signature of the bidder
1. Introduction
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
1.1 ABOUT SURAT
Located in western part of India in the state of Gujarat, Surat is referred as the silk city and the
diamond city. It has the most vibrant present and an equally varied heritage of the past. Surat is
also known as economic capital of Gujarat and is having one of the highest growth rates
amongst Asian cities. As per the Census 2011, it is the eighth largest city in the country with
population of 4.48 million. On the scale of population growth, Surat is the fastest growing city in
Asia and holds 4th rank in the world. On the economic front, Surat holds top most position with
highest per house-hold income in the country.
1.2 About Surat Municipal Corporation
Surat Municipal Corporation is a local self-government which has come into being under the
Bombay Provincial Municipal Act, 1949. It carries out all the obligatory functions and
discretionary functions entrusted by the BPMC Act, 1949. It became one of the first municipalities
of India in 1852 AD, and a municipal corporation in
The administration of SMC with the help of the people and elected members of the city has
transformed Surat to one of the cleanest cities of India. SMC has taken all necessary steps to
make the city a better place to live with all amenities. SMC has taken up many path breaking
initiatives and these efforts have been acknowledged at national and international level.
Municipal Workshop Department in SMC performs the following:
1. To procure vehicles/machineries in line with the demands raised by various zones.
2. To procure specialized vehicles/machineries for specific purpose like sewer jetting machines,
gulper machines, etc.
3. To undergo preventive and breakdown maintenance of various vehicles/machineries of SMC
either in house or through third party agencies whom work is allotted.
2. Project Background
Surat Municipal Corporation is responsible for providing basic amenities to the citizens. Surat
Municipal Corporation has a large fleet of around 1400 vehicles ranging from LMV, MGV, HGV,
Case rollers, TIppers, Excavators, sewer jetting machines, cess pool tankers, gulper machines
2.1 Existing Process
a) At present only GPS tracking device is installed in around 400 number of vehicles which
incorporates various SMC owned and Contractual Vehicles and special dedicated vehicles.
b) Surat Municipal Corporation has a dedicated ITMS dashboard/website with
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
https://smcitms.in/avls/index.php/DeptDashboard.
3. Project Objectives and Scope of Work
Definition – GPS + Fuel Sensor Combo: The term “GPS + Fuel Sensor Combo” refers to an
integrated functional solution comprising a GPS/VTS tracking device and one or more fuel-
level sensors installed in the vehicle and interfaced with the tracking platform. The GPS
device and fuel sensor may be physically separate devices, provided they operate as one
integrated solution and all required data is available on the centralized VTS/FMS
3.1 Primary Objective:-
The primary objectives of implementing the Integrated Vehicle Tracking System (VTS) and Fuel
Monitoring System (FMS) are as follows:
3.1.1 Real-Time Vehicle Tracking and Monitoring
To monitor the real-time location, movement, operational status and availability of SMC
vehicles and mobile assets through GPS/GNSS-based tracking, thereby improving fleet visibility,
operational control and vehicle productivity.
3.1.2 Centralized Fleet Monitoring
To provide a centralized platform through the existing Integrated Command & Control Centre
(ICCC) for monitoring vehicles belonging to different SMC departments, divisions, locations and
operational categories through a common dashboard.
3.1.3 Fleet UtilisationOptimisation
To monitor actual vehicle utilisation, distance travelled, operating hours, idle time, trip
frequency and vehicle availability and identify under-utilised, idle or excessively utilised vehicles
for better deployment, reassignment and resource optimisation, including the potential
reduction of dependence on rented/vendor vehicles.
3.1.4 Route Monitoring and Optimisation
To monitor actual vehicle routes against planned or authorised routes, identify route deviations
and support efficient route planning and allocation for reducing unnecessary vehicle
movement, travel time and fuel consumption.
3.1.5 Geo-Fencing
To create configurable geographical zones/geofences for SMC offices, workshops, depots, fire
stations, water works, other designated municipal locations, project sites and other designated
locations and generate automated alerts whenever a vehicle enters or exits such zones or
remains within a zone beyond a predefined duration.
3.1.6 Fuel Level Monitoring
To continuously monitor the fuel level of vehicles through suitable fuel-level sensors and
provide real-time, periodic and historical fuel-level information through the centralized
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.1.7 Fuel Filling Validation
To electronically record and validate fuel-filling events by correlating fuel-level sensor data with
the vehicle's GPS location, date/time and vehicle movement. The system shall facilitate
identification of whether a reported fuel filling event is consistent with the actual increase in
fuel level and shall support detection of discrepancies between fuel issued/recorded and actual
fuel added to the vehicle.
3.1.8 Fuel Theft and Fuel Drainage Detection
To detect and report abnormal or unauthorized reduction in fuel level, including sudden fuel
drops, fuel theft, fuel drainage, siphoning or other unexplained fuel losses. The system shall
support configurable thresholds and generate alerts for abnormal fuel-level reduction events.
3.1.9 Fuel Consumption Monitoring
To monitor vehicle-wise fuel consumption and analyse fuel usage in relation to distance
travelled, operating hours, engine running time and vehicle utilisation.
3.1.10 GPS–Fuel Correlation
To correlate GPS-based vehicle movement and operational data with fuel-level sensor data to
establish the relationship between vehicle movement, distance travelled, operating hours,
stoppages and fuel consumption.
The system shall assist in identifying abnormal fuel consumption patterns, including cases
where fuel consumption is inconsistent with the actual distance travelled or operating
conditions of the vehicle.
3.1.11 Fuel Consumption Analytics and Exception Reporting
To provide vehicle-wise, department-wise, division-wise, vendor-wise and fleet-level analysis of
fuel consumption and generate exception reports for vehicles showing unusually high or low
fuel consumption compared with predefined benchmarks or historical performance.
3.1.12 Idling Analysis and Monitoring
To identify and monitor excessive vehicle idling and unnecessary engine running. The system
shall provide configurable idle-time thresholds and generate alerts/reports for vehicles
remaining stationary with the engine running beyond the prescribed duration.
Idling analysis shall assist SMC in reducing unnecessary fuel consumption, emissions, engine
wear and operating costs.
3.1.13 Driver Behaviour Monitoring
Where supported by the installed GPS tracking device or vehicle interface, the system shall
facilitate monitoring of driving behaviour including over-speeding, harsh acceleration, harsh
braking, excessive idling and other configurable driving events.
3.1.14 Unauthorised Vehicle Movement
To identify vehicle movement outside authorised operating hours, routes or geographical areas
and generate automated alerts to the designated officials.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.1.15 Trip and Journey Management
To maintain complete electronic trip history including trip start and end time, distance travelled,
route followed, stoppage duration, trip duration, destination and other relevant operational
3.1.16 Departmental Activity Monitoring
To enable concerned departments to verify whether vehicles assigned for specific municipal
activities are operating in the intended geographical areas and during the prescribed
operational periods.
3.1.17 Vendor Vehicle and Contract Monitoring
For vendor/rented vehicles, the system shall facilitate verification of actual vehicle deployment,
operating hours, kilometres travelled, geographical presence, trip details and other contractual
performance parameters.
3.1.18 Vendor Billing Verification
The system shall facilitate verification of vendor bills/claims by providing electronically recorded
information relating to vehicle deployment, kilometres travelled, operating hours, trips, fuel
consumption and other measurable parameters specified in the applicable contract/SLA.
The system shall assist SMC in identifying discrepancies between vendor-submitted claims and
system-generated operational records before processing of payments, wherever such
parameters are contractually applicable.
3.1.19 SLA Monitoring and Compliance
The system shall support monitoring of applicable Service Level Agreement (SLA) parameters
for outsourced/vendor-operated vehicles and services, including vehicle availability,
deployment, operating hours, response time, route adherence, attendance/deployment and
other measurable service parameters.
3.1.20 Emergency Response Monitoring
For Fire & Emergency Services and other critical municipal services, the system shall facilitate
rapid identification of available vehicles, real-time location monitoring, route visibility and
operational coordination to improve response time.
3.1.21 Vehicle Breakdown and Operational Exception Monitoring
The system shall provide suitable alerts for prolonged stoppage, abnormal inactivity,
communication failure and other configurable operational exceptions. Where supported by the
vehicle/device interface, the system may also provide relevant vehicle-status information.
3.1.22 Maintenance and Vehicle Usage Monitoring
The system shall facilitate monitoring of distance travelled, engine operating hours and other
usage parameters for supporting preventive maintenance schedules and maintenance-related
3.1.23 Centralized Vehicle and Document Management
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
To maintain a centralized digital database of vehicles and associated information including
registration details, department, vehicle category, assigned location, insurance, PUC, fitness
certificate, permit, tax, contract details and other applicable documents.
3.1.24 Automated Document Expiry Alerts
To provide automated alerts and reminders for expiry/renewal of insurance, PUC, fitness
certificates, permits, tax, contracts and other statutory or departmental documents.
3.1.25 Device Tamper Detection
The system shall support detection and reporting of unauthorized tampering, disconnection,
removal, power interruption or other abnormal conditions affecting the GPS tracking device
and/or fuel monitoring equipment, to the extent technically supported by the proposed
Suitable alerts shall be generated for device tampering, power disconnection, communication
interruption and restoration of connectivity.
3.1.26 GPS/Device Connectivity Monitoring
To continuously monitor the communication status of installed GPS and fuel-monitoring
devices and identify vehicles/devices that are offline, not transmitting data or experiencing
prolonged communication interruptions.
The system shall generate configurable alerts for prolonged loss of communication and shall
record the duration and time of such communication failures.
3.1.27 Data Recovery and Synchronisation
Where communication is temporarily unavailable due to network or connectivity issues, the
system should support appropriate data buffering/storage and subsequent synchronization of
recorded data upon restoration of communication, subject to device capability.
3.1.28 Reduction of Manual Intervention
To minimize dependence on manual registers, vehicle logbooks and manually prepared fuel-
consumption records by automatically capturing vehicle movement, fuel events and
operational data wherever technically feasible.
3.1.29 Transparency and Accountability
To establish a transparent and auditable system for vehicle deployment, movement, utilisation
and fuel consumption, thereby reducing the possibility of manipulation of manual records and
improving accountability of concerned personnel.
3.1.30 Audit Trail
The application shall maintain an appropriate audit trail of system activities, including user
login/access, important configuration changes, vehicle assignment changes, alert
acknowledgement, data modifications and other critical administrative activities.
The audit trail shall assist SMC in reviewing system usage, investigating discrepancies and
maintaining administrative accountability.
3.1.31 Historical Data and Analytics
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
The system shall maintain suitable historical records of vehicle movement, fuel levels, fuel filling
events, fuel consumption, trips, idling, alerts and other relevant parameters for the period
specified by SMC.
The system shall provide historical analysis and trend reports to identify recurring
abnormalities, changes in fuel consumption, vehicle utilisation patterns and departmental
3.1.32 Comparative Fleet Analytics
The system shall provide comparative analytics at vehicle-wise, department-wise, division-wise,
vehicle-category-wise, vendor-wise and fleet-wide levels to assist SMC in identifying high-
performing and under-performing vehicles and operational units.
3.1.33 Management Information System (MIS)
To provide management with comprehensive dashboards, KPIs, graphical analysis and detailed
reports covering vehicle utilisation, fuel consumption, fuel abnormalities, idling, route
adherence, vendor performance, SLA compliance and other relevant fleet parameters.
3.1.34 Exception-Based Monitoring
The system shall provide exception-based monitoring so that supervisory and management
personnel can focus on abnormal events rather than continuously monitoring every vehicle.
Configurable alerts shall include, but not be limited to:
1. Sudden fuel drop
2. Fuel theft/drainage
3. Abnormal fuel consumption
4. Fuel filling event
5. Fuel filling discrepancy
6. Excessive idling
7. Over-speeding
8. Route deviation
9. Geofence entry/exit
10. Unauthorised vehicle movement
11. Unscheduled/prolonged stoppage
12. Vehicle operation outside authorised hours
13. Prolonged vehicle inactivity
14. GPS/device communication failure
15. Device tampering/disconnection
16. Power interruption
17. Restoration of device connectivity
18. Other configurable operational exceptions
3.1.35 Role-Based Access Control
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
To provide role-based access to authorised users such as ICCC operators, Vehicle Supervisors,
Assistant Engineers, Department Heads, Divisional Heads, administrators and other designated
Access to vehicles, dashboards, reports, configurations and administrative functions shall be
controlled according to the user's assigned role and jurisdiction.
3.1.36 Centralized ICCC Integration
The proposed VTS/FMS application shall be capable of integration with SMC's existing
Integrated Command & Control Centre (ICCC) and associated monitoring infrastructure.
The solution shall provide appropriate mechanisms for displaying real-time vehicle location,
status, alerts and other relevant information through the ICCC, wherever required by SMC.
3.1.37 API and System Integration
The proposed system shall provide secure and documented APIs/web services or other
standard integration mechanisms to facilitate integration with SMC's existing and future IT
applications, ICCC, dashboards, departmental applications and other approved systems.
The API architecture should support, as applicable, exchange of vehicle master data, GPS
location, vehicle status, fuel level, fuel events, alerts, trip information and other relevant data.
3.1.38 Data Export and Reporting
The system shall provide authorized users with facilities for generating, viewing, downloading
and exporting reports in commonly used formats such as PDF, Excel/CSV or other formats
specified by SMC.
3.1.39 Fleet Cost Optimisation
The system shall assist SMC in reducing fleet operating costs through improved vehicle
utilisation, fuel monitoring, reduction of fuel wastage, reduction in excessive idling, route
optimisation and better deployment of owned and rented vehicles.
3.1.40 Vendor Performance Assessment
The system shall provide objective operational data for evaluating vendor performance, vehicle
availability, deployment, kilometres, operating hours, route compliance and other applicable
contractual parameters.
3.1.41 Data Security and Access Control
The solution shall ensure secure transmission, storage and access of vehicle and operational
data through appropriate authentication, authorization, role-based access control, audit
logging and other suitable information-security mechanisms.
3.1.42 System Availability and Reliability
The system shall be designed to provide reliable and continuous monitoring and shall
incorporate suitable mechanisms for handling GPS/network interruptions, device connectivity
failures and restoration/synchronisation of data after communication is re-established.
3.1.43 Scalability to 1,400+ Vehicles
The proposed solution shall be scalable and capable of supporting SMC's existing fleet as well
as future expansion to at least 1,400 vehicles/mobile assets, or such higher number as may be
required by SMC during the contract period.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
The scalability shall include the capability to accommodate additional GPS devices, fuel-level
sensors, users, departments, geofences, historical data, reports, alerts and integrated systems
without requiring fundamental modification or replacement of the core application.
3.1.44 Future Technology and System Expansion
The architecture shall permit incorporation of additional fleet-management features, sensors,
vehicle interfaces, dashboards, analytical modules and integrations in the future, as required by
3.1.45 Data-Driven Decision Making
To provide reliable, consolidated and actionable data to SMC management for fleet planning,
budgeting, vehicle procurement/replacement, vehicle hiring/renting, route planning, fuel
budgeting, deployment and operational decision-making.
3.1.46 Improved Operational Efficiency and Public Service Delivery
The overall system shall assist SMC in improving vehicle availability, productivity, response time,
fuel efficiency, accountability and service delivery while reducing avoidable operating
expenditure, fuel wastage and inefficient utilisation of municipal resources.
3.2 OVERALL PROJECT GOAL
The overall goal of the project is to establish a centralized, integrated, scalable, technology-
driven and transparent Vehicle Tracking and Fuel Monitoring ecosystem for SMC.
The proposed solution shall integrate GPS/GNSS Vehicle Tracking, Fuel Level Monitoring , Fuel
Filling Validation , Fuel Theft/Drainage Detection , GPS–Fuel Correlation , Geofencing, Route &
Trip Monitoring , Idling Analysis, Vendor/SLA Monitoring , Device Health Monitoring , Alerts
,Compliance Management , Historical Analytics ,MIS Dashboards and ICCC/API Integration into
a single dedicated application.
The system shall enable SMC to transition from a predominantly manual and reactive fleet-
management approach towards a real-time, data-driven, preventive, transparent and
accountable fleet-management model.
The system shall ultimately assist SMC in:
1. Minimising fuel theft, leakage and wastage;
2. Validating fuel filling and consumption;
3. Improving vehicle and fleet utilisation;
4. Reducing unnecessary idling and vehicle movement;
5. Improving route planning and operational efficiency;
6. Monitoring vendor/rented vehicle deployment and SLA compliance;
7. Supporting verification of vendor bills/claims;
8. Improving emergency response and service delivery;
9. Reducing manual intervention and scope for manipulation;
10. Providing transparent and auditable fleet operations;
11. Enabling data-driven managerial decision-making; and
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
12. Establishing a scalable platform capable of supporting 1,400+ vehicles and future
expansion of SMC's fleet.
3.3 SCOPE OF WORK
3.3.1 Broad Scope of Work
The broad scope of work shall include the design, development/provisioning, supply, installation,
integration, configuration, commissioning, operation, maintenance and comprehensive support
of an end-to-end Integrated Vehicle Tracking System (VTS) and Fuel Monitoring System (FMS),
including all required hardware, GPS/GNSS tracking devices, fuel-level sensors,
communication/SIM connectivity, servers, storage, software/application, database, GIS, mobile
applications, APIs, dashboards, reports, alerts, training, technical support and other components
necessary for successful implementation of the solution.
The successful bidder shall be responsible for delivering a complete end-to-end working solution
and shall not restrict its responsibility only to supply and installation of hardware/software. All
hardware, software, accessories, cabling, connectors, mounting arrangements, communication
components, integration components and other items necessary for proper functioning of the
system shall be within the scope of the bidder.
The broad activities shall include, but not be limited to, the following:
1. Supply, installation, configuration, integration, testing, commissioning and comprehensive
maintenance of GPS/GNSS-based Vehicle Tracking Devices in all vehicles identified by
2. Supply, installation, configuration, calibration, integration, testing, commissioning and
comprehensive maintenance of Fuel Level Monitoring Sensors in all identified vehicles.
3. Supply, installation, configuration and maintenance of application servers, database
servers, storage, backup infrastructure and other necessary hardware/software required
for hosting the solution at the SMC Data Centre or at any other location specified by SMC.
4. Design, development, customization, configuration, deployment and maintenance of a
centralized Integrated Vehicle Tracking and Fuel Monitoring Application for real-time,
data-driven, preventive, transparent and accountable fleet management.
5. Integration of GPS devices, fuel-level sensors and other approved hardware components
with the centralized VTS/FMS application.
6. Integration with SMC's existing systems, applications, other SMC systems, ICCC and other
systems as specified by SMC through suitable APIs/web services or other approved
integration mechanisms.
7. Provision of real-time dashboards, GIS-based visualization, fleet monitoring screens and
customizable reports for day-to-day operational monitoring, management information
and decision-making.
8. Provision of configurable alerts and notifications for specified events through
application/dashboard and SMS and/or other communication channels approved by SMC.
9. Provision of real-time and historical vehicle movement, fuel-level, fuel-consumption, trip,
idling, alert and other fleet-related data in formats and at time intervals specified by SMC.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
10. Provision of a scalable solution capable of supporting the existing fleet and future
expansion of SMC's fleet to at least 1,400 vehicles/mobile assets or such higher number as
may be required by SMC during the contract period.
3.3.2 Detailed Scope of Work
The successful bidder shall be responsible for carrying out the following activities:
3.3.2.1 Supply and Installation of Complete VTS/FMS Solution
The bidder shall supply, install, configure, integrate, commission and maintain:
Vehicle Tracking GPS/GNSS devices;
Fuel Level Monitoring Sensors;
Required wiring, connectors, mounting accessories and protective arrangements;
Communication/SIM connectivity;
Servers and storage;
Desktop/workstation equipment, wherever specified;
Networking and communication components required within the bidder's scope;
Application software;
Database and GIS components;
Mobile applications;
APIs/integration components;
Backup and recovery components; and
All other hardware, software and accessories necessary for successful operation of the
The bidder shall maintain minimum 5% spare GPS devices and 5% spare fuel sensors, or such
higher quantity as may be specified by SMC, during the contract period.
3.3.2.2 Comprehensive Warranty
The scope shall include a five (05) year comprehensive warranty for all hardware, software and
associated components supplied by the bidder.The bidder shall replace defective/non-repairable
hardware with new or equivalent/higher specification hardware at no additional cost to SMC
during the contract period.Repeatedly failing equipment shall be replaced with new equipment
where considered necessary by SMC.
3.3.2.3 GPS-Based Vehicle Tracking Application
The bidder shall design, develop/configure, deploy and maintain a GPS-based Vehicle Tracking
Application integrated with the GPS devices for:
Real-time vehicle tracking;
Vehicle location monitoring;
Route tracking;
Trip monitoring;
Historical route playback;
Distance calculation;
Vehicle status monitoring;
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Route deviation monitoring;
Vehicle utilisation analysis;
Vehicle availability monitoring;
GIS-based visualization;
Trip reports;
Vehicle day summary;
Department-wise and vehicle-wise monitoring; and
Other VTS functions specified by SMC.
3.3.2.4 Fuel Monitoring System
The bidder shall provide an integrated Fuel Monitoring System connected with the fuel-level
sensors installed in the vehicles.The system shall provide, as applicable:
Real-time fuel level;
Historical fuel level;
Fuel filling events;
Fuel consumption;
Fuel drop events;
Sudden fuel drop detection;
Fuel theft/drainage detection;
Fuel filling validation;
Abnormal fuel consumption detection;
Vehicle-wise fuel analysis;
Department-wise fuel analysis;
Vendor-wise fuel analysis;
Fuel trend analysis;
Fuel efficiency analysis; and
Fuel-related alerts and exception reports.
3.3.2.5 Fuel Filling Validation
The system shall validate fuel filling events by correlating:
Vehicle identification;
Date and time;
GPS location;
Vehicle movement status;
Fuel level before filling;
Fuel level after filling;
Quantity of fuel increase; and
Other relevant available parameters.
The system shall enable SMC to identify discrepancies between reported/recorded fuel filling and
actual increase in fuel level.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.3.2.6 Fuel Theft/Drainage Detection
The system shall identify abnormal or unauthorized fuel-level reductions and generate alerts for:
Sudden fuel drop;
Fuel drainage;
Suspected fuel theft;
Repeated unexplained fuel loss;
Fuel loss while vehicle is stationary;
Fuel loss outside authorized locations; and
Other configurable abnormal fuel events.
Thresholds for generation of alerts shall be configurable by SMC.
3.3.2.7 GPS–Fuel Correlation
The system shall correlate GPS-based vehicle movement with fuel-level information to analyse:
Distance travelled;
Fuel consumed;
Fuel efficiency;
Operating hours;
Vehicle utilisation;
Fuel filling;
Fuel loss; and
Abnormal consumption.
The system shall provide exception-based reports where fuel consumption is inconsistent
with the vehicle's actual movement or operating conditions.
3.3.2.8 Idling Monitoring and Analysis
The system shall monitor vehicle idling and identify excessive engine-running time while
the vehicle is stationary, wherever the required vehicle/device data is technically
available.The system shall provide:
Vehicle-wise idling duration;
Department-wise idling analysis;
Daily/monthly idling reports;
Configurable idling thresholds;
Excessive-idling alerts; and
Historical idling trend analysis.
3.3.2.9 Geofencing and Location-Based Monitoring
The bidder shall configure geofences as required by SMC, including:
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Fire stations;
Ward offices;
other designated SMC facilities;
designated municipal locations;
Project sites;
Authorized parking locations; and
Other designated locations.
The system shall generate configurable alerts for entry, exit and prolonged stay within defined
3.3.2.10 Vendor Vehicle and SLA Monitoring
For vendor/rented vehicles, the system shall facilitate monitoring and verification of:
Vehicle deployment;
Vehicle availability;
Operating hours;
Kilometres travelled;
Trips performed;
Route adherence;
Attendance/deployment;
Service availability;
Response time; and
Other applicable contractual/SLA parameters.
3.3.2.11 Vendor Bill/Payment Verification
The system shall provide electronically generated data required for verification of vendor
claims/bills wherever applicable.
The system shall facilitate generation of monthly payment sheets incorporating, as applicable:
Vehicle deployment;
Vehicle attendance;
Operating hours;
Approved deductions;
SLA violations;
Non-deployment;
Excess/short deployment; and
Other contractual parameters specified by SMC.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
The system shall not automatically authorize payment unless specifically approved by SMC.
The final payment approval shall remain with the competent authority of SMC.
3.3.2.12 Centralized Application
The bidder shall design, develop/configure, deploy and maintain a dedicated centralized
application incorporating SMC's requirements, existing business processes and approved
workflows.The application shall include, as applicable:
Vehicle tracking;
Fuel monitoring;
Trip management;
Vendor monitoring;
SLA monitoring;
Document management;
User management;
Mobile application;
API integration;
Configuration management; and
Administrative modules.
3.3.2.13 Mobile Application
The bidder shall develop/provide and maintain a mobile application for designated SMC officials
Real-time vehicle monitoring;
Vehicle location;
Vehicle status;
Trip reports;
Vehicle day summary;
Geofence monitoring;
Fuel status, where authorized;
Other approved monitoring functions.
The mobile application shall also provide functionality for vehicle attendance/deployment
marking at Ward level at the start of the day, as specified by SMC.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.3.2.14 Server, Storage and Database
The bidder shall deploy and maintain suitable server, storage and database infrastructure at the
SMC Data Centre or any other location specified by SMC.
The infrastructure shall have sufficient processing capacity, storage and scalability to support:
Existing fleet;
Expansion to at least 1,400 vehicles;
Historical transactional data;
Mobile applications;
User access; and
Future expansion requirements.
3.3.2.15 Backup and Disaster Recovery
The bidder shall establish and maintain appropriate backup mechanisms for application, database
and configuration data.The bidder shall:
Schedule regular backups;
Monitor backup completion;
Maintain backup logs;
Facilitate restoration testing;
Protect backup data from unauthorized access; and
Restore data/application functionality in accordance with the approved recovery
SMC may specify backup frequency, retention period and recovery requirements.
3.3.2.16 API and ICCC Integration
The bidder shall provide secure APIs/web services or other standard integration mechanisms for
integration with:
other SMC applications;
Existing/future SMC applications;
Departmental systems;
Mobile applications; and
Other systems specified by SMC.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
The integration may include exchange of:
Vehicle master data;
Vehicle location;
Vehicle status;
Distance;Utilisation data; and
Other approved information.
3.3.2.17 Data Availability and Data Exchange.
The bidder shall make vehicle, GPS, fuel and other relevant system data available to SMC in the
formats, frequency and data structure specified by SMC.
Data shall be made available through:
Export facilities; and
Other approved mechanisms.
3.3.2.18 Data Ownership
All vehicle, GPS, fuel, operational, transactional, historical and other data generated, collected or
processed under this project shall remain the property of Surat Municipal Corporation.
The bidder shall not sell, share, commercially exploit or disclose SMC's data to any third party
except with prior written authorization from SMC or where legally required.
3.3.2.19 MIS and GIS Reports
The bidder shall design and develop MIS/GIS reports as required by SMC.
Reports shall include, but not be limited to:
Vehicle movement;
Vehicle utilisation;
Fuel consumption;
Fuel filling;
Fuel theft/drainage;
Fuel efficiency;
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Route deviation;
Vehicle availability;
Vendor performance;
SLA compliance;
Vehicle attendance;
Department-wise analysis;
Historical trends;
Exception reports; and
Management dashboards.
3.3.2.20 Historical Analytics
The system shall maintain historical records for the period specified by SMC and provide
analytical capabilities for comparison of:
Vehicle performance;
Fuel consumption;
Fuel efficiency;
Vehicle utilisation;
Route patterns;
Vendor performance; and
Other relevant parameters.
The system shall support daily, weekly, monthly and yearly trend analysis wherever applicable.
3.3.2.21 Alert and Notification Management
The system shall provide configurable alerts through dashboard/application and SMS and/or
other approved channels.
Alerts shall include, but not be limited to:
Fuel theft/drainage;
Sudden fuel drop;
Fuel filling;
Fuel filling discrepancy;
Excessive idling;
Over-speeding;
Route deviation;
Geofence entry/exit;
Unauthorized movement;
Prolonged stoppage;
Device tampering;
Device disconnection;
GPS/network communication failure;
Power interruption;
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Restoration of connectivity; and
Other events specified by SMC.
3.3.2.22 Device Tamper and Connectivity Monitoring
The bidder shall provide mechanisms for detecting and reporting:
GPS device disconnection;
Device tampering;
Device removal;
Power interruption;
Communication failure;
Prolonged absence of data;
Fuel sensor disconnection/failure; and
Restoration of connectivity.
The system shall maintain the history of such events for audit and analysis.
3.3.2.23 User Management and Role-Based Access
The system shall provide role-based access for authorized users including:
ICCC Operators;
Vehicle Supervisors;
Assistant Engineers;
Department Heads;
Divisional Heads;
Ward-level users;
Administrators; and
Other users nominated by SMC.
Users shall only be provided access to the vehicles, departments, divisions, reports and functions
authorized for their role.
3.3.2.24 Audit Trail
The application shall maintain an audit trail of significant system and administrative activities,
User login/logout;
User creation/deactivation;
Role changes;
Vehicle assignment changes;
Configuration changes;
Alert acknowledgement;
Important data modifications;
Report generation where required;
Administrative actions; and
Other critical system events.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Audit records shall be protected from unauthorized alteration or deletion.
3.3.2.25 Payment Sheet and Penalty Module
The bidder shall develop/configure a module for generation of monthly payment sheets for
applicable vendor-operated vehicles/services.
The module shall provide provision for applying penalties/deductions based on:
Non-deployment;
Late deployment;
SLA violation;
Excessive downtime;
Route deviation;
Non-compliance;
Other contractual parameters specified by SMC.
The final penalty/payment rules shall be configurable by SMC.
3.3.2.26 Vehicle and Master Data Management
The bidder shall register and maintain master data including:
Vehicle number;
Vehicle type;
Vehicle ownership;
Driver/operator details where applicable;
Fuel sensor ID;
Assigned location;
Contract details;
Other information specified by SMC.
3.3.2.27 Maintenance and Support
The bidder shall maintain the complete solution throughout the contract period, including:
Fuel sensors;
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Mobile application;
Dashboards; and
Other components supplied under the contract.
3.3.2.28 Onsite Technical Manpower
The bidder shall provide, during the five (05) year Post Go-Live Support (PGLS) period:
One (01) Programmer/Application Support Engineer, and
Three (03) Hardware/Field Support Engineers
or such additional manpower as may be specified by SMC based on actual operational
3.3.2.29 Programmer/Application Support Responsibilities
The Programmer/Application Support Engineer shall:
Provide application-level support;
Implement approved changes;
Configure reports;
Support users;
Resolve application issues;
Coordinate with SMC users;
Support testing and deployment;
Coordinate with bidder's backend development team;
Assist in data/API integration;
Support application enhancements; and
Facilitate smooth adoption of the system.
3.3.2.30 Hardware Engineer Responsibilities
The Hardware Engineers shall:
Resolve field-level hardware issues;
Attend GPS/device/sensor complaints;
Carry and manage spare devices;
Replace defective devices;
Attend wiring and installation issues;
Carry out preventive maintenance;
Carry out breakdown maintenance;
Coordinate with bidder's backend support team;
Maintain hardware issue records;
Ensure timely restoration of vehicle tracking/fuel monitoring; and
Monitor the operational health of server/storage infrastructure within the bidder's scope.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.3.2.31 Spare Management
The bidder shall maintain sufficient spare GPS devices, fuel sensors, accessories, wiring and other
components at Surat or at locations specified by SMC.
The minimum spare stock shall be 5% of the deployed quantity, unless otherwise specified by
The bidder shall ensure timely replacement of defective equipment without waiting for
procurement of fresh stock.
3.3.2.32 Replacement of Non-Working Hardware
The bidder shall collect non-working hardware from the field and provide equivalent or
higher specification working hardware.
Replacement shall be carried out within the response/resolution time specified in the SLA.
3.3.2.33 SIM Card and Communication Connectivity
The successful bidder shall provide SIM cards and required data connectivity for the GPS/VTS
devices. SIM cards shall be procured/registered in the name of the selected bidder or in such
manner as approved by SMC.The bidder shall propose the communication/data plan for approval
The cost of SIM/data connectivity shall be included in the quarterly Annual Maintenance bill to be
paid to the bidder., The bidder shall submit the applicable service-provider invoice/supporting
documents as specified by SMC.
The bidder shall be responsible for maintaining continuous communication connectivity for the
deployed devices and resolving SIM/network-related issues within the applicable SLA.
3.3.2.34 Training and Handholding
The bidder shall provide training and handholding to SMC and contractor/vendor staff as
required.Training shall cover:
GPS device operation;
Fuel sensor operation;
Application usage;
Mobile application;
User administration;
Troubleshooting;
Basic system administration; and
Other relevant modules.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.3.2.35 Manuals and Documentation
The bidder shall provide manuals in English and Gujarati, wherever specified by SMC, including:
Training Manual;
System Administration Manual;
Installation Manual;
Operational Manual;
Maintenance Manual;
Troubleshooting Manual;
API/Integration Documentation;
Backup/Restore Procedure; and
Other technical documentation required by SMC.
3.3.2.36 Help Desk and Complaint Management
The bidder shall establish a well-managed help desk/service support mechanism for registering
and resolving complaints related to:
Fuel sensors;
Communication;
Mobile application;
Database; and
Other components of the solution.
Every complaint shall be assigned a unique complaint/ticket number.The system shall maintain:
Complaint date/time;
Complaint description;
Vehicle/device details;
Assigned support person;
Action taken;
Resolution date/time; and
Closure details.
3.3.2.37 Preventive and Breakdown Maintenance
The bidder shall carry out preventive and breakdown maintenance of all supplied hardware
and software components.
Preventive maintenance shall include inspection of:
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Power connection;
Device mounting;
Sensor calibration/health;
Communication;
Server/storage;
Application performance; and
Other relevant components.
3.3.2.38 Application Bug Fixing and Enhancement
The bidder shall promptly rectify all bugs, errors, defects and performance issues identified
during the contract period.
Approved changes arising from changes in SMC's operational requirements shall be
implemented by the bidder as per the agreed change-management procedure.
3.3.2.39 Departmental Change Requirements
The bidder shall implement approved changes in workflows, reports, dashboards, configurations
and other application functionality arising from changes in SMC's departmental requirements
during the contract period.
3.3.2.40 Cybersecurity and Access Security
The bidder shall implement appropriate security measures for:
User authentication;
Role-based access;
Password management;
Secure API access;
Data transmission;
Database security;
Application security;
Audit logging;
Backup security; and
Prevention of unauthorized access.
Any security vulnerability identified in the solution during the contract period shall be addressed
by the bidder within the stipulated period.
3.3.2.41 Application Performance
The bidder shall ensure that the application, dashboards, reports and APIs perform satisfactorily
under the expected operational load.
The solution shall be designed to support simultaneous access by authorized SMC users and shall
be scalable for future expansion.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.3.2.42 Data Retention
The bidder shall maintain historical data for the period specified by SMC.The bidder shall ensure
that historical data remains searchable, retrievable and exportable throughout the contract
3.3.2.43 Data Migration and Initial Setup
The bidder shall assist SMC in:
Collection and validation of vehicle master data;
Existing vehicle registration;
Device mapping;
Fuel sensor mapping;
Department mapping;
Ward/division mapping;
Geofence creation;
User creation;
Initial configuration; and
Other activities required for commissioning.
3.3.2.44 Testing and Commissioning
The bidder shall conduct complete testing before Go-Live, including:
Hardware testing;
GPS tracking testing;
Fuel sensor testing;
Fuel filling event testing;
Fuel drop detection testing;
Communication testing;
Application testing;
Mobile application testing;
Report testing;
Alert testing;
User-role testing;
Security testing; and
Integration testing.
The system shall be considered commissioned only after successful completion of the testing and
acceptance procedure specified by SMC.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.3.2.45 Acceptance Testing
System Acceptance Testing: SMC shall conduct acceptance tests covering GPS position accuracy,
configurable transmission interval, offline data buffering and synchronization, fuel-level
resolution and guaranteed accuracy, fuel filling validation, fuel drainage/theft detection, GPS-fuel
correlation, geofencing, overspeeding, idling, tamper/disconnection alerts, application
availability, dashboards, reports, APIs, mobile application, audit trail, backup/restore and data
export. The bidder shall submit a detailed UAT procedure and test cases for SMC approval before
commencement of UAT.
SMC shall have the right to conduct User Acceptance Testing (UAT), field verification and
performance verification before acceptance of the system.
Any deficiency identified during testing shall be rectified by the bidder at no additional cost to
3.3.2.46 Vehicle Attendance and Deployment
The system shall provide functionality for recording vehicle attendance/deployment at
Ward/department level, including date, time, vehicle and designated location.
The attendance/deployment information shall be capable of being correlated with GPS
movement and vehicle operational data.
3.3.2.47 Vehicle Availability Monitoring
The system shall provide real-time information regarding:
Available vehicles;
Deployed vehicles;
Non-operational vehicles;
Under-maintenance vehicles;
Offline vehicles;
Idle vehicles; and
Other configured vehicle statuses.
3.3.2.48 Comprehensive Reporting
The bidder shall generate all reports specified by SMC during the contract period.The system
shall provide configurable report generation based on:
Vehicle category;
Fuel consumption;
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Other parameters.
3.3.2.49 System Scalability
The solution shall be capable of scaling to at least 1,400 vehicles/mobile assets, with provision for
further expansion without fundamental replacement of the application architecture.
Scalability shall cover:
Fuel sensors;
Historical data;
Dashboard users; and
Other system components.
3.3.2.50 Exit Management and Handover
At the end of the contract period, or upon termination as per contractual provisions, the bidder
shall provide SMC with:
Complete vehicle master data;
Historical GPS data;
Historical fuel data;
Application data;
Database backup;
Configuration data;
User/master data;
API documentation;
Technical documentation;
Other project-related data and documentation.
The bidder shall assist SMC in migration/transition to another system or agency, if required,
without withholding SMC's data.
3.3.2.51 General End-to-End Responsibility
The successful bidder shall be responsible for ensuring the complete and functional operation of
the Integrated VTS & FMS solution throughout the contract period.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Any item, component, accessory, software module, integration, configuration, cabling,
communication component or service reasonably required for successful operation of the
solution, even if not individually listed in the Scope of Work, shall be provided by the bidder
where it is within the bidder's technical scope and shall not be used as a reason for non-
functioning of the system.
The bidder shall ensure that the solution remains operational, reliable, secure, scalable and fit for
the intended municipal fleet-management purpose throughout the contract period.
3.4 FUNCTIONAL REQUIREMENTS AND SPECIFICATIONS
Below diagram provides software and hardware components involved in entire ecosystem.
Vehicle Tracking
Fuel level Sensors
SOFTWARE SOLUTION
PenaltyCalculation
On Vehicles At ICCC, Ward offices and Zone /ward offices
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.4.2 SOFTWARE SOLUTION – VEHICLE TRACKING AND FUEL LEVEL SENSOR
MANAGEMENT SYSTEM
For the purpose of implementing the Vehicle Tracking and Fuel Level Sensor Management
Solution, the selected Bidder/System Integrator (SI) shall provide, install, configure, integrate,
commission and maintain a complete end-to-end hardware and software solution.
The proposed solution shall provide a single, integrated and centralized software platform for
monitoring GPS-based vehicle tracking and fuel-level information received from the GPS devices
and fuel-level sensors installed in SMC vehicles.
The solution shall support real-time monitoring, historical analysis, alerts, route management, fuel
monitoring, fuel consumption analysis, vehicle management, device management, reporting,
dashboard, mobile access, system administration and integration with other SMC systems.
The requirements specified below are indicative and shall be finalized/refined during preparation
of the System Requirement Specification (SRS) and implementation, provided that such
refinement does not dilute the essential requirements specified in this tender.
3.4.2.1 General Requirements of Software Solution
3.4.2.1.1 Integrated Application
1. The VTS and Fuel Monitoring System shall be provided as a single integrated
application/platform.
2. SMC users shall not be required to access separate applications for routine monitoring,
reporting, alert management or analysis of GPS and fuel-level data.
3. The application shall integrate all GPS devices and fuel-level sensors installed on SMC
4. The application shall provide a common database and common user-management
framework for GPS and fuel-monitoring information.
5. The system shall support real-time data acquisition, processing, storage, visualization and
6. The system shall maintain a unique relationship between:
Vehicle → GPS Device → Fuel Sensor → SIM/Communication → Driver/Operator
7. The system shall maintain historical mapping whenever a GPS device, fuel sensor, SIM or
other device is replaced or reassigned.
8. The application shall be browser-based and accessible through standard web browsers
without requiring proprietary client software, except where specifically required.
9. The solution shall support access from desktops, laptops, tablets and smartphones
through the web application and/or approved mobile application.
10. The solution shall support role-based access and shall ensure that users can access only
the functions and data authorized for their respective roles.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.4.2.1.2 System Architecture
The proposed solution shall generally comprise the following logical layers:
A. Vehicle/Field Layer
GPS Vehicle Tracking Device
Fuel Level Sensor
GPS/GNSS antenna, wherever applicable
Communication module/SIM
Tamper/power monitoring
Necessary wiring, connectors and accessories
B. Communication Layer
The system shall receive data transmitted from vehicles through the applicable cellular/mobile
communication network or other approved communication mechanism.
C. Central Application Layer
The central system shall comprise, as applicable:
Application Server
Database Server
GIS/Map Service
API/Integration Layer
Reporting Engine
Authentication and Authorization Layer
Backup and Recovery mechanism
System Monitoring mechanism
The system shall provide:
Web-based application
Management dashboard
Operator dashboard
Mobile application, where applicable
Alerts and notifications
Administrative functions
The SI shall submit the detailed solution architecture and data-flow diagram during the
implementation phase for approval by SMC.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.4.2.1.3 Application Hosting
1. The application shall be hosted in the SMC Data Center, unless otherwise directed by
2. SMC shall provide the required virtual machine/virtual infrastructure and necessary
network connectivity as specified by SMC.
3. The SI shall be responsible for installation, configuration, deployment, optimization,
monitoring and maintenance of the application and database components.
4. Necessary application software, database software, middleware, supporting software and
licenses required for operation of the proposed solution shall be provided by the SI unless
specifically stated otherwise in the tender.
5. The SI shall configure the application to operate within the infrastructure provided by
6. The SI shall be responsible for application-level security, database security, patching of
application dependencies and other components falling within its scope.
7. The SI shall ensure appropriate backup, restoration and disaster-recovery mechanisms in
coordination with SMC.
8. The system shall be scalable to accommodate the present and future SMC fleet without
major redesign of the application.
3.4.2.1.4 Login and Authentication
1. The system shall provide a secure login screen for authorized users.
2. Users shall authenticate using username/password and/or other authentication
mechanisms approved by SMC.
3. The system shall provide a forgot-password mechanism.
4. Password reset shall be performed through a secure mechanism using the registered
mobile number/email or other authentication mechanism approved by SMC.
5. The system shall support configurable password policies.
6. The system shall automatically terminate/expire sessions based on configurable security
7. The system should support multi-factor authentication if required by SMC.
8. The system shall maintain login/logout and authentication audit logs.
3.4.2.2 ADMINISTRATION AND MASTER MANAGEMENT MODULE
The Administration Module shall enable authorized administrators to configure and manage the
complete VTS/FMS solution.
3.4.2.2.1 User and Role Management
The system shall provide:
a) Create, edit, deactivate and manage users.
b) Define roles and associated privileges.
c) Create/Edit/Delete/Deactivate roles.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
d) Assign specific permissions to each role.
e) Show/hide application screens and functions based on user roles.
f) Restrict users to specific zones, wards, vehicle groups or vehicle categories, wherever
g) Reset/change user passwords.
h) Maintain user activity logs.
i) Maintain login and logout history.
j) Support configurable user-access hierarchy.
3.4.2.2.2 Vehicle Master
The system shall provide functionality to create and manage vehicle records including, as
Vehicle registration number
Vehicle category
Chassis number
Engine number
Tank capacity
Owner/department
Vehicle group/sub-group
Contractor, if applicable
Assigned driver
Operational status
Installation date
Commissioning date
Warranty details
Other relevant vehicle information
3.4.2.2.3 GPS Device Master
The system shall maintain:
IMEI/unique device identification
Firmware version
SIM/mobile number
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Installation date
Vehicle mapping
Device status
Last communication time
Warranty details
Replacement history
Maintenance history
The system shall maintain historical mapping of GPS devices to vehicles.
3.4.2.2.4 Fuel Sensor Master
The system shall maintain detailed information relating to each fuel-level sensor, including:
Sensor ID/serial number
Measurement range
Vehicle mapping
Fuel tank capacity
Installation date
Calibration date
Calibration parameters
Calibration history
Sensor status
Replacement history
Warranty details
Maintenance history
The system shall maintain historical records whenever a fuel sensor is replaced or reassigned.
3.4.2.2.5 Driver Management
The system shall provide:
Driver registration
Employee/contractor ID
Contact details
Driving licence details, where required
Vehicle assignment
Driver-to-vehicle history
Start/end date of assignment
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.4.2.2.6 Vehicle Group and Location Management
The administrator shall be able to create and manage:
Vehicle groups
Vehicle sub-groups
Vehicle categories
Operational areas
Contractors/agencies, where applicable
Vehicles and users shall be mapped to the relevant groups/locations.
3.4.2.2.7 Audit Trail
1. The system shall maintain audit trails for all critical administrative and transactional
2. The audit trail shall capture, as applicable:
Activity performed
Previous value
IP/device information, where available
3. Any modification/deletion of critical master or transactional information shall be
4. Deletion of critical records should preferably be implemented through logical
deletion/deactivation rather than permanent deletion.
3.4.2.3 GIS / MAP AND GEO-FENCING MODULE
3.4.2.3.1 GIS Map
1. The system shall display vehicles on an interactive digital map.
2. The map shall display:
Current vehicle location
Vehicle number
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Vehicle status
Fuel level, where applicable
3. Vehicles shall be identifiable through different icons/status indicators.
4. The user shall be able to zoom, pan and search the map.
5. The system shall support map-based vehicle selection.
6. The solution shall support standard GIS/map services.
7. Map layers and geo-tagged information shall be configurable.
3.4.2.3.2 Geo-Fencing
The system shall provide functionality to:
a) Create geo-fences.
b) Edit/delete geo-fences.
c) Define circular, polygonal and/or other supported geo-fence shapes.
d) Assign vehicles/groups to geo-fences.
e) Configure entry and exit alerts.
f) Generate geo-fence violation reports.
g) Maintain historical geo-fence events.
3.4.2.4 VEHICLE MANAGEMENT AND REAL-TIME TRACKING MODULE
3.4.2.4.1 Vehicle Tracking
The system shall provide real-time tracking of all connected vehicles. The user shall be able to
Vehicle number
Current location
Distance travelled
Ignition status
Moving/idle/stopped status
GPS availability
Communication status
Fuel percentage
Fuel sensor status
3.4.2.4.2 Vehicle Search and Filtering
Users shall be able to select/filter vehicles based on:
Vehicle number
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Vehicle category
Vehicle group
Operational status
3.4.2.4.3 Historical Vehicle Tracking
The system shall allow users to select a specific vehicle and date/date range to view:
Route travelled
Start location
Distance travelled
Geo-fence events
Fuel level history
3.4.2.4.4 Trip Replay
The system shall provide trip-replay functionality. The user shall be able to select:
and replay the vehicle movement on the map.The replay should display relevant vehicle and fuel
information along the timeline.
3.4.2.5 GPS EVENT AND ALERT MANAGEMENT
The system shall support configurable alerts, including, as applicable:
2. Excessive idling.
3. Unauthorized movement.
4. Route deviation.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
5. Geo-fence entry.
6. Geo-fence exit.
7. Ignition ON/OFF.
8. Vehicle movement during unauthorized hours.
9. GPS device tampering.
10. Device disconnection.
11. GPS communication failure.
12. Low battery/power failure where supported.
13. Prolonged data gap.
14. Vehicle stationary beyond configured duration.
15. Other alerts specified by SMC.
Alerts shall be configurable by vehicle, group, zone and user.
The system shall support on-screen alerts and integration with SMS/email gateways provided by
3.4.2.6 FUEL LEVEL SENSOR MANAGEMENT MODULE
This module shall be a core component of the proposed solution.
3.4.2.6.1 Real-Time Fuel Monitoring
The system shall display real-time fuel information received from the fuel-level sensor.
The system shall provide:
Fuel level in litres
Fuel level in percentage
Fuel tank capacity
Date/time of reading
Vehicle location
Fuel sensor status
Last valid reading
Data communication status
3.4.2.6.2 Fuel Level History
The system shall provide graphical and tabular fuel-level history. The user shall be able to select a
vehicle and date/date range and view:
Initial fuel level
Final fuel level
Minimum fuel level
Maximum fuel level
Fuel level trend
Fuel filling events
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Fuel drainage events
Vehicle movement corresponding to fuel-level changes
3.4.2.6.3 Fuel Filling Detection
The system shall identify and record fuel-filling events based on configurable business rules.
The fuel filling event should include:
Vehicle number
Fuel level before filling
Fuel level after filling
Estimated quantity filled
Vehicle status
Relevant alert/event
3.4.2.6.4 Fuel Drainage / Abnormal Fuel Reduction
The system shall detect abnormal fuel reduction/drainage based on configurable thresholds and
business rules. The system should consider, as applicable:
Rate of fuel reduction
Quantity reduced
Vehicle movement status
Ignition status
Fuel level before and after event
The system shall generate an alert for abnormal fuel reduction.
3.4.2.6.5 Fuel Consumption Analysis
The system shall provide vehicle-wise fuel-consumption analysis. Reports should include, as
Fuel consumed
Distance travelled
Fuel consumption per kilometre
Fuel consumption per operating hour
Average fuel efficiency
Fuel filling quantity
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Abnormal fuel loss
Period-wise consumption
The SI shall ensure that fuel-consumption calculations use clearly defined business rules
approved by SMC.
3.4.2.6.6 Low Fuel Alert
The system shall provide configurable low-fuel thresholds.The system shall generate an alert
when fuel falls below the configured threshold. Thresholds may be defined in:
Litres; and/or
Percentage of tank capacity.
3.4.2.6.7 Fuel Sensor Health Monitoring
The system shall monitor:
Sensor communication
Last received data
Sensor failure
Sensor disconnection
Abnormal sensor values
Sensor tampering, where supported
Communication/data gap
Calibration status
The dashboard shall identify vehicles having non-functional or abnormal fuel sensors.
3.4.2.6.8 Fuel Sensor Calibration
The system shall maintain:
Calibration date
Calibration method
Calibration parameters
Calibration result
Calibration history
Next calibration date, where applicable
Person/agency performing calibration
Any calibration modification shall be recorded in the audit trail.
3.4.2.7 GPS + FUEL CORRELATION / ANALYTICS MODULE
The system shall correlate GPS and fuel data for the same vehicle.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
The system shall support analysis such as:
1. Fuel level versus distance travelled.
2. Fuel level versus vehicle operating time.
3. Fuel consumption versus distance.
4. Fuel consumption versus vehicle category.
5. Fuel consumption versus route.
6. Fuel filling versus GPS location.
7. Fuel drainage versus GPS location.
8. Fuel drainage while vehicle is stationary.
9. Abnormal fuel reduction during vehicle movement.
10. Vehicle-wise fuel efficiency.
11. Vehicle/category-wise comparison.
12. Historical fuel-consumption trends.
The purpose shall be to identify abnormal fuel consumption, possible fuel loss and operational
inefficiencies.
3.4.2.8 DEVICE HEALTH AND MAINTENANCE MODULE
The system shall provide a device-health dashboard covering:
GPS device online/offline
Fuel sensor online/offline
Last communication
Device failure
Sensor failure
Power status, where available
Communication status
Firmware/software status, where available
The system shall maintain maintenance and replacement history for each device.
3.4.2.9 DASHBOARD REQUIREMENTS
The dashboard shall provide a quick and comprehensive view of the SMC fleet.
The dashboard shall be configurable according to user role.
Fleet Dashboard
The dashboard should display:
Total vehicles
Moving vehicles
Idle vehicles
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Stopped vehicles
Offline vehicles
GPS-failed vehicles
Fuel-sensor-failed vehicles
Vehicles with low fuel
Vehicles with abnormal fuel reduction
Vehicles with active alerts
GPS Dashboardshould display:
Vehicles online
Vehicles offline
GPS data gaps
Route deviations
Overspeed events
Excessive idling
Tampering alerts
Fuel Dashboard should display:
Vehicles with valid fuel data
Vehicles with no fuel data
Low-fuel vehicles
Fuel filling events
Abnormal fuel reduction
Fuel consumption
Fuel efficiency
Vehicle-wise fuel trends
Fuel sensor health
Alert Dashboard
All active and historical alerts shall be displayed with:
Acknowledgement
3.4.2.10 REPORTING AND MIS MODULE
The solution shall provide configurable MIS and operational reports.
Indicative reports shall include:
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Vehicle Reports
1. Vehicle master report.
2. Vehicle-wise tracking report.
3. Vehicle movement report.
4. Vehicle trip report.
5. Vehicle stoppage report.
6. Vehicle idling report.
7. Overspeed report.
8. Route deviation report.
9. Geo-fence report.
10. Vehicle utilization report.
11. GPS device status report.
12. GPS downtime report.
13. GPS data-gap report.
14. Device tampering report.
15. Device replacement history.
16. GPS availability report.
17. Vehicle-wise fuel-level report.
18. Fuel filling report.
19. Fuel consumption report.
20. Fuel efficiency report.
21. Abnormal fuel reduction report.
22. Fuel drainage alert report.
23. Low-fuel report.
24. Fuel sensor status report.
25. Fuel sensor failure report.
26. Fuel sensor calibration report.
27. Fuel sensor replacement history.
28. Vehicle-wise fuel trend report.
29. Daily/weekly/monthly fuel consumption report.
30. Vehicle/category-wise fuel comparison report.
Combined GPS & Fuel Reports
31. Vehicle movement versus fuel consumption.
32. Distance travelled versus fuel consumed.
33. Fuel filling with GPS location.
34. Fuel drainage with GPS location.
35. Fuel consumption during idling.
36. Abnormal fuel consumption report.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
37. Vehicle performance report.
38. Fleet fuel-efficiency report.
The final report list shall be finalized during preparation of the SRS.
3.4.2.11 MOBILE APPLICATION
The selected Bidder shall provide a mobile application for Android and iOS, where specified by
The mobile application shall provide authorized users with access to relevant VTS/FMS
The application shall include, as applicable:
1. Secure login.
2. Vehicle list.
3. Real-time vehicle location.
4. Vehicle status.
5. Vehicle movement.
7. Vehicle history.
8. Trip replay.
10. Fuel level.
11. Fuel filling alerts.
12. Abnormal fuel reduction alerts.
13. Low-fuel alerts.
14. Fuel history.
15. Vehicle-wise fuel consumption.
16. Dashboard for authorized officers.
17. Alert acknowledgement.
18. Basic reports.
19. Search and filtering by vehicle/zone/ward/category.
The mobile application shall use the same centralized data source as the web application.
3.4.2.12 ALERT NOTIFICATION AND COMMUNICATION GATEWAY
1. The system shall support integration with SMS and email gateways.
2. SMC shall provide the required gateway/API details wherever applicable.
3. Integration with the gateway shall be the responsibility of the SI.
4. The system shall support configurable notification recipients.
5. Notifications may be configured based on:
Vehicle group
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
6. The system shall maintain notification history including:
Delivery status
3.4.2.13 API AND SYSTEM INTEGRATION
1. The solution shall provide open and documented APIs for integration with SMC's
existing/future applications.
2. The system shall support data exchange through standard APIs and commonly used
3. APIs may be required for:
Vehicle master
Vehicle location
Fuel consumption
Vehicle/device mapping
4. The SI shall provide necessary API documentation.
5. The SI shall provide necessary support for integration with SMC systems during
implementation and support periods.
3.4.2.14 DATA STORAGE, ARCHIVAL AND BACKUP
1. All GPS and fuel-monitoring data shall be stored in a centralized database.
2. The database shall maintain appropriate relationships between vehicle, GPS device and
3. Historical data shall be retrievable based on vehicle/date/date range and other applicable
4. The SI shall implement the data archival policy approved by SMC.
5. Archived data shall be provided in a usable and machine-readable format whenever
required by SMC.
6. The SI shall configure and monitor database backup.
7. Backup shall be periodically tested for restoration.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
8. The SI shall take reasonable measures to prevent data loss.
9. Data shall not be deleted or altered except through authorized administrative functions
and in accordance with SMC-approved policies.
3.4.2.15 SECURITY REQUIREMENTS
The SI shall implement appropriate security measures for the complete solution.
The solution shall include, as applicable:
1. Role-based access control.
2. Secure authentication.
3. Password policy.
4. Session management.
6. Database access controls.
7. Secure API access.
8. Encryption of sensitive communication.
9. Secure backup.
10. Malware protection at applicable infrastructure layers.
11. Regular security patches.
12. Vulnerability remediation.
13. Logging and monitoring.
14. Protection against unauthorized access.
The SI shall comply with applicable SMC information-security policies and applicable Government
of India requirements communicated by SMC.
Any security breach attributable to the SI shall be handled in accordance with the SLA and
Security Breach provisions of the Contract.
3.4.2.16 SCALABILITY
The solution shall be scalable and shall not impose unreasonable restrictions on:
Number of vehicles
Number of GPS devices
Number of fuel sensors
Number of users
Number of vehicle groups
Number of zones/wards
Number of alerts
Number of reports
Number of geo-fences
Number of API integrations
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
The proposed architecture shall be capable of accommodating future expansion of the SMC fleet
without fundamental redesign.
3.4.2.17 CONFIGURATION AND BUSINESS RULE ENGINE
The solution should provide configuration capabilities for authorized administrators without
requiring source-code modification for routine changes.
The system should allow configuration of:
Alert thresholds
Overspeed limits
Idling duration
Geo-fence parameters
Low-fuel threshold
Fuel-drainage threshold
Data-gap threshold
Notification recipients
Vehicle groups
Report parameters
User permissions
Other operational parameters approved by SMC
Any change to critical business rules shall be captured in the audit trail.
3.4.2.18 DATA EXPORT
The system shall provide export functionality for authorized users.Reports/data should be
exportable in commonly used formats such as; Excel, CSV and PDF. The system should support
Fuel filling events
Fuel drainage events
Device information
3.4.2.19 SYSTEM ACCEPTANCE AND SRS
1. The selected SI shall prepare a detailed System Requirement Specification (SRS) based on
the tender requirements.
2. The SRS shall be submitted to SMC for review and approval.
3. The SRS shall include:
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Functional requirements
Non-functional requirements
System architecture
Screen layouts
Business rules
GPS integration
Fuel sensor integration
API requirements
Data retention
Performance requirements
4. The approved SRS shall form the basis for implementation and acceptance testing.
5. No essential requirement specified in the tender shall be omitted from the SRS.
3.4.2.20 SOFTWARE TESTING AND COMMISSIONING
Before Go-Live, the SI shall conduct:
1. Functional testing.
2. GPS device integration testing.
3. Fuel sensor integration testing.
4. Real-time tracking testing.
5. Fuel-level accuracy/data testing.
6. Alert testing.
7. Report testing.
8. User/role testing.
9. API testing.
10. Backup and restoration testing.
11. Security testing.
12. Performance testing.
13. Mobile application testing.
14. User Acceptance Testing (UAT).
The system shall be declared operational only after successful completion of the applicable
acceptance tests and approval by SMC.
3.4.2.21 OWNERSHIP OF DATA
1. All vehicle tracking data, fuel-level data, fuel-consumption data, alerts, reports and other
operational data generated under this Contract shall belong to SMC.
2. The SI shall not claim ownership over SMC's operational data.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3. The SI shall not disclose or share SMC data with any third party except where specifically
authorized by SMC or required by applicable law.
4. On expiry or termination of the Contract, the SI shall provide complete data and necessary
technical information to SMC in a usable electronic format.
3.4.2.22 EXIT AND TRANSITION SUPPORT
Upon expiry or termination of the Contract, the SI shall provide reasonable transition support to
SMC or its nominated agency. The SI shall provide:
Complete vehicle master data
GPS device mapping
Fuel sensor mapping
Historical GPS data
Historical fuel data
Alert history
Configuration information
API documentation
Database/data export
Other information reasonably required for transition
The SI shall not obstruct or restrict SMC's access to its own data or operational records.
3.4.2.23 GENERAL REQUIREMENT
The proposed solution shall be an end-to-end integrated Vehicle Tracking and Fuel Level Sensor
Management System capable of providing SMC with reliable, real-time and historical information
Vehicle Location + Vehicle Movement + Vehicle Utilization + GPS Health + Fuel Level + Fuel
Filling + Fuel Consumption + Fuel Efficiency + Abnormal Fuel Reduction + Alerts + Reports +
The SI shall ensure that the complete solution is designed, supplied, integrated, commissioned
and maintained as a single operational platform throughout the Contract Period.
3.4.3 Hardware Specifications
The below section specifies the minimum specification and requirement for the proposed
solution components under this RFP.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.4.3.1. Vehicle Tracking GPS Device Specifications
I. Vehicle Tracking GPS Device Specifications
# Parameters Minimum Specification/Particulars
1. Navigation GPS/IRNSS Complied
2. GPS Channels 32 Channel or more
3. GPS Acquisition Time Cold Start <55 sec
Warm Start< 40 sec
Hot Start < 10 sec
4. GPS Sensitivity -165dBm
5. Horizontal Position on Up to 10 meter
6. Standards WGS-84 Standard compliant
Outputs as per NMEA protocol
7. Antenna Internal Antenna for GPS and GPRS
8. Input Voltage Range 8V - 36V / Optional 8V-90V for EV Support
9. Average current < 100mA
10. Average current with < 135mA
Battery charging
11. Battery Specification Lithium-ion
12. Battery Backup Time 3 hrs. or more in active mode
13. Digital Inputs/Outputs Minimum
14. Analog Inputs Minimum
15. Over speed User Settable Speed limit
16. Internal Memory Support minimum 40,000 data logs
17. GPS Track Recording and Built in memory to store data when out of GPRS radio
Resending coverage.
Automatically resend Non- GPRS coverage data when device
goes into GPRS coverage.
18. Power Supply External & Internal Battery
19. GPS based Speed up to 180 KMPH
Measurement Range
20. Factory setting Switch for default factory setting
21. Data send frequency Adjustable up to 8 seconds or more
22. LED status Power
23. USB for parameter Required
24. Multi IP connection two Primary, Secondary
25. Operating Temperature -10°C to +60°C
26. Storage Temperature -10°C to +60°C
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
27. Humidity 95% non-condensing
28. Protection IP
29. API/SDK Should provide API's protocols and necessary
documentation for integration purpose.
30. Connection USB/RS232 port
31. GPRS 1 In- Built GPRS module/Modem
2 Multi Slot GPRS
3 GPRS class 10 or Above
Should support – SMS, Voice, Data, GPRS, TCP/IP
32. GSM Module Quad Band GSM 850/900/1800/1900Mhz
33. AGPS support Required
34. GSM Module Number IMEI
35. Firmware Upgrade Firmware over the air upgrade (FOTA)
36. Certification ARAI Approved
37. Warranty 5-year comprehensive replacement warranty from the date
of Post Go Live.
3.4.3.2 Fuel Level Sensor Specifications
II. Fuel Level Sensor Device Specifications
# Parameters Minimum Specification/Particulars
1. Technology Digital capacitive fuel-level sensor or equivalent solid-state
technology suitable for vehicle fuel tanks.
2. Application Suitable for diesel/petrol fuel tanks used in SMC vehicles and
compatible with the vehicle/tank construction.
3. Measurement Continuous fuel-level measurement with output in litres
and/or percentage after calibration.
4. Accuracy ±1% of full-scale tank capacity or better after vehicle/tank-
specific calibration. Bidder shall declare guaranteed accuracy,
repeatability and temperature-related tolerance, which shall
be demonstrated during calibration and UAT.
5. Resolution 1 mm or better fuel-level resolution, or equivalent resolution
appropriate to the tank capacity.
6. Probe Length Suitable/customizable probe length for different tank
depths; installation shall not adversely affect the tank or
7. Supply Voltage Nominal 9–36 V DC or wider range suitable for the vehicle
electrical system.
8. Output/Interface RS-485/RS-232/CAN/analogue or other standard interface
compatible with the proposed GPS/VTS device;
protocol/documentation shall be provided.
9. Communication Fuel sensor data shall be transmitted through the integrated
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
GPS/VTS device to the central application.
10. Sampling/Reporting Configurable sampling/reporting interval; the proposed
system shall support sufficiently frequent data capture for
detection of filling and abnormal fuel reduction.
11. Operating Temperature At least -20°C to +70°C, or better.
12. Ingress Protection Minimum IP67 for sensor/electronic enclosure exposed to
vehicle environment.
13. Fuel Compatibility Sensor materials shall be compatible with the applicable fuel
and resistant to corrosion/chemical effects under normal
operating conditions.
14. Tamper/Disconnection System shall support detection/reporting of sensor
disconnection, abnormal signal and/or tampering where
supported by the sensor/device.
15. Calibration Calibration shall be vehicle/tank specific and shall include
calibration records and history in the software.
16. Installation Complete installation shall include mounting, wiring,
connectors, sealing, protection and integration accessories
required for safe and reliable operation.
17. Data Retention at Device Where communication is unavailable, the integrated solution
shall buffer/store relevant fuel data and transmit it after
communication is restored, subject to device memory.
18. Certification/Compliance The sensor and installation shall comply with applicable
statutory, safety and vehicle requirements. Bidder shall
submit OEM datasheet and relevant test/certification
19. Warranty Five (05) year comprehensive warranty/replacement support
as specified in the Contract.
20. Factory setting Switch for default factory setting
21. Warranty 5-year comprehensive replacement warranty from the date of
3.4.4 NON- FUNCTIONAL REQUIREMENTS OF SOFTWARE SOLUTION
Non-Functional requirements of an IT system are quality requirements or constraints of the
system that must be satisfied. These requirements address major operational and functional
areas of the system in order to ensure the robustness of the system. The Non-Functional
Requirements established for the Integrated monitoring and tracking system are described in this
section of the document. The main areas addressed are:
1. Capacity Estimates and Planning
a. Response Time
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
4. Availability (including recoverability and reliability)
6. Disaster Recovery
These Non-Functional Requirements should be used:
a) As a basis for system sizing and estimates of cost.
b) To assess the viability of the proposed IT system components.
c) To drive the design of the operational models.
d) As an input to component design.
Details of the NFRs are as follows:
1. Capacity Estimates & Planning- The architecture of the system must support the current
anticipated load of more than 30 concurrent users. The solution is expected to provide
acceptable level of performance under peak load.
2. Performance- Response Time requirements define the time to complete a specific system
task or process. The time interval, or response time, can be expressed as an exact
measurement of time or as an acceptable range. The following table provides response time
bands for the most significant user-system interaction within the different classes of
transaction present in the system.
Frequency of Use Target Average End-to-End Response Time (seconds)
Simple Page / Screen Load 1–4
Complex Page / Screen Load 5–8
Simple Page / Screen Load – Example: Screen to screen transition during static page /
Complex Page / Screen Load – Example: Delivery of a dynamic page / screen that is
populated with information from various tables in database (e.g. complex report).
During Inception and requirement analysis phase, architecturally significant use cases
should be mapped to one of these response time bands and agreed upon by Bidder.
3. Scalability- Scalability is the ability to expand the system architecture to accommodate more
users and vehicles, more transactions and more data as additional users and data are added
in the future. The existing systems should be extensible up to additional 50% of existing
capacity without necessarily having to replace them. System should be able to scale
horizontally and vertically.
4. Availability- Availability requirements address the time a system must be available (up and
running) to service user requests. Availability is the acceptable and agreed-to level of service
during scheduled periods.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
The following table has grouped different service levels bands based on how critical the
overall availability of the system is to system users.
Requirement Critical High Medium Low
Availability 99.9% 99% 98% 97%
Mean Time to Repair (MTTR) 2 – 4 hours 8 hours 16 hours 32 hours
The bidder shall be responsible for designing and implementing high availability for the
solution. All the components proposed like DB, OS, Application server should support high
5. Maintainability-The Integrated VTS/FMS Solution should be easy to maintain. Technical
design should not be monolithic in such a way that any change/repair of a single module
affects entire application which needs to be tested every time. Design should be modular so
that only affected module needs to be deployed and tested in case of any change in that
6. Browser Requirements- Solution should support application accessibility from latest web-
browser from Google, Microsoft, Firefox and Safari.
7. Security- Solution must have necessary security in place to protect the application and data
from any unauthorized access and exploits. Necessary audit trail should be maintained to
8. Authentication-
a) System should support a password based authentication.
b) System should enable setting up of password policies based on roles and responsibilities.
c) System should support password storage and transmission using strong encryption.
d) Authentication technologies utilized must be industry standards.
e) User accounts must contain a unique ID.
f) System should allow administrators the ability to create, delete and manage user
g) System should have configurable password restrictions and policies.
9. Authorization-
(a) System should support a role based access control model.
(b) System should support the creation of user roles.
(c) System should support delegated administration of role assignment and management
Performance testing to measure and ensure performance (and scalability) of the application,
network emulation capabilities to test real world load scenarios and network conditions along
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
with regression testing across releases will be required as part of the project. Any test tool
required for the testing will be responsibility of Implementation Agency.
3.4.4 POST IMPLEMENTATION SUPPORT AND MAINTENANCE
The following section describes post go live support requirements, service management and
support requirements and enduring support requirements.
As part of the delivery of the solution it is expected that the Bidder shall provide Post Go Live
Support (“PGLS”) for the Solution for five (5) years. The Post Go Live Support (“PGLS”) will start
after completion of 3 months of Hypercare Support after Go Live. Warranty support for the
solution will be provided for the 3 months Hyper Care Support period or until all defects in the
Solution for which the Bidder shall be responsible are resolved, whichever is longer.
Defects include those that were known prior to Go-Live and any new defects that materialize in
operation during Warranty.
The Bidder shall work to ensure that all defects and issues are resolved in line with agreed
processes and procedures.
The five (05) year Post Go-Live Support (PGLS) period shall commence after Go-Live, with the
initial Hypercare period forming part of the implementation/stabilisation support unless
otherwise specified in the Contract. The Bidder shall provide appropriate levels of on-site and off-
site support as necessary. The Bidder’s PGLS team shall be responsible for the continued delivery
of stable systems, development, and operational support. The selected agency shall provide
operations and maintenance services for the software, hardware and other IT and Non-IT
infrastructure installed as part of project for a period of five (05) years post Go-Live. This would
also include the support for various solution components that may be under warranty or
comprehensive AMC.
This includes a preventive maintenance program, managing releases, monitoring and system
health checks and incident management. It is expected that out of hours support will be provided
Support of the system is key to establishing system and process stability within the Integrated
VTS/FMS ecosystem following the deployment. Over and above the technical support required in
this period, it is expected that support efforts shall target improving end-user familiarization with
new applications and processes to enhance adoption and aid transition of new processes to a
business-as-usual status.
3.4.5.1 Operations and Maintenance for a Period of Five (05) Years
Success of the Project would also depend on how the entire Project is managed once the
implementation is completed. From the System Integrator perspective too this is a critical
phase since the quarterly payments are linked to the SLA’s in the post implementation phases.
SI shall provide operations and maintenance services for the software, hardware and other IT
and Non-IT infrastructure installed as part of project for a period of 5 years (post Go-Live). This
would also include the support for various solution components that may be under warranty or
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
3.4.5.1.1 Warranty, ATS and Annual Maintenance Services
(1) The bidder shall provide warranty and maintenance services for the entire solution
covering all components including the IT infrastructure and software infrastructure for
contract duration. The bidder shall provide the comprehensive manufacturer's warranty in
respect of proper design, quality and workmanship of all hardware, equipment,
accessories etc. covered by this bidding document. The bidder must warrant all hardware,
equipment, accessories, spare parts, software etc. procured and implemented as per this
bidding document against any manufacturing defects during the warranty period.
(2) The bidder shall provide comprehensive and on-site warranty from the date of Go-Live for
the infrastructure deployed on the project. The bidder needs to have OEM support for
these components and documentation in this regard need to be submitted to SMC on
(3) Maintain all defined Service Level Agreements (SLA) mentioned in this RFP
(4) Hand-over of the system at the end of the contractual period along with all
documentation required to operate and maintain the system. After the completion of
contract duration, the bidder shall hand over the entire solution covering all the
components in working condition to SMC.
(5) The bidder is responsible for sizing and procuring the necessary hardware and software
licenses as per the performance requirements provided in the RFP. During the warranty
period the bidder shall replace or augment or procure higher-level new equipment or
additional licenses/hardware at no additional cost to the SMC in case the procured
hardware or software is not enough or is undersized to meet the service levels and the
project requirements.
(6) Maintain the entire solution, modify, repair or otherwise make improvements in all
components, if any to comply with Technical Specifications, Service Level Agreements
specified in RFP.
(7) To ensure smooth operation of all components and the entire solution by undertaking
routine and periodic maintenance including all periodic software upgrades in order to
maintain the Minimum Service Levels specified in RFP.
(8) The bidder shall carry out Preventive Maintenance (PM) of all components and should
maintain proper records. Necessary PM activities including cleaning, washing, blowing,
etc. will be carried out with proper security and safety measures from time to time. The
PM should be carried out at least once in six months as per industry standard maintaining
proper checklist. If required, SMC may ask to modify the maintenance plan/activity to
cover additional components/activities.
(9) The bidder shall carry out Corrective Maintenance for maintenance/troubleshooting of
supplied hardware/software and support infrastructure. The bidder shall also maintain
complete documentation of problems, cause and rectification procedures for building
knowledge base for the known problems in centralized repository, accessible to SMC
(10) Take responsibility for any defect or failure of any components comprising of Hardware
and Software (including Non-IT/ passive items) due to defective design, material or
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
workmanship, manufacturing or development defects or latent defect or normal wear and
tear within the design limit, during the Contract Period.
(11) The bidder shall have to stock and provide adequate onsite and offsite spare parts and
spare component to ensure that the uptime commitment as per SLA is met. No separate
charges shall be paid for visit of engineers or attending to faults and repairs or supply of
(12) The rectification change of spare of hardware and software units, modification and all
software upgrades (Major and minor) shall have to be undertaken by the bidder to cure
the faults/defects/deficiency in order to raise speed, efficiency and/or effectiveness of the
sub system and achieve a higher performance level of Project within the Remedial Period
specified by the SMC.
(13) In case if breakdown/ maintenance work is required to be carried out during non-working
days/ hours, the bidder shall attend the task(s) during this period at no extra payment.
(14) The bidder should either repair the equipment, or replace the equipment with new
equipment, to ensure that the proposed system/solution is operational. Any equipment is
either breakdown, damaged due to the negligence of the bidder, or any technical reasons,
it should be replaced with new equipment or item under the guidance of operational
team of the SMC.
(15) In case the quoted item is not available in the market, the bidder shall have to supply
higher Version/ Replacement of that item with prior approval of SMC at no extra cost. No
“End of Life” product should be supplied to minimize such instances during OEM support
for 5 years. If any spare(s)/ material(s) found defective than the same should be repaired
or new spare(s)/ material(s) is to be replaced. In any case secondhand material is not
(16) In case if the bidder is not able to repair the original equipment or any part of it, the
bidder shall supply the new substitute of same specifications or of higher specifications,
with prior approval of the concern officer in SMC. In case, if it is found that the substituted
item is of lower quality/specification then the same must be replaced. In case of, repetitive
instances, SMC will take punitive action against the bidder.
(17) The bidder should perform all the tasks that need to be taken to upkeep the proposed
system in a 24 x 7 days environment. This includes but not limited to any component
breakdowns, reworks; relay of cable/re-configure system that needed to perform / replace
the breakdown components etc. as per SLA.
(18) The bidder should also take up the work including reworks, relaying of cable cuts, shifting
of equipment, reconfiguring the system, optimization or performance of the proposed
system/solution, re-installation of software, etc. as & when needed. The bidder to ensure
above activities without any additional cost to SMC.
(19) The bidder will supply all the installation material/ accessories/ consumables (e.g. screws,
clamps, fasteners, ties anchors, supports, grounding strips, wires etc.) necessary for the
installation and operation of the systems.
(20) Deploy required number of competent technical manpower /engineers/ supervisors along
with necessary spare parts, standby items and inventories of all parts of the proposed
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
system during the Contract period at its own cost for evaluation of performance,
operation, maintenance and management of all components in order to maintain the
Minimum Service Levels specified in RFP during the Contract period. Necessary technical
personnel shall also be deputed by the bidder at its own cost for investigating defects and
failures and carrying out modifications as and when required during the Contract Period.
(21) Ensure smooth operation of the end to end solution during the Contract Period by
undertaking routine and periodic maintenance of all components and carrying out
rectification, modification, software upgrades, change of spare if need so arise in order to
maintain the Minimum Service Levels all time during the Contract Period.
(22) Ensure uptime and availability of the proposed system/solution, all times of Contract
Period at all identified locations in relation to the minimum Service Levels specified in this
RFP and the scope specified in RFP.
(23) Undertake timely upgradation of the system if need so arise during the Contract Period.
(24) Prepare a Maintenance Manual and other manuals specified in this RFP in consultation
with SMC specifying the detailed operation plan, methodology and time period of
regular and preventive maintenance, comprehensive information of equipment, hardware,
software (including Non-IT/ passive items) used in Project, operation procedure of each
sub system installed, the repair and maintenance procedures of each component and
hardware of the Project, procedures for diagnosis, removal of bugs and replacement of
any item of equipment, diagnosis procedures of faults and procedures for removing it and
(25) Provide all MIS report specified in RFP or any other reports required by SMC.
(26) Component that is reported to be down on a given date should be either fully repaired or
replaced by temporary substitute (of equivalent configuration) within the time frame
indicated in the Service Level Agreement (SLA). In case the selected System Integrator fails
to meet the above standards of maintenance, there will be a penalty as specified in the
(27) The bidder shall also maintain records of all maintenance of the system and shall maintain
a logbook on-site that may be inspected by SMC at any time
(28) The support for planning, optimization and tuning of hardware and software after
commissioning, whenever needed during Operation period/ Warranty / AMC shall be
provided by System Integrator at no extra cost to SMC.
(29) Take all precautions to ensure that all software and hardware (including Non-IT/ passive
items) involved remains safe and secure in general and free from attacks arising from
attempted manipulation, fraud, break down, compromising of data security, malware and
virus attacks, physical attacks or damage due to neglect or omission.
(30) Provide training and handholding support to SMC.
(31) The server and other system software should be regularly patched/ updated. Major
patching / update which requires system downtime has to be informed well in advance
and should be undertaken only after SMC’s confirmation.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
(32) Necessary network connectivity LAN/WAN will be provided by SMC. However, the bidder
will be responsible for network configuration and management of the IT infrastructure
provided under this project
(33) Ensure that any premises/Project Site provided by SMC to the System Integrator for the
purpose of carrying out its obligations shall be used solely for the purpose of carrying out
the functions intended and obligations placed under this contract and not for any other
(34) The bidder shall not permit anti-social activities/illegal activities on Project Site during the
Contract Period. Any liabilities arising as consequences of such event shall be borne by
the bidder. On occurrence of such event, the bidder shall solely be responsible for legal
remedies and SMC may consider Termination on occurrence of such event.
(35) Take prompt and reasonable action for redressal of each complaint received from users.
(36) Obtain and keep valid all applicable permits/ Licenses required by it under applicable laws
for carrying out its scope of work during the Contract Period.
(37) The bidder shall be required to hand over all the equipment’s under the scope of this
project in working condition at the time of completion/termination of the Contract,
otherwise the equipment, found faulty, shall be rectified from any external agency and
whole replacement/repair cost will be borne by the bidder only.
(38) During post-implementation period, in case the edge devices in the scope is damaged by
a vehicular accident (or due to any other reason outside the control of THE BIDDER) and
needs repair, then the corresponding device will not be part of the SLA monitoring for
max. 15 days. The bidder will need to repair / have the new edge device within 15 days of
the incident. Post 15 days, the corresponding device would be again considered for SLAs.
The cost for repair/replacement of such device will not be in the scope of the bidder.
(39) The bidder is not responsible to maintain the existing infrastructure which is being re-
utilized for this scope. However, the bidder is required to inform the SMC if any
damage/discrepancies observed during the monitoring. SMC shall get the faulty
equipment repaired by their respective Service Provider.
3.4.5.1.2 Systems Administration Services:
The bidder shall ensure that IT Environment for the proposed solution operates smoothly,
securely and consistently. The bidder shall ensure following activities for SMC:
(1) Configuration of server, storage, networking & security component parameters, operating
systems administration, and tuning.
(2) Adequate hardening of the operating systems of the servers, storage, etc. to prevent
known and unknown attacks.
(3) Operating system administration, including but not limited to management of users,
processes, resource contention, preventive maintenance and management of upgrades
including migration to higher versions and patches to ensure that the system is properly
(4) Re-installation in the event of system crash/failures.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
(5) Maintenance of a log of the performance monitoring of servers including but not limited
to monitoring CPU, disk space, memory utilization, I/O utilization, etc.
(6) Periodic health check of the systems, troubleshooting problems, analyzing and
implementing rectification measures.
(7) Troubleshooting issues in the infrastructure, network and IT application to determine the
areas where fixes are required and ensuring resolution of the same.
(8) Identification, diagnosis and resolution of problem areas pertaining to various solution
components and application and maintenance of assured SLA levels under the scope of
(9) IT assets performance monitoring, fine-tuning, optimization & Problem Resolution
(10) Configuring and monitoring of regular backups of relevant database and application so as
to ensure minimum loss and ensure prompt restoration of the same as and when
(11) Installation, configuration, monitoring and management of the storage system in
accordance to the application requirement and uptime and KPI requirements.
(12) Monitoring, maintenance and tuning of the databases to meet ensure optimum
performance maximize efficiency and minimize outages, as necessary and proactively
reviewing database logs and alert logs and taking appropriate actions.
(13) Sever and application hardening to prevent attack from any known and unknown attacks.
Ensuring that patches / workarounds for identified vulnerabilities are patched / blocked
3.4.5.1.3 Application Support and Maintenance Support
Application support includes, but not limited to, production monitoring, troubleshooting and
addressing the functionality, availability and performance issues, implementing the system
change requests etc. The SI shall keep the application software in good working order; perform
changes and upgrades to applications as requested by the SMC team. Key activities to be
performed by SI in the application support phase are as follows:
(1) Compliance to SLA: SI shall ensure compliance to SLAs as indicated in the RFP and any
upgrades/major changes to the software shall be accordingly planned by SI ensuring the
SLA requirements.
(2) Annual Technology Support: The SI shall be responsible for arranging for annual technology
support for the OEM products to SMC provided by respective OEMs during the entire
project duration
(3) Application Software Maintenance:
SI shall provide unlimited support through onsite team or offsite team as and when
required during the contract period.
SI shall address all the errors/bugs/gaps in the functionality in the solution implemented
by the SI at no additional cost during the contract phase
All patches and upgrades from OEMs shall be implemented by the SI ensuring
customization done in the solution as per the SMC requirements are unaffected. Technical
upgrade of the installation to the new version, as and when required, shall be done by the
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
SI. Any version upgrade of the software / tool / appliance by SI to be done after taking
prior approval of SMC and after submitting impact assessment of such upgrade.
Any changes/upgrades to the software performed during the support phase shall subject
to the comprehensive and integrated testing by the SI to ensure that the changes
implemented in the system meets the specified requirements and doesn’t impact any
other function of the system. Release management for application software will also
require SMC approval. A detailed process in this regard will be finalized by SI in
consultation with SMC.
Issue log for the errors and bugs identified in the solution and any change done in the
solution shall be maintained by the SI and periodically submitted to the SMC team.
SI, at least on a monthly basis, will inform SMC about any new updates/upgrades available
for all software components of the solution along with a detailed action report. In case of
critical security patches/alerts, the SI shall inform about the same immediately along with
his recommendations. The report shall contain SI’s recommendations on update/upgrade,
benefits, impact analysis etc. The SI shall need to execute updates/upgrades though
formal change management process and update all documentations and Knowledge
databases etc. All such updates and upgrades will be carried out free of cost.
(4) Problem Identification and Resolution:
SI shall identify and resolve all the application problems in the identified solution (e.g.
system malfunctions, performance problems and data corruption etc.).
Monthly report on problem identified and resolved would be submitted to SMC team
along with the recommended resolution.
(5) Change and Version Control: All planned or emergency changes to any component of the
system shall be through the approved Change Management process. For any change, SI
Detailed impact analysis
Change plan with Roll back plans
Appropriate communication on change required has taken place
Proper approvals have been received
Schedules have been adjusted to minimize impact on the production environment
All associated documentations are updated post stabilization of the change
Version control maintained for software changes
The SI shall define the Software Change Management and Version control process. For
any changes to the solution, SI has to prepare detailed documentation including
proposed changes, impact to the system in terms of functional outcomes/additional
features added to the system etc. SI shall ensure that software and hardware version
control is done for entire duration of SI’s contract.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
(6) Maintain Configuration Information: SI shall maintain version control and configuration
information for application software and any system documentation.
3.4.5.1.4 Provision for Onsite Support
SI shall deploy Manpower during implementation and O&M phases. The deployed resource
shall report to SMC Project In-charge. The support team must be backed by off-site support as
necessary. The SI’s Post Go Live Support team shall be responsible for the efficient functioning
of the system and continued delivery of stable systems, development, and operational support.
It is expected that out of business hours support will be provided as needed.
Minimum Required onsite support: The bidder is required to provide the dedicated onsite team
as per the below mentioned table during the support. Necessary backend support must be
extended to the onsite team so as to achieve the SLAs and KPIs defined in RFP. The selected
bidder shall nominate one senior official as a Project Manager for this project, who will be the
SPOC for SMC, who intern will coordinate with onsite and offsite team members.
The onsite team will also be engaged in development of new reports and requirements,
functionalities. Necessary backend support must be imparted by SI to the onsite team so that
apart from maintaining and managing existing setup the team is able to deliver new
development/integration activities.
Following are the minimum resources required to be deployed in the Project, however SI may
deploy additional resources based on the need of the Project and to meet the defined SLAs in
# Resource Type Minimum Quantity Minimum Deployment during
Operation & Maintenance Phase
Programmer/Developer 1 100%
Hardware Engineer 3 100%
# Qualification & Experience of the Resource
1 Programmer/Developer
Availability: Onsite
Educational Qualification: BE (Computer, IT, Electronics) / B. Tech (Computer, IT,
Electronics) / MCA / M.Sc. (IT)
Work experience: Minimum 3 or 5 years of experience in software
implementation Projects
Roles & Responsibility:The Application Developer will be responsible to carry out
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
necessary changes in the application, provide application-level support to the users, and
coordinate with users for easy and early adaptation of the system. S/he shall be well versed
and experienced to handle above stated activities. S/he must be in a position to ascertain
and carryout the necessary activities w.r.t. any minor or major changes in the existing domain
system integrated or use cases created. S/he will capture the requirements and carry out
necessary developments on her/his own. S/he will keep the Project Manager informed about
the activities. S/he will interact the OEM/back office team either directly or through Project
Manager for necessary changes/developments/support issues for resolving problems if any.
2 Hardware Engineers
Availability: Onsite
Educational Qualification: Graduate/ Diploma
Work experience: Minimum 3 years of experience in IT infrastructure
Roles & Responsibility:S/he will be responsible to provide field level support at ward
level/zone offices and vehicles for any issue related to the supplied solution components like
GPS devices, Fuel Level sensors, etc. S/he will be responsible to ensure preventive and
breakdown maintenance. S/he will resolve any hardware/network related issues and will
coordinate with onsite programmer or backend team either directly or through Project
Manager for necessary repair/replacement of hardware or support issues for resolving
problems if any.
1. All persons deputed shall be on the payroll of the Bidder. If required, the resource will be
interviewed/screed using any screening procedure by SMC and/or is representative prior to
deputation at SMC. The bidder would also remove a person from its staff at SMC if instructed
to do so by the SMC within one month and provide suitable replacement with minimum
overlap of 15 days.
2. Deputed resources must be imparted necessary training by the SI/OEM to perform their tasks
3. Onsite team must have mobile phones round the clock and must have personal vehicle.
4. SMC may verify attendance of each person proposed as part of the onsite team through an
appropriate attendance mechanism on a monthly basis.
5. Considering the criticality of the nature of work, the SI is expected to deploy the best of the
breed resources to ensure smooth service delivery to the end users and seamless
coordination with other entities involved for tasks related to smooth operation of entire
6. The SI will be notified through an email or phone or any other medium by the SMC or any
operational team that would exist as the case may be on the issues faced related to the
system. The SI will be required to extend support during office hours and beyond as well to
attend the issues.
7. The SI’s Engineer shall be responsible to identify the fault and take corrective measures.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
8. These engineers shall be deputed for the sole purpose for configuring, installing and
maintaining the hardware, deploying and installing the system software as per the
requirements /testing /integration of various hardware and software, as may be needed at
SMC Site without any additional cost during contract period from the date of installation for
all supplied items.
9. These engineers shall be deputed for the sole purpose of installation, re-installation,
maintenance and troubleshooting the hardware and software supplied and installed for the
duration of the contract. SMC may provide a table space for the engineer(s) deputed for the
sole purpose of servicing products installed under this project at SMC.
10. The onsite engineers shall also be required to install, configure and troubleshoot all hardware
/ software issues pertaining to smooth functioning of deployed system/solution at various
locations within SMC limit. In case of major issues, the support engineer will be required to
inform SMC. The same applies for network problems as well, where in client side
troubleshooting and primary diagnosis is to be done by the deputed resident support
11. The Engineer must be equipped with all necessary facilities/equipments such as Laptop,
mobile telephone, Internet connection, personal vehicles, etc.
12. The SI shall depute only such individuals as are skilled and experienced in the works to be
executed under the contract. The SMC has all the rights to reject the services of any support
engineer and can ask for a change, if not found fit. The service engineer’s leave applications
are to be channeled through SMC. In the event of change of any support engineer from the
site, prior approval from the Head of ISD, SMC shall be essential.
13. The SI shall be responsible for providing all materials, equipment, installation / maintenance
tools and services, specified or otherwise, which are required to fulfil the intent of ensuring
operability, maintainability and reliability of total materials covered under these specifications.
4. PROJECT MILESTONES AND PAYMENT SCHEDULES
4.1. Project Milestones & Deliverables
The selected bidder shall be required to adhere to the timelines and deliverables as under. The
delay in delivery will attract delayed penalty as mentioned in this RFP.
# Milestone/Particulars SITC Time Limit
1 Installation, configuration, calibration, integration, testing and 75 days Post Issuance of
commissioning of GPS/VTS devices and fuel-level sensors on Request Order
identified vehicles along with SIM/data connectivity, required
accessories, spares and other hardware components.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
2 Installation, configuration and commissioning of centralized 45 days Post installation
application, database, dashboards, GIS, mobile application, of GPS/VTS devices and
APIs/integrations and related infrastructure. Fuel Level Sensors as
mentioned in Milestone
3 User Acceptance Testing (UAT), defect rectification and 20 days Post Installation,
approval configuration and
commissioning of
centralized application,
database, dashboards,
GIS, mobile application,
APIs/integrations and
related infrastructure as
mentioned in Milestone
4 Go-Live of the complete Integrated VTS & FMS solution. 10 days Post User
Acceptance Testing
(UAT), defect rectification
and approval as
mentioned in Milestone
5 Hyper Care Support and stabilization 90 days Post Go-Live
1. The bidder can identify various independent activities under different milestones and can
initiate them in parallel to achieve the implementation timelines.
2. For delay in completion of any milestone, solely attributable to the SI, liquidated damages
shall be levied at 0.2% per day of the value of the delayed milestone/work package,
subject to a maximum of 10% of the value of such delayed milestone/work package. The
same delay shall not be penalized twice under different clauses for the same period/event.
4.2. Payment Schedule
# Payment Milestone Release
1 Installation & Commissioning of the GPS devices and 50%
Fuel Monitoring Sensors
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
4 Completion of 1st year of Support 2.5%
5 Completion of 2nd year of Support 2.5%
6 Completion of 3rd year of Support 2.5%
7 Completion of 4th year of Support 2.5 %
8 Completion of 5th year of Support 15% (shall be released along
i. The contract period of 5 years is considered from the Go-Live.
ii. The payment of Support Cost to the Selected Bidder shall be on quarterly basis post
completion of respective quarter.
iii. The payments are subject to meeting of KPIs & SLAs failing which the necessary penalty will
be made applicable as per RFP.
Hypercare deliverables shall include closure of issues reported at Go-Live, stabilization of the
solution and rectification of defects attributable to the SI.
Monthly Progress Reports/MIS to be submitted every month or as and when desired by SMC
indicating the activities remaining/completed and progress as against the scheduled tasks /
5. 5. SERVICE LEVEL AGREEMENT (SLA), PERFORMANCE INDICATORS AND PENALTIES
5.1 Service Level Agreement
The Service Level Agreement (SLA) shall form an integral part of the Agreement between Surat
Municipal Corporation (SMC) and the Successful Bidder/System Integrator (SI).
The SLA defines the responsibilities of the SI for ensuring timely delivery, availability, reliability,
accuracy, maintainability and performance of the complete Vehicle Tracking System (VTS) and
Fuel Monitoring System (FMS) based on the agreed Performance Indicators specified in this
The SI shall comply with the prescribed Service Level Requirements throughout the Contract
Period, including the implementation period, warranty period and subsequent support/AMC
period, as applicable.
The SI shall provide suitable software/automated tools within the proposed Application/Portal for
monitoring and generating SLA compliance reports for all applicable SLA parameters.
The SI shall be responsible for monitoring the complete end-to-end solution comprising, as
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
GPS/VTS devices;
Fuel Level Sensors;
vehicle wiring and installation;
communication/SIM connectivity under SI's scope;
GPS and fuel-data transmission;
application/software;
web portal/dashboard;
mobile application;
cloud/server infrastructure;
APIs/integration;
alerts and notifications;
data storage and archival;
technical support;
preventive and corrective maintenance.
5.1.1 Exclusions from SLA Penalty
Penalty shall not ordinarily be levied for non-compliance where the SI establishes that the failure
1. Force Majeure events beyond the reasonable control of the SI.
2. Deliberate damage to GPS devices, fuel sensors, antennas, wiring or other equipment by
SMC personnel or third parties, provided the SI reports the incident promptly.
3. Theft of installed equipment, where the SI has complied with its installation and
protection responsibilities.
4. Accident/mishap resulting in physical damage to the equipment, where such damage is
not attributable to defective installation or negligence of the SI.
5. Power failure or deliberate electrical isolation by SMC or its authorized personnel.
6. Vehicle being officially declared under repair/maintenance and unavailable for operation.
7. Loss of mobile/network connectivity in an area where the SI demonstrates that the
communication network was genuinely unavailable and that the device was otherwise
functioning correctly.
8. Planned maintenance approved in advance by SMC.
9. Any other reason specifically accepted by SMC as being beyond the reasonable control of
The SI shall provide documentary/technical evidence for claiming exclusion from SLA calculation.
Mere declaration by the SI shall not automatically constitute acceptance by SMC.
5.2 Definitions
“Uptime” shall mean the period during which the specified service/component is available to
SMC and performing in accordance with the prescribed technical and functional requirements.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Uptime (%) shall generally be calculated as:
Uptime (%) = [(Total Time – Planned Maintenance Time – Unplanned Downtime) / (Total Time –
Planned Maintenance Time)] ×
“Downtime” shall mean the period during which the specified service/component is unavailable
or fails to perform its intended function. Downtime shall exclude approved planned maintenance
and accepted Force Majeure/reasons beyond the control of the SI.
“Incident” means any event, abnormality, defect, malfunction or failure affecting the normal
operation of the VTS/FMS or any component thereof.
5.2.4 Resolution Time
“Resolution Time” means the time elapsed between registration/logging of a complaint/incident
and restoration of the affected service or implementation of an acceptable corrective solution.
5.2.5 GPS Device Availability
GPS Device Availability means the percentage of time an installed GPS device is operational and
capable of transmitting valid GPS/vehicle data to the central application, subject to approved
5.2.6 Fuel Data Availability
Fuel Data Availability means the percentage of expected fuel-level/fuel-related data records
successfully received, processed and displayed by the central system.
A Data Gap means an unexplained period during which expected data from an otherwise
operational GPS device/fuel sensor is not received by the central application.
5.2.8 Critical Incident
A Critical Incident means any failure materially affecting the operation of the system, including:
complete application/server failure;
large-scale GPS tracking failure;
large-scale fuel monitoring failure;
loss of critical vehicle/fuel data;
failure of critical alerts;
major cybersecurity incident;
failure affecting essential SMC operations.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
5.3 Measurement of SLA
1. All SLA calculations shall ordinarily be performed on a monthly basis.
2. SLA performance shall be measured using system-generated logs, device communication
logs, server/application logs, complaint/ticket records and other appropriate electronic
3. The SI shall provide all required SLA measurement and monitoring tools as part of the
4. SMC shall have the right to audit, verify or independently measure SLA compliance either
itself or through an appointed consultant/agency.
5. In case of discrepancy between the SI's SLA report and SMC's records, SMC shall examine
the available technical evidence and determine the applicable SLA performance.
6. The SI shall submit a monthly SLA Compliance Report to SMC by the 7th day of the
succeeding month.
7. The report shall include, at minimum:
o vehicle-wise GPS uptime;
o vehicle-wise fuel-data availability;
o application uptime;
o server/cloud uptime;
o communication/data gaps;
o device failures;
o fuel-sensor failures;
o device replacement records;
o fuel filling events;
o abnormal fuel drainage alerts;
o complaint/ticket details;
o response and resolution time;
o system downtime;
o SLA violations;
o penalties applicable;
o corrective and preventive actions.
8. SMC may review SLA parameters periodically based on actual system performance and
operational requirements. Any material modification shall be communicated to the SI in
accordance with the Contract.
5.4 SLA Performance Parameters
A. Project Implementation SLA
1. Delay in Implementation/Deployment
The SI shall complete supply, installation, configuration, integration, testing and commissioning
within the timelines specified in the Contract.
Any delay in the delivery of the project (solely attributable to vendor) would attract a penalty of
0.2% per day of the CAPEX value of that particular item.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Total penalty applicable under this clause shall be limited to 10% of the value of the
equipment/device in software or hardware to be supplied, installed and commissioned for which
Request Order is placed
If the penalty reaches 10% of the total contract value, Authority may invoke termination clause.
B. GPS Device Performance
1. GPS Device Availability
Sr. Performance Area
No Performance SLA Penalty
1 Equipment Baseline ≥ 99% No penalty
Availability (EA)
Penalty of 0.5% of purchase cost
for that particular equipment
Lower <99% to during warranty or 1% of (yearly
[Total minutes in a
Performance ≥97% AMC + withheld CAPEX amount
for that particular component for
downtime – Total
down time(min) in a that year)
month]*100/[Total Penalty of X*0.5% of purchase
minutes in a month -
cost for that particular equipment
Planned downtime]
during warranty or X*1% of
(yearly AMC + withheld CAPEX
X= [100-(uptime
amount for that particular
component for that year)
The penalty shall be determined based on the number of affected vehicles and duration of
3. GPS Data Transmission
The GPS device shall transmit data at the approved frequency/configuration specified in the
Technical Specifications.
Repeated unexplained data gaps attributable to the SI shall constitute SLA non-compliance.
Where the average data availability falls below the prescribed level, penalty shall be imposed as
per the GPS availability SLA.
3. GPS Location/Data Accuracy
The GPS system shall provide location and vehicle-status information within the accuracy
specified in the Technical Specifications.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Repeated false location, impossible movement, incorrect vehicle association or abnormal GPS
data attributable to the SI shall require immediate corrective action.
Persistent failure may attract a penalty of up to 0.5% of the applicable monthly service
C. Fuel Monitoring System Performance
5. Fuel Data Availability
Sr. Performance Area
No Performance SLA Penalty
1 Equipment Baseline ≥ 99% No penalty
Availability (EA)
Penalty of 0.5% of purchase cost
for that particular equipment
Lower <99% to during warranty or 1% of (yearly
[Total minutes in a
Performance ≥97% AMC + withheld CAPEX amount
for that particular component for
downtime – Total
down time(min) in a that year)
month]*100/[Total Penalty of X*0.5% of purchase
minutes in a month -
cost for that particular equipment
Planned downtime]
during warranty or X*1% of
(yearly AMC + withheld CAPEX
X= [100-(uptime
amount for that particular
component for that year)
The SI shall ensure that fuel-level data is correctly received, processed, displayed and associated
with the respective vehicle.
6. Fuel-Level Measurement Accuracy
The fuel sensor shall perform within the accuracy/tolerance specified in the Technical
Specifications and approved during acceptance testing.
Persistent deviation beyond the approved tolerance shall constitute an SLA violation.
The SI shall recalibrate, repair or replace the affected sensor at no additional cost to SMC.
Persistent failure may attract penalty up to 0.5% of applicable monthly service consideration.
7. Fuel Filling Detection
The system shall detect and record fuel filling events as per the approved
configuration. The system should provide, as applicable:
vehicle number;
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
date and time;
GPS location;
fuel level before filling;
fuel level after filling;
estimated quantity filled;
duration of filling.
Failure of the system to record a valid fuel-filling event due to SI-controlled system/device failure
shall constitute SLA non-compliance.
8. Abnormal Fuel Drainage/Fuel Theft Alert
The system shall generate configured alerts for abnormal fuel reduction/drainage.
Failure of a configured critical fuel-drainage alert attributable to the SI shall attract a penalty of
up to 0.5% of applicable monthly service consideration per established occurrence, subject to the
overall penalty ceiling.
D. Central Application / Server / Cloud
9. Application Availability
Sr. Performance Area
No Performance SLA Penalty
1 Application Baseline ≥ 99% No Penalty
Availability (EA)
Penalty of 0.5% of purchase cost
for software during warranty or
Lower <99% to 1% of (yearly AMC for software +
[Total minutes in a
Performance ≥97% withheld CAPEX amount for that
particular component for that
downtime – Total
down time(min) in a year)
month]*100/[ Total Penalty of X*0.5% of purchase
minutes in a month -
cost for software during warranty
Planned downtime]
or X*1% of (yearly AMC for
software + withheld CAPEX
X= [100-(uptime
amount for that particular
component for that year)
Planned maintenance approved by SMC shall be excluded from downtime calculation.
10. Number of Application/System Failure Instances
Sr. Performance Area Perfor
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
1 Number instance the Up to
equipment / instances in No penalty
application is down a month
More than 2 additional penalty per instance of 25% of
instances in total penalty levied on that particular
a month equipment in a month will be applicable
Repeated failure shall also be considered for the purpose of determining persistent default.
E. Mean Time to Repair (MTTR)
MTTR shall be measured from the time of registration/logging of the complaint until
restoration/closure of the complaint.
≤ 4 hours No penalty
>4 to ≤6 hours ₹250 per hour of delay
>6 to ≤8 hours ₹500 per hour of delay
>8 hours ₹1,000 per day of delay or applicable hourly penalty, whichever is higher
≤ 4 hours No penalty
>4 to ≤6 hours ₹250 per hour of delay
>6 to ≤8 hours ₹500 per hour of delay
>8 hours ₹1,000 per day of delay or applicable hourly penalty, whichever is higher
3. Application/Server/Critical System
For a Critical Incident:
Response: within 2 hours
Restoration: within 8 hours, wherever technically feasible.
Failure to restore within the prescribed period shall attract penalty up to ₹3,000 per day of delay,
in addition to any applicable system-availability penalty.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
F. Device Replacement
1. GPS Device Replacement
A failed GPS device shall be repaired/restored or replaced within 48 hours of confirmation of
Failure to restore/replace within 48 hours shall attract: ₹1,000 per vehicle/device per day of delay.
15. Fuel Sensor Replacement
A failed fuel sensor shall be repaired/replaced within 48 hours.
Failure to restore/replace within the prescribed period shall attract: ₹1,000 per vehicle/sensor per
For critical vehicles identified by SMC, a shorter restoration period may be prescribed.
G. Alerts and Reports
16. Critical Alerts
The SI shall ensure proper functioning of approved alerts, including as applicable:
ignition ON/OFF;
vehicle movement;
prolonged idling;
GPS tampering;
device disconnection;
fuel filling;
abnormal fuel drainage;
abnormal fuel level variation.
Failure of a critical configured alert attributable to the SI shall be treated as an SLA violation.
All mandatory reports specified in the Technical Specifications shall be available through the
Failure to generate a mandatory report due to SI-controlled system failure shall attract:
₹2,000 per report/occurrence, subject to the overall penalty ceiling.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
H. Data Availability and Integrity
18. Historical Data
The SI shall maintain historical GPS and fuel-monitoring data for the period specified in the
The data shall be retrievable through the application and/or exportable in commonly usable
electronic format.
Loss of data attributable to the SI shall constitute a serious SLA violation and may attract penalty
up to 1% of applicable monthly service consideration per established occurrence, in addition to
other contractual remedies.
19. Data Manipulation
Any deliberate alteration, deletion, suppression or manipulation of GPS/fuel data by the SI, its
employees, agents or subcontractors shall constitute a Major/Material Default.
SMC may invoke applicable security, penalty and termination provisions.
5.5 Security Breach SLA
The security of the complete VTS/FMS solution shall be of paramount importance.Security
breach shall include:
unauthorized access to the application;
unauthorized access to SMC data;
unauthorized modification/deletion of data;
denial-of-service/disruption;
compromise of administrator credentials;
unauthorized access through APIs;
malware/ransomware or other cybersecurity incident attributable to the SI;
violation of applicable Government of India information-security requirements.
Service Level Requirement :- Security compliance: 100%
Every established security breach shall be treated as a Priority-1 incident.For every security breach
attributable to the SI and established through investigation, SMC may impose:
Penalty of ₹2,00,000 per established breach, or may initiate termination proceedings depending
upon the severity of the breach.This penalty shall be over and above other applicable SLA
penalties, subject to the overall contractual provisions and applicable law.The SI shall
1. report the breach to SMC;
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
2. contain the breach;
3. investigate the cause;
4. take corrective measures;
5. preserve relevant logs/evidence;
6. submit a Root Cause Analysis (RCA);
7. submit a corrective and preventive action report.
5.6 Onsite Technical Support / Manpower SLA
Where onsite technical manpower is prescribed in the tender, all personnel shall be deployed as
per the approved resource deployment plan.
1. All deployed personnel shall be on the payroll of the SI.
2. SMC may interview/screen proposed personnel before deployment.
3. SMC may require replacement of personnel whose performance or conduct is found
unsatisfactory.
4. In case an onsite resource remains absent for more than 5 consecutive days, the SI shall
provide a competent substitute.
5. Failure to provide a substitute shall result in deduction on a prorata basis from the
applicable monthly support charges.
6. The SI shall maintain the minimum manpower specified in the Contract.
7. Any vacancy due to resignation, attrition, leave or other reason shall be filled promptly.
8. Replacement personnel shall possess qualifications and experience equal to or better than
the approved resource.
Suggested deduction
Position Deduction per Resource/Day
Programmer/Developer ₹1,500
Hardware/GPS Engineer ₹1,500
No separate penalty ceiling shall apply to manpower-related deductions where such deductions
represent payment for services/resources not actually provided; however, overall contractual
remedies shall remain subject to the terms of the Contract.
5.7 Monthly SLA Report : The SI shall submit the monthly SLA report by the 7th day of the
succeeding month. The report shall contain:
1. Vehicle-wise GPS uptime.
2. Vehicle-wise fuel-data availability.
3. Application uptime.
4. Server/cloud uptime.
5. Number of device failures.
6. Number of sensor failures.
7. Device replacement details.
8. Fuel filling events.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
9. Abnormal fuel drainage alerts.
10. GPS data gaps.
11. Fuel data gaps.
12. Alert performance.
13. Complaint/ticket details.
15. Pending complaints.
16. Preventive maintenance.
17. Security incidents.
18. SLA breaches.
19. Penalty calculation.
20. Corrective action taken.
SMC may reject an SLA report if the underlying data is incomplete, inaccurate or not supported
by system logs.
5.8 Penalty Recovery
1. Penalties may be recovered from the payment due to the SI.
2. If the amount payable in a particular billing period is insufficient to recover the applicable
penalty, SMC may recover the balance from subsequent payments or other amounts due
to the SI in accordance with the Contract.
3. Penalty shall not relieve the SI from its obligation to rectify the underlying defect.
4. Payment of penalty shall not constitute acceptance of deficient service by SMC.
5.9 Cumulative Liquidated Damages / Penalty Ceiling
The total liquidated damages/penalties recoverable under the SLA provisions shall ordinarily be
capped at 10% of the Total Contract Value.
However, the following shall not be treated as a waiver of SMC's other contractual rights:
deliberate data manipulation;
serious cybersecurity breach;
willful misconduct;
abandonment of services;
persistent material failure;
repeated critical SLA breach;
failure to rectify major defects;
any other Major/Material Default specified in the Contract.
Where the cumulative liquidated damages/penalties reach 10% of the Total Contract Value, SMC
shall have the right to initiate termination proceedings in accordance with the Contract.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
5.10 Notice and Opportunity for Representation
Except in cases requiring immediate action for protection of SMC's operational or security
interests, before levy of penalty SMC shall issue a notice to the SI specifying:
nature of the default;
applicable SLA;
date/time of failure;
supporting records;
proposed penalty;
required corrective action.
The SI shall be given reasonable opportunity to submit its justification and corrective action.If the
explanation is not found satisfactory, or the deficiency is not rectified within the stipulated period,
SMC shall be entitled to levy the applicable penalty.
5.11 Continued Failure / Termination
In case of continued, repeated or material failure to comply with the established SLA, technical
specifications or contractual requirements, SMC shall be entitled to initiate termination
The following may, inter alia, constitute grounds for such action:
1. Repeated GPS service failure.
2. Repeated fuel-monitoring failure.
3. Persistent application/server downtime.
4. Repeated loss of vehicle/fuel data.
5. Deliberate manipulation of GPS/fuel data.
6. Repeated failure to rectify critical defects.
7. Repeated failure to maintain prescribed manpower.
8. Major security breach.
9. Abandonment of services.
10. Failure to comply with critical SLA requirements despite written notices.
Upon termination due to SI default, SMC shall have the right, subject to the Contract, to:
forfeit Performance Security/Security Deposit;
recover applicable penalties;
recover additional expenditure incurred for alternate arrangements;
obtain complete SMC data and records;
require transition assistance;
take any other contractual remedy available to SMC.
No compensation/damages shall be payable by SMC merely on account of termination arising
from the SI's default.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
5.12 Final Authority
The Commissioner, Surat Municipal Corporation, or an officer authorized by the Commissioner,
shall determine the applicability and quantum of penalty after considering the nature, severity,
frequency, duration and impact of the failure and the representation submitted by the SI.
The decision of the Competent Authority of SMC shall be final and binding, subject to the
dispute-resolution provisions of the Contract.
5.13 Important Principle :- The objective of the SLA is to ensure continuous, reliable, accurate
and usable GPS tracking and fuel monitoring services for SMC vehicles.
The SI shall therefore remain responsible for immediate corrective action notwithstanding levy of
any penalty.Penalty shall not substitute the SI's obligation to restore the service.
5.14 OTHER PENALTIES
5.14.1 Insufficient or Unsatisfactory Overall Support
In case the overall support and services provided by the Bidder/Service Provider (SI) to Surat
Municipal Corporation (SMC) are found to be insufficient, inadequate or unsatisfactory, the
same shall constitute a failure of service and shall attract a penalty of up to 10% of the total
Contract Consideration, depending upon the nature, severity and duration of such failure.
The penalty may be calculated proportionately for the period during which the support is
found to be insufficient or unsatisfactory.
5.14.2 Repeated Non-Compliance with SLA
In case the Bidder/SI repeatedly fails to comply with the Service Level Agreement (SLA)
requirements and performance standards specified in the tender, penalty shall be imposed up
to 10% of the total Contract Consideration, depending upon the nature, frequency and
severity of the non-compliance or shortfall.
5.14.3 Serious Bug, Flaw, Error or System Failure
In case any serious bug, flaw, error or defect is detected in the Application/Software/System,
or the system fails to perform in accordance with the approved specifications, functional
requirements or intended purpose due to any software-related issue attributable to the
Bidder/SI, the Bidder/SI shall rectify the same within the prescribed resolution period.
Failure to rectify such issue within the stipulated period shall attract a penalty of up to 10%
of the total Contract Consideration, depending upon the severity and duration of the
5.14.4 Inadequate Support Staff
In case the support, assistance, deployment or performance of the Bidder's/SI's personnel
provided to SMC is found to be insufficient, inadequate or unsatisfactory, the same shall
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
constitute a failure and shall attract a penalty of up to 10% of the total Contract
Consideration, depending upon the nature and duration of the deficiency.
5.14.5 Non-Availability of Application/System
In case the Application/System becomes unavailable or non-functional due to improper
configuration, administration, monitoring, maintenance or other negligence attributable to
the Bidder/SI or its support personnel, a penalty of up to 10% of the total Contract
Consideration may be imposed, depending upon the duration, severity and impact of such
non-availability.
5.14.6 Failure to Deliver Services as per Scope of Work
In case the Bidder/SI fails to provide any service, functionality, deliverable, support or activity
specified in the Scope of Work, Technical Specifications, SLA or other contractual
requirements, penalty of up to 10% of the total Contract Consideration may be imposed,
depending upon the nature, extent and severity of the failure or shortfall.
5.14.7 Cumulative Ceiling of Penalties
The cumulative value of penalties imposed under Clauses 5.14.1 to 5.14.6, during the entire
contract period, shall ordinarily be limited to a maximum of 10% of the total Contract
Consideration. However, this ceiling shall not restrict SMC from taking any other contractual
action, including termination of the Contract, forfeiture of Performance Security/Security
Deposit, recovery of additional losses or damages, or any other remedy available under the
Contract, in case of persistent, material or serious default by the Bidder/SI.
5.14.8 Notice and Opportunity for Representation
Before imposing any penalty under this Clause, SMC shall issue a written notice to the
Bidder/SI specifying the nature of the failure, shortfall, non-compliance or deficiency and
the proposed penalty. The Bidder/SI shall be given a reasonable opportunity to submit its
explanation, justification and/or corrective action plan within the period specified by SMC. If
the explanation is not found satisfactory, or the deficiency is not rectified within the
stipulated period, SMC shall be entitled to impose the applicable penalty.
5.14.9 Determination of Penalty
The percentage of penalty to be imposed in each case shall be determined by the
Competent Authority/Commissioner, SMC, based on the nature, severity, frequency,
duration and impact of the failure, as well as the Bidder's/SI's response and corrective
action. The decision of the Competent Authority/Commissioner, SMC, in this regard shall be
final and binding on the Bidder/SI, subject to the provisions of the Contract.
5.14.10 Continued or Material Failure
In case of continued, repeated or material failure to meet the prescribed service levels,
technical requirements, performance standards or other contractual obligations, despite
written notices and opportunities for rectification, SMC shall be entitled to terminate the
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Contract in accordance with the applicable termination provisions. In such cases, SMC shall be
entitled to withhold/recover applicable dues, forfeit the Performance Security/Security
Deposit, and recover any additional loss, cost or expenditure incurred by SMC in accordance
with the terms of the Contract. No compensation or damages shall be payable by SMC to the
Bidder/SI on account of such termination.
5.14.11 No Waiver of Other Contractual Remedies
Imposition of any penalty under this Clause shall not relieve the Bidder/SI of its obligation
to continue providing the services and rectify the deficiency. Payment or imposition of a
penalty shall not be construed as acceptance by SMC of the deficient service or as a waiver
of any other right or remedy available to SMC under the Contract.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
6. Eligibility Criteria
To be considered qualified for evaluation of Technical Proposal, each Bidder should meet pre-
qualification Criteria specified hereunder.
# Pre-Qualification Criteria Proof Document Required
1. The Bidder should be: • Certificate of Incorporation /
• A company incorporated in India under the Registration Certificate
Companies Act, 1956 (and subsequent • Copy of PAN card
amendments thereto) and in operation for at • Copy of GST
least 5 years as on publication of bid
• Bidder should have a registered number
2. The bidder should have average turnover of • Certificate from the statutory
minimum INR 1.05 crores in last three financial auditor / Charted Accountant
years (FY2023-24, FY 2024-25, FY 2025-26) (CA) clearly specifying the annual
turnover for each of the last
financial years as on 31st March
• Copy of Audited and Certified
Balance Sheet and Profit/Loss
Account of last 3 Financial Years
should be uploaded online.
3. Bidder should have experience of implementing IT Documentary proof from end
enabled Vehicle Tracking/Fuel Monitoring System client like purchase order,
in any ULB/Government in India in last five years completion certificate / Go Live
as on publication of RFP with minimum project Certificate, contract agreement,
value of Rs. 50 lakhs. etc. to be uploaded online to
(The project must have been implemented and substantiate the claim
gone live in last five years as on publication of In case of an ongoing project, the
RFP) project must have achieved the
respective value in terms of
entire project cost from financial
perspective. The Certificate to
this effect from the client on
client’s letter head to be
provided. The supporting
documents must clearly specify
the information that help
ascertain the compliance to the
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
respective evaluation criteria.
4. Bidder should have executed the following projects Documentary proof from end
pertaining to supply and installation of GPS based client like purchase order,
vehicle tracking devices to any ULB/Central /State completion certificate, contract
Govt Departments/PSU in India in last five years as agreement, etc. to be uploaded
on publication of RFP. online to substantiate the claim
- One (1) project of supply and installation of In case of an ongoing project, the
minimum 800 GPS devices/Fuel Level sensors or project must have achieved the
both respective count in terms of GPS
OR devices/Fuel Level sensors
- Two (2) projects of supply and installation of installed and commissioned. The
minimum 500 GPS devices/Fuel Level sensors or Certificate to this effect from the
both in each work client on client’s letter head to be
OR provided. The supporting
- Three (3) projects of supply and installation of documents must clearly specify
minimum 400 GPS devices/Fuel Level sensors or the information that help
both in each work ascertain the compliance to the
respective evaluation criteria.
5. The Bidder should possess valid certification for Copy of Certificates (valid as on
software/application development and/or quality of date of submission).
GPS hardware. Bidder should have any two (2) of
the below certificates.
i CMMI- Process Level 3 or above
ii ISO 9001:2015
iii ISO/IEC 27001:2022 for Information Security
Management Systems and
iv ISO/IEC 20000-1:2018 for IT Service
6. The Bidder should not be debarred/blacklisted by Self-declaration / Undertaking by
any Government / PSU in India as on date of bidder on letter head as per
submission of bid. Annexure
7. The bidder should have an office in Surat. In case of Self-declaration / Undertaking by
unavailability of office in Surat, the selected bidder bidder on letter head as per
must provide an undertaking for establishment of Annexure
an office with 60 days of award of work. Property Tax Bill/Electricity Bill/Gas
Bill/Agreement/etc. of the office.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
7. INSTRUCTION TO BIDDERS AND TERMS & CONDITIONS
7.1 Bidders are advised to study all instructions, forms, terms, requirements and other information
in the Bid Documents carefully.
7.2 Submission of bid shall be deemed to have been done after careful study and examination of
the Bid Document with full understanding of its implications.
7.3 The response to this Bid Document should be full and complete in all respects. Failure to
furnish all information required by the Bid Documents or submission of a proposal not
substantially responsive to the Bid Documents in every respect will be at the bidder’s risk and
may result in rejection of its Proposal.
7.4 Additionally, proposals of only those Bidders who satisfy the Conditions of Eligibility, stated
herein, will be considered for evaluation by SMC.
7.5 Introduction to this Bid Proposal: SMC intends to invite proposals through this RFP. The
Technical Bid along with EMD & Bid Fee in the name of “Surat Municipal Corporation” is to be
submitted in hardcopy whereas the Price Bid is to be submitted online on
https://smctender.nprocure.com.
7.6 Cost of Bidding: All costs and expenses (whether in terms of time or money) incurred by the
bidder in any way associated with the development, preparation and submission of the Bid and
bidder’s participation in the Bid Process, including but not limited to attendance at meetings,
discussions, demonstrations, etc. and providing any additional information required by
Authority, will be borne entirely and exclusively by the bidder. SMC will in no case be
responsible or liable for those costs, regardless of the conduct or outcome of the bidding
This Bid Document does not commit the SMC to award a contract or to engage in
negotiations. Further, no reimbursable cost may be incurred in anticipation of award. All
materials submitted by the Bidder shall become the property of SMC and may be returned at its
sole discretion.
7.7 Bid availability: Bid documents can be downloaded from the web site
https://smc.nprocure.com up to the date and time mentioned in the Online RFP Notice
“ACE/WORKSHOP/06/2026-27 ”.
7.8 Pre-bid Queries: A prospective Bidder requiring any clarification on the RFP Document may
submit his queries, via email, to the following e-mail id on or before 29/08/2026 upto 18:00 hrs.
Email Id for submission of queries: [email protected]
The queries must be submitted in the following format:
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Bidder’s Request for Clarification
Name and Address of the Name and Position of Contact Details of the Organization /
Organization submitting Person submitting request Authorized Representative
Sr. Bid Reference(s) Content of Bid requiring Points of clarification required
N (Section, Page) clarification
7.9 Addenda & Corrigenda: At any time before the deadline for submission of bids, the SMC,
may, for any reason, whether at its own initiative or in response to a clarification requested by
a prospective Bidder, modify the RFP Document by an amendment.
7.10 The bidders are advised to visit https://smctender.nprocure.com on regular basis for checking
necessary updates. SMC also reserves the rights to amend the dates mentioned in this RFP
for bid process
7.11 Governing Law and Jurisdiction: The Bidding Process shall be governed by, and construed
in accordance with, the laws of India and the Courts at Surat shall have exclusive jurisdiction
over all disputes arising under, pursuant to and/or in connection with the Bidding Process.
7.12 SMC rights to terminate the selection process
a) SMC may terminate the RFP process at any time and without assigning any reason. SMC
makes no commitments, express or implied, that this process will result in a business
transaction with anyone.
b) This RFP does not constitute an offer by SMC.
c) The bidder’s participation in this process may result in SMC selecting the bidder to engage in
further discussions and negotiations toward execution of a contract. The commencement of
such negotiations does not, however, signify a commitment by the SMC to execute a contract
or to continue negotiations. SMC may terminate negotiations at any time without assigning
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
7.13 Authority’s Right to Accept and Reject Any Proposals or All Proposals
a) Authority reserves the right to accept or reject any Proposal and annul the bidding process/
Proposal Evaluation Process and reject any/all Proposals at any time, without thereby
incurring any liability to the affected bidder or bidders or any obligation to inform the
affected bidder or bidders of the ground for Authority’s action.
b) Without prejudice to the generality of Clause (a), the Authority reserves the right to reject any
Proposal/Bid if:
1) at any time, a material misrepresentation is made or discovered, or
2) The Bidder does not provide, within the time specified by the Authority, the supplemental
information sought by the Authority for evaluation of the Proposal.
3) Bidder submitted conditional Proposal/Bid.
c) If such disqualification/ rejection occurs after the Proposals have been opened and the
Selected Bidder as per award criteria gets disqualified/ rejected, then the Authority reserves
the right to consider the next best Preferred Bidder, or take any other measure as may be fit
in the sole discretion of the Authority, including annulment of the Selection Process.
7.14 Bid Fee &Earnest Money Deposit (EMD)
(a) Bid Fee: The bidder mustsubmit non-refundable Bid Fee of Rs. 7080 (Rs. 6000/- + 18%
GST)byseparate Demand Draft or Banker's Cheque of any scheduled/nationalized bank
payable at Surat in favour of Surat Municipal Corporation.
(b) Earnest Money Deposit (EMD):The bidder must submit Earnest Money Deposit (EMD) of Rs.
3,51,000 (Rupees Three Lakh Fifty One Thousand only)by separate Demand Draft or
Banker's Cheque of any scheduled/nationalized bank payable at Surat in favour of Surat
Municipal Corporation.
(c) Failure to submit Bid Fee and EMD as required shall lead to the bid being rejected
(d) No interest will be payable by the Authority on the Earnest Money Deposit.
(e) The EMD of unsuccessful Bidders will be returned by the Authority, without any Interest, as
promptly as possible on acceptance of the Proposal of the Selected Bidder or when the
Authority cancels the Bidding Process.
(f) The Selected Bidder’s EMD will be returned, without any interest, upon the Selected Bidder
signing the Agreement and furnishing the Security Deposit in accordance with the provision
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
(g) The EMD shall be forfeited and appropriated by the Authority as damages without
prejudice to any other right or remedy that may be available to the Authority hereunder or
otherwise, under the following conditions:
If a Bidder withdraws their bid or increases their quoted prices during the period of bid
validity or its extended period, if any; or
In the case of a successful bidder, if the Bidder fails to sign the Contract or to furnish
Performance Bank Guarantee within specified time
During the bid process, if a Bidder indulges in any such deliberate act as would jeopardize
or unnecessarily delay the process of bid evaluation and finalization.
During the bid process, if any information found wrong / manipulated / hidden in the bid.
7.15 Non-submission of Bid Fee &Earnest Money Deposit (EMD)
“Demand Draft for EMD & Tender Fee shall be submitted in electronic format only
through online (By colored Scanning) while uploading the bid. This submission shall
mean that EMD & Tender Fee are received for purpose of opening the bid. Accordingly
offer of those shall be opened whose EMD & Tender Fee is received electronically.
However, for the purpose of realization of D.D. Bidder shall send the D.D. in original
through RPAD/Speed Post so as to reach to Accountant Department (Main Office) within
7 Day from the last date of online submission of the bid or as per date mentioned tender
notice. Punitive action for not submitting D.D. in Original to Account Department (Main
Office) by bidder shall be initiated and action shall be taken for abeyance of registration
and cancellation of E-tendering code for as follows.
At first instance following amount is to be paid to SMC
Sr Penalty Amount
2 Above 1.00 Cr up to 10.00 Cr Rs. 20,000/-
3 Above 10.00 Cr up to 50.00 Cr Rs. 30,000/-
4 Above 50.00 Cr up to 100.00 Cr Rs. 70,000/-
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
If bidder fails to submit the said amount within 10 days for the First instance OR in case
of second instance of this similar of mistake i.e. non submission of Valid Original
Demand Draft (D.D.)/B.G. to the Accounts Department (Main Office) within the specified
time limit, punitive action of abeyance/cancellation of E-tendering code for 6 months
shall be taken.
Any documents in supporting of bid shall be in electronic format only through online (By
colored Scanning) &hard copy will not be accepted separately.”
7.16 Due Diligence
The Bidders are encouraged to examine and familiarize themselves fully about the nature of
assignment, scope of work, all instructions, forms, terms and conditions of RFP, local conditions
and any other matter considered relevant by them before submitting the Bid by paying a visit to
the site, sending written queries to the Authority, and attending a Pre-Bid meeting.
7.17 Acknowledgement by Bidder
a) It shall be deemed that by submitting the Bid, the Bidder has:
1) made a complete and careful examination of the RFP
2) received all relevant information requested from the Authority;
3) accepted the risk of inadequacy, error or mistake in the information provided in the
RFP or furnished by or on behalf of the Authority
4) acknowledged that it does not have a Conflict of Interest
5) agreed to be bound by the undertakings provided by it under and in terms hereof.
b) The Authority shall not be liable for any omission, mistake, or error in respect of or any of the
above or on account of any matter or thing arising out of or concerning or relating to the RFP
or the Bidding Process, including any error or mistake therein or in any information or data
given by the Authority.
7.18 Sealing, marking and submission of the Bid Fee, EMD and Affidavit:
Following documents shall only be submitted in Hard Copy to Surat Municipal
Corporation by the bidder:
- Earnest Money Deposit (EMD)
- Affidavit on Non Judicial Stamp Paper of Rs. 300 (as per 9: Annexures to Technical Bid – E:
The “Bid Fee and EMD” shall be put in an envelope containingBid Fee and Earnest Money
Deposit (EMD) and shall be super scribed as “Bid Fee and EMD”
The envelope must be sealed and super scribed and must be sent as under:
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Details to be mentioned exactly on sealed envelop
TENDER DETAILS To,
The Chief Accountant,
ACE/Workshop/06/2026-2027
Surat Municipal Corporation,
Bid Fee and EMD for “RFP for Vehicle
MahanagarSevaSadan,
Tracking and Fuel Monitoring Solution”
GordhandasChokhawala Marg,
Tapipura(Muglisara), Surat - 395
Gujarat, INDIA.
The envelope containing Bid Feeand EMD must be sent strictly by Postal Speed Post or
Registered Post ADonly so as to reach on or before 14/09/2026 up to 18:00 hrs.Bids
received in any other manner or mode (like courier, in person, etc.) will not be
considered. SMC won’t be responsible for postal delays.
TECHNICAL BID &PRICE BID
The technical bid &price bid must be submitted online on https://smctender.nprocure.com. It
should not to be sent physically, if submitted physically the bid shall be rejected.
7.19 Submission of Price Bid and Technical BID
The price bid and the technical bid containing all the relevant supporting documents must be
submitted online only on https://smctender.nprocure.com on or before the last date of
submission of the bid. No documents except the Bid Fee, EMD and Affidavit to be accepted
in hardcopy. It is advised to keep the softcopy of the relevant documents ready and upload
the same in advance on https://smctender.nprocure.com with respect to this tender to avoid
All the relevant softcopy should invariably follow the (n)Code portal's specific requirements
pertaining to file types, file size, file name length, etc.
o File Types: Files with only .pdf, .doc, .txt, .xls, .ppt, .pps, .png, .gif, .jpg, .zip, .rar extension
can be uploaded.
o File name: It should not be more than70 characters. Special Characters Like ( ' % @ <> : *
? | & ~ ^) are not permitted.
o File size: Single file size should not be more than 3 MB.
7.20 Online Submission of the Technical Bid:
The bidder will be required to upload the duly signed, stamped and notarized color
scanned copy of various supporting documents online on smc.nprocure.com during e-
tendering process. The bidder shall submit all the relevant documents so as to ascertain the
claims made. Following is the indicative list of documents that are to be submitted.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
# Criteria/Clause Proof Document Required Instruction for Online
Document Submission
1. Section-6: Basic Eligibility • Certificate of Incorporation / Registration Notarised colour scan copy
Criteria-1 Certificate clearly-displaying stamp,
• Copy of PAN card number and name of the notary.
2. Section-6: Basic Eligibility • Certificate from the statutory auditor / Notarised colour scan copy
Criteria-2 Charted Accountant (CA) as per Form-1.4 clearly-displaying stamp,
clearly specifying the annual turnover for number and name of the notary.
each of the last 3 financial years as on
• Copy of Audited and Certified Balance
Sheet and Profit/Loss Account of last
Financial Years should be uploaded
3. Section-6: Basic Eligibility Documentary proof from end client like Notarised colour scan copy
Criteria-3 purchase order, completion certificate, clearly-displaying stamp,
Go-live certificate, contract agreement, number and name of the notary.
etc. to be uploaded online to
substantiate the claim
Experience Statement as in Form –
4. Section-6: Basic Eligibility Documentary proof from end client like Notarised colour scan copy
Criteria-4 purchase order, completion certificate, clearly-displaying stamp,
Go-live certificate, contract agreement, number and name of the notary.
etc. to be uploaded online to
substantiate the claim
Experience Statement as in Form –
5. Section-6: Basic Eligibility Documentary proof from end client like Notarised colour scan copy
Criteria-5 purchase order, completion certificate, clearly-displaying stamp,
Go-live certificate, contract agreement, number and name of the notary.
etc. to be uploaded online to
substantiate the claim
Experience Statement as in Form –
6. Section-6: Basic Eligibility Criteria- Copy of Certificates (valid as on date of Notarised colour scan copy
6 submission). clearly-displaying stamp,
number and name of the notary.
7. Section-6: Basic Eligibility Self-declaration / Undertaking by bidder on Colour scan copy of
Criteria-7 letter head as per Form – 1.1 document.
8. Section-6: Eligibility Criteria-8 Self-declaration / Undertaking by bidder on Colour scan copy of
letter head as per Form – 1.7 document.
Address Proof like Property Tax Bill/Electricity
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
Bill/Gas Bill/Agreement/etc. of the office.
9. The bidder should furnish, as As per Section 7, Clause 7.14 Colour scan copy of
part of its bid, Bid Fee of Rs. document.
7080/- in the form of Demand
Draft or Banker’s Cheque (Physical copy to be submitted
as per Clause-7.18)
10. The bidder should furnish, as As per Section 7, Clause 7.14 Colour scan copy of
part of its bid, Earnest Money document.
Deposit (EMD) of Rs. 3,51,000/-
in the form of Demand Draft or (Physical copy to be submitted
Banker’s Cheque as per Clause-7.18)
11. Particulars of the Bidders As per Form-1.3 Colour scan copy of
document, which is duly
signed & stamped by
authorized signatory
12. Proof of Authorized Signatory Power of Attorney for signing of the proposal Colour scan copy of
as per Form-1.2 document, which is duly
signed & stamped by
authorized signatory
13. Details of the projects Copy work order / purchase order and Notarised colour scan copy
completed by the bidder / completion certificate from client for each of clearly-displaying stamp,
Experience Center the projects undertaken clearly specifying the number and name of the
date, project value and nature of work along notary.
with details as per Form-1.5
14. Affidavit& Undertaking As per Annexure II & III Colour scan copy of
Physical copy to be submitted
as per Clause-7.18.
15. Solvency Certificate amounting As per Section 7, Clause 7.44.27 Notarised colour scan copy of
Rs. 70,00,000/- from a supporting documents clearly
scheduled / nationalized bank. displaying stamp, number and
name of the notary.
16. GST Registration GST Registration Certificate indicating GST Notarised colour scan copy of
number supporting documents clearly
displaying stamp, number and
name of the notary.
17. PAN Card PAN Card Notarised colour scan copy of
supporting documents clearly
displaying stamp, number and
name of the notary.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
18. Technical Specification As per Form –1.9: Technical Specification duly filled, signed and
Compliance Compliance stampedcolour scan copy of
Supporting documents like
datasheets, brochure, etc. to
be uploaded online.
19. Any other supporting document Any other document not mentioned above Notarised colour scan copy of
required to fulfill RFP but required as per RFP or as supporting supporting documents clearly
requirements. document to substantiate the claim made by displaying stamp, number and
the bidder. name of the notary.
20. Addendum and Corrigendum Colour scanned copy of duly
signed& stamped Addendum
and Corrigendum
7.21 All documents must be coloured scanned to be seen as original. Scanning in black and
white or gray shall not be acceptable.
7.22 All documents must be notarized with clearly-displaying stamp, number and name of
7.23 Bidders are required to submit the online price bid well in advance on nprocure website. And
representation from the bidder of non-submission of bid due to the nprocure portal issue will
not be entertained. In case bidder needs any clarification or if training required for
participating in online tender, they can contact the following office: -
(n) Code solutions – A division GNFC Ltd.
403, GNFC Infotower, Bodakdev, Ahmedabad – 380 054, Gujarat (India)
E-mail: [email protected] Web-site: www.nprocure.com
For further particulars contact above office/ or visit on following websites:
1. www.nprocure.com
2. www.smc.nprocure.com
7.24 Evaluation Process
(a) A two-stage selection procedure will be adopted: Stage-1: Technical Bid (Basic
Eligibility Criteria + Technical Compliance) and Stage-2: Commercial bid.
(b) In the first stage SMC shall examine the statement of eligibility, experience, technical
capabilities etc. furnished by the Bidder and select the bidders who satisfy the technical
evaluation criteria.
(c) In the second stage, subsequent to technical evaluation stage, commercial bids of only
shortlisted Bidders will be opened. It should be noted the bids shall be evaluated on the basis
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Municipal Workshop(Surat Municipal Corporation)
(d) There should be no mention of bid prices in any part of the Bid other than the Commercial
(e) The bidder must make sure to provide all the relevant documents to support the claim made
with regards to various evaluation criteria like turnover, past experience, etc. SMC will
examine the Bids to determine conformity to eligibility criteria and technical compliance.
SMC may waive any informality or nonconformity in a Bid which does not constitute a
material deviation according to SMC.
(f) If required, SMC may at its own discretion require written clarifications from the Bidders to
clarify ambiguities and uncertainties arising out of the evaluation of the Bid.
7.25 Notifications of Award and Signing of Contract
(a) On completion of selection process, the selected bidder will be notified regarding acceptance
of the bid by issuance of the purchase order/Letter of Intent (LoI).
(b) It is to be noted that the date of commencement of the project and all contractual
obligations shall commence from the date of issuance of Purchase Order/Letter of Intent
(LoI), whichever is earlier. All reference timelines as regards the execution of the project and
the payments to the System Integrator shall be considered as beginning from the date of
issuance of the Purchase Order/Letter of Acceptance, whichever is earlier.
(c) The notification of award (LoI/Purchase Order) will constitute the formation of the Contract.
Upon the Bidder’s executing the contract with SMC, it will promptly return EMDs of
unsuccessful bidders.
7.26 Quantity Variation
(a) The quantity defined in the bid are estimated and the actual quantity is subject to change.
The quoted rate will remain firm and same for such variation in quantity. The successful
bidder shall not object to the upward or downward variation in quantities (including
locations). The payment will be made as per actual executed quantity as per tender rates for
entire duration of contract.
(b) Quantities mentioned in the commercial formats are indicative in number. SMC at its
discretion may or may not procure the listed components in mentioned quantities at the
time of placing order.
(c) If required additional quantity over and above may be executed on later stage, the payment
for such additional quantities shall be made at tender rates. The rates mentioned in the price
bid will be valid during the entire contract period andthe selected bidder shall be bound to
supply additional quantity.
(d) No claim shall be entertained or become payable for price variation of additional quantities.
Sign& Stamp RFP for Vehicle Tracking & Fuel Monitoring Solution SMC
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GPS and FMS Tender_FINAL.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].