Loading…
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
3 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Add. City Engineer,North Zone
Reparing and Renovation of Aganwadi Regarding work at Sardarnagar Ward of North Zone.
359744
Short E Tender Notice no – 12/2026-27 Tender no -03
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
26 Oct 2026
26 Oct 2026
26 Oct 2026
3 Nov 2026
26 Oct 2026
Sr. Department No. of Total Amount
Zone). The technical bid of Tenders shall be open date.-05.11.2026 at 11.00 am.
Any change / correction / corrigendum in respect of above work shall be placed on line.
Contractors are requested to see the website before 24 hours of submission of their tender.
Assistant Manager (North zone), Ahmedabad Municipal Corporation
North Zone Office Building, Memco-Naroda road, Ahmedabad
Deputy Municipal Commissioner
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Naroda Raod, Ahmedabad-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online e-tenders from interested contractors for Reparing and
Renovation of Aganwadi Regarding work at Sardarnagar Ward of North Zone
1 Name of work Reparing and Renovation of Aganwadi Regarding work
at Sardarnagar Ward of North Zone
2 Time Limit 12 MONTHS
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register class "E2" in Only AMC register No any
other state Govt. or institutions Register are Allowe.
5 Estimated Cost put to Rs.10,00,000.
6 Tender fees Rs.900/--Demand Draft in favour of Municipal
(Non refundable) Commissioner, Ahmedabad)
7 Earnest Money Deposit Rs.10,000.(Demand Draft in favor of Municipal
Commissioner, AHMEDABAD/) To be submitted as
prescribed in 8.0 below. Demand Draft shall be from
Nationalized Bank / Scheduled Bank and valid for -
180- days.(As per AMC finance dept. circular No-5
Dt.5/5/07 & F.D. Circular No. 29 Dt. 7/08/2010) &
attached ANNEXURE - 1 Finance dept. circular
8 Submission of EMD In separate sealed cover each for EMD and Tender
and Fees along with Tender as described in the invitation
Tender Fees of tender and submitted to Assistant Manager
(NORTH zone) , Rajiv Gandhi Bhavan, Memco-
Naroda Road, Ahmedabad To be Submitted
Physically As per N.I.T
9 Date of Opening of Technical Bid will be opened online as per N.I.T. in
Technical bid the office of Deputy. City Engineer (North Zone),
Rajiv Gandhi Bhavan, Memco – Naroda Road,
Ahmedabad Municipal Corporation, Ahmedabad
10 Security Deposit 5 % of the Sanctioned Tender Amount in form of
Demand Draft. (As per Annexure-I)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
11 Mode of sending the Price bid should be submitted by online e-tender
Tender Documents only and Technical bid should be submitted
physically also in sealed envelope systems By
RPAD/Speed post/ Hand Delivery in sealed covers
in Duplicate (One Original & One Duplicate) Each
part shall be separately duly sign & seal by
12 liquidated damages 0.1% of contract price per day from the date of
delay. Maximum limit of liquidated damages for
delay in completion of work will be 10% of the
Contract Price rounded of to the neared thousand.
13 Deduction of Retention Retention
Money from each RA 1. @ 2% of the value of work done will be deducted
Bill from each RA bill. It will be released along with
release of payment of Final Bill.
14 Place of Arbitration Ahmedabad
15 Language of English
16 Amount to be deducted Welfare cess as per act 1996 @ 1 % of bill amount
from each bill for
labour welfare fund
(non-refundable)
17 Time Permitted to start Whenever a work is allotted by Engineering Staff
parts of Work whether minor or major part there of any amount,
the contractor shall be bound to start the works
within 48 hours so intimation of work.
Communication done telephonically via SMS, via
WhatsApp and through letter/E-mail shall be
considered legal and binding for the same. Failure of
comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied
penalty of (1)Rs.1000/- per day (for tenders
amounting upto Rs.10Lakhs), (2)Rs.2500 per day
(for tenders amounting above Rs.10 Lakhs and upto
Rs.30 Lakhs), (3)Rs.5000 per day (for all tenders
amounting above Rs.30 Lakhs). Three times failures
by contractor shall make contractor responsible to be
black listed unless and otherwise justified properly
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
in writing/binding within 15 days of last notice of
18 GST GST will be paid extra by AMC/Authority at
prevailing rate to the Contractor.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any
or all the tenders without assigning any reasons there of.
(1) vhevºt lk-28 <&t ltKktFt<t vhevºt lk 32 <t.7/7/2017 îtht <t.1/7/2017 vAe cnth
vtzJtbt ytJuj/ytJlth xuLzhbt (bxehegÕm + juch mÃjtg mt&u) G.S.T lt ltuxeVefuNl bwsc
G.S.T sgt jtdw vz<tu ntug ðgt mœhnw ftblt cezhu G.S.T ltuxeVefuNl bwscle yuÃjefucujexe
ægtlbt htFe xuLzhlwk cezekd fhJtlw hnuNu.
(2) ftuLx[t¾xhu fboathe CrJ»g rl^e mkdXl yk<do< vtu{rJzLz Vkz hSMx[uNlle lfj hsw fhJtle
hnuNu.yLg&t <ulu fthKu ftuRvK «¹l WœTCJu <tu <ule sJtcœthe ftuLx[t¾xhle ntuJt ctc<u ftuLx[tfxhu
ltuxtuhtRÍ Yt.100/- MxuBv vuvh Wvh ctknu^he hsw fhJtle hnuNu.
(3) ftuLx[t¾xhu btlleg bwÏgbkkºte yu«uLxem gtuslt ctc<u bnuhctl Bgwrlrmvj frbNlh
mtnuc©elt mhfgwjh lkk-41 <t-09-11-2021 bwsc The Apprentices act,1961 ylÔgu
<uytulwk Employes ltufheœt<t <hefu hSMx[[uNl VhSgt< fhtJe <uytulwk hSMx[[uNlle ftuve hsw
Seal and Signature of the Bidder ADD City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Seal and Signature of the Bidder ADD City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( hereinafter called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of Works
detailed in the Table below:-
Sr. Name of Works Approximate Earnest Money Completion
No. value of works Deposit (Rs.) Period
1 Reparing and Renovation of Rs.10,00,000. Rs.10,000 12 MONTHS
Aganwadi Rrgarding work at
Sardarnagar Ward of North
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of Demand
Draft from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad,
payable at Ahmedabad, which shall be non refundable. The Details of Tender fees shall be
submit with scan copy at the time of Quoting price bid of the tender and Physically to be
submitted along with technical bid Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works
in the above Table payable at Ahmedabad and drawn in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have
to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi
Bhavan, Memco – Naroda Road, Ahmedabad As per N.I.T
6. The Bids will be opened on As per N.I.T at the office of Deputy.City Engineer (N/Z) , 1st
Floor, Rajiv Gandhi Bhavan, Ahmedabad Municipal Corporation, Memco-Naroda road,
Ahmedabad-25. in the presence of bidders or their representatives who choose to attend. In the
event of the specified date of bid submission/opening being declared a holiday for the
Employer, the bids shall be received /opened on the next working day at the same place and the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as per
N.I.T and all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/
Speed Post/ Hand Delivery in duplicate. This envelope shall be sealed in an outer envelope. The
Bid envelopes shall be marked as follows:-
Tender Document Vol.
Registration certificate of class
Power of Attorney
Personal Details
Enclosures as asked in tender
Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, North Zone,
1st Floor, Rajiv Gandhi Bhavan,
Memco-Norada Road,
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Form
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures
then announce the names of bidders in the presence of bidders or their representatives who
choose to attend on the date and time mentioned in the IFB. In the event of specified date of
bid opening being declared as a holiday for the Employer, the Tender will be opened at the
appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD, the
amount and validity of EMD furnished with each bid, is valid registration and such other
details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the
Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the
EMD, the bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified
in the bid documents and is substantially responsive to the requirement of the bidding
documents and provides any clarification for ascertaining the correctness of the
information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
including the information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing
their attendance.
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and
will not subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to
be substantially responsive in accordance with Clause 2 and qualified for award of Contract in
accordance with Clause 5(General Terms and Condition).
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule
date and time. In the event of specified date of bid opening being declared bidders who qualify
the criteria then bidder bid will be considered for opening of price bid.(Following clause no.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated
Bid Price, provided that such bidder has been determined to be (i) eligible in accordance with
the provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with
the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will
notify the successful bidder by cable/fax and confirmed by registered letter that his bid has
been accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. As per City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful Bidder
has to deposit security deposit Demand draft with in 15 days after receiving letter of
Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details
furnished by him in his bid. Such request by the Employer and the response by bidder shall be
in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid
from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has
been announced. Any effort by a bidder to influence the Employer's processing of bids or
award decisions may result in the rejection of his bid.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain
for itself on its own responsibility all information that may be necessary for preparing the bid
and entering into a contract for construction of the Works. The costs of visiting the Site shall
be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to
enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer
and its personnel and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
Seal and Signature of the Bidder ADD City Engineer
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to as
"the Works") detailed in the table given in the IFB.
1.2 The Works consist of:
“Reparing and Renovation of Aganwadi regarding work at Sardarnagar Ward of North
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the
following requirements:
The bidders shall have a registration with State PWD, and/or CPWD for Required class
and or equivalent with specialization in road works. If contractor is not registered with
AMC in the relevant class, on award of contract he shall be required to register himself
with AMC within 3 month's time.
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as
the Employer shall reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction
of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined,
grown, produced or manufactured; similarly for equipments and from where the services are
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of
the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in
a joint venture. A bidder who submits or participates in more than one bid for a contract package
will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures
to comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to
Clause 16, bids which are not substantially responsive to the requirements of the bidding
documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder
and the Employer shall be written in the English language. Supporting documents and printed
literature furnished by the bidder may be in another language provided they are accompanied by an
accurate translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in
figures and words) for overall items of the Works provided in the Bill of Quantities
9.3. All duties, taxes (excluding GST), and other levies payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder, except otherwise stated in the Bid document. Any change in
prevailing taxes and duties at the time of bid due date, shall be paid/deducted at actual as per
Employer/Authority/AMC Account department decide. If Employer will not compensate as per
Any change in prevailing taxes and duties and other levies then payable by the contractor under
the contract and any other reasons.
9.4. The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of
work and shall not be subject to adjustment on any account, except where expressly specified,
otherwise, in the contract.
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer
may request the bidders to extend the period of validity for a specified additional period. The
request and the responses thereto shall be made in writing or by fax. A bidder may refuse the
request without forfeiting his bid security. A bidder agreeing to the request will not be
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
required or permitted to modify his bid but will be required to extend the validity of his Bid
Security for the period of the extension, and in compliance with Clause 2 ( Financial Terms
& Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and
date specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted,
the Employer will direct him to submit the Performance Security and attend the Employer's office
on a date determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of
original and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in competing for the contract in
question. The Employer will declare the firm ineligible, either indefinitely or for a stated
period of time, to be awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
it at any time determines that the firm has engaged in corrupt or fraudulent practices in
competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those
close to them, or induce others to do so, by misusing the position in which they are
placed, and it includes the offering, giving, receiving, or soliciting of anything of
value to influence the action of any such official in the procurement process or in
contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the Borrower,
and includes collusive practice among bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable
for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria it
will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect
or are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such
laws shall be directly deducted from the contractor's outstanding.
All necessary safety measures and precaution (including those laid down in the various relevant Indian
Standards) shall be taken to ensure the safety of men, materials and machinery on the works as also of
the work itself.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of
the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary
florescent marking on traffic signs to be provided so that it should be visible at night. During
night working hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signages, safety cones, traffic
blinkers, barricading tapes, red and green flags etc for making easy smooth and safe
conditions for the traffic. The Contractor shall and must provide above at his own cost.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or
new connection on behalf of AMC. It includes filling the necessary application to power
Supply Company, follow up and getting the supply, filling the necessary test reports to the
power supply company. All official fees including security deposits and other expenses shall
be of initially paid by the contractor.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder ADD. City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Contractor shall have to deposit Earnest Money deposit with tender.
2.2 Demand draft (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.3 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as
promptly as possible as but not later than 28 days after the expiration of the period of bid validity.
2.4 The EMD of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed
2.5 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) furnish the required Performance Security or
ii) sign the Agreement.
3. (A) Security Deposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance, the successful
bidder shall deliver to the Employer, a Initial Security Deposit in the form of a Demand draft
for an amount equivalent to 5% (five percent) of the Contract Price.
(B) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
4. Approved Bank: - As per AMC Finance dept. circular No - 21 Dt.19/06/20
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to permissible limits as per prevailing norms of AMC and
contractor shall not claim any extra rate for the same.
8. No rate difference will be paid for due to any increase in rate of any item due to any reason what so ever.
9. No price escalation / advance payment / machinery advance will be paid.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
10. Payment of running bill will be made as per recent A.M.C. policy in force.
11. No extra payment will be made due to increase of central / state Govt. Taxes.
12. If the work is not completed within time limit the penalty will be recovered from immediate bills of
13. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor
shall not claim for any extra rate for non execution of such item, partly/fully.
14. The contract rate of the item of work shall be for the work completed in all respects.
15. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent
towards testing charges is separately made.
16. In case of extra item, rate shall be finalized as per prevailing norms and condition of AMC
and payment shall be made accordingly.
17. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, GST/sales tax and Govt. duties/tax etc.
on material procured for the works from any source shall be borne by the contractor. No(P) or “C”
or “D” form shall be supplied by the AMC for this purpose. GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
18. If the contractor fails to execute the said works within prescribed time limit, the said
work will be carried out at the risk and cost by other contractors with 15 % supervision
charges as may be decided by the Addi. City Engineer (North Zone).
19. Water, Electricity Contractor shall have to make his own arrangements for water and
electricity for the purpose of construction work at site at his own expense.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender
amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder ADD. City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of
Gujarat State Road and Building Department / Water Resources Department shall be
applicable. Binding on the contractors unless specifically mentioned about it hereunder in
clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of
Gujarat “wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State
Public Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer
wherever written.
05. “Ahmedabad Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Ahmedabad
Municipal Corporation”
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading
“NOTICE INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work of
“Reparing andRenovation of Aganwadi work Regarding work at Sardarnagar Ward of
OF AHMEDABAD CITY Point No.3 : The class of contractor shall be as per Memorandum of
Works in Brief.
The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as
Point No .2.1 may be read as per the details mentioned in the tender notice
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
10. DECLARATION FORM & DECLARATION CERTIFICATE if given separately in
Tender Document and it shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSE under the
heading “TERMS AND CONDITION OF CONTRACT” shall be read as under-
Clause 1: Security Deposit: to be read as per the details given separately
elsewhere in the tender documents.
Clause 2: Liquidated Damages for delay: to be read as per the details given
separately elsewhere in the tender documents.
Seal and Signature of the Bidder ADD. City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL TECHNICAL CONDITION
1. Contractor shall register the work to labour commissioner as per labour act.
2. Contractor shall not sub-let the work without permission of the authority.
3. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by
the Engineer-in-charge.
4. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean
as a reference to the latest edition of the same in force on the date of agreement.
5. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the
relevant Indian Standards shall be referred to.
6. All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
7. The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
8. Where no lead is specified, it shall mean "all leads"
9. Lift shall be measured from plinth level.
10. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
11. Reference to specifications of materials as made in the detailed specification o f the items of work
is in the form of a designation containing the number of the specification of the material and prefix
12. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used
in the work found defective at a later date.
13. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
14. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stone at site of work in a systematic manner. Materials shall be stored in such a manner as
to prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation of
their quality and fitness for the work.
15. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the
site of work within 24 hours.
16. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
17. All works shall be carried out in workmanlike manners per the best techniques for the particular
18. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
19. The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of Ninety Calendar days (90)
from opening of price bids.
SECURITY DEPOSIT
Within 15 days of receipt of Intent from the Corporation, the successful tender shall furnish to the
Corporation Security Deposit of 5% (five percent) of the contract price demand draft of Nationalized Banks
and Schedule Banks approved by AMC only.
Seal and Signature of the Bidder ADD. City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to
that letter, contractor shall have to arrange for Security Deposit within 15 days. If S.D is
given within 10days of issuance of Letter of Intent, time limit shall be counted from that
date. If S.D is given after 15 days of issuance of letter of intent, contractor shall be
penalized as per prevailing norms and condition of AMC and shall be deducted from
contractor’s bill. In this case time limit shall start latest by the 10th day of letter of intent,
Security Deposit of 5% of tender amount shall be deposited by demand draft of
nationalized bank /scheduled bank by demand draft of nationalized bank/scheduled bank
only. Contractor shall have to sign contract paper with AMC.
2. In case of earnest money cheque bounce back, contractor’s tender shall treated as cancelled
and the contractor shall not be given any tender, offer, quotation work in AMC for one
3. Conditional tender shall not be accepted.
4. Tender validity period is 120 days from the date of opening of tender.
5. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at
which tender to be accepted and awarded.
6. Specification of tender items shall be as per PWD manual in general/AMC’s norms and B-
1 form conditions shall be applicable. In case of controversy, Add.C.E’s decision shall be
7. Work shall be allotted as per contractors registration class.
8. Contractor shall have to work in such a system that there shall be no damage to any service
line of electric, telephone, gas, any type of service cable ,drainage or water lines etc. In
case of damage to service line, the whole responsibility of accident shall be on contractor’s
shoulder. It will be responsibility of contractor to safe guard the labours against any
accident or damage of lives. In case of police complain, Contractor shall be held
responsible for negligence. In case of soil /land collapse, contractor shall be held
responsible for not supporting the soil suffering with strutting, shuttering Contractor shall
safeguard the labour before allowing the labour to enter in excavated or other site. In case
of accident to labours, contractor shall be held responsible for police complain against him.
AMC’s staff shall be responsible for any accident at the site of the work.
9. Contractor shall take insurance of his all labour. and supervisory staff
10. Only registered contractor shall quote the tender , If the contractor is registered with
government then they shall have to apply to registration in AMC within 90 days from the
date of work order.
11. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is put
up on AMC’s web site.
12. Payment of running bill , final bill shall be as per policy of AMC in force at time of
13. Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
14. As per site conditions/requirement of site, there shall be increase or decrease in tender item
quantities. In such case contractor is bind to execute. Excess and saving in quantity to the
extent of prevailing norms of the AMC. In case of decrease in any tender item quantity,
contractor shall not ask for compensation.
15. If any construction material brought to site by contractor , is not as per specification, or
any inferior quality material brought to site, then such rejected material shall be removed
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
from the site within 24 hours, otherwise AMC can throw away such material at any place
and recover the amount for such removal work from contractor bill. In this case contractor
shall not be entitled for compensation.
16. Cost of testing of material shall be done by the contractor. He shall provide vehicle for
taking material/staff from site to testing laboratory/ manufacturing site and contractor shall
be bear the cost of transportation of staff and material.
17. Contractor shall work as per labour Act. Contractor shall not be given any payment if
labour act rules are not followed or insurance of labour is not taken for work
18. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
19. In case of cancellation/rejection of tender, contractor shall not be entitled for any
compensation Or right
20. During execution of work, contractor shall take safety measures like protection by ropes,
drums, danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement &
instruction of Engg.- in- charge. In case of accident due to lack of protection, contractor
shall responsible for police complains, compensation etc AMC staff shall not be held
responsible for contractors negligency.
21. If instructed by AMC officials, contractor shall have to keep daily progress register and get
is signed by Ass. city Engineer. Contractor shall maintain record of daily No. of labours,
employed, work done, rectification work carried out by contractor after Eng.-in-charge
inspection & the compliance of the same. If such rectification work is not done by
contractor within 24 days the contractor shall be finned Rs. 250/- day of delay & shall be
recovered from the contractors bill.
22. Contractor is not entitled for any type of compensation or right for the cancellation of
tender or tender items by any means.
23. If work is not completed within specified time limit penalty shall be recovered from bills
as per tender condition.
24. Deduction from bills shall be done as per rules prevailing or the rules which shall come in
to force, by State or Central Govt.
25. 1% amount shall be deducted for labour welfare fund as per state Govt order.
26. All above conditions shall over rule the conditions given in Form B-1
27. Befor quoting tender, contractor shall have to take complete information of the work after
seeing site and from the concerned Asst. Engineer or Asst. city engineer.
28. In case of the bank detail are not given then EMD return procedure shall be delayed.
29. Before quoting the tender contractor should know that, he has seen the site & understood
the item of works, site conditions. He should be in a position to provide labours at the time
of festivals like Holi, Diwali, Navratri, Marriage season, rainy season or any other time of
the year Contractor can not say that he has no labours due to festivals.
I have read all above conditions carefully and ready to work as per above conditions.
Seal and Signature of the Bidder ADD. City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TECHNICAL SPECIFICATIONS
Name Of Work :-“ Reparing andRenovation ofDifferent Places Aganwadi Regarding
work at Sardarnagar Ward of North Zone.
STANDARD TECHNICAL SPECIFICATIONS FOR BUILDING
Item No. :-1 Demolition incl. stacking of serviceable materials & disposal of unserviceable
materials with all lead and lift.
(a) R.C.C. work (20.3)
(b) Brick work & Stone Masonary in Cement mortar (20.11)
(d) Tiles or Stone flooring (20.23,page 219)
(e) Sheet roofing (G.I. ) (20.27)
(e) Doors,Windows ventilators (wood/steel) Not Exiding 3.00 Sq.mt.(20.49,)
Demolition incl. stacking of serviceable materials & disposal of unserviceable materials with all
(a) R.C.C. work (20.3)
(b) Brick work & Stone Masonary in Cement mortar (20.11)
(d) Tiles or Stone flooring (20.23,page 219)
(e) Sheet roofing (G.I. ) (20.27)
(e) Doors,Windows ventilators (wood/steel) Not Exiding 3.00 Sq.mt.(20.49,)
The rate shall be for a unit of one Cubic metre.
Item No. :- 2, Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C
member including stacking of serviceable material and disposal of unserviceable from site of work
with all lead and lift
Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C member
including stacking of serviceable material and disposal of unserviceable from site of work with all
Measurement shall be given in Smt. Basis
Item No. :- 3, Excavation for foundation upto 1.5m depth including sorting out and stacking of
useful materials and disposing off the excavated stuff upto 50 Meter lead. (A) Loose or soft soil.
Excavation for foundation upto 1.5m depth including sorting out and stacking of useful
materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil.
Measurement shall be given in cmt. Basis
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No.4 :- Filling available excavated earth (excluding rock ) in trenches.plinth,sides of
foundations etc.in layers not exceeding 20cm.in depth consolidating each disposited layer by
ramming and watering.
Filling available excavated earth (excluding rock ) in trenches.plinth,sides of foundations etc.in
layers not exceeding 20cm.in depth consolidating each disposited layer by ramming and
The mode of measurement shall be per Cmt. Basis
Item No5:- Filling in plinth with sand under floors including watering ramming,consolidating
and dressing complete.
Filling in plinth with sand under floors including watering ramming,consolidating and dressing
Measurement shall be given in Cmt. Basis
Item No. 6 :- Filling in foundation and plinth with murrum or selected soil in layers of
20cm.thickness including watering, ramming and consolidating etc.complete..
Filling in foundation and plinth with murrum or selected soil in layers of 20cm.thickness
including watering, ramming and consolidating etc.complete.
The mode of measurement shall be on Cmt. basis.
Item No. 7 :- Conveyance charge of earth ,lime,murrum, building rubbish, manual
garbage,sludge,excavated rock, fly ash, aggregate of any kind etc. comp. Up to
Conveyance charge of earth ,lime,murrum, building rubbish, manual
garbage,sludge,excavated rock, fly ash, aggregate of any kind etc. comp. Up to 5.0 Km. lead.
The mode of measurement shall be on Cmt. basis.
Item No. 8 :- Providing and laying cement concrete1:4:8 (1-Cement: 4-coarse sand:8-hand
broken stone aggregates 40 mm nominal size) and curing complete excluding cost of
form work in (A) Foundation and Plinth.
Providing and laying cement concrete1:4:8 (1-Cement: 4-coarse sand:8-hand broken stone
aggregates 40 mm nominal size) and curing complete excluding cost of form work in (A)
Foundation and Plinth.
The mode of measurement shall be on Cmt. basis.
Item No. 9 :- Providing and laying cement concrete work 1:2:4 (1-Cement:2-Coarsesand:4-
graded stone aggregates 20 mm nominal size) and curing complete excluding cost of
form work and reinforcement for reinforced concrete work in.
Foundations,footings,Base of columns and Mass concrete.
Slabs, landing, shelves, Balconies ,Lintels ,Beams, Girders and Cantilever upto floor two level.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Providing and laying cement concrete work 1:2:4 (1-Cement:2-Coarsesand:4-graded stone
aggregates 20 mm nominal size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in
Foundations,footings,Base of columns and Mass concrete.
Slabs, landing, shelves, Balconies ,Lintels ,Beams, Girders and Cantilever upto floor two level..
The mode of measurement shall be on Cmt. basis.
Item No. 10: Providing form work of ordinary timber planking so as to give a rough finish including
centering, shuttering, strutting and propping etc.Height to propping and centering below supporting
floor to ceiling not exceeding 4M.and removal of the samefor in situ reinforced concrete and plain
concrete work in.
(A)Foundations Footings Basesof Columns etc.and Mass concrete.
(B)Flat surfaces such as soffits of supspened floors slabs Landings and the like.(1)Floors etc. upto
200 mm in thickness.
(H)(1) Sides and soffits of Beams Beam Haunchings cantilevers Girders Bressumers and Lintels not
exceeding 1M.in Depth.
Providing form work of ordinary timber planking so as to give a rough finish including centering,
shuttering, strutting and propping etc.Height to propping and centering below supporting floor to ceiling not
exceeding 4M.and removal of the samefor in situ reinforced concrete and plain concrete work in..
(a)up to 0.15 mt. (@ Two Coarse)
(A)Foundations Footings Basesof Columns etc.and Mass concrete.
(B)Flat surfaces such as soffits of supspened floors slabs Landings and the like.(1)Floors etc. upto
200 mm in thickness.
(H)(1) Sides and soffits of Beams Beam Haunchings cantilevers Girders Bressumers and Lintels
not exceeding 1M.in Depth.
The M/s shall be on Sqmt. Basis.
Item No. :-11 Providing TMT Bar FE 415 reinforcement for R.C.C.work including
bending,binding and placing inposition complete upto floor two level
Providing TMT Bar FE 415 reinforcement for R.C.C.work including bending,binding and placing
inposition complete upto floor two level
The rate shall be for a unit of KG.
Item No. :- 12, Brick work using common burnt clay building bricks having crushing strength not
less than 35 kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6(1-Cement:6-fine sand) (B)
Brick work using common burnt clay building bricks having crushing strength not less than
kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6(1-Cement:6-fine sand) (B) Conventional.
Measurement shall be given in Cmt. Basis
Item No. :- 13, Providing and laying polished kota stone slab 25 mm thick in risers of
steps,skirting,Dedo and pillars laid on10 mm thick cement mortar1:3 (1-Cement:3coarse sand) and
jointed with gray cement slury mixed with pigment to match the shade of slab including rubbing and
polishing etc.complete.
Providing and laying polished kota stone slab 25 mm thick in risers of steps,skirting,Dedo
and pillars laid on10 mm thick cement mortar1:3 (1-Cement:3coarse sand) and jointed with gray
cement slury mixed with pigment to match the shade of slab including rubbing and polishing
Measurement shall be given in Smt. Basis
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No.14 :- Providing and laying 24"x24"Vitrified 8mm thick tile flooring over 20 mm
(average) base of cement mortar 1:6 (1cement:6 coarse sand) or L.M1:1.5 laid on new
surface or fixing on existing flooring by adhesive material including dismentalling of existing
flooring and jointed with colour cemet slurry including finished with flush pointing &
cleaning the surface etc.complete.For Antiskid.
Providing and laying 24"x24"Vitrified 8mm thick tile flooring over 20 mm (average) base of
cement mortar 1:6 (1cement:6 coarse sand) or L.M1:1.5 laid on new surface or fixing on
existing flooring by adhesive material including dismentalling of existing flooring and
jointed with colour cemet slurry including finished with flush pointing & cleaning the
surface etc.complete.For Antiskid.
The mode of measurement shall be per Smt. Basis
Item No15:- Providing and laying broken chine mosaic flooring for terrace using 12mm to
20mm broken pieces of glazed tiles to be laid over cement mortar1:3 top lain or slope and to
be tempered to bring mortar creme out up to surface using white cement including rounding
off junctions and extending them upto 15 cm along the wall,clearing with water and oxalic
acid etc.as directed.
Providing and laying broken chine mosaic flooring for terrace using 12mm to 20mm broken
pieces of glazed tiles to be laid over cement mortar1:3 top lain or slope and to be tempered to
bring mortar creme out up to surface using white cement including rounding off junctions and
extending them upto 15 cm along the wall,clearing with water and oxalic acid etc.as directed..
Measurement shall be given in Smt. Basis
Item No. 16 :- Providing 15mm thick cement plaster in single coat on Rough (Similar) side of
single or half brick walls for interior plastering upto floor two level and finished even
and smooth in (ii) Cement mortar 1:3 (1-cement :3-sand)
Providing 15mm thick cement plaster in single coat on Rough (Similar) side of single or
half brick walls for interior plastering upto floor two level and finished even and smooth in (ii)
Cement mortar 1:3 (1-cement :3-sand)
The mode of measurement shall be on Smt. basis.
Item No. 17 :- 20mm thick sand faced cement plaster on walls upto height 10 metres above
ground level consisting of 12 mm thick backing coat of C.M. 1:3 (1-cement: 3-sand )
and 8mm thick finishing coat of C.M.1:1 (1-cement: 1-sand) etc. complete.
20mm thick sand faced cement plaster on walls upto height 10 metres above ground level
consisting of 12 mm thick backing coat of C.M. 1:3 (1-cement: 3-sand ) and 8mm thick finishing
coat of C.M.1:1 (1-cement: 1-sand) etc. complete.
The mode of measurement shall be on Smt. basis.
Item No. 18 :- Providing and applying fibere reinforced cementitious micro concrete work in
cellings and beams incl.mixture of CEMSCREED HM (F) fair mate company material,
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
FBR bonding agent material with water in suItable proportion anti corrosive
treatment on exposed beam,celling steel bars with safeCore R incl.all kind of labour
etc.comp.including three coat of white wash.(Approved Rate).
Providing and applying fibere reinforced cementitious micro concrete work in cellings and
beams incl.mixture of CEMSCREED HM (F) fair mate company material, FBR bonding agent
material with water in suItable proportion anti corrosive treatment on exposed beam,celling steel
bars with safeCore R incl.all kind of labour etc.comp.including three coat of white
wash.(Approved Rate).
The mode of measurement shall be on Smt. basis.
Item No. 19 :- Colour washing with lime on wall surfaces (two coat) to give an even shade
including thoroughly brooming the surface to remove all dirt,dust,mortar drops &
loose scales of lime wash and other foreign matter.
Colour washing with lime on wall surfaces (two coat) to give an even shade including
thoroughly brooming the surface to remove all dirt,dust,mortar drops & loose scales of lime wash
and other foreign matter.
The mode of measurement shall be on Smt. basis.
Item No. 20: Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to
give an required shape even shade after thoroughly brushing the surface to remove all dirt, and
remains of loose powdered materials .etc complete
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an
required shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose
powdered materials .etc complete
The M/s shall be on Sqmt. Basis.
Item No. :-21 Wall painting (two coats) with plastic emulsion paint of approved brand &
manufacture on undercoated wall surface to give an even shade including thoroughly
brushing the surface free from mortar droppings and other foreign matter and sand papered
Wall painting (two coats) with plastic emulsion paint of approved brand & manufacture on
undercoated wall surface to give an even shade including thoroughly brushing the surface free
from mortar droppings and other foreign matter and sand papered smooth.
The rate shall be for a unit of one Square metre.
Item No. :- 22, Applying two coats of putty & two coats of primer of approved brand and
manufacture on new wall surface to give an even shade including thoroughly brushing the surface
free from mortrd ropping and other foreign matter and sand papered smooth.
Applying two coats of putty & two coats of primer of approved brand and manufacture on new
wall surface to give an even shade including thoroughly brushing the surface free from mortrd
ropping and other foreign matter and sand papered smooth.
Measurement shall be given in Smt. Basis
Item No. :- 23, Applying priming coat over new steel and other metel surface after and
including preparing the surface by throughly cleaning , oil, grease, dirt and other foreign matter and
scoured with brushes fine steel wood, scraper sandpaper with readymixed priming paint brushing
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Applying priming coat over new steel and other metel surface after and including preparing
the surface by throughly cleaning , oil, grease, dirt and other foreign matter and scoured with
brushes fine steel wood, scraper sandpaper with readymixed priming paint brushing red lead.
Measurement shall be given in Smt. Basis
Item No.24 :- Painting two coats (excluding priming coat) on new steel and other metal
surface with enamel paint, brushing, interior to give an even shade including cleaning the
surface an even shade including cleanign the surface of all dirt, dust and other foreign
Painting two coats (excluding priming coat) on new steel and other metal surface with enamel
paint, brushing, interior to give an even shade including cleaning the surface an even
shade including cleanign the surface of all dirt, dust and other foreign matter.
The mode of measurement shall be per Smt. Basis
Item No25:- Appliying priming coat over new wood and wood based surface after and
including preparing the surface by throughly cleaning oil, grease, dirt and other foreign
matter, sandpaper in gandknotting.(B) Ready mixed paint brushing wood primier pink.
Appliying priming coat over new wood and wood based surface after and including preparing the
surface by throughly cleaning oil, grease, dirt and other foreign matter, sandpaper in
gandknotting.(B) Ready mixed paint brushing wood primier pink..
Measurement shall be given in Smt. Basis
Item No. 26 :- Providing & fixing Steel door with Shutter for steel sheet 18 Gauge, and angel
and 40 x 40 x 3mm and steel doors frame of size 40 x 40 x 5 mm incl. anodised Iron
butt hinges and nece.fitting and fastening with necessary screws.Rate also incl. two
coats of oil paint etc comp.
Providing & fixing Steel door with Shutter for steel sheet 18 Gauge, and angel and 40 x
x 3mm and steel doors frame of size 40 x 40 x 5 mm incl. anodised Iron butt hinges and
nece.fitting and fastening with necessary screws.Rate also incl. two coats of oil paint etc comp.
The mode of measurement shall be on Smt. basis.
Item No. 27 :- Providing laying and jointing in true line and level 15mm dia.U.P.V.C.Pipe (SCH-
40) for cold water including fittings make PRINCE/SUPREME/ASTRAL/FINOLEX or
equivalent as approved by Engineer In Charge.Pipe shall be fixed on the wall with
the help of clamp at every two metre C/C or shall be concelled as directed including
necessary fittings etc.including testing of pipe and joints and fixing the same with
adhesive solvent,including cost of all materials.
Providing laying and jointing in true line and level 15mm dia.U.P.V.C.Pipe (SCH-40) for cold
water including fittings make PRINCE/SUPREME/ASTRAL/FINOLEX or equivalent as approved by
Engineer In Charge.Pipe shall be fixed on the wall with the help of clamp at every two metre C/C
or shall be concelled as directed including necessary fittings etc.including testing of pipe and
joints and fixing the same with adhesive solvent,including cost of all materials.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The mode of measurement shall be on Rmt. basis.
Item No. 28 :- Making hole on existing CI/DI/MS water pipe line including nacessary GI fittings
item also includes necessary excavation, dewatering and refilling as per instruction
Engineer In charge etc.comp.
Making hole on existing CI/DI/MS water pipe line including nacessary GI fittings item also
includes necessary excavation, dewatering and refilling as per instruction Engineer In charge
The mode of measurement shall be on No. basis.
Item No. 29 :- Providing,laying and jointing in true line and level 110 diametre U.P.V.C (TypeB)
conforming to IS 13592-1992 with one end plain and other end socketed with rubber
ring,& fittings conforming to ISI 14735-1999 of approved make for drainage system
pipe line,pipe shall be jointed with each other with rubber lubricant,pipe shall be
fixed on wall using of PVC clamp of the size 110 mm diametre x 149 mm length x145
mm heigh at every 2000 mm center to center or shall be concealed in walls as
directed including necessary fittings such as bends,shoes etc.including testing of
pipes and joints and jointed with adhesive solvent cement including cost of all
Providing,laying and jointing in true line and level 110 diametre U.P.V.C (TypeB)
conforming to IS 13592-1992 with one end plain and other end socketed with rubber ring,&
fittings conforming to ISI 14735-1999 of approved make for drainage system pipe line,pipe shall
be jointed with each other with rubber lubricant,pipe shall be fixed on wall using of PVC clamp of
the size 110 mm diametre x 149 mm length x145 mm heigh at every 2000 mm center to center or
shall be concealed in walls as directed including necessary fittings such as bends,shoes
etc.including testing of pipes and joints and jointed with adhesive solvent cement including cost
of all materials.
The mode of measurement shall be on Rmt. basis.
Item No. 30: Providing and fixing urinal of approved quality including connecting the urinal with
waste pipe,trap etc.complete (A) White earthen ware flat back or corner type size 430 mm x 260 mm
Providing and fixing urinal of approved quality including connecting the urinal with waste pipe,trap
etc.complete (A) White earthen ware flat back or corner type size 430 mm x 260 mm x 350 mm .
The M/s shall be on Each Basis.
Item No. :-31 Providing and fixing Urinal of approved quality including connection with trap
and with integral longitudinal flush pipe.(A) Squating plate pattern white earthen ware
Providing and fixing Urinal of approved quality including connection with trap and with integral
longitudinal flush pipe.(A) Squating plate pattern white earthen ware 550mm x 300mm.
The rate shall be for a unit of Each.
Item No. :- 32, Providing and fixing water closets quatting pan (Indian type W.C pan) size 580 mm
(earth work,bed concrte,foot rests and trap to be measured and paid for seperately)(A)Vitreous
China (I) Long pattern white colour.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Providing and fixing water closets quatting pan (Indian type W.C pan) size 580 mm (earth
work,bed concrte,foot rests and trap to be measured and paid for seperately)(A)Vitreous China (I)
Long pattern white colour.
Measurement shall be given in Each. Basis
Item No. :- 33, Providing and fixing wash down water closet (European type W.C pan) with integral
PorS trap including jointing the trap with soil pipe in cement mortar1:1(1cement:1fine sand) (seat
and cover to be measured and paid for seperately) (A) Vitreous China (I) Long pattern white colour.
Providing and fixing wash down water closet (European type W.C pan) with integral PorS
trap including jointing the trap with soil pipe in cement mortar1:1(1cement:1fine sand) (seat and
cover to be measured and paid for seperately) (A) Vitreous China (I) Long pattern white colour.
Measurement shall be given in Each. Basis
Item No.34 :- Providing and fixing wash basin with single hole for pillar tap with C.I.or
M.S.brackets painted white including sutting holes and making good the same but excluding
fittings.(A) Vitreous China:(ii) Flat Back wash basin 550mm x 400mm size.(i) In white
Providing and fixing wash basin with single hole for pillar tap with C.I.or M.S.brackets painted
white including sutting holes and making good the same but excluding fittings.(A)
Vitreous China:(ii) Flat Back wash basin 550mm x 400mm size.(i) In white colour.
The mode of measurement shall be per Each. Basis
Item No35:- Providing and fixing angle cock of 15 mm dia of "Ess Ess" trend series or
equivalent standard make as approved by Engineer in charge all complete.
Providing and fixing angle cock of 15 mm dia of "Ess Ess" trend series or equivalent standard
make as approved by Engineer in charge all complete.
Measurement shall be given in No. Basis
Item No. 36 :- Providing and fixing S.W.gully trap with C.I.grating brick masonry chamber and
water tight C.I.cover with frame of 300 mm x 300 mm size (inside) with standard
weight.(i) Square mouth traps.(B)150 mm x 100 mm size P or R type
Providing and fixing S.W.gully trap with C.I.grating brick masonry chamber and water tight
C.I.cover with frame of 300 mm x 300 mm size (inside) with standard weight.(i) Square mouth
traps.(B)150 mm x 100 mm size P or R type
The mode of measurement shall be on No. basis.
Item No. 37 :- Providing erecting and fixing double coated PVC.(ISI) water tank of required
capacity each with all necessary fittings and connection etc.complete on terrace.
Providing erecting and fixing double coated PVC.(ISI) water tank of required capacity each
with all necessary fittings and connection etc.complete on terrace.
The mode of measurement shall be on Lit. basis.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No. 38 :- Providing and fixing 100 mm size P or S trap for water closet squatting pan
including jointing the trap with the pan and soil pipe in cement Mortar1:1 (1-
Cement : 1-Fine sand) (A) Vitreous China.
Providing and fixing 100 mm size P or S trap for water closet squatting pan including
jointing the trap with the pan and soil pipe in cement Mortar1:1 (1-Cement : 1-Fine sand) (A)
Vitreous China.
The mode of measurement shall be on Each basis.
Item No. 39 :- Providing and fixing in Cement Mortar1:3 (1-Cement:3-coarse sand) a pair of
white vitreous China 250 mm x 130 mm x 30 mm foot rest to long pattern squatting
pan water closet.
Providing and fixing in Cement Mortar1:3 (1-Cement:3-coarse sand) a pair of white
vitreous China 250 mm x 130 mm x 30 mm foot rest to long pattern squatting pan water closet..
The mode of measurement shall be on Each basis.
Item No. 40: Providing and fixing 12.5 Litres low level flushing cistern with a pair,of C.I.or Mild
brackets,complete with fittings such as lead valveless syphon,15mm nominal size brass ball valve with
poly thene float,C.P brass handle unions and couplings for connections,with inlet,outlet and overflow
pipes,40 mm dia.porcelain enamelled flush bend including cutting holes in walls and making good the
same connecting the flush bend with cistern and closet (over flow pipe to be measured and paid for
separately) (A) Vitreous China (I) In white colour
Providing and fixing 12.5 Litres low level flushing cistern with a pair,of C.I.or Mild
brackets,complete with fittings such as lead valveless syphon,15mm nominal size brass ball valve with poly
thene float,C.P brass handle unions and couplings for connections,with inlet,outlet and overflow pipes,40
mm dia.porcelain enamelled flush bend including cutting holes in walls and making good the same
connecting the flush bend with cistern and closet (over flow pipe to be measured and paid for separately)
(A) Vitreous China (I) In white colour
The M/s shall be on Each Basis.
Item No. :-41 Providing and fixing in position with clamps etc.32 mm nominal internal
diameter galvanised steel tube flush pipe for high level flushing cistern including connecting
the flush pipe with cistern and closet and making good the walls and floors.
Providing and fixing in position with clamps etc.32 mm nominal internal diameter galvanised steel
tube flush pipe for high level flushing cistern including connecting the flush pipe with cistern and
closet and making good the walls and floors.
The rate shall be for a unit of one Running metre.
Item No. :- 42, Providing and fixing G.I.inlet connection for flush pipe with W.C. Pan
Providing and fixing G.I.inlet connection for flush pipe with W.C. Pan.
Measurement shall be given in Each Basis
Item No. :- 43, Providing and fixing plastic seat and cover for wash down water closer with C.P.brass
hinges and rubber buffers. (B) Black plastic seal and cover..
Providing and fixing plastic seat and cover for wash down water closer with C.P.brass
hinges and rubber buffers. (B) Black plastic seal and cover.
Measurement shall be given in Each Basis
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No.44 :- Providing and fixing screw down bib taps of following size.(A) Brasss crew
down bib tap polished bright. (i) 15mm dia.
Providing and fixing screw down bib taps of following size.(A) Brasss crew down bib tap polished
bright. (i) 15mm dia.
The mode of measurement shall be per Each Basis
Item No 45:- Providing and fixing brass screw down stop tap.(A) 15mm dia.
Providing and fixing brass screw down stop tap.(A) 15mm dia.
Measurement shall be given in Each Basis
Item No. 46 :- Providing and fixing Gun metal check or non-return full way wheel valve.
Providing and fixing Gun metal check or non-return full way wheel valve.
The mode of measurement shall be on Each basis.
Item No. 47 :- Providing and fixing chromium plated brass half turn flush cock of approved
quality including fixing in pipe line etc.complete.
Providing and fixing chromium plated brass half turn flush cock of approved quality
including fixing in pipe line etc.complete.
The mode of measurement shall be on Each basis.
Item No. 48 :- Providing and fixing cast iron (Spun) Nahni trap of the following nominal
diameter of self cleaning design with C.I.screaed down or higned grating including
cost of cutting and making good the walls and floor100 mm inlet and 50 mm
outlet.(C)100mm dia.
Providing and fixing cast iron (Spun) Nahni trap of the following nominal diameter of self
cleaning design with C.I.screaed down or higned grating including cost of cutting and making
good the walls and floor100 mm inlet and 50 mm outlet.(C)100mm dia.
The mode of measurement shall be on Each basis.
Item No. 49 :- Providing and fixing Rubber plug for sink or wash basin.
Providing and fixing Rubber plug for sink or wash basin.
The mode of measurement shall be on Each basis.
Item No. 50: Providing and fixing chromium plated,bottle trap with necessary couplings of approved
quality for wash basin.
Providing and fixing chromium plated,bottle trap with necessary couplings of approved quality for
The M/s shall be on Each Basis.
Item No. :-51 Providing and fixing ball cock of approved.quality as directed.(A) Copper
Metal (i) 25mm dia.
Providing and fixing ball cock of approved.quality as directed.(A) Copper Metal (i) 25mm dia.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The rate shall be for a unit of Each .
Item No. :- 52, Providing and fixing ball cock of approved.quality as directed.(B) Abonite (i) 25mm
Providing and fixing ball cock of approved.quality as directed.(B) Abonite (i) 25mm dia.
Measurement shall be given in Each Basis
Item No. :- 53, Supplying, erecting, testing & commitioning of horizontal non-clog centrifugal
pump set of 1.5 HP of standard make against the total monometric head of 15 mt as per specification
including motor starter single phase preventer/liquid level controller ,GI fitting check valve etc.
coplete as directed.
Supplying, erecting, testing & commitioning of horizontal non-clog centrifugal pump set of
1.5 HP of standard make against the total monometric head of 15 mt as per specification including
motor starter single phase preventer/liquid level controller ,GI fitting check valve etc. coplete as
Measurement shall be given in No. Basis
Item No. 54 :- Making connection to the ex.M.H.in running sewer incl. Dewatering and
other required machinery etc. of following dia pipes at any convenient time. All damaged
work shall be well repaired as per instructions. etc..complete.
Making connection to the ex.M.H.in running sewer incl. Dewatering and other required machinery
etc. of following dia pipes at any convenient time. All damaged work shall be well
repaired as per instructions. etc..complete.
The mode of measurement shall be per No. Basis
Item No 55:- Providing and jointing stoneware pipes including excavation upto 2 Mt.
refilling, transporting pipes to worksite,unloading,lowering in trench,jointing material such as
cement,sand,hemp bitumen as directed,including watering the trenches spreading and
carting away of surplus material as directed by engineer in charge.
Providing and jointing stoneware pipes including excavation upto 2 Mt. refilling, transporting
pipes to worksite,unloading,lowering in trench,jointing material such as cement,sand,hemp
bitumen as directed,including watering the trenches spreading and carting away of surplus
material as directed by engineer in charge.
Measurement shall be given in Rmt. Basis
Item No. 56 :- Constructing a sink (chowkedi) with C.C.1:2:4,12cm.thick over B.B.masonry in
C.M,(1:6 ) in front and dwarf wall 1.0 Mt.high and 23 cm.thick cement plaster to
masonry/in C.M.1:3) and cement concrete flooring in 1:2:4:mix 5 cm.dia.drain pipe
etc.complete.(at health dept and MH Dept)
Constructing a sink (chowkedi) with C.C.1:2:4,12cm.thick over B.B.masonry in C.M,(1:6 ) in
front and dwarf wall 1.0 Mt.high and 23 cm.thick cement plaster to masonry/in C.M.1:3) and
cement concrete flooring in 1:2:4:mix 5 cm.dia.drain pipe etc.complete.(at health dept and MH
The mode of measurement shall be on Rmt. basis.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No. 57 :- Providing and fixing MS structure from square and rectangle pipes,angles,flats
etc of required size for above mentioned granite board of suitable size mentioned
by Engineer in charge.
Providing and fixing MS structure from square and rectangle pipes,angles,flats etc of
required size for above mentioned granite board of suitable size mentioned by Engineer in
The mode of measurement shall be on kg. basis.
Item No. 58 :- Supplying and fixing of 380 mm H x 300 B Kerb block for Central Verge in M-20
grade using 20 mm L x 150 mm nominal size black trap aggregate of Sevaliya/Timba
or equivalent quality for pre-cast blocks, reasonably exposed finish/ formwork,
mould with well equipped with vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of formwork etc. complete. The
rate shall also include necessary cutting of asphalt, fixing the Kerb stones in line and
level on 5 cm thick sand bedding with necessary equipments and materials. The rate
shall also include the flush pointing in CM (1:3) for all joints of the kerbstones. Filling
of zari alone the sides of the kerb stone fixed with Bituminous concrete / C.C. mixed
in proper position to flush with the road surface as directed by Engineer in change to
form a portable mixture. In any case Gravel or such type of materials shall not be
allowed for production.
Supplying and fixing of 380 mm H x 300 B Kerb block for Central Verge in M-20 grade
using 20 mm L x 150 mm nominal size black trap aggregate of Sevaliya/Timba or equivalent
quality for pre-cast blocks, reasonably exposed finish/ formwork, mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the
cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt, fixing the
Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and
materials. The rate shall also include the flush pointing in CM (1:3) for all joints of the kerbstones.
Filling of zari alone the sides of the kerb stone fixed with Bituminous concrete / C.C. mixed in
proper position to flush with the road surface as directed by Engineer in change to form a
portable mixture. In any case Gravel or such type of materials shall not be allowed for production.
The mode of measurement shall be on Rmt. basis.
Item No. 59 :- Labour work for fixing interlocking blocks / any kind of pavement on up to
mm th sand bedding, levelling,watering and fixing in line & level as well cleaning the
site etc.comp. as directed.
Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm th sand
bedding, levelling,watering and fixing in line & level as well cleaning the site etc.comp. as
The mode of measurement shall be on Smt. basis.
Item No. 60: Providing & Fixing 3 mm thick F.R.P.sheet of Approved Quality & Color / Pattern as
per Consultant's design also includes required fabrication structure in the grid of 2'-0x2'-0 size using
hollow pipe of 16 gauge & size 2"x1" & 1"x1",G.I. & Bitumen Washers,Silicon paste application for
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
fixing the sheet.Rate also include necessary bending,cutting,labour charges,Zinc Primer coat & Two
coats of oil painting of color as approved by consultants & making good the wall.(N.S.)
Providing & Fixing 3 mm thick F.R.P.sheet of Approved Quality & Color / Pattern as per
Consultant's design also includes required fabrication structure in the grid of 2'-0x2'-0 size using hollow
pipe of 16 gauge & size 2"x1" & 1"x1",G.I. & Bitumen Washers,Silicon paste application for fixing the
sheet.Rate also include necessary bending,cutting,labour charges,Zinc Primer coat & Two coats of oil
painting of color as approved by consultants & making good the wall.(N.S.)
The M/s shall be on Sqmt. Basis.
Item No. :-61 Providing and fixing 1.20 meter high fencing with 2.0 meter long M.S angle
posts 40mm x 40mm x 6mm and oil painting three coats,fixed at 2.50 meter C/C with five
horizontal lines and two diagonals of galvanised steel barbed wire weighing
Kg/100Rmt,strained and fixed to posts with G.I staples,including fixing the posts in ground
with 0.50 meter x 0.50 meter x 0.50 meter block in C.C1:5:10 etc complete.
Providing and fixing 1.20 meter high fencing with 2.0 meter long M.S angle posts 40mm x 40mm
x 6mm and oil painting three coats,fixed at 2.50 meter C/C with five horizontal lines and two
diagonals of galvanised steel barbed wire weighing 9.38 Kg/100Rmt,strained and fixed to posts
with G.I staples,including fixing the posts in ground with 0.50 meter x 0.50 meter x 0.50 meter
block in C.C1:5:10 etc complete.
The rate shall be for a unit of one Running metre.
Item No. :- 62, Repairing of Exit. Wooden/steel doors incl necessary smithy publlick
carpentry work and also including necery fixtures and fastening req. etc comp. directed.
Repairing of Exit. Wooden/steel doors incl necessary smithy publlick carpentry work and also
including necery fixtures and fastening req. etc comp. directed.
Measurement shall be given in No. Basis
Item No. :- 63, P/L brickbats sand concrete (1:2) of one part of sand and two part of old
brickbats including spreading, laying, ramming, watering and consolidation etc complete as directed.
P/L brickbats sand concrete (1:2) of one part of sand and two part of old brickbats
including spreading, laying, ramming, watering and consolidation etc complete as directed.
Measurement shall be given in Cmt. Basis
Item No.64 :- Providing cement vata ( 10 cm. x 10 cm. size) quarter round in cement mortar
1:1 including neat cement finishing, watering etc. complete.
Providing cement vata ( 10 cm. x 10 cm. size) quarter round in cement mortar 1:1 including neat
cement finishing, watering etc. complete.
The mode of measurement shall be per Rmt. Basis
Item No 65:- Carring out plinth treatment to post construction / existing structure by
spraying chemical solution for termite control treatment including labour and material
consistment with I.S.I specification. Using Chlordene and Chiorpurfiles 20 EC. As Per
6131_paret-II Consentration Weight one percent is recommended i.e one litre 20 EC chemical
emulsion with 19 liter give 1 % concrentration inclusive of one litre chemical emulsion
appication at the rate of 5 Litre chemical / Sqm of surface is recommended as per I.S.
Carring out plinth treatment to post construction / existing structure by spraying chemical
solution for termite control treatment including labour and material consistment with I.S.I
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
specification. Using Chlordene and Chiorpurfiles 20 EC. As Per 6131_paret-II Consentration
Weight one percent is recommended i.e one litre 20 EC chemical emulsion with 19 liter give 1 %
concrentration inclusive of one litre chemical emulsion appication at the rate of 5 Litre chemical /
Sqm of surface is recommended as per I.S.
Measurement shall be given in Smt. Basis
Item No. 66 :- Providing and fixing factory made polyvinyl chioride(PVC)door frame of the
size50x47mm with a wall thickness of 5mm,madeou to fextruded 5mm rigid PVC
foam sheet,mitre out of two corner sand joined with 2nos.of 150 mm long brackets
of 15x15mmM.s.Squaretubes.The two vertical door profiles are to ber einforced
with 19x19mm m.s. square tube of 19 gauge,EPDM rubber gasket weather seal to be
provided throughout the frame. The door frame shal be fixed to the wall using
65/100 mm long M.S. screws through the frame by using PVC fasteners. Aminiumum
of 4nos. osscrews to be provided for each vertical members and minium 2nos. for
horizontal members etc. complete as per manufactures specification and direction
of Engineer in charge.
Providing and fixing factory made polyvinyl chioride(PVC)door frame of the size50x47mm
with a wall thickness of 5mm,madeou to fextruded 5mm rigid PVC foam sheet,mitre out of two
corner sand joined with 2nos.of 150 mm long brackets of 15x15mmM.s.Squaretubes.The two
vertical door profiles are to ber einforced with 19x19mm m.s. square tube of 19 gauge,EPDM
rubber gasket weather seal to be provided throughout the frame. The door frame shal be fixed to
the wall using 65/100 mm long M.S. screws through the frame by using PVC fasteners.
Aminiumum of 4nos. osscrews to be provided for each vertical members and minium 2nos. for
horizontal members etc. complete as per manufactures specification and direction of Engineer in
The mode of measurement shall be on Smt. basis.
Item No. 67 :- Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm
thick, M-35 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for footpath, parking areas, service
lanes and other areas as mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould, Rate providing and laying
paver blocks as per required grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks shall be executed in line and
level by skill mason of flooring work only. It should be laid in such a way that the no
cutting of the paver block to be necessary. if cutting of paver block necessary then it
should be cut by machine only and carting. The finished surface of the paver block
shall have resonably good, plain finished. Paver blocks shall be compacted and shall
be relaid if necessary. Gravel or such type of materials shall not be allowed for
production. Laying on 5 cms thick sand bedding. (SOR 2016 Central
Verge/Footpath/ Stone Paving, sr no.3).
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of
mm nominal size for footpath, parking areas, service lanes and other areas as mentioned in the
drawing / instruction of engineer in charge. Cost includes formworks using rubber mould, Rate
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
providing and laying paver blocks as per required grading and specification. The paver block shall
be mechanically compacted. The work of paving blocks shall be executed in line and level by skill
mason of flooring work only. It should be laid in such a way that the no cutting of the paver block
to be necessary. if cutting of paver block necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall have resonably good, plain finished. Paver
blocks shall be compacted and shall be relaid if necessary. Gravel or such type of materials shall
not be allowed for production. Laying on 5 cms thick sand bedding. (SOR 2016 Central
Verge/Footpath/ Stone Paving, sr no.3).
The mode of measurement shall be on Smt. basis.
Item No. 68 :- Providing and fixing sheet glasss elected quality (type-C) bedded in putty and
fixed with wooden beading including the cost of wooden beadings of first class teak
wood and necessary cutting of glass.[1] 5 mm thick
Providing and fixing sheet glasss elected quality (type-C) bedded in putty and fixed with
wooden beading including the cost of wooden beadings of first class teak wood and necessary
cutting of glass.[1] 5 mm thick.
The mode of measurement shall be on Smt. basis.
Item No. 69 :- Providing and fixing eco-friendly light weight calcium silicate false ceiling tiles
having Tegular edge & 15mm Thick Densified edges on the Tile Periphery for Extra
Strength The Light weight calcium silicate ceiling tiles shall have, light reflection 85%
non-combustible as per B.S.476 part IV , 100% humidity resistance and also having
thermal conductivity 0.043°w/mKC. for the best thermal Insulation. The Light weight
calcium Silicate tiles hall be of approved texture Fine fissured / Spintone / Cosmos
having NRCvalue of 0.5 & Globe having NRCvalue of 0.75NR Corequivalent of size
595 X 595 mm to be laid on true horizontal level suspended interlocking metal grid
of hot dipped galvanized steel sections (galvanizing @ 120 grams per sqm including
both side) consisting of main ‘T’ runner suitably spaced at joints to get required
length and size of 24X38mm made from 0.30 mm thick (minimum) sheet, 1200 mm
centre to centre, and cross ‘T’ of size 24 X 28 mm made out of 0.33mm (Minimum)
sheet spaced 1200mm along spaced badded in case of Ready Mix C l i ii f di.
Providing and fixing eco-friendly light weight calcium silicate false ceiling tiles having
Tegular edge & 15mm Thick Densified edges on the Tile Periphery for Extra Strength The Light
weight calcium silicate ceiling tiles shall have, light reflection 85% non-combustible as per B.S.476
part IV , 100% humidity resistance and also having thermal conductivity 0.043°w/mKC. for the
best thermal Insulation. The Light weight calcium Silicate tiles hall be of approved texture Fine
fissured / Spintone / Cosmos having NRCvalue of 0.5 & Globe having NRCvalue of 0.75NR
Corequivalent of size 595 X 595 mm to be laid on true horizontal level suspended interlocking
metal grid of hot dipped galvanized steel sections (galvanizing @ 120 grams per sqm including
both side) consisting of main ‘T’ runner suitably spaced at joints to get required length and size of
24X38mm made from 0.30 mm thick (minimum) sheet, 1200 mm centre to centre, and cross ‘T’
of size 24 X 28 mm made out of 0.33mm (Minimum) sheet spaced 1200mm along spaced badded
in case of Ready Mix C l i ii f di.
The mode of measurement shall be on Smt. basis.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Item No. 89: Providing and fixing FRP frame size 125x65 mm and 35mm thick FRP shutter with
wood grain raised panneled design finish shutter having extra reinforcement on sides & edges in
Gelcoat finish. The core of the shutter & frame is to be filed up with injected polyurethene foam done
insitu along with embedded wooden pieces for stiffening & also taking hinges & fintures. The whole
FRP frame & shutter is to be waterproof weather proof, termite proof & resistance to mild acid /
alkali. Rates are to be inclusive of S. Shinges with fastener sleeve & alluminium fixtures & fastenings
Providing and fixing FRP frame size 125x65 mm and 35mm thick FRP shutter with wood grain
raised panneled design finish shutter having extra reinforcement on sides & edges in Gelcoat finish. The
core of the shutter & frame is to be filed up with injected polyurethene foam done insitu along with
embedded wooden pieces for stiffening & also taking hinges & fintures. The whole FRP frame & shutter is
to be waterproof weather proof, termite proof & resistance to mild acid / alkali. Rates are to be inclusive of
S. Shinges with fastener sleeve & alluminium fixtures & fastenings .
The M/s shall be on Smt. Basis.
Item No. :-90 Providing and fixing 35 mm thick shutters for doors and windows & clear
story windows including black enamelled butt hinges with necessary screws. (A) Indianteak
wood (I) Fully panalled.
Providing and fixing 35 mm thick shutters for doors and windows & clear story windows including
black enamelled butt hinges with necessary screws. (A) Indianteak wood (I) Fully panalled.
The rate shall be for a unit of Smt.
Item No. :- 91, Providing and fixing flush door shutters solid core construction with frame of first
class hard wood with cross band and face veneeror plywood face panels including an odized
alluminium but thinges with necessary screws, (B)Non-decorative type & block board core an odized
alluminium but thinges in flush door shutters 35mm. thick.
Providing and fixing water closets quatting pan (Indian type W.C pan) size 580 mm (earth
work,bed concrte,foot rests and trap to be measured and paid for seperately)(A)Vitreous China (I)
Long pattern white colour.
Measurement shall be given in Smt. Basis
1. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
2. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken
to mean as a reference to the latest edition of the same in force on the date of agreement.
3. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
4. All measurements and computations, unless otherwise specified, shall be carried out
nearest to the following limits:
(i) Length, width and depth (height)-------0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
5. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
6. Where no lead is specified, it shall mean "all leads"
7. Lift shall be measured from plinth level.
8. Upto "floor two level" means actual height of floor (Maxi. 4 M.) upto 3 Mt. above plinth
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
9. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
10. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the
material and prefix 'M' e.g. 'M-5'.
11. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on
site or materials used in the work found defective at a later date.
12. The contract rate of the item of work shall be for the work completed in all respects.
13. No collection of materials shall be made before it is got approved from the Engineer-in-
14. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be done at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
15. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work.
16. NO materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
17. All works shall be carried out in a workmanlike manners per the best techniques for the
particular item.
18. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in
sufficient numbers and in good working condition on the site of the work.
19. The mode, procedure and manner of execution shall be such that it does not cause damage
or over loading of the various components of the structure during execution or after
completion of the structure.
20. Special modes of construction not adopted in general Engineering practice, if proposed to
be adopted by the Contractor, shall be considered only if the contractor provides
satisfactory evidence that such special mode of construction is safe, sound and helps in
speedy construction and completion of work to the required strength and quality.
Acceptance of the same by the Engineer-in-Charge shall not, however, absolve the
contractor of the responsibility of any adverse effects and consequences of adopting the
same in the course of execution of completion of the work.
21. All installations pertaining to water supply and fixtures thereof as well as drainage lines
and sanitary fittings shall be deemed to be completed only after giving satisfactory tests by
the Contractor.
22. The contractor shall be responsible for observing the rules and regulations imposed under
"Minor Minerals Act", and such other laws and rules prescribed by Government from time
23. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
24. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
25. Approval to any of the executed items for the work does not in any way relieve the
contractor of his responsibility for the correctness, soundness and strength of the structure
as per the drawings and specification.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
SPECIFICATIONS OF MATERIALS
1.1. Water shall not be salty or brackish and shall be clean, reasonably clear and free
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic matter
and other deleterious material which will either weaken the mortar or concrete or cause
efflorescence or attack the steel in R.C.C Container for transport, storage and handling of
water shall be clean. Water shall conform to the standards specified in I.S.456-1978.
1.2. If required by the Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall be made by means of standard cement tests for soundness, time of setting
and mortar strength as specified in I.S.269-1976. Any indication of unsoundness, change in
time of setting by 30 minutes or more or decrease of more than 10 per cent in strength of
mortar prepared with water sample when compared with the results obtained with mortar
prepared with distilled water shall be sufficient cause for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It
shall be free of elements which significantly affect the hydration reaction or otherwise
interfere with the hardening of concrete during curing or those which produce
objectionable stains or other unsightly deposits on concrete or mortar surfaces.
1.4. Hard and bitter water shall not be used for curing.
1.5. Portable water will be generally found suitable for curing mortar or concrete.
2.1. Lime shall be hydraulic lime as per I.S. 712-1973. Necessary test shall be carried out as per
I.S. 6932 (Parts I to X),
2.2. The following field tests for limes are to be carried out:
(1) A very rough idea can be formed about the type of lime by its visual examination i.e. fat
lime bears pure white colour, lime in form of porous lumps of dirty while colour indicates
quick lime, and solid lumps are the unburnt lime stone.
(2) Acid tests for determining the carbonate content in lime, Excessive amount of impurities
and rough determination of class of lime.
2.3. Storage shall comply with I.S. 712-1973. The slaked lime, if stored, shall be kept in a
weather proof and damp-proof shed with impervious floor and sides to protect it against
rain, moisture, weather and extraneous materials mixing with it. All lime that has been
damaged in any way shall be rejected and all rejected materials shall be removed from site
2.4. Field testing shall be done according to I.S. 1624-1974 to show the acceptability of
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag
cement as per I.S. 455-1976.
M-4. White Cement :
4.1 The white cement shall conform to I.S. 80412-E
M-5. Coloured Cement:
5.1 Coloured cement shall be with white or gray Portland cement as specified in the item of
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed
10% of cement used in the Mix. The mixture of pigment shall be properly grounded to
have a uniform colour and shade. The pigments shall have such properties to provide for
durability under exposure to sunlight and weather.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
5.3 The pigment shall have the property such that it is neither by the cement nor detrimental to
6.1. Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free
from injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali,
salts organic matter, loam, mica or another deleterious substance and shall be got approved
from the Engineer-in-charge. The sand shall not contain more than 8 percent of silt as
determined by field test. If necessary the sand shall be washed to make it clean.
6.2. Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not
The sieve analysis of coarse shall be as under:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
6.3 Fine Sand:The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
M-7. Stone Dust :
7.1. This shall be obtained from crushing hard black trap or equivalent. It shall not contain more
than 8% of silt as determined by field test with measuring cylinder. The method of
determining silt contents by field test is given as under :
7.2. A sample of stone dust to be tested shall be placed without drying in 200 mm. measuring
cylinder. The quantity of the sample shall be such that it fills the cylinder upto100 mm.
mark. The clean water shall be added upto 150 mm. mark. The mixture shall be stiffed
vigorously and the content allowed to settle for 3 hours.
7.3. The height of silt visible as settled layer above the stone dust shall be expressed as
percentage of the height of the stone dust below. The stone dust containing more than 8%
silt shall be washed so as lowering the silt content within the allowable limit.
7.4. The fineness modulus of stone dust shall not be less than 1.80.
M-8. Stone Grit:
8.1. Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of
proper gradation and free from skin or coating likely to prevent adhesion of mortar Grit
shall generally be cubical in shape and as far as possible flaky elongated pieces shall be
avoided. It shall generally comply with the provisions of I.S. 383-1970. Unless special
stone of particular quarries is mentioned, grit shall be obtained from the best black trap or
equivalent hard stone as approved by the Engineer-in-charge. The grit shall have no
deleterious reaction with cement.
8.2. The grit shall conform to the following gradation as per sieve analysis:
I.S.Sieve Percentage by I.S.Sieve Percentage by
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Designation through Sieve Designation through Sieve
8.3. The crushing strength of grit will be such as to allow the concrete in which it is used to
used to built up the specified strength of concrete.
8.4. The necessary tests for grit shall carried out as per the requirements of I.S.2386(Parts I to
VII) 1963, as per instructions of the Engineer-in-charge. The necessity of test will be
decided by the Engineer-in-charge. The necessity of test will be decided by the Engineer-
9.1 Cinder is well burnt furnace residue, which has been fused or sintered into lumps of
9.2 Cinder aggregates shall be well burnt furnace residue obtained from furnace using coal fuel
only. it shall be sound clean free from clay, dirt ash or other deleterious matter.
9.3 The average grading for cinder aggregates shall be as mentioned below :
I.S.Sieve Percentage I.S.Sieve Percentage
Designation passing Designation passing
M-10. Lime Mortar :
10.1. Lime shall confirm to specification M-2 Water shall conform to specification M-1.
Sand: Sand Shall conform to specification M-6.
10.2. Proportion of Mix : 10.2.1. Mortar shall consist of such proportions of slaked lime and
sand as may be specified in the item. The slaked lime and sand be measured by volume.
10.3. Preparation of Mortar :
10.3.1. Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power driven mill
shall be used for preparation of lime mortar. The slaked lime shall be placed in the mill in
an even layer and ground for the 180 revolutions with a sufficient water. Water shall be
added as required during grinding (care being taken not to add more water) that will bring
the mixed material to a consistency of stiff paste. Thoroughly wetted sand shall then be
added evenly and the mixture ground for another 180 revolutions.
10.4. Storage : 10.4.1 Mortar shall always be kept damp, protected form sum and rain till used up
, covering it by tarpaulin or open sheds.
10.5. Use : 10.5.1 All mortar shall be used as soon as possible after grinding it should be used on
the day on which it is prepared. But in no case mortar made earlier than 36 hours shall be
permitted for use.
M-11. Cement Mortar:
11.1 Water shall conform to specification M –1. Cement : Cement shall conform to
specification M-
Sand: Sand shall conform to M-6
11.2 Preparation of Mix :11.2.1 Cement and shall be mixed to specified proportion, sand being
measured by measuring boxes. The proportion of cement will be by volume on the basic of
50 kg / Bag of cement being equal to 0.0342 Cu.m. The mortar may be hand mixed or
machine mixed as directed.
11.3 Preparation of mortar : 11.3.1 In hand mixed mortar cement and sand in the specified
proportions shall be thoroughly mixed dry on a clean impervious platform by turning over
at least 3 times or more till a homogenous mixture of uniform colour is obtained., Mixing
platform shall be so arranged that no delirious extraneous material shall get mixed with
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
mortar or mortar shall be gradually added and thoroughly mixed to form a stiff plastic mass
of uniform colour so that each particle of sand shall be completely covered with a film of
wet cement. The water cement ratio shall be adopted as directed.
11.3.1 The mortar so prepared shall be used within 30 minutes of adding water Only such quantity
of mortar shall be prepared as can be used within 30 minutes.
M-12 Stone Coarse Aggregate For nominal Mix Concrete :
12.1 Coarse aggregate shall be machine crushed stone of black trap or equivalent and be hard,
strong m dense, durable clean and free form skin and coating likely to prevent proper
adhesion for mortar.
12.2 The aggregate shall generally be cubical in shape. Unless special stones of particular
quarries are mentioned aggregates shall be machine crushed from the best black trap or
equivalent hard stone as approved. Aggregate shall have no deleterious reaction with
cement. The size of the coarse aggregate for plain cement concrete and ordinary reinforced
cement concrete shall generally be as per the table given below. However in case of
reinforced cement concrete the maximum limit may be restricted to 6 mm. less than the
minimum lateral clear distance between bars or 6 mm. less than the cover, Whichever is
l.s.sieve percentage passing for single I.S.Sieve Percentage passing for single
sized aggregates of nominal Designati aggregates of Nominal size
NOTE: This percentage may be carried some what by Engineer-in-charge when considered
necessary for obtaining better density and strength of concrete.
12.3. The grading test shall be taken in the beginning and at the change of source of materials.
The necessary test indicated in I.S. 383-1970 and I.S. 456-1978 shall have to be carried out
to ensure the acceptability. The aggregates shall be stores separately and handled in such a
manner as to prevent the intermixing of different aggregates. If the aggregates. are covered
with dust, they shall be washed with water to make them clean.
M-13. Black Trap or Equivalent Hard Stone Coarse :
13.1 Aggregate For Design Mix Concrete :Coarse aggregate shall be of machine crushed stone
of black trap or equivalent hard stone and be hard strong dense, durable clean and free skin
and coating likely to prevent proper adhesion of mortar.
13.2 The aggregates shall generally be cubical in shape. Unless special stones of particular
quarries are mentioned, aggregates shall be machine crushed from the best, black trap or
equivalent hard stones as approved. Aggregate shall have no deleterious reaction with
13.3 The necessary tests indicated in I.S. 383-1970 and I.S. 456-1978 shall have to be carried
out to ensure the acceptability of the material.
13.4 If aggregate is covered with dust it shall be washed with water to make it clean.
M-14. Brick Bats Aggregate :
14.1 Brick bat aggregate shall be broken from well burnt or slightly over burnt and dies brick. It
shall be homogeneous in texture roughly cubical shape, clean and free from dirt of any
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
other foreign material. The brick bats shall be of 40 mm. to 50 mm. size unless otherwise
specified in the item. The unburnt or over burnt brick bats shall not be allowed.
14.2 The brick bats shall be measured by volume by suitable boxes or as directed.
15.1 The bricks shall be hand or machine moulded and made from suitable soils and kiln-burnt.
They shall be free from crack and nodules of free lime. They shall have smooth rectangular
faces with sharp corers and shall be of uniform colour.
The bricks shall be moulded with a frog of 100 mm. X 40 mm. and 10 mm. to 20 mm. deep
on one of its flat sides. The bricks shall not break when thrown on the ground from a height
15.2 The size of modular bricks shall be 190 mm. X 90 mm. X 90 mm.
15.3 The size of the conventional bricks shall be as under : (9”x4 ” x 2 ”)225 x 110 x 75 mm.
15.4 Only bricks of one standard size shall be used on one work. The following tolerances shall
be permitted in the conventional size adopted in a particular work.
Length : 1.8 (3.0 mm.) Width : 1/6 “ (1.51 mm.) Height : 1/6” 1.50 mm.)
15.5 The crushing strength of the bricks shall not be less than 35 Kg./Sq.Cm. The average water
abscriptics shall not be more than 20 prevent by weight. Necessary tests for crushing
strength and water absorption etc. shall be carried out as per I.S. .3493 (Part-I to IV)
16.1 The stone shall be of the specified variety such as Granite/Trap Stone. Quartzite or any
other type of good hard stones. The stones shall be obtained only from the approved quarry
and shall be hard, sound, durable and free from defects like cavities, cracks, sand holes,
flaws, injurious veins, patches of loose or soft materials etc. and weathered portions and
other structural defects or imperfections tending to affect their soundness and strength. The
stone with round surface shall not be used. The percentage of water absorption shall not be
more that 5% of dry weight, When tested in accordance with I.S. 1134-1974. The
minimum crushing strength of the stone shall be 200 kg./Sq. Cm. unless otherwise
16.2 The samples of the stone to be used shall be got approved before the work is started.
16.3 The Khanki facing stone shall be dressed by chisel as specified in the item for khanki
facing in required shape and size. The face of stone shall be so dressed that the bushing on
the exposed ace shall not project by more than 40 mm. from the general wall surface and
on face to be plastered it shall not project by more than 19 mm. nor shall it have
depressions more than 10 mm. from the average wall surface.
M-17. Laterite Stone :
17.1 Laterite stone shall be obtained from the approved quarry. It shall be compacted in texture,
sound, durable and free from soft patches. It shall have a minimum crushing strength of
100 K.G/S.q. Cm. in its dry condition. It shall not absorb water more than 20% of its own
weight, When immersed for 24 hours in water. After quarrying the stone shall be allowed
to weather for some time before using in work.
17.2 The stone shall be dressed into regular rectangular blocks so that all faces are free from
waviness and unevenness, edges true and square.
17.3 Those types of stone in which white clay occur, should not be used.
17.4 special corner stones shall be provided where so directed.
M-18. Mild Steel Bars :
18.1 Mild steel bars reinforcement for R.C.C work shall conform to I.S. 432(Part-II) 1966 and
shall be tested quality. It shall also comply with relevant part of I.S. 456-1978.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
18.2 All the reinforcement shall be clean and free from dirt, paint, grease, mile scale or loose or
thick rust at the time of placing.
18.3 For the purpose of payment, the bar shall be measured correct upto 100 mm. length and
weight payable worked out at the rate specified below :
1. 6mm. x 0.22 Kg./Rmt 8. 20mm. 2.47 Kg./Rmt
2. 8mm. x 0.39 Kg./Rmt. 9. 22mm. 2.98 Kg./Rmt
3. 10mm x 0.62 Kg./Rmt 10. 25mm. 3.85 Kg./Rmt
4. 12mm x 0.89 Kg./Rmt 11. 28mm. 4.83 Kg./Rmt
5. 14mm x 1.21 Kg./Rmt 12. 32mm. 6.31 Kg./Rmt
6. 16mm x 1.58 Kg./Rmt 13. 36mm. 7.99 Kg./Rmt
7. 18mm x 3.00 Kg./Rmt 14. 40mm 9.86 Kg./Rmt.
M-19. High yield Strength Steel Deformed Bars :
19.1 High yield strength steel deformed bars are either cold twisted or hot rolled, shall conform
to I.S. 1739-1966 and I.S.1139-1966 respectively.
19.2 Other provision and requirements shall conform to specification NO. M-18 for Mild steel
M-20. High Tensile Steel Wire:
20.1 The high tensile wires for the use in prestressed concrete work shall conform to I.S. 2090-
20.2 The tensile strength of the high tensile steel bars shall be as specified in the item. In
absence of the given strength, the minimum strength shall be taken as per para 6.1 of I.S.
1785-1962. Testing shall be done as per I.S. requirements.
20.3 The high tensile steel shall be free from loose mill scale, rust oil, grease, or any other
harmful matter, Cleaning of steel bars may be carried out by immersion in solvent solution,
wire brushing or passing through a pressure box containing carborundum.
20.4 The high tensile wire shall be obtained from manufactures in coil having diameter not less
than 350 times the diameter of wire itself so that wire springs back straight back straight on
being uncoiled.
M-21. Mild Steel Binding Wire :
21.1. The mild steel wire shall be of 1.63 mm or 1.22 mm. (16 or 18 gauge) diameter and shall
conform to I.S. 280-197.
21.2. The use of black wire be permitted for binding reinforcement bars. It shall be free from
rust, Oil paint, grease, looser mile scale or any other undesirable coating which may
prevent adhesion of cement mortar.
M-22. Structural Steel :
22.1. All structural steel shall conform to I.S. 226-1965. The steel shall be free from the defects
mentioned in I.S. 226-1975 and shall have a smooth finish. The material shall have a
smooth finish. The material shall be free from loose mile scale, rust pits or other defects
affecting the strength and durability. Rivet bars shall conform to I.S. 1148-1973.
22.2. When the steel is supplied by the Contractor test certificates of the manufactures shall be
obtained according to I.S. 226-1975 and other relevant Indian Standards.
M-23. Galvanised Iron Sheets :
23.1 The galvanised iron sheets shall be plain or corrugated sheets of specified in item. The G.I.
sheets shall conform it I.S. 217-1977. The sheets shall be undamaged in carriage and
handling either by rubbing off of zinc coating or otherwise they shall have clean and bright
surface and shall be as directed as per site condition.
23.2 The length and width of G.I. sheet shall be as directed as per site condition.
M-23 (A) G.I Valleys gutter ridges :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
23.A.1. The G.I.ridges and hips shall be of plain galvanised sheets class-3 of the thickness as
specified in item. These shall be 600 mm. in width and properly bent up to shape without
damage to the sheets in process of bending.
23.A.2. Valleys gutters and flashings shall also be galvanised sheet of thickness as specified in
item. Valleys shall be 900 mm. Wide overall and flashing shall be 380 mm. wide overall.
They shall be bent to the required shape without damage to the sheet in the process of
M-24. Asbestos Cement Sheets :
24.1. Asbestos cement sheets plain, corrugated or semi corrugated shall conform to I.S. 459-
24.2. Ridges & Hips :
24.2.1 Ridges and hips shall be same thickness at that of A.C.sheets. The types of ridges suitable
for the type of sheets and locations.
24.2.2 Other accessories to be used in roof such as flashing pieces, caves filler pieces valley
gutters, north light and ventilator curves, barge boards etc. shall be standard manufacture
and shall be suitable for the type of sheets and location.
M-25. Manglore Pattern Roof Tiles :
25.1 The manglore pattern tiles shall conform to I.S. 654-1972 for Class AA or Class “A” type
as specified in item. Samples of the tiles to be provided shall be got approved from the
Engineer-in-charge. Necessary tests shall be carried out as directed.
M-26. Shuttering :
26.1. The shuttering shall be either of widen planking of 30 mm. minimum thickness with or
without steel lining roof steel plates stiffened by steel angles. The shuttering shall be
supported on battens and beams and props of vertical ballies properly cross braced togather
so as to make the centering rigid. In places of bully props, brick pillar of adequate section
built in mud mortar may be used.
26.2. The form work shall be sufficiently strong and shall have camber, so that it assumes correct
shape after deposition of the concrete and shall be able to resist forces caused by vibration
of live load of men working over it and other incidental loads associated with it. The
shuttering shall have smooth and even surface and its joints shall not permit leakage of
26.3. If at any stag of work during or after placing concrete in the structure, the form work sags
or bulges out beyond the required shape of the structure, the concrete shall be removed and
work redone with fresh concrete and adequately rigid form work. The complete from work
shall be got inspected by and got approved from the engineer-in-charge, before the
reinforcement bars are placed in position.
26.4. The props shall consist of bullies having 100 mm. minimum diameter measured at mix
length and 80 mm, at thin end and shall be placed as per design requirement. These shall
rest squarely on wooden sole plates 40 mm. thick and minimum bearing area if 0-10 sq. m.
laid on sufficiently hard base.
26.5. Double wedges shall further be provided between the sole plate and the wooden props so
as to facilitate tightening and easing of shuttering without jerking the concrete.
26.6. The timber used in shuttering shall not be so dry as to absorb water from concrete and swell
or bulge nor so green or wet as to shrink after erection. The timber shall be properly sawn
and planed on the sides and surface coming in contact with concrete. Wooden from work
with metal sheet lining or steel plates stiffened by steel angles shall be permitted.
26.7. As far as practicable, clamps shall be used to hold the forms together and use of nails and
spikes avoided.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
26.8. The surface of timber shuttering that would come in contact with concrete shall be well
wetted and coated with soap solutions before the concreting is done. Alternatively coat of
raw linseed oil or oil of approved manufacturer may be applied in place of soap solution. In
case of steel shuttering either soap solution or raw linseed oil shall be applied after
thoroughly cleaning the surface. Under no circumstances black or burnt oil shall be
26.9. The shuttering for beams and slabs shall have camber of 4 mm. per meter (1 to 250) or as
directed by the Engineer-in-charge so as to offset the subsequent deflection. For
cantilevers, The camber at free end shall be 1/50 of the projected length or as directed by
the Engineer-in-charge.
M-27. Expansion joints-Premoulded filter :
27.1 The item provides for expansion joints in R.C.C frame structures for internal joints, as well
as exposed joints, with the use of premoulded bituminous joint filler.
27.2 Premoulded bituminous joint filler, i.e. performed strip of expansion joint filler shall not
get deformed or broken by twisting, bending or other handling when exposed to
atmospheric condition. Pieces of joint filler that lave been damaged shall be rejected.
27.3 Thickness of the pre-moulded joint filler shall otherwise specified.
27.4 Premoulded bituminous joint filler shall conform to I.S. 1838-1961.
M-28 Expansion joints-Copper strips & hold fasts :
28.1 The item provide for expansion joints in R.C.C frame structure for internal joints as well as
for exposed joints with the use of necessary copper strip and hold fasts.
28.2 Copper sheet shall be of 1.25 mm. thick and of 1.25 mm. width when the ‘U’ shape in
middle. Copper strips shall have hold fast of 3 mm. diameter copper rod fixed to the plate
soldered on strip at intervals of about 30 cm. or as shown in the drawing or as directed. The
width of each flange (horizontal side) of the copper plate to be embedded in the concrete
work shall be 25 mm. Depth of ‘U’ to be provide in the expansion joint, in the copper plate
shall be of 25 mm.
M-29. Teak wood :
29.1 The teak wood shall be of good quality as required for the item to be executed. When the
kind of wood is not specifically mentioned, good Indian teak wood as approved shall be
29.2 Teak wood shall generally be free from large, loose, dead or cluster knots, flaws, shakes,
warps, twists bends or any other defects. It shall generally be uniform in substance and of
straight fibres as far as possible. It shall be free from rot, decay, harmful fungi and other
defects of harmful nature which will affect the strength durability of its usefulness for the
purpose for which it is required. The colour shall be uniform as far as possible. Any effort
like painting, using any adhesive or resins materials made to hide the defects shall render
the pieces liable to rejection by the Engineer-in-charge.
29.3 All scantlings, planks etc. shall be sawn in straight lines and planes in the direction of
grains and of uniform thickness.
29.4 The tolerances in the dimensions shall be allowed at the rate of 1.5 m.m. per face to be
29.5 First class teak wood : 29.5.1. First class teak wood shall have no individual hard and
sound knots, more than 6 sq. cm. size and the aggregate area of such knots shall not be
more than 1% of area of piece. The timber shall be closed grained.
29.6 Second Class Teak Wood : 29.6.1. No individual hard and sound knots shall be more than
15 Sq. cms. in size and aggregate area of such knots shall not-exceed 2% of the area of
M-29. (A) Non-teak wood :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The non teak-wood shall be chemically treated, seasoned as per IS Specifications and of
good quality. The type of wood shall be got approved before collecting the same on site.
Fabrication of wooden members shall be started only after approval.
For this purpose wood of Bio, Kalali, Siras, Behda, Jamun, Sisoo will be used for door
frames where as only Kalali, Siras,Halda,Kalam etc. will be permitted for shutters after
proper seasoning and chemical treatment.
The non-teak wood shall be free from large, loose, dead of cluster knots, flows, shakes
warps bends or any other defect. It shall be uniform in substance and of straight fibers as
far as possible. It shall be free rots, decay harmful fungi and other defects of nature which
effect the strength, durability or its usefulness for the purpose for which it is required. The
colour of wood shall be uniform as far as possible. The scantlings planks etc. shall be sawn
in straight lines and planes in the direction of grain and uniform thickness.
The department will use the Agency to produce certificate from forest Department in event
of Disputes and the decision of the Department shall be final and binding to the contractor.
The tolerance in the dimension shall be allowed as 1.5 mm. per face to be planed.
M-30. Wooden flush door shutters (solid core) :
30.1 The solid core type flush door shutters shall be decorative or non-decorative type as
specified in the drawing. The size and thickness of the shutter shall be as specified in
drawings or as directed. The timber species for core shall be used as per I.S. 2202- (Part-I)
1980. The timber shall be free from decay and insect attack. Knots and knot holes less than
half the width of cross-section of the members in which they occur may be permitted. Pitch
pockets, Pitch streaks and harmless pin holes shall be permissible except in the exposed
edges of the core members. The commercial plywood, cross-bands shall conform to I.S.
30.2 The face panel of the shutters shall be formed by gluing by the hot press process on both
faces of the core with either plywood or cross-bands and face veneers. The hopping
rebating opening of glazing, Venetian etc. shall be provided if specified in the drawing.
30.3 All edges of the door shutters shall be square. The shutters shall be free twist or warp in its
plane. Both faces of the shutters shall be sand papered to smooth even texture.
30.4 The shutters shall be tested for
(1) End immersion test : The test shall be carried out as per I.S. 2202 (part-I) 1980. There
shall be no delamination at the end of the test.
(2) Knife test : The face panel when tested in accordance with I.S. 1659-1979 shall pass the
(3) Glue adhesion Test : The flush door shall be tested for glue adhesive test in accordance
with I.S. 2202 (Part-I) 1980. The shutters shall be considered to have passed the test if no
delamination occurs in the glue lines in the plywood and if no single declamination more
than 80 mm. in length and more than 3 mm. in depth has occurred in the assembly glue
lines between the plywood face and the style and rail. Delamination at the corner shall be
measured continuously around the corner. Delamination at the knots, knots holes and other
permissible wood defects shall not be considered in assessing the sample.
30.5 The tolerance in size of solid core type flush door shall be as under :
In Normal thickness + 1.2 mm. In Normal height + 3 mm.
30.6 The thick of the shutters shall be uniform throughout with a permissible variation of not
more than 0.8 mm. when measured at any two points.
M-31. Aluminum doors, Windows, Ventilators.
31.1 Aluminum alloy used in the manufacture of extruded window sections shall conform to I.S.
designation HEA-WP of I.S. :733-1975 and also to I.S. Designation WVG-WP of I.S.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
1285-1975. The Section shall be as specified in the drawing and design. The fabrication
shall be done as directed.
31.2 The hinges shall be cast or extruded aluminum hinges of same type as in windows but of
31.3 The hinges shall normal be of 50 mm. projecting type. Non-projecting type of hinges may
also be used if directed. The handles of door shall be of specified in the drawing and
design. The fabrication shall be done as directed.
M-32. Rolling Shutters :
32.1 The rolling shutter shall conform to I.S. 6248-1979. Rolling shutters shall be supplied of
specified type with accessories. The size of the rolling shutters shall be specified in the
drawings. The shutters shall be constructed with interlocking lath sections formed from
cold rolled steel strips not less than 0.9 mm. thick and 80 mm. wide for shutters upto
mm., width not less than 1.25 mm. thick and 80 mm. wide for shutters 3.5 mm in width and
above unless otherwise specified.
32.2 Guide channels shall be of mild steel deep channel section and of rolled pressed or built up
(fabricated) jointures construction. The thickness of sheet used shall not be less than
32.3 Hood covers shall be made of M.S. Sheets not less that 0.92 mm. thickness For shutters
having width 3.5 Meter and above the thickness of M.S. Sheet for the hood cover shall be
not less than 1.25 mm.
32.4 The spring shall be of best quality and shall be manufactured from tested high tensile
spring steel wire or strip of adequate strength to balance the shutters in all position. The
spring pipe shaft etc. shall be supported on strong M.S. or malleable C.I. brackets. The
brackets shall be fixed on or under the lintel as specified with raw plugs and screws bolts
32.5 The rolling shutters shall be of self rolling type up to 8 Sq.m. clear area without ball
bearing and p to 12 Sq.m. clear area with ball bearing. If the rolling shutters are larger, then
gear operated type shutters shall be used.
32.6 The locking arrangement shall be provided at the bottom of shutter at both ends. The
shutters shall be opened from outside.
32.7 The shutters shall be completed with door suspension shafts, locking arrangements pulling
hooks, handles and other accessories.
M-33. Collapsible Steel Gate :
33.1 The collapsible steel gate shall be in one or two leaves and size as per approved drawings
or as specified. The gate, shall be fabricated from best- quality mild steel channels, flats
etc. Either steel pulleys or ball bearing shall be provided in every double channel. Unless
otherwise specified the particulars of collapsible gate shall be as under :
(a) Pickets : These shall be of 20 mm. M.S., channels of heavy sections unless otherwise
shown on drawings. The distance center to center of pickets shall be 12 cms. with an
opening of 10 Cms.
(b) Pivoted M.S. flats shall be 20 mm x 6 mm.
(c) Top and bottom guides shall be from tee or flat iron of approved size.
(d) The fittings like stoppers, fixing hold fasts, locking cleats, brass handles and cast iron
rollers shall be of approved design and size.
M-34. Welded Steel Wire Fabric :
34.1. Welded steel wire fabric for general purpose shall be manufactures from cold drawn steel
wire “as drawn” or galvanised steel conforming to I.S. 226-1975 with longitudinal and
transverse wire securw4ely connected at every intersection by a process of electrical
resistance welding and conforming to I.S. 4948-1974. It shall be fabricated and finished in
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
workmanlike manner and shall be free from injurious defects and shall be rust proof. The
type of mesh shall be oblong or square as directed. The mesh sizes and size of wire for
square as well as oblong welded steel wire fabric shall be as directed. The steel wire fabric
in panels shall be in one whole piece in each panel as far as stock size permit.
M-35. Expanded Metal Sheets :
35.1. The expanded metal sheets shall be free from flaws, joints, broken strands, laminations and
other harmful surface Expanded metal steel sheet shall conform to I.S. 412-1975, Except
that blank sheets need not be with guaranteed mechanical properties. The size of the
diamond mesh of expended metal and dimensions of strands (width and thickness) shall be
as specified. The tolerance in nominal weight of expended metal sheets shall be of +
35.2. Expanded metal in panels shall be in one whole piece panel each as far as stock size permit.
The expanded metal sheets shall be coated with suitable protective coating to prevent
M-36. Mild Steel Wire (Wire ) :
36.1 Mild steel wire may be galvanised, as indicated All finished steel wire shall be well cleanly
drawn to the dimensions and size of wire as specified in item. The wire shall be sound, free
from splits, surface flaws, rough jagged and imperfect edges and other harmful surface
defects and shall conform to I.S. 280-1978.
M-37. Plywood :
37.1 The plywood for general purpose shall conform I.S. 303-1975. Plywood is made by
cementing together thin boards or sheets of wood into panels. There are always an odd
number of layers 3,5,7,9 ply etc. The plies are placed so that grain of each layer is right
angle to the grain in the adjacent layer.
37.2 The Chief advantages of plywood over a signal board of the same thickness is the more
uniform strength of the plywood, along the length and width of the plywood and grater
resistance to cracking and splitting with change in moisture content.
37.3 Usually synthetic resins are used for gluing, pherolic resins are usually cured in a hot press
which compresses and simultaneously heats the plies between hot plates which maintain a
temperature of 90 degrees C. to 140 degrees C. and a pressure of 11 to 14 kg/sq.cm. on the
wood. The time of heating may be anything from 2 to 69 minutes depending upon
37.4 When water glue are used , the wood absorbs so much water that the finished plywood
must be dried carefully. When synthetic resins are used as adhesive finished by plywood
must be exposed to an atmosphere of controlled humidity until the proper amount of
moisture has been absorbed.
37.5 According to I.S. 303-1975 the plywood for general purpose shall be of three grades
BWR, WWR and CWR, depending upon the adhesives used for bonding and veneers, and
it will be further classified into six types namely AA,AB,AC,BB,BC and CC based on the
quality of the two faces, each face being of three kinds namely, A,B and C, After pressing,
the finished plywood should be reconditioned to a moisture content not less than 8 percent
and not more than 16 percent.
37.6 Thickness of plywood Boards :
Board Thickness Board Thickness Board Thickness Board Thickness
3 ply 3 mm. 5 ply 5 mm. 7 ply. 9 mm. 9 ply. 16 mm.
5 mm. 8 mm. 16 mm. 11 ply. 19 mm.
6 mm. 9 mm. 9 ply. 13 mm. 22 mm.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
38.1 All glass shall be of the best quality free from specks, bubbles, smokes, veins, air holes
blisters and other defects. The king of glass to be used shall be mentioned in the item or
specification or in the special provisions or as shown in detailed drawings. Thickness of
glass panes shall be uniform. The specifications or different kinds of glass shall be as
38.2 Sheet Glass :
38.2.1 In absence of any specified thickness or weight in the item or detailed specifications of the
item of work, sheet glass shall be weighing 7.5 Kg/Sq.m. for panes upto 600 mm x
38.2.2 For panes larger than 600 mm. x 600 mm. and upto 800 m. x 800 mm. the glass weighing
not less than 8.75 Kg/Sq.m. shall be used. For bigger panes upto 900 mm. x 900 mm. glass
weighing not less than 11.25 Kg/Sq.m. shall be used.
38.2.3 Sheet glass shall be patent flattened glass of best quality and for glazing and framing
purposes shall conform to I.S. : 1761-1960. Sheet glass of the specified colours shall be
used, if so shown on detailed drawings or so specified. For important buildings and for
panes with any dimension over 900 mm. plate glass of specified thickness shall be used.
38.3. Plate Glass. 38.3.1. When plate glass is specified it shall be ‘Polished patent plate glass’ of
best quality. It shall have both the surface ground flat and parallel and polished to obtain
clear undisturbed vision and reflection. The plate glass shall be of the thickness mentioned
in the item or as shown in the detailed drawing or as specified. In absence of any specified
thickness and type of glass shall be as per details on drawings or as specified or as directed.
38.4 Obscured Glass : 38.4.1. This type of glass transmits light so that vision is Partially or
almost completely obscured. Glass shall be plain rolled, figured, ribbed or fluted or frosted
glass as may be specified as required. The thickness and type of glass shall be as per details
on drawings or as specified or as directed.
38.5. Wired Glass : 38.5.1 Glass shall be with wire netting embedded in a sheet of plate glass
electrically welded 13 mm. Georgian square mesh may be used. Thickness of glass shall
not be less than 6 mm. Wired glass shall be of type and thickness as specified.
M-39. Acrylic Sheets :
39.1. Acrylic sheet be of thickness as specified in the item and of an specified shape and size as
the case may be. Panels may be flat or curved . It should be light in weight. It shall be
colourless or coloured or opaque as specified in the item. Colourless sheet shall be as
transparent as the finest optical glass. Its light transmission rate shall be about 95%.
Transparency shall not be affected for the sheets of larger thickness. It shall be extremely
resistant to sunlight, weather and low temperatures. It shall not show any significant
yellowing or change in physical properties or loss of light transmission over a longer period
of use. The sheet shall be impact resistant also. Sheets should be available in complete
range of standard transparent, translucent and opaque colours. Sheets shall be of such
quality that they can be cut bent and jointed as desired. Solution for the joints shall be used
as per the requirement of manufacturer.
M-40. Particle board :
40.1. The particle boards used for face panels shall be of best quality free from any defects. The
particle boards shall be made with phenolmaldehyde adhesive. The particle boards shall
conform to I.S. 3087-1965. “Specification for wood particle board for general purpose”.
The size and the thickness shall be as indicated.
M-41. Expanded polystyrene of framed stopper slabs :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
41.1 The expanded polystyrene ceiling boards and tiles shall be approved make and shall be of
size, thickness, finish and colour as indicated. It shall be of high density and suitable for
use as insulating material. The insulating material shall be like slab of Thermocol etc.
M-42. Resin bonded fiber glass :
42.1 The resin bonded fiber glass tiles, or rolls shall be of approved make and shall be of sizes,
thickness and finish as indicated.
42.2. For test of Minerrak wool thermal insulation Blanket I.S. : 3144?1965 shall be followed.
42.3. Insulation wool blanket shall be with following coverings on one or both sides as indicated.
(1) Bituminised hessain Kraft paper for keeping out dust.
(2) Hessian cloth or Kraft paper for keeping out dust.
(3) G.I. wire netting, suitable for surface to be plastered over.
M-43. Fixtures and fastenings :
43.1.1 The fixtures and fastenings, that is, butt, hinges, tee and strap hinges sliding door bolts,
tower bolts, door latch, bath room latch, handles, door stoppers, casement window
fasteners, casement stays and ventilators catch shall be made of the metal as specified in
the item or its specifications.
43.1.2 They shall be of iron, bras, aluminum, chromium plated iron chromium plated brass,
copper oxidised iron, copper oxidised brass or anodized aluminum as specified.
43.1.3 The fixtures shall be heavy, Medium or light type. The fixtures and fastenings shall be
smooth finished and shall be such as will ensure ease of operation.
43.1.4 The samples of fixtures and fastenings shall be got approved as regards quality and shape
before providing them in position.
43.1.5 Brass and anodised aluminum fixtures and fastenings shall be bright finished.
43.2. Holdfasts :
43.2.1. Holdfasts shall be made from mild steel flat 30 cm. length and one of the holdfasts shall be
bent at right angle and two nos. of 6 mm. diameter holes shall be made in it for fixing it to
the frame with screws. At the other end. The holdfast shall be forked and bent at right
angles n opposite directions.
43.3. Butt hinges :
43.3.1. Railway standard heavy type butt hinges shall be used when so specified.
43.3.2. The strap hinges shall be manufactured from M. S. Sheet.
43.4 Siding door bold (Aldrops): 43 The Aldrops as specified in the item shall be used and
shall be got be got approved.
43.5 Tower bolts (Barrel Type):43.5.1 : Tower bolts as specified in the item shall be used as
shall be used and shall be got approved.
43.6 Door Latch:43.7.1 The size of door latch shall be taken as the length of latch.
43.7 Bathroom Latch :43.5.1 Bathroom latch shall be similar to tower bolt.
43.8 Handle : The size of the handles shall be determined by the inside grip length of the
handles. Handles shall have a base plate of length 50 mm more than size of the handle.
43.9 Door Stopper: 43.9.1 door stoppers shall be either floor door stopper type or door catch
type floor stopper shall be of overall size as specified as shall have rubber cushion.
43.10 Door Catch :43.10.1 Door catch shall be fixed as height of about 900 mm from the floor
level so that one part of the catch is fitted on the inside of the shutter and the other part is
fixed in the wall with necessary wooden plug arrangements for appropriate fixate. The
catch shall be fixed 20 mimesed the face of the door for easy operation of catch.
43.11 Wooden Door stop with highs :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
43.11.1wooden door stop of size 100mm X 60 mm X 40 mm shall be fixed on the door frame with
a high of 75 mm size at high of 900 mm from the floor level the wooden door stop shall be
provided with 3 coats of approve oil paint.
43.12 Case meant window fastener : Casement window fastener for single leaf window shutter
shall be left or right handled as directed.
43.13 Casement stays (straight peg stay) :
43.13.1The stays shall be made from a channel section having three holes at appropriate position
so that the window can be opened either fully or partially as directed as directed. size of the
stay shall be 250 mm to 300 mm as directed.
43.14 Ventilator catch :
43.14.1The pattern and shape of the catch shall be as approved .
43.15.1The base and socket plate shall be made form minimum 3 mm thick plate and projected
pivot shall not be less than 12 mm length and shall be firmly riveted to the base plate in
case of brass pivot.
44.1 (A) Oil Paints :
44.1.1. Oil Paints shall be of the specified colour and shade, and as approved. The ready mixed
paints shall only be used. However, if ready mixed paint or specific shade or tint is not
available, white ready mixed paint with approved stainer will be allowed. In such a case,
the contractor shall ensure that the shade of the paint so allowed shall be uniform.
44.1.2. All the paints shall meet following general requirements :
(i) Paint shall not show excessive setting in a freshly opened full can and shall easily be
redispressed with a pDeputye to a smooth homogeneous state. The paint shall show no
curing, livering, caking or colour separation and shall be free from lumps and skins.
(ii) The paint as received shall brush easily, possess good levelling properties and show no
running or sagging tendencies.
(iii) The paint shall not skin within 48 hours in a three quarters filled closed container.
(iv) The paint shall dry to a smooth uniform finish free from roughness, grit, unevenness and
other imperfections.
44.1.3. Ready mixed paint shall be used exactly as received from the manufactures and generally
according to their instructions and without any admixtures whatsoever.
44.2. (B) Enamel Paints :
44.2.1. The enamel paint shall satisfy in general requirements as mentioned in specification of oil
paints. Enamel paint shall conform to I.S. 2933-1975.
M-45 French polish :
45.1. The french polish of requirement and shape shall be prepared with the below mentioned
ingredients and other necessary materials:
(I) Denatured sprit of approved quality (ii) Chandras (iii) Shellac (iv) Pigment.
45.2. The French polish so prepared shall conform to I.S. : 348-1968.
M-46 Marble chips for marble mosaic terrazzo :
46.1. The marble chips shall be of approved quality and shades. It shall be hard, sound, dense
and homogenous in texture with crystalline and coarse grains. It shall be uniform in colour
and free from stains, cracks decay and weathering.
46.2. The size of various colours of marble chips of approved quality and colours only as per
grading as decided by the Engineer-in-charge shall be used for marble mosaic tiles or
46.3. The marble chips shall be machine crushed. They shall be free from foreign matter, dust
etc. Except as above, the chips shall conform to I.S. : 2114-1962.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
M-47. Flooring Tiles :
47.1. (A) Plain Cement tiles :
47.1.1. The plain cement tiles shall be general purpose type. These are the tiles in the manufacturer
of which no pigments are used Cement used in the manufacturer of tiles shall be as per
Indian Standards.
47.1.2. The tiles shall be manufactured from a mixture of cement and natural aggregates by
pressure process. During manufacture, the tiles shall be subjected to a pressure of not less
than 140 Kg/Sq. Cm. The proportion of cement to aggregate in the backing of the tiles shall
be not less than 1:3 by weight. The wearing face through the tiles are of plain cement, shall
be provided with stone chips of 1 to 2 mm. Size. The proportions of cement to the marble
chips aggregate in the wearing layer of the tiles shall be three parts of cement to one part
chips by weight. The minimum thickness Of wearing layer shall be 3 mm. The colour and
texture of wearing layer shall be uniform through out its face and thickness. On removal
from mould, the tiles shall be kept in moist conditions continuously at least for seven days
and subsequently, if necessary, for such long period as would ensure their conformity to
requirements of I.S. : 1237-1980 regarding strength resistance to wear and water
47.1.3. The wearing face of the tiles shall be plain, free from projections, depressions and cracks
and shall be reasonably parallel to the back face of the title. All angles shall be right and all
edges shall be sharp and true.
47.1.4. The size of tiles shall generally be square shape 24.85 Cm. x 24.85 Cm. or 25 Cm. x25 Cm.
The thickness of tiles shall be 20 mm.
47.1.5. Tolerance of length and breadth shall be plus or minus one millimeter, Tolerance or
thickness shall be plus 5 mm.
47.1.6. The tiles shall satisfy the tests as regards transverse strength, resistance to wear and water
absorption as per I.S.:1237-1980.
47.2. (B) Plain Coloured Tiles :
47.2.1. These tiles shall have the same specification as per plain cement tiles as per (A) above
except that they shall have a plain wearing surface where in pigments are used. They shall
conform to I.S. 1237-1980.
47.2.2. The pigment used for colouring cement shall not exceed 10 percent by weight of cement
used in the mix. The pigments, synthetic or otherwise, used for colouring tiles shall have
permanent colour and shall not contain materials detrimental to concrete.
47.2.3. The colour of the tiles shall be specified in the item or as directed.
47.3. (C) Marble mosaic tiles :
47.3.1. These tiles have the same specifications as per plain cement tiles except the requirements
as stated below:
47.3.2. The marble mosaic tiles shall conform to I.S. 1237-1980. The wearing face of the tiles shall
be mechanical ground and filled. The wearing face of tiles shall be free from projections,
depressions and cracks and shall be reasonably parallel to the back face of the tiles. All
angles shall be right angles and all edges shall be sharp and true.
47.3.3. Chips used in the tiles be from smallest up to 20 mm. size. The minimum thickness of
wearing layer of tiles shall of 6 mm. For pattern of chips to be used on the wearing face, a
few samples with or without their full size photographs as directed shall be presented to the
Engineer-in-charge for approval.
47.3.4. Any particular samples, If found suitable shall be approved by the Engineer-in-charge, or
he may ask for a few more samples to be prepared indicating roughly the particular sized
chips to be more or less in the samples presented. The samples have to be made by the
contractor till a suitable sample is finally approved for use in the work.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The Contractor shall ensure that the tiles supplied for the work shall be in conformity with
the approved sample only, in terms of its dimensions, thickness of backing layer and
wearing surface, materials, ingredients, colour shade, chips, distribution etc. required.
47.3.5. The tiles shall be prepared from cement conforming to Indian Standards or coloured
Portland cement generally depending upon the colour of tiles to be used or as directed.
47.4. (D) Chequred Tiles:
47.4.1. Chequred tiles shall be plain cement tiles or marble mosaic tiles. The former shall have the
same specification as per (A) above and the letter as per marble mosaic tiles as per (C)
except as mentioned below :
47.4.2. The tiles shall be of nominal size of 250 mm. x 250 mm. or as specified. The center to
center distance of chequer shall not be less than 25 mm. and not more than 50 mm. The
overall thickness of the tile shall be 22 mm.
47.4.3. The grooves in the chequers shall be uniform and straight. The depth of the grooves shall
not be less than 3 mm. The chequred shall be plain, coloured or mosaic as specified. The
thickness of the upper layer measured from the top of the chequres shall not be less than
mm. The tiles shall be given the first grinding with machine before delivery to site.
47.4.4. Tiles shall conform to relevant I.S. 1237-1980.
47.5 (E) Chequred Tiles for Stair cases :
47.5.1. The requirements of these tiles shall be the same as chequred as per (D) above except in
following respects;
(1) The length of a tile including nose shall be 330 mm.
(2) The minimum thickness shall be 28 mm.
(3) The noising shall have also the same wearing layer as at the top.
(4) The nosing edge shall be rounded.
(5) The front portion of the tile for a minimum length of 75 mm. from and including the nosing
shall grooves running parallel to noising and at center not exceeding 25 mm. Beyond that
the tiles shall have normal chequer pattern.
M-48. Rough Kotah Stone :
48.1. The kotah stones shall be hard, even, sound, and regular in shape and generally be green.
Brown colour stones shall not be allowed for use. They shall be without any soft veins,
cracks or flows.
48.2. The size of the stones to be used for flooring shall be of size 600 mm x 600 mm and/or size
600 mm x 450 mm, as directed. However smaller sizes will be allowed to be used to the
extent of maintaining required pattern. Thickness shall be as specified.
48.3. Tolerance of minus 30 mm. on account of chisel dressing of edges shall be permitted for
length as well as breadth. Tolerance in thickness shall be + 3 mm.
48.4. The edges of stones shall be truly chiselled and table rubbed with coarse sand before
paving. All angles and edges of the stone shall be true, Square and free from chipping and
the surface shall be true and plain.
48.5. When machine cut edges are specified, the exposed edges and the edges at joints shall be
machine cut. The thickness of the exposed machine cut edges shall be uniform.
M-49. Polished Kotah Stones
49.1. Polished kotah stone shall has same specifications as per rough kotah stone except as
mentioned below:
49.2. The stones shall have machine polished smooth surface. When brougth on site, the stones
shall be single polished or double polished depending upon its use. The stones for paving
shall generally be single polished. The stones to be used for dedo, skirting, platforms, sink,
veneering, sills, steps, etc. Where machine polishing after the stones are fixed in situ is not
possible, shall be double polished.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
M-50. Dholpur Stone Slab :
50.1. Dholpur stone slab shall be of best qualityas approved by the Engineer-in-charge The stone
slab shall be even, sound and durable, regular in shape and of uniform colour.
50.2. The size of the stone shall be specified in the item or detailed drawings or as approved by
the Engineer-in-charge. The thickness of the stone shall be as specified in the item of work
with the permissible tolerance of plus or minus 2 mm. The provisions in respect of
polishing as for polished Kotah stone shall apply to polished Dholpur stone also. All angles
and edges of the face of the stone slab shall be fine chiseled or polished as specified in the
item of work and all the four edges shall be machine cut. All angle and edges of the stone
slab shall be true and plane.
50.3. The sample of stone shall be got approved form the Engineer-in-charge for shade and tint
for a particular work. It shall be ensured that stones to be used in a particular work shall not
differ much in shade or tint from the approved sample.
M-51. Marble Slab :
51.1. Marble slab shall be while or of other colour and of best quality as approved by the
Engineer-in-charge
51.2. Slabs shall be hard, uniform and homogeneous in texture. They shall have even crystalline
grain and free from defects and cracks. The surface shall be machine polished to an even
and perfectly plant surface and edges machine cut true and square. The rear face shall be
rough to provide key for the mortar.
51.3. Marble slabs with natural veins, if selected shall have to be laid as per the pattern given by
the Engineer-in-charge. Size of the slab shall be minimum 450mm x 450mm. and
preferable 300 mm x 600 mm. However, smaller sizes will be allowed to be used to the
extent of maintaining required pattern.
51.4. The slab shall not be thinner than the specified thickness at its thinnest part. A few
specimen of finished slab to be used shall be deposited by the Contractor in the office for
51.5. Except as above, the marble slabs shall conform to I.S. 1130-1969.
M-52 Granite Stone Slab :
52.1 Granite shall be of approved colour and quality. The stone shall be hard, even, sound
regular in shape and generally uniform in colour. It shall be without any soft veins, cracks
52.2 The thickness of the stone shall be as specified in items.
52.3 All exposed face shall be double polished to tender truly smooth and the even reflecting
surface. The exposed edges and corners shall be rounded off as directed. The exposed
edges shall be machine cut and shall have uniform thickness.
M-53 P.V.C. Flooring :
53.1 P.V.C sheets for P.V.C. floor covering shall be homogenous flexible type, conforming to
I.S. 3452-1966. The P.V.C covering shall neither develop any toxic effect while put to use
nor shall give off any disagreeable order.
53.2 Thickness of flexible type covering tiles shall be as specified in the description of the item.
53.3 The flexible type shall be backed with Hussein or other woven fabric. The following
tolerances shall be applicable on the nominal dimension of the sheet rolls or tiles :
(a) Thickness + 0.15 mm
(b) Length or Width :
1. 300 mm. square tiles + 0.20 mm. 39.00 mm.square tiles +0.30 mm.
2. 600 mm. square tiles + 0.40 mm. 4 Sheets ad rolls +0.10 percent
53.4 Adhesive :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
53.4.1 The adhesive for PVC flooring shall be of the type and make recommended by the
manufactures of PVC sheets/tiles.
M-54. Facing tiles :
54.1. The facing tiles (burnt clay facing bricks) shall be free from cracks, flaws and nodules of
free lime. They shall be thoroughly burnt and shall have plane rectangular faces with
parallel sides and sharp straight right edged faces. The texture of the finished surface that
will be exposed when in place, Shall conform to an approved sample consisting not less
than four stretcher bricks each representing the texture desired. The facing tiles shall have a
pleasing appearance, sufficient resistance to penetration by rain and greater durability than
common bricks. The tiles shall conform to I.S. 2691-1972.
54.2. The standard size of facing brick tiles shall be 19 x 9 x 4 cms. The facing brick tiles shall
be provided with frog which shall conform to I.S. 1077-1976.
54.3. The permissible tolerance in dimensions specified above shall be as follows :
Size Tolerance for
1 class Brick 2nd class Brick
54.4 The tolerance for distortion or war page of face or edges of individual brick from a plane
surface and from a straight line respectively shall be as follows :
Facing dimensions Permissible tolerance
Max. below 19 cms. Max. 2.5 mm.
-do- above 19 cm. Max 3.0 mm.
54.5 The average compressive strength obtained as sample of five tiles when tested in
accordance with the procedure laid as per I.S. 1077-1976 shall be not less than 175 Kg./Sq.
Cm. The average compressive strength of any individual bricks shall be not less than
54.6 The average water absorption for five bricks tiles shall not exceed 12 percent of average
weight of brick before testing.
The absorption for each individual bricks shall not exceed 25 percent.
54.7 The brick tiles when tested in accordance with I.S. 1077-1976, the rate of efflorescence
shall not be more than ‘Slightly effloresced.
M-55. White glazed tiles :
55.1 The tiles shall be of best quality as approved by the Engineer-in-charge. They shall be flat
and true to shape. They shall free from cracks , crazing, spots chipped edges and corners.
The glazing shall be of uniform shade.
55.2 The tiles shall be nominal size of 150 mm x 150 mm. unless otherwise specified. The
maximum variation from the stated sizes, other than the thickness of tile, shall be plus or
minus 1.5 mm. The thickness of tile shall be 6 mm. Except as above the tiles shall conform
M-56. Galvanised iron pipes and fittings : 56.1. Galvanised iron pipe shall be of the medium
type and of required diameter and shall comply with I.S. 1239-1979. The specified
diameter of the pipes shall refer to the inside diameter of the bore, Clamps, screw and all
galvanised iron fittings shall be of the standard ‘R’ or equivalent make.
M-57. Bib cock and stop cock :
57.1 A bib cock is a draw off tap with a horizontal inlet and free outlet. A stop cock is a valve
with a suitable means of connection for insertion in a pipe line for controlling or stopping
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
57.2 They shall be of screw down type and of brass chromium plated and of diameter as
specified in the description of the item. They shall conform to I.S. 781-1977 and they shall
be of best Indian make. They shall be polished bright.
57.3 The minimum finished weight of bib cock and stop cock shall be as given below :
Diameter Bib cock Stop cock Diameter Bibcock Stop cock
M-58. Gun metal wheel valve :
58.1. The gun metal wheel valve be of approved quality. These shall be gun metal fitted with
wheel and shall be of gate valve opening full way and of the size as specified. These shall
conform to I.S. 778-1971.
M-59. White glazed porcelain wash basin :
59.1. Wash basin shall be of white porcelain first quality best Indian make and it shall conform it
I.S. 2556 (Part-IV) 1972 and I.S. 771-1979.
The size of the wash basin shall be as specified in the item, Wash basin shall be of one
piece construction with continued over-flow arrangements. All internal angles shall be
designed so as to facilitate cleaning. Wash basin shall have single tap hole or two holes as
specified. Each basin shall have a circular waste hole which is either rebated or beveled
internally with 65 mm. diameter at top and 10 mm. depth to suit the waste fitting. The
necessary stud slot to receive the bracket on the under side of the basin shall be provided.
Basin shall have an internal soap holder recess which shall fully drain into the bowl.
59.2. White glazed pedestal of the quality and colour as that of the basin shall be provided where
specified in the item. it shall be completely recessed at the back for reception of supply and
wash pipe. It shall be capable of supporting the basin rigidly and adequately and shall be so
designed as to make the height from floor to top of basin 750mm. to 800 mm. as directed.
M-60. European type water closet/with low level flushing :
60.1. The European type water closet shall be white glazed porcelain first quality and shall be of
wash down type conforming to I.S. 2556-1973 and I.S. 771-1979.
60.2. ‘S’ trap shall be provided as required with water seal not less than 50 mm. The solid plastic
seat and cover shall be of the best Indian make conforming to I.S. 2548-1980. They shall be
made of moulded syntactic materials which shall be tough and hard with high resistance to
solvents and shall be free from blisters and other surface defects and shall have chromium
plated brass hinges and rubber buffer of suitable size.
M-61. Orissa type water closet :
61.1. The specification of Orissa type white glazed water closet of first quality shall conform to
I.S. 2556 (Part-III) 1981 and relevant specification of Indian type water closet except that
pan will be with the integral squatting pan of size 580 mm x 440 mm. with raised footrest.
M-62. Indian type water closet :
62.1. The Indian type white glazed water closet of first quality shall be of size as specified in the
item and conforming to I.S. 771-1979 and I.S. 2556 (Part-II) 1981. Each pan shall have
integral flushing ring of suitable type with adequate number of holes alroung as directed to
have satisfactory flushing. It shall also have inlet at back or front connecting flush pipe as
directed. The inside of the bottom of the pan shall have sufficient slope from the front
towards the outlet and surface shall be uniform and smooth.
Pan shall be provided with 100 mm. diameter ‘P’ or ‘S’ trap with approximately 50 mm.
water seal and 50 mm. diameter vent horn.
M-62. (A) Foot Rests :
62-A-1 A pair of white glazed earthen ware rectangular foot rests of minimum size 250 mm. x
mm 20 mm. shall be provided with water closet.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
M-63. Glazed Earthen Ware Sink :
63.1. The glazed earthen-ware sink shall be specified size colour and quality. The sink shall
conform to I.S. 771 Part-II-1979 waste coupling of standard pattern with brass chain and
rubber plug shall be provided with sink.
63.2. The pipes shall conform to I.S. 1239-Part-I 1973 and I.S. 404-1962 for steel and lead pipes
respectively 32 mm. brass waste coupling of standard pattern with brass chain and rubber
plug shall be provided with sink.
M-64. Glazed earthen ware Lipped type flat back urinal/corner type urinal :
64.1 The lipped type urinal shall be flat back or corner type as specified in the item and shall
conform to I.S. 771-1979. It shall be of best Indian make and size as specified and
approved by the Engineer-in-charge. The flat back or corer type urinal must be 1 st quality
free from any defects, cracks, etc.
M-65. Low level enamel flushing tank :
65.1. The low level flushing tank shall be of 15 liters capacity. It shall conform to I.S. 774-1971.
The flushing vaster shall be of best quality and free from any defects. The flushing tank
shall have outlet 32 mm. diameter The outlet shall be connected with W.C. Pan by lean
pipe or P.V.C. pipe as specified. The flushing tank shall be provided with inlet and outlet
for fixing G.I. inlet pies and over-flow pipes. The flushing castern shall be provided with
chromium plated handle for flushing. The flushing tank shall be provided with brackets of
cast iron so that it can be fixed on wall at specified height. The brackets shall Conform to
M-66. Cast iron flushing cistern :
66.1. The cast iron flushing cistern shall be of 15 liters capacity. It shall conform to I.S. 774-
1971. The flushing cistern shall be of best quality free from any defects. The flushing
cistern shall have outlet of 32 mm. diameter. The outlets shall be connected to lead pipe of
32 mm. diameter. The lead pipe shall conform to I.S. 404 (Part-I) 1962. For fixing G.I. inlet
pipes and overflow pipe 20 mm. diameter. inlet and outlet shall be provided. The flushing
cistern shall be provided with galvanised iron chain and pull of sufficient length and shall
be got approved from the Engineer-in-charge. The cast iron flushing cistern shall be
painted with one coat of anticorrosive paint and two coats of paints. The flushing cistern
shall be fixed on two C.I. brackets. The C.I. brackets shall conform to I.S. 775-1970.
M-67. Flush cock :
67.1. Half turn flash cock (Heavy Weight) shall be of gun metal chromium plated of diameter as
specified in the description of the item. The flush cock shall conform to relevant Indian
M-68. Cast iron pipes and fittings :
68.1. All soil waster, vent and antisyphonage pipes and fittings shall conform to I.S. 1729-1964.
The pipe shall have spigot and socket ends with head on spigot end. The pipes and fittings
shall be true to shape, smooth, cylindrical, their inner and outlet surfaces being as nearly as
practicable concentric. They shall be sound and nicely cast and shall be free from cracks,
laps, pinholes or other imperfection and shall be neatly dressed and carefully fettled.
68.2. The end of pipes and fittings shall be of reasonable square to their axis.
68.3. The sand cast iron pipes shall be of the diameter as specified in the description and shall be
in lengths of 1.5 M, 1.8 M. and 2 M. including socket ends of the pipe unless shorter
lengths are either specified or required at junctions etc. The pipes and fittings shall be
supplied without ears unless specified or directed otherwise.
68.4. Tolerances.
68.4.1. The Standard weights and thickness of pipes shall be as shown in the following table : A
tolerance up to minus 10 percent may however be against these standard weights.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Sr. Nominal Thickness Overall Weight of pipe excluding
1.5 m. long 1.8m. long 2.m. long
68.4.2. A tolerance upto minus 15 percent in thickness and 20 mm. in length will be allowed. For
fittings tolerance in lengths shall be plus 15 mm. and minus 10 mm.
68.4.3. The thickness of fittings and their socket and spigot dimensions shall conform to the
thickness and dimensions specified for the corresponding sizes of straight pipes. The
tolerances in weights and thickness shall be the same as for straight pipes.
M-69. Nahni Trap :
69.1. Nahni trap shall be of cast iron and shall be sound and free from porosity or other defects
which affect serviceability The thickness of the base metal shall not be less than 6.5 mm.
The surface shall be smooth and free from craze, ships and other flaws or any other kind of
defects which affect serviceability. The size of nahni trap shall be as specified and shall be
of self cleaning design.
69.2. The Nahni trap shall be of quality approved by the Engineer-in-charge and shall generally
conform to the relevant Indian Standards.
69.3. The Nahni trap provided shall be with deep seal, minimum 50 mm, except at places where
trap with deep seal can not be accommodated. The cover shall be cast iron. Performed
cover shall be provided on the trap of appropriate size.
M-70. Gully Trap :
70.1 Gully Trap shall conform to I.S. 651-1980. It shall be sound, free defects such as fire
cracks. The glaze of the traps shall be free from crazing. They shall give a sharp clear note
when struck with light hammer. There shall be no broken blisters.
70.2 The size of the gully trap shall be as specified in the item.
70.3 Each gully trap shall have one C.I. gratings of square size corresponding to the dimensions
of inlet of gully trap, It will also have a water tight. C.I. cover with frame inside dimensions
300 mm. x 300 mm., the cover with frame inside dimension, 300 mm. 300 mm., the cover
weighing not less than 4:53 Kg. and the frame not less than 2.72 Kg. The grating cover and
frame shall be of sound and good casting and shall have truly square machined seating
M-71. Glaze Stone Ware Pipe And Fitting :
71.1. The pipes and fittings shall be of best quality as approved by the Engineer-in-charge. The
pipe shall be of best quality manufactured from stone-ware of fire clay, salt glazed
thoroughly burnt through the whole thickness, of a close even texture, shall be smooth and
perfectly glazed. The pipe shall be capable to withstand pressure of 1.5 mm. lead without
showing sign of leakage. The thickness of the wall shall not be less than 1/12 th of the
internal dia. The depth of socket shall not be less than 38 mm. The socket shall be
sufficiently large to allow a joint of 1 mm. around the pipe.
71.2. The pipes shall generally conform to relevant I.S. 651-1980.
M-72. Wall Peg Rail :
72.1. The aluminum wall peg rail shall have three aluminum pegs of approved quality and size.
It shall be fixed on teakwood plant of size 450 mm. x 75 mm. x 20 mm. The teakwood
shall be french polished or oil painted as specified.
M-73. G.I.Water Spot :
73.1. The G.I.pipes of 40 mm. dia shall be of medium quality and specials shall be of ‘R’ brand
or equivalent brand of best approved quality.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
73.2. The pipe shall have length as required for the thickness of wall in which it is fixed. and at
the outside end tee and bend cut at half the length shall be provided and at other end
coupling shall be provided to have better fixing. The water spout shall be provided as per
detailed drawings or as directed.
M-74. Asbestos Cement Pipe (A.C. Pipe):
74.1. The asbestos cement pipe of diameter as specified in the description of the item shall
conform to I.S. 1626-1980. Specials like bends, shoes cowls, etc. shall conform to relevant
Indian Standards. The interior of pipe shall have a smooth finish, regular surface and
regular, internal diameter. The tolerance in all dimensions shall be as per I.S. 1626-Part-I
M-75. Crydon Ball valve :
75.1. Ball valve of screwed type including polyethylene float and necessary lever etc. shall be of
the size as mentioned in the description of item and shall conform to I.S. 1703-1977.
M-76. Bitumen Felt For Water Proofing And Damp Proofing :
76.1 Bitumen felt shall be on the fiber bases and shall be type 2, self finished grade-2 and shall
conform to I.S. 1322-1970.
M-77 Selected Earth :
77.1. The selected earth shall be hat obtained from excavated material or shall have to brought
from outside as indicated in the item. If item does not indicate anything, The selected earth
shall have to be brought from outside.
77.2. The selected earth shall be good yellow soil and shall be got approved from the Engineer-
in-charge. In no case black cotton soil or similar expansive and suitable soil shall be used.
It shall be clean and free from all rubbish and perishable materials, stones or brick bats.
The clods shall be broken to a size of 50. mm or less, Contractor shall make his own
arrangement at his own cost for land for borrowing selected earth. The stacking of material
shall be done as directed by the Engineer-in-charge in such a way as not to interfere with
any constructional activities and in proper stacks.
77.3. When excavated material is to be used, only selected stuff got approved form the
Engineer-In-Charge shall be used. It shall be stacked separately and shall comply with all
the requirements of selected earth mentioned above :
M-78. Barbed Wire :
78.1. The barbed wire shall be of galvanised steel and it shall generally conform to I.S. 278-
1978. The barbed wire shall be if type-I whose nominal diameter for line wire shall be
mm. and point wire 2.24 mm. The nominal distance between two bars shall be 75 mm.
Unless otherwise specified in the item. The barbed wire shall be formed by twisting
together two line wires, One containing the barbs. The size of the line and point wires and
barb spacings shall be as specified above. The permissible deviation form the nominal
diameter of the line wore and point wire shall not exceed + 0.08 mm.
78.2. The barbs shall carry four points shall be formed by twisting two point wires each two
turns, lightly round one line wire, making altogether four complete turns. The barbs shall
be so finished that the four points are set and locked at right angles to each other. The barbs
shall have a length of not less than 13 mm. and not more than 13 mm. and not more18 MM.
The points shall be sharp and cut at an angle not greater than 35 degree of the axis of the
wire forming the barbs.
78.3. The lind and point wire shall be circular section free from scale and other defects and shall
be uniformly galvanised. The line wire shall be in continuous length and shall not contain
any weld other than those in the rod before it is drawn. The distance between two
successive splices shall not be less than 15 meters.
78.4. The lengths per 100 Kg. of barbed wire I.S. type I shall be as under
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Nominal 1000 meter Minimum 834 Meter Maximum 1066 Meter.
DETAILED SPECIFICATIONS-EXCAVATION
4.0.0 (a) Excavation for foundation upto 1.5 M depth including sorting out and stacking
useful materials disposing of the excavated stuff upto 50 meter lead in loose or soft soil.
1.1. Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes
or any such ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay,
peat etc., fall under this category.
2.0. Clearing the site :
2.1. The site on which the structure is to be built shall be cleared and all obstructions, loose
stone, materials and rubbish of all kind, bush, wood and trees shall be removed as directed.
The materials so obtained shall be property of the Government and be conveyed and
stacked as directed. within 50 M. lead. The roots of the trees coming in the sides shall be
cut and coated with a hot asphalt.
2.2. The rate of site clearance is deemed to be included in the rate of earth work for which no
extra will be paid.
3.0 Setting Out : After clearing the site, the center lines will be given by the Engineer-in-
charge. The contractor shall assume full responsibility for alignment, elevation and
dimension of each and all parts of the work. Contractor shall supply laborers, materials, etc.
required for setting out the reference marks and bench marks and shall maintain them as
long as required and directed.
4.0 Excavation : The excavation in foundation shall be carried out in true line and level and
shall have the width and depth as shown in the drawings or as directed. The contractor shall
do the necessary shoring and shutting or providing necessary slopes to a safe angle, at his
own-cost. The payment for such precautionary measures shall be paid separately if not
specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be
allowed for bringing it to level, if mistake or any other reason excavation is made. deeper
or wider that shown on the plan or directed. The extra depth or width shall be made up with
concrete of same proportion as specified for the foundation concrete at the cost of the
contractor. The excavation up to 1.5 m. depth shall be measured under this item.
5.0 Disposal of the excavated stud :
5.1 The excavated stuff of the selected type shall be used in filling the trenches and plinth or
leveling the ground in layer including ramming and watering etc.
5.2 The balance of the excavated quantity shall be removed by the contractor from the site of
work to a place as directed with lead upped 50 M. and all lift.
6.0. Mode of measurement and payment :
6.1 The measurement of excavation in trenches for foundation shall be made according to the
sections of trenches shown on the drawing or as per sections given by the Engineer-in-
charge. No payment shall be made for surplus excavation made in excess of above
requirements or due to slopping and sloping back as found necessary on account of
conditions of soil , and requirements of safety.
6.2 The rate shall be for a unit of one cubic meter.
4.0.0. (B) Excavation for foundation upto 1.5 M. depth including sorting out and stacking of
useful materials and disposing of the excavated stuff upto 50 meter lead in dense or hard
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
1.0. Dense or Hard Soil : Any soil which generally require close application of picks or
jumpers or scarifiers to loosen it stiff clay, gravel and rubble stone etc. fall under this
2.0. Workmanship : The relevant specification of item No. 4.0.0. (A) shall be followed except
that the excavation work shall be carried out in dense or hard soil.
3.0. Mode of measurement and payment :
3.1. The relevant specification of item No. 4.0.0 (A) shall be followed.
3.2. The rate shall be for a unit of one cubic meter.
4.0.0 (C) : Excavation for foundation upto 1.5. M depth including sorting out and stacking of
useful materials and disposing of the excavated stuff upto 50 meter In lead-hard
1.0. Hard murrum : The hard murrum shall be clean of good binding quality and of approved
quality obtained from approved quarries, of disintegrated rocks which contain silicones
material and nature mixture of clay of calcareous origin. The size of hard murrum shall not
be more than 20 mm.
2.0. Workmanship: The relevant specification of item No. 4.0.0. (A) shall be followed except
that the excavation work shall be carried in hard murrum.
3.0. Mode of measurement and payment :
3.1. The relevant specification of item No. 4.0.0. (A) shall be followed.
3.2. The rate shall be for a unit of one cubic meter.
4.0.0. (D) : Excavation for foundation up to 1.50 M.depth including sorting out and stacking of
useful materials and disposing of the excavated stuff upto 50 meter lead-soft rock not
requiring blasting.
1.0. Workmanship :
1.1. The relevant specification of item 4.0.0. (A) shall be followed except that the excavation
shall be carried out for foundation upon 1.5. m. lift in soft-rock not requiring blasting.
1.2. The excavation in soft or disintegrated rock shall be carried out by crow bards pickaxes or
pneumatic drills or any other suitable means.
1.3. If contractor desires to resort to blasting, he can do so with permission of the Engineer-in-
charge but nothing extra shall be paid to him.
1.4. The materials available from rock excavation shall be properly stacked within 50 m. lead
and 1.5. m. lift and shall be property stacked within 50 m. lead and 1.5.m. lift and shall be
the property of department.
1.5. The classification of state of the foundation soil shall be done by the Engineer-in-charge
and shall be acceptable to the contractor.
1.6. However this shall include the type of rock and boulder which may quarried or split with
crow bars. Laterite and conglomerate also come under this category.
2.0. mode of measurement and payment :
2.1 The relevant specification of item NO. 4.0.0. (A) shall be followed.
2.2 The rate shall be for a unit of one cubic meter.
4.0.0. (E) : Excavation for foundation upto 1.5 M. depth including sorting out and stacking of
useful materials and disposing of the excavated stuff upto 50 meter lead in hard rocks.
1.0. Workmanship :
1.1. The relevant specification of item No. 4.0.0.(A) shall be followed except that the
excavation for foundation work shall be carried out in hard rock.
1.2. Excavation shall be done by blasting to the dimensions shown in the drawings or as
directed. The blessing shall be carried out only with written permission of the Engineer-in-
charge. All the laws, regulations etc. pertaining to the precautions, acquisition, transport,
storage, landing and use of explosives shall be rigidly followed. The Magazine for the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
storage for the explosive shall be built to the design and specifications of explosive
authority and located at the approved site. No unauthorized persons shall be admitted into
the magazine and when not in use it shall be kept securely locked. No matches or
inflammable materials shall be allowed in the Magazine. The Magazine shall have an
effective lightning conductor. The rules of explosive 1940 revised for time to time shall be
followed strictly for obtaining, handling, undertaking blasting work.
1.3. The contractor shall be responsible for damage to property, workman, public due to any
accident due to use of explosives and blasting operations.
1.4. Precautions :
1.4.1. The blasting operation shall remain in charge of competent and experienced supervisor and
workman who are thoroughly acquainted with the details of handling explosives and
blasting operations. The blasting shall be carried out during fixed hours of the day,
preferably during the mid-day-lunch hours or at the close of the work as ordered in writing
by the Engineer-in-charge. The hours of blasting shall be notified in advance to the people
in the vicinity. All the charges shall be prepared by the man in charge only.
1.4.2. Red danger flags shall be displayed prominently in all directions during the blasting
1.4.3. People except this who actually light the fuse shall be prohibited from entering into this
area. The flag shall be stationed as 200 m. from the firing site in all directions and all
persons including workmen shall be excluded from the flagged area at least 10 minutes
before the firing warning whistle being sounded for this purpose.
1.4.4. During excavation in rock by blasting, the lowest 15 cm. of the stratas shall be blasted with
light charges so as not to shatter or weaken the underlying rock on which the foundation
will be actually laid. If excavation in rock is done to larger width and lengths than those
shown on the drawings or as directed, no payment shall be made for such over break. If
excavation is done to depth grater than shown on the drawings or directed, excess depth
shall be made up with foundation grade concrete as directed at the contractor’s cost.
1.4.5. The charged hole shall be drilled to the required depth and in suitable places when blasting
Is done with powder, the fuse cut to the required length shall be inserted in the holes and
the powder dropped in. The powder shall be gently tamped with copper rod with rounded
ends. The explosive powder shall then be covered with trapping materials which shall be
tamped lightly but firmly. When blasting is done with dynamite and other high explosive
dynamite cartridges shall be prepared by inserting the square cut ends of fuse into the
detonator, and finished with dippers at the open ends. The detonator should be gently
pushed into the premier leaving one third of the copper exposed outside. The primer shall
be housed into the explosive. Bore holes shall be of such size that the cartridges can be
easily passed down. The primer shall be cleared of all debris and explosive inserted. The
space for about 20 cms. above the charge shall then be gently filled with dry clay pressed
home and rest of the tamping is firmed with any convenient materials gently packed with a
1.4.6. At a time, not more than 20 such charges shall be prepared and fired. The man in charge
shall blow a whistle in a recognised manner for cautioning the people. All the people shall
then be required to move to safe distances. The charges shall be lighted by the man in
charge only. The man-in-charge shall count the number of explosions. He shall satisfy
himself that the charges have been exploded before allowing the workman to go to the
1.4.7. The contractor shall be fully responsible to strictly follow the prevailing rules and
procedures regarding blasting procedures.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
1.5.1. In case of a misfire the following procedure shall be observed :
1.5.2. Sufficient time shall be allowed to account for the delayed blast. The man in charge shall
inspect all the charges and determine the missed charge.
1.5.3 If it is the blasting powder charge, it shall be completely flooded with water. A new hole
shall be drilled at about 45 cm. from the old and fired. This should blast the old charge.
Should it not blast the old charge. Should it not blast the old charge, the procedure shall be
repeated till the old charge is blasted.
1.5.4. In case of charge of gelatin, dynamite etc. the man in charge shall gently remove the
tamping and the primer with detonator. A fresh detonator and primer shall then be used to
blast the charge. Alternatively the hole may then be drilled 15 cm. away and parallel to it.
This hole shall then be charged fired when the misfired hole should explode at the same
time. The man in charge shall report to the office at once all cases of misfire, the cause of
the same and what steps were taken in connection therewith.
1.5.5. If a misfire has been found to be due to defective detonator or dynamite, the whole quantity
in the box from which defective article was taken must be sent to the authority as directed
for inspection to ascertain whether all the remaining materials in the box are also defective
1.6. Accidents :
1.6.1. The contractor shall be solely responsible for any accident during the entire procedure of
handling explosive and blasting and shall pay necessary compensation to persons affected
or damage t lands or properly etc., due to the blasting without extra claims on the
1.7.1. A careful and day-to day account of explosives shall be maintained by the contractor in an
approved manner and shall be open to inspection of the Engineer-in-charge at all times.
Surprise visit may also be paid by the Engineer-in-charge to the storage and in case of any
unaccountable shortage or unsatisfactory accounting, the contractor shall be liable to be
penalised by forfeiture of part or whole of his Security Deposit or by cancellation of tender
in which case be shall not be entitled for any compensation.
1.8. Disposal of Excavated materials :
1.8.1. No materials excavated from foundation trenches of whatever kind they may be, are to be
placed even temporarily nearer than1.5m. of distance prescribed by the Engineer from the
outer edges of excavation. All materials excavated shall remain the property of
Government. Rate for excavation includes sorting out of useful materials and stacking them
separately as directed within the specified lead. Materials suitable and useful for back
filling or other use shall be stacked in convenient places but not in such a way as to
obstruct free movement of men, animals and vehicles or encroach upon the area required
for constructional purpose. The site shall be left clean of all debris on completion.
1.8.2. Disposal of excavated materials is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off
within a lead of 50 meters as directed. useful materials obtained from clearing site and
excavation shall be stacked within a lead of 50 M. beyond the building area as directed.
Materials suitable for back filling shall be stacked at convenient places within a lead of
M. from the structure for reuse. Useful stones from rock excavation shall be stacked neatly
within a lead of 50 M. and will be allowed to be used by the contractor on payment at rates
laid down in the contract or if not so aid down, at schedule of rates of the Division or at a
mutually agreed rates if there are no such rates in the Schedule of rates.
1.8.3. If surplus materials are required to be conveyed beyond 50 M. conveyance will be paid for
under a separate item.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.0. Mode of measurement and payment :
2.1. The work shall be measured for the work limited to the dimensions shown on drawings or
directed, Excavation to dimensions in excess of the above will not be measured or paid for
and if so ordered by the Engineer the contractor shall have to fill up the excess depth with
cement concrete specified for foundation without extra payment.
2.2. Driving of sounding bards, drill holes to explore the nature of substratum upto a total
length of meter distributed in 2 or 3 places in each foundation if necessary, will be
considered incidental work and eill not be paid for separately.
2.3. Removal of slips and blows in the foundation trenches will not be measured or paid for.
2.4. If it is necessary in the opinion of the Engineer-in-charge to carry foundation below the
levels shown on the plants the excavation for the first 1.5 M. of additional depth will be
included in the quantity for the particular classification and will be paid for as extra work at
rate to be decided under the general conditions of contract unless the contractor unless the
contractor is willing to accept payment as tendered rates.
2.5. The rate shall be for a unit of one cubic meter.
4.001 (A) : Excavation for foundation for depth from 1.50 M. to 3.0 M. including sorting out
and stacking of useful materials and dosposing of the excavated stuff upto 50 M. in lead-
loose or soft soil.
1.0. Workmanship :
1.1. The relevant specifications of item No. 4.0.0.(A) shall be followed except that the
excavation work shall be carried out in loose or soft soil with lift 1.5 M. to 3.0.M.
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. A() shall be followed.
2.2. The excavation work of lift 1.5 M. to 3.0.M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.001. (B) Excavation for foundation for depth from1.5.M. to 3.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50M.lead in Dense or
1.0. Workmanship : The relevant specification of item No. 4.0.0. (B) shall be followed except
that the excavation work shall be carried out with 1.5 M. to 3.0. M. lift in dense or hard
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. A() shall be followed.
2.2. The excavation work of lift 1.5 M. to 3.0.M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.001 (C) Excavation for foundation for depth from1.5.M. to 3.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50M.lead in Hard
1.0. Workmanship : The relevant specification of item No. 4.0.0. (C) shall be followed except
that the excavation work shall be carried out with 1.5 M. to 3.0. M. lift in hard murrum.
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. A() shall be followed.
2.2. The excavation work of lift 1.5 M. to 3.0.M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.001 (D) Excavation for foundation for depth from1.5.M. to 3.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50M.lead in soft rock
not requiring blasting.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
1.0. Workmanship : The relevant specification of item No. 4.0.0. (B) shall be followed except
that the excavation work shall be carried out with 1.5 M. to 3.0. M. lift in soft rock not
requiring blasting.
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. A() shall be followed.
2.2. The excavation work of lift 1.5 M. to 3.0.M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.001. (E) Excavation for foundation for depth from1.5.M. to 3.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50M.lead in Hard
1.0. Workmanship :1.1. The relevant specification of item No. 4.0.0. (B) shall be followed
except that the excavation work shall be carried out with 1.5 M. to 3.0. M. lift in hard rock.
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. A() shall be followed.
2.2. The excavation work of lift 1.5 M. to 3.0.M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.002. (A) Excavation for foundation for depth from1.5.M. to 3.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50M.lead in loose of
1.0. Workmanship : The relevant specification of item No. 4.0.0. (B) shall be followed except
that the excavation work shall be carried out with 1.5 M. to 3.0. M. lift in loose of soft soil.
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. (A) shall be followed.
2.2. The excavation work of lift 1.5 M. to 3.0.M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.002. (B) Excavation for foundation for depth from3.0.M. to 5.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50 M. lead in Dense
1.0. Workmanship : The relevant specification of item No. 4.0.0. (B) shall be followed except
that the excavation work shall be carried out with 3.0. M. to 5.0. M. lift in loose of soft soil.
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. (A) shall be followed.
2.2. The excavation work of lift 3.0. M. to 5.0..M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.002. (C) Excavation for foundation for depth from 3.0.M. to 5.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50M.lead in Hard
1.0. Workmanship : The relevant specification of item No. 4.0.0. (C) shall be followed except
that the excavation work shall be carried out with 3.0. M. to 5.0. M. lift in loose of soft soil.
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. (A) shall be followed.
2.2. The excavation work of lift 3.0. M. to 5.0..M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.002. (D) Excavation for foundation for depth from 3.0.M. to 5.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50M.lead in soft rock
not requiring blasting.
1.0. Workmanship : The relevant specification of item No. 4.0.0. (D) shall be followed except
that the excavation work shall be carried out with 3.0. M. to 5.0. M. lead in soft rock not
requiring blasting.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. (A) shall be followed.
2.2. The excavation work of lift 3.0. M. to 5.0..M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.002. (E) Excavation for foundation for depth from 3.0.M. to 5.0. M. including sorting out and
stacking of useful materials and disposing of excavated stuff upto 50M.lead in soft rock
not requiring blasting.
1.0. Workmanship : The relevant specification of item No. 4.0.0. (E) shall be followed except
that the excavation work shall be carried out with 3.0. M. to 5.0. M. lead in soft rock not
requiring blasting.
2.0. Mode of measurement and payment :
2.1. The relevant specification of item No. 4.0.0. (A) shall be followed.
2.2. The excavation work of lift 3.0. M. to 5.0..M. shall be measured under this item.
2.3. The rate shall be for a unit of one cubic meter.
4.003. (A) Extra for additional depth more than 5.0.M. for excavation for foundation including
sorting out and stacking of useful materials disposing of the excavated stuff upto 50 M.
lead in loose or soft soil.
1.0. Workmanship :
1.1. The relevant specifications of item NO. 4.0.0.(A) shall be followed except that the
excavation work shall be carried out from more than 5.0.M lift in loose or soft soil.
2.0. Mode of measurement and payment :
2.1. The relevant specifications of item No. 4.0.0. (A) shall be followed.
2.2. The rate shall be paid extra over and above the rate of No. 4.002. (E) for carrying out
excavation work for additional depth from 5.0 M. and above.
2.3. The rate shall be for a unit of one cubic meter per meter.
4.003. (B) Extra for additional depth more than 5.0.M. for excavation for foundation including
sorting out and stacking of useful materials disposing of the excavated stuff upto 50 M.
lead in Dense or hard soil.
1.0. Workmanship :
1.1. The relevant specifications of item NO. 4.0.0.(A) shall be followed except that the
excavation work shall be carried out from more than 5.0.M lift in Dense or hard soil.
2.0. Mode of measurement and payment :
2.1. The relevant specifications of item No. 4.0.0. (A) shall be followed.
2.2. The rate shall be paid extra over and above the rate of No. 4.002. (A) for carrying out
excavation work for additional depth from 5.0 M. and above.
2.3. The rate shall be for a unit of one cubic meter per meter.
4.003. (C) Extra for additional depth more than 5.0.M. for excavation for foundation including
sorting out and stacking of useful materials disposing of the excavated stuff upto 50 M.
lead in Hard murrum.
1.0. Workmanship :
1.1. The relevant specifications of item NO. 4.0.0.(C) shall be followed except that the
excavation work shall be carried out from more than 5.0.M lift in Hard murrum.
2.0. Mode of measurement and payment :
2.1. The relevant specifications of item No. 4.0.0. (A) shall be followed.
2.2. The rate shall be paid extra over and above the rate of No. 4.002. (C) for carrying out
excavation work for additional depth from 5.0 M. and above.
2.3. The rate shall be for a unit of one cubic meter per meter.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
4.003. (D) Extra for additional depth more than 5.0.M. for excavation for foundation including
sorting out and stacking of useful materials disposing of the excavated stuff 5.0. M. lead
in soft rock not requiring blasting..
1.0. Workmanship :
1.1. The relevant specifications of item NO. 4.0.0.(D) shall be followed except that the
excavation work shall be carried out from more than 5.0.M lift in soft rock not requiring
2.0. Mode of measurement and payment :
2.1. The relevant specifications of item No. 4.0.0. (A) shall be followed.
2.2. The rate shall be paid extra over and above the rate of No. 4.002. (D) for carrying out
excavation work for additional depth from 5.0 M. and above.
2.3. The rate shall be for a unit of one cubic meter per meter.
4.003. (E) Extra for additional depth more than 5.0.M. for excavation for foundation including
sorting out and stacking of useful materials disposing of the excavated stuff upto 50 M.
lead in Hard rock.
1.0. Workmanship :
1.1. The relevant specifications of item NO. 4.0.0.(E) shall be followed except that the
excavation work shall be carried out from more than 5.0.M lift in Hard rock.
2.0. Mode of measurement and payment :
2.1. The relevant specifications of item No. 4.0.0. (A) shall be followed.
2.2. The rate shall be paid extra over and above the rate of No. 4.002. (C) for carrying out
excavation work for additional depth from 5.0 M. and above.
2.3. The rate shall be for a unit of one cubic meter per meter.
4.12. Filling available from excavated earth (excluding rock) in trenches, plinth sides of
foundations etc. in layers not exceeding 20 CM in depth, consolidating each deposited layer
by ramming and watering.
1.0. Workmanship :
1.1. The earth to be used for filling shall be free from salts, organic or other foreign matter, All
clods of earth shall be broken.
1.2. As soon as the work in foundation has been completed and measured, the site of foundation
shall be cleared of all debris, brick bats, mortar dropping etc; and filled with earth in layers
not exceeding 20 Cms. Each layer shall be adequately watered rammed and consolidated
before the succeeding layer is laid. The earth shall be rammed with iron rammers where
feasible and with the butt ends of crow-bars, where rammer cannot be used.
1.3. The plinth shall be similarly filled with earth in layers not exceeding 20 Cms adequately
watered and consolidated by ramming with iron or wooden rammers. When nfilling reaches
finished level, the surface shall be flooded with water for at least 24 hours and allowed to
dry and then rammed and consolidated.
1.4. The finished level of filling shall be kept to shape intended to be given to floor.
1.5. In case of large heavy duty flooring like factory flooring, the consolidation may be done by
power rollers, where so specified. The extent of consolidation required shall also be as
1.6. The excavated stuff of the selected type shall be allowed to be used in filling the trenches
and plinth. Under no circumstances black cotton soil be used for filling the plinth.
2.0. Mode of measurement and payment :
2.1. The payment shall be made for filling in plinth and trenches, No deduction shall be made
for shrinkage or voids if consolidated as instructed above.
2.2. The rate shall be for a unit of one cubic meter.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
4.24. Filling in plinth with sand under floors including watering, ramming consolidated and
dressing etc. complete.
1.0. Materials:
1.1. Sand shall conform to M.
2.0. Workmanship:
2.1. The relevant specifications of item No. : 4.12 shall be followed except that sand shall be
filled in under floors, including watering, ramming, consolidation and dressing etc.
3.0. Mode of measurement and payment :
3.1. The relevant specifications of item NO. 4.12 shall be followed.
3.2. The rate includes cost of collecting carting sand with all lead and labour for filling the same
in plinth under floors.
3.3. The rate shall be for a unit of one cubic meter.
4.004.: Filling in foundation and plinth with murrum or selected soil in layers of 20 cm.
thickness including watering, ramming and consolidating etc. Complete.
1.0. Materials:
1.1. Murrum shall be clean, of good binding quality, and of approved quality obtained from
approved pots/quarries of disintegrated rocks which contain silicones materials and natural
mixture of clay of calcareous origin. The size of murrum shall not be more than 20 mm.
2.0. Workmanship:
2.1. The relevant specifications of item No. 4.12 shall be followed except that the murrum or
selected soil shall be filled in foundation and plinth in 20 cms. layers including
consolidating , ramming, watering, dressing etc. complete.
3.0. Mode of measurement and payment :
3.1. The relevant specifications of item No. 4.12 shall be followed.
3.2. The rate includes cost of collecting and carting murrum/or selected earth of approved
quality with all lead and labour required for filling in trenches and plinth.
3.3. The rate shall be for a unit of one cubic meter.
4.005 Filling foundation and plinth with brick-bats/chhara in layers of 20 cms thickness
including watering ramming and consolidating etc. complete.
1.0 Materials: “Bricks bats shall conform to M-14.
2.0 Workmanship: The relevant specifications of item No. 4.12 shall be followed except that
brick-bats of burnt bricks shall be filled in foundation and plinth in 20 cms layers including
watering, ramming, consolidating etc. complete.
3.0 Mode of measurement and payment:
3.1 The relevant specifications of item No. 4.12 shall be followed.
3.2 The rate includes cost of collecting and carting brick/chhara with all lead and labour
required for filling in trenches and plinth.
3.3 The rate shall be for a unit of one cubic meter.
4.27. Boring holes 3.5 M. deep in ordinary soil (for cast in site piles) and getting out the soil
and disposal of the surplus excavated soil as directed within a lead of 50 M. for following
diameter for piles (I) 200 mm. (ii) 250 mm. (iii) 300 mm.
1.0. Workmanship :
1.1. The ground shall be roughly leveled and after making the position of piles, the holes shall
be bored with aspire angle to the 3.5 M. depth and specified diameter using boring guide.
1.2. The bore holes shall be truly vertical and uniform bore throughout of specified diameter.
After boring to the required depth, the bore shall be cleared off the loose soil and disposal
of surplus excavated stuff as directed within a lead of 50 M.
2.0. Mode of measurement and payments :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.1. The rate for boring holes shall include :-
(a) Roughly leveling the ground in positions where piles are to be provided.
(b) Making the positions of piles by pegs and boring guide and also for shifting of boring
(c) Bailing out water, if any met with during boring.
(d) Disposal of surplus excavated soil within a lead of 50 M. and
(e) All tools, plants, equipment’s and labor required for satisfactory completion of work.
2.2. The rate shall before a unit of one number.
4.28. Extra for under reaming inside the bore holes for under reamed piles of following
nominal diameter. (I) 200 mm. (ii) 250 mm. (iii) 300 mm.
1.0. Workmanship : The relevant specifications of item No. 4.27 shall be followed except that
after boring to the required depth, the bore shall be enlarged at the bottom by an under
reamer 2 to 2 ½ times the diameter of the bore as directed. It shall be ensured that the bore
for the pile shall be enlarged to the correct diameter.
2.0. Mode of measurement and payment :
2.1. The relevant specifications of item No. 4.27 shall be followed.
2.2. The rate shall be paid extra over and above the rate of item No. 4.27 under reaming the
2.3. The rate shall be for a unit of one Number.
DETAILED SPECIFICATIONS- PLAIN & RCC WORKS
5.1.6. Providing and laying in foundation and plinth/under floors concrete with hard broken
aggregate 40 mm. nominal size and 40% mortar comprising of 1 Lime putty : 2 fine sand
and curing complete excluding cost of form work.
1.0. Materials:
1.1. Water shall conform to M-1. Sand shall conform to M-6. Lime shall conform to M-12.
2.0. Workmanship:
2.1.1. Before starting the concrete the bed of the foundations trenches shall be cleared of all loose
materials and watered and rammed as directed .
2.2. Proportion of Mix :
2.2.1. The proportion of lime, sand and aggregate shall be specified in the item of the work and
shall be measured by volume.
2.2.2. The lime mortar shall consist of proportion of 1 Lime putty : 2 sand volume. The lime
mortar shall be prepared by wet. process power driven mill shall be used for preparation of
lime mortar. The slaked lime shall be placed in the Mill in even layers and ground for
revolutions with sufficient water, The water shall be added as required during grinding (and
care shall be taken not to add more water) so that it will bring the mixed materials to a
consistency of stiff paste, thoroughly wetted sand shall then be added evenly and the
mixture ground for another 180 revolutions.
2.2.3. Lime mortar shall be kept damp, protected from sun and rain till used-up covering it by
tarpaulin or open sheds.
2.2.4. All the lime mortar shall be used as soon as possible after grinding. It should be used on the
day of which it is prepared but in no case mortar made earlier than 36 hours shall be
permitted for use.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.3.1. The concrete shall be mixed in mechanical mixer. Mixing shall be continued until there is
uniform distribution of the material and the mass is uniform in colour and consistency but
in no case mixing shall be done for less than 2 to 3 minutes.
2.4. Laying & Compacting :
2.4.1. The concrete shall always be used while quite fresh. It shall be laid (not thrown) in layers
not exceeding 150 mm. in thickness and shall be well and quickly rammed with wooden or
iron rammers, till the required compaction is achieved. The concrete laid shall not be of too
fluid consistency. After it has been mixed no more water shall be added, but the surface
during rough before the upper layer is laid. The concrete shall be kept continuously wet for
period of 7 days from the date of placing or until it is built over whichever is more.
2.5. Mode of measurement and payment :
2.5.1. The concrete work shall be measured in length, breadth and depth as specified on drawing
or as directed, correct upto nearest centimeter and cubical content shall be worked out
nearest upto two places or decimals.
2.5.2. The rate shall be for a unit of one cubic meter.
5.1.8. Providing and laying in foundation and plinth/under floors lime concrete with graded
bricks aggregate 40 mm. nominal size and 40% mortar comprising of 1 Lime Putty :
find sand and curing complete excluding cost of form work.
1.0. Materials :
1.1. Water shall conform to M-1. Lime mortar shall conform to M-10. Brick bats aggregates
mm. nominal size shall conform to M-14.
2.0. Workmanship:
2.1. The relevant specifications of item No. 5.1.6. shall be followed except that brick aggregate
shall be used instead of graded of graded stone aggregate.
3.0. Mode of measurement and payment :
3.1. The concrete work shall be measured in length, breath and depth as specified in drawing or
as directed, correct upto nearest centimeter and cubical content shall be worked out upto
two places of decimals.
3.2. The rate shall be for a unit of one cubic meter.
5.3.2. (A) Providing and laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded
stone aggregates 40 mm. nominal size) and curing complete excluding the cost of form
work in foundations and plinth.
1.0. Materials :
1.1. Water shall conform to M-1. Sand shall conform M-6. Cement shall conform to M-3. Stone
aggregate 40 mm. nominal size shall conform to M-12.
2.0. Workmanship :
2.1.1. Before starting concrete bed of foundation treaches shall be cleared of all loose materials,
leveled, watered, and rammed as directed.
2.2. Proportion of Mix :
2.2.1. The proportion of cement, sand and coarse aggregate shall be one part of cement, 3 parts of
sand, 6 parts of stone aggregates and shall so measured by volume.
2.3.1. The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may
however be allowed for smaller quantity of work if approved by the Engineer-in-charge.
When hand mixing is permitted by the Engineer-in-charge incase of break-down of
machinery’s and in the interest of the work. it shall be carried out on a water tight platform
and care shall be taken to ensure that mixing is continued until the mass is uniform in
colour and consistency. However in such cases 10% more cement than otherwise required
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
shall have to be used without any extra cost. The mixing in mechanical mixer shall be done
for a period 1 to 2 minutes. The quantity of water shall be sufficient to produce a dense
concrete of required workability for the purpose.
2.4. Transporting & Placing the concrete :
2.4.1. The concrete shall be handled from the place of mixing to the final position in not more
than 15 minutes by the method as directed and shall be placed into its final position,
compacted and finished within 30 minutes of mixing with water i.e. before the setting
2.4.2. The concrete shall be laid in layers of 15 cms. to 20 cms.
2.5. Compacting :
2.5.1. The concrete shall be rammed with heavy iron rammers and rapidly to get the required
compaction and to allow all the interstriees to be filled with mortar.
2.6.1. After the final set, the concrete shall be kept continuously wet, if required by pounding for
a period of not less than 7 days from the date of placement.
2.7. Mode of measurement and payment :
2.7.1 The concrete shall be measured for its length breadth and depth, limiting dimensions to
those specified on plan or as directed.
2.7.2 The rate shall be for a unit of one cubic meter.
5.3.3. (A) Providing and laying cement concrete 1:4:8 (1 cement:4 coarse sand : 8 graded stone
aggregate 40 mm. nominal size) and curing compete excluding cost of form work in
foundations and plinth.
1.0. Materials :
1.1. Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.
Stone aggregate 40 mm. nominal size shall conform to M-12.
2.0. Workmanship :
2.1. Relevant specifications of item No. 15.3.2. shall be followed except that cement concrete
shall be mixed in the proportion of 1:4:8 instead of 1:3:6 by volume.
3.0. Mode of measurement and payment :
3.1. The concrete shall be measured for its length, breadth and depth, limiting dimensions to
those specified on plans or directed.
3.2. The rate shall be for a unit of one cubic meter.
5.3.14 (A) Providing and laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 crushed
stone aggregate 20 mm. nominal size) and curing complete including cost of form work
in wallcaps/coping.
1.0. Materials & Workmanship :
1.1. The relevant specification of item No. 5.3.2. (A) shall be followed except that the work
shall be carried out for coping and wall caps, except the stone aggregate 20 mm. nominal
size shall be used for the concrete work of wall caps/coping.
2.0. Mode of measurement and payment :
2.1. The relevant specifications of item No. 5.3.2.(A) shall be followed except that the rate
includes cost of necessary form work.
2.1. The rate shall be for a unit of one cubic meter per meter.
5.3.3. (B) Providing and laying brick bats cement 1:4:8(1 cement :4 coarse sand :8 graded
brick bats) and curing complete excluding the cost of from work in foundation and
1.1 Materials :
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall
conform to M-6. Brick bat shall conform to M-14.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.0 Workmanship :
2.1 The specification of this item shall be followed as per item No. 5.3.3. except that the
proportion of brick bat cement concrete shall be 1:4:8 i.e. 1 part of cement, 4 parts of
coarse sand and 8 parts of graded brick bat by volume, using graded brick bat as coarse
aggregate instead of stone aggregate.
3.0 Mode of measurement and payments :
3.1.1 The concrete work shall be measured in length, breadth and depth as specified on drawing
limiting dimensions to those specified on drawings or as directed.
3.2 The rate shall be for a unit of one cubic meter.
5.3.4 (a) : Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded
stone aggregate 40 mm. nominal size) and curing complete, excluding the cost of form
work, for foundation and plinth.
1.0 Materials :
1.1 Water shall conform to M-1, Cement shall conform to M-3. Sand shall conform to M-6.
Stone aggregate 40 mm. nominal size shall conform to M-12.
2.0 Workmanship :
2.1 The relevant specification of item No 5.3.2.(A) shall be followed for the work except that
the work is to be carried out in cement concrete 1:5:10.
3.0 Mode of measurement and payment :
3.1 The concrete shall be measured for its length, breadth and depth. limiting dimensions to
those specified on plans or as directed.
3.2 The rate shall be for a unit of one cubic meter.
5.3.8 (A) : Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded
bricks bats 10 mm. nominal size) and curing complete excluding, cost of form work in
foundation and plinth.
1.0 Materials :
1.1 Water shall conform to M-1, sand shall conform to M-6. Cement shall conform to M-3.
Brick bats shall conform to M-14.
2.0 Workmanship :
2.1 The relevant specification of item No. 5.3.4 shall be followed except that brick bats
aggregate shall be used instead of stone aggregate.
3.0 Mode of measurement and payment :
3.1 The relevant specification of item No 5.3.4 shall be followed
3.2 The rate shall be for a unit of one cubic meter.
5.3.2 (B) : Providing and laying brick bat cement concrete : 1:3:6 (1 cement : 3 coarse sand :
graded brick bats) and curing complete excluding cost of form work in foundation and
1.0 The specification of item No. 5.3.2 A shall be followed for mode of measurements and
payment except that it excludes the cost of form work.
2.2 The rate shall be for a unit of one cubic meter.
5.4.18 Providing throating or plaster drip and moulding to R.C.C. Chhajas.
1.0 Materials : Water shall conform to M-1. Cement shall conform to M-3. Sand shall
conform to M-6. Cement mortar shall conform to M-11.
1.1 Workmanship :
2.1 The work shall be carried out as directed. The proporation of mix for finishing touching
shall be in CM. 1:2 by volume. Curing shall be done for not less than 7 days. The work
shall be carried out in best workman like manner. The throating or plaster drip and
moulding shall be one centimeter in thickness.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
5.7.5 Extra for providing and mixing water proofing or plaster drip and moulding shall be one
centimeter in thickness.
2.0 Workmanship :
2.1 The propotions of materials for the cement concrete shall be mentioned with the
specification of that item. The quantity of water proofing materials to be added and the
method of addition shall be as specified by manufacturers.
2.2.1 The mixing of the water proofing materials ion cement, water or concrete shall be done
according to the specifications of the manufacturer.
3.0 Mode of measurement and payment :
3.1 The payment is extra over and above the rate of concrete for mixing water proofing proper.
3.2 The rate shall be for a unit of one liter of Kg. per quintal of cement in which water proofing
material is added.
5.7.1 Providing and laying damp proof course 25 mm thick cement concrete 1:2:4(1 cement :
coarse sand : 4 stone aggregate 10 mm nominal size) and curing complete.
1.0 The specifications of item No. 5.3.13 (A) of ordinary concrete with or without
reinforcement shall be followed except that the size of the stone aggregate shall be 10 mm
nominal size and the concrete work shall be carried out in 25 mm thick damp proof course.
2.0 Mode of measurement and payment :
2.1 The rate includes cost of all materials and labour required to complete the item.
2.2 The rate shall be for a unit of one sq. meter.
5.3.13 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) and curing complete excluding cost of form work in (A)
foundation and plinth, (B) Independent piers, columns and pillars up to floor two level.
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform
to M-6, Grit shall conform to M-8 Graded stone aggregate 20 mm nominal size shall
conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the
concrete mix shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm
nominal size) by volume. Concrete work shall have exposed concrete surface or as
specified in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond
approximately to 1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by
volume respectively.
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by
weight (0.0342 Cu. M) for different proportions of mix shall be as under:
Grade of Total quantity of Proportion of fine Quantity
concrete dry aggregate by aggregate to coarse of water
volume per 50 Kgs, aggregate per
of cement to be Kgs. of
taken as the sum of cement
individual volume of maximum.
fine and coarse
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
M-150 (1:2:4) 220 ” aggregate by volume 32 “
M-200 (1:1 1/2 :3) 160 “ but subject to and 30 “
and lower limit 1:3
2.4 The water cement ratios shall not more than those specified in the above table. The cement
content of the mix specified in the Table shall be increased if the quantity of water in a mix
has to be increased to overcome the difficulties of placement and compaction so that the
water cement ratio specified in the Table is not exceeded.
2.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is
bound to give a concrete mix which is just sufficiently wet to be placed and compacted
without difficulty with the means available.
2.6 the maximum size of coarse aggregate shall be as large as possible within the limits
specified but in no case greater than surround all reinforcement thoroughly and to fill the
corners of the form.
2.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are
generally considered satisfactory.
2.8 For heavily reinforced concrete members as in the case of ribs of main beams the nominal
maximum size of coarse aggregate should usually be restricted to 5 mm less than the
minimum clear distance between the main bars, or 5 mm less than the minimum cover to
the reinforcement whichever is smaller.
2.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the
aggregate may not be important and the nominal maximum size may sometimes be as
greater than the minimum cover.
2.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon the
evidence that with the passage of time, neither the compressive strength of concrete is
reduced nor are other requisite qualities of concrete and steel impaired by the use of such
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be
measured in terms of bags of 50 Kg. weight. The volume of one such bag being taken as
0.0342 Cu. Meter. Boxes of suitable sizes shall be used for measuring sand aggregate. The
size of the boxes (internal) shall be 35 cms x 25 cms. and 40 cms deep. White measuring
the aggregate and sand, the box shall be filled without shaking ramming or hammering.
The proportioning of sand shall be on the basis of its dry volume and in case of damp sand,
allowances for bulkage shall be made.
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other
accessories shall be kept in first class working condition and so maintained throughout the
construction. Measured quantity of aggregate, sand, cement required for each batch shall be
poured into the drum of the mechanical mixer while it is continuously running. After about
half a minute of dry mixing, measured quantity of water required for each batch of concrete
mix shall be added gradually and mixing continued for another one and half a minute.
Mixing shall be continued till materials are uniformly distributed and uniform color of the
entire mass is obtained and each individual particle of the coarse aggregate shows complete
coating of mortar containing its proportionate amount of cement. In no case shall the
mixing be done for less than 2 minutes after all ingredients have been put into the mixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain
other reasons, it shall be done on the smooth watertight platform large enough to allow
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
efficient turning over the ingredients of concrete before and after adding water. Mixing
platform shall be so arranged that no foreign material gets mixed with concrete nor does the
mixing water flow out. Cement in required number of bags shall be placed in a uniform
layer on top of the measured quantity of fine and coarse aggregate, which shall also be
spread in a layer of uniform thickness on the mixing platform. Dry coarse and fine
aggregate and cement shall then be mixed thoroughly by turning over to get a mixture to
uniform color. Specified quantity of water shall then be added gradually through a rose-can
and the mass turned over till a mix of required consistency is obtained. In hand mixing
quantity of cement shall be increased by 10 percent above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned
before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge the
first batch of concrete from the mixture shall contain only two thirds of normal quantity of
coarse aggregate. Mixing plant shall be thoroughly cleaned before changing from one type
of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of
vibration of concrete, shall be determined by regular slump tests in accordance with I.S.
1199-1959. The slump of 10mm to 25mm. shall be adopted when vibrators are used and
80mm when vibrators are not used.
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the
forms to permit him to inspect and accept the false work and forms as to their strength,
alignment, and general fitness but such inspection shall not relieve the contractor of his
responsibility for the safety of men, machinery, materials and for results obtained.
Immediately before concreting, all forms shall be thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One
carpenter with helper shall invariably be kept present throughout the period of concreting.
Movement of labour and other persons shall be totally prohibited for reinforcement laid in
position. for access to different parts, suitable mobile platforms shall be provided so that
steel reinforcement in position is not disturbed. For ensuring proper cover, mortar blocks of
suitable size shall be provided so that steel reinforcement in position is not disturbed. For
ensuring proper cover, mortar blocks of suitable size shall be cast and tied to the
reinforcement. Timber kapachi or metal pieces shall not be used for this purpose.
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so
transported and placed that no contemination, segregation or loss of its constituent material
All form wok shall be cleaned and made free from standing water, dust, show or ice
immediately before placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-
in-charge has been obtained.
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh
concrete shall not be placed against concrete which has been in position for more than
minutes unless a proper construction joint is formed. Concrete shall compacted in its final
position within 30 minutes of its discharge from the mixer. Except where otherwise agreed
to by the Engineer-in-charge concrete shall be deposited n horizontal layers to a compacted
depth of not more than 0.45 meter when internal vibrators are used and not exceeding
meter in all other cases.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into
place from a height exceeding 2 meters. When trunking or chutes are used they shall be
kept close and used in such a way as to avoid segregation. When concreting has to be
resumed on a surface which has hardened, it shall be roughened, swept clean, thoroughly
wetted and covered with a 13 mm thick layer of mortar composed of cement and sand in
the same ratio as in the concrete mix itself. This 13 mm layer of mortar shall be freshly
mixed and placed immediately before placing of new concrete. Where concrete has not
fully hardened, all laitance shall be removed by scrubbing the wet surface with wire or
bristle brushes, care being taken to avoid dislodgment of any particles of coarse aggregate.
The surface shall then be thoroughly wetted, all free water removed and then coated with
neat cement grout. The first layer of concrete to be placed on this surface shall not exceed
150 mm in thickness and shall be well rammed against old work particular attention being
given to corners and close spots.
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance
of vibrators, unless, otherwise permitted by the Engineer-in-charge for exceptional cases,
such as concreting under water, where vibrators cannot be used. Sufficient vibrators in
serviceable condition shall be kept at site so that spare equipment is always available in the
event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the
coarse aggregate and begins to cream up to form an even surface. Compaction shall be
completed before the initial setting starts i.e. within 30 minutes of addition of water to dry
mixture. During compaction, it shall be observed that needle vibrators are not applied on
reinforcement which is likely to destroy the bond between concrete and reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including
rain, running water, shocks, vibration, traffic, rapid temperature changes, frost and drying
out process. It shall be covered with wet sacking, hassain or other similar absorbant
material approved, soon after the initial set and shall be kept continuously wet for a period
of not less than 14 days from the date of placement. Masonary work over foundation
concrete may be started after 48 hours of its laying but curing of concrete shall be
continued for a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made,
cured and tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959.
A random sampling procedure shall be adopted to ensure that each concrete batch shall
have a reasonable chance of being tested i.e. the sampling should be spread over the entire
period of concreting and cover all mixing units. The minimum frequency of sampling of
concrete of each grade shall be in accordance with following:
Quantity of No. of Quantity of concrete in No. of
concrete in the samples the works samples
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made
from each sample, five for testing at 7 days and the remaining five at 28 days. The samples
of concrete shall be taken on each day of the concreting as per above frequency. The
number of specimens may be suitably increased as deemed necessary by the Engineer-in-
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
charge when procedure of tests given above reveals a poor quality of concrete and in other
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the
specified cube strength of 150 Kg/Cm2 at 28 days. 20% of the cubes cast for each day may
have value less than the specified strength provided the lowest value is not less than 85%
of the specified strength. If the concrete made in accordance with the proportions given for
a particular grade, does not yield the specified strength; such concrete shall be classified as
belonging to the appropriate lower grade. Concrete made in accordance with the
proportions given for a particular grade shall not, however, be placed in a higher grade on
the ground that the test strength are higher than the minimum specified.
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to
strike the form work. While fixing the time for removal of form work, due consideration
shall be given to local conditions, character for the structure, the weather and other
condition that influence the setting of concrete and of the materials used in the mix. In
normal circumstances (generally where temperatures are above 20 0 C) and where ordinary
concrete is used, forms may be struck after expiry of periods specified in item No 9.1(A)
for respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage
the concrete. Before the soffit and struts are removed, the concrete surface shall be
exposed, where necessary in order to ascertain that the concrete has sufficiently hardened.
Centering shall be gradually and uniformly lowered in such manner as to permit the
concrete to take stresses due to its own weight uniformly and gradually. Where internal
metal ties are permitted, the or their removable parts shall be extracted without causing any
damage to the concrete and remaining holes filled with mortar. No permanently embedded
metal part shall have less than 25 mm cover to the finished concrete surface. Where it is
intended to re-use the form work, it shall be cleaned and made good to the satisfaction of
the Engineer-in-charge. After removal of form work and shuttering, the Executive Engineer
shall inspect the work and satisfy by random checks that concrete produced is of good
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement
concrete member and used for shuttering or any other purpose shall be cut inside the
cement concrete member to a depth of at least 25 mm below the surface of the concrete and
the resulting holes be filled by cement mortar. All fine caused by form joints, all cavities
produced by the removal of form ties and all other holes and depressions honeycomb spots,
broken edges or corners and other defects shall be thoroughly cleaned, saturated with water
and carefully pointed and rendered true with mortar of cement and fine aggregate mixed in
the proportions used in the grade of concrete that is being finished and of as dry
consistency as is possible to use. Considerable pressure shall be applied in filling and
pointing to ensure thorough filling in all voids. Surfaces which are pointed shall be kept
most for a period of 25 hours.
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent
or character as to effect the strength of the structure materially or to endanger the life of the
steel reinforcement, he may declare the concrete defective and require the removal and
replacement of the portion of the structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured.
The concrete laid in excess of section shown on drawings or as directed shall not be
measured. No deduction shall be made for –
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses,
corbels and steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing
in position, vibrating and compacting, finishing, as directed, curing and all other incidental
expenses for producing concrete of specified strength. The rate excludes the cost of form
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies,
internals beams girders and cantilever up to floor two level (C) Columns, pillars, posts and
struts up to floor two level (D) Staircase up to floor two level (E) Vertical and horizontal
fins up to floor two level.
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall
be carried out for reinforced concrete work for work as specified in item 1.2. In addition,
the following stipulations shall be followed for :
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement
mortar 1:2 (1 cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to
the specified cover shall be placed between the bars and shuttering as to secure and
maintain the requisite cover of concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall
be held in position by introducing chain spacers or supports bars at 1.0 to 1.2 meters
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber
temphtes with slotes accurately out in them. The temphtes shall be removed after
concreting has been done below it. The bars may also be suitably tied by means of annealed
steel wires to the shuttering to maintain their position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and
concrete are to be attached or bounced to later on, shall be protected with a coat of thin neat
cement grout, if the bars are not likely to be incorporated with succeeding mass of concrete
within the following 10 days. This coat of thin neat cement shall be removed before
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
5.4.4 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) for reinforced concrete chhajas not exceeding 10 cms.
thick ness up to floor level including finishing the exposed surface with cement mortar
1:3 (1 cement : 3 fine sand) to give a smooth and even surface centering and form work
and curing complete excluding cost of reinforcement.
1.0 Materials & Workmanship:
1.1 The cement mortar shall conform to M-11
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
1.2 The relevant specifications of item No. 5.3.13 and 5.4.1 shall be followed except that the
work shall be carried out for reinforced concrete chhajas not exceeding 10 cms in thick
1.3 The specifications for form work and centering shall be as per item No.
1.4 The finishing work in cement mortar 1:3 (1 cement : 3 fine sand) shall be carried out as per
specifications of item No. 17.59(I). Before the plastering is done, the surface of the
concrete shall be raked for proper bond.
2.0 Mode of measurement and payment:
2.1 The relevant specifications of item No. 5.3.13 and 5.4.1 shall be followed except that the
work of chhajas up to 10 cms shall be carried out including centering form work and
finishing the surface with cement mortar 1:3 (1 cement : 3 fine sand)
2.2 The rate shall be for a unit of one cubic meter.
5.4.10 Providing Mild Steel reinforcement of R.C.C. work including bending binding and
placing in position etc. complete up to floor two level.
1.0 Materials :
1.1 Mild steel bars shall conform to M-18. Mild steel binding wires shall conform to M-21.
2.0 Workmanship:
2.1 The work shall consist of furnishing and placing reinforcement to the shape and dimensions
shows as on the drawings or as directed.
2.2 Steel shall be clean and free from rust and loose mill scale at the time of fixing in position
and subsequent concreting.
2.3 Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape and
dimensions or as directed using a proper bar bender, operated by hand or power to attain
proper radius of bends. Bars shall not be bent or straightened in a manner that will injure
the material. Bars bent during transport or handling shall be straightened before being used
on the work. They shall not be heated to facilitate bending. Unless otherwise specified, a
‘U’ type hook at the end of each bar shall invariably be provided to main reinforcement.
The radius of the bend shall not be less than twice the diameter of the round bar and the
length of straight part of the bar beyond the end of the curve shall be at least four times the
diameter of the round bar. In case of bars which are not round and in case of deformed
bars, the diameter shall be taken as the diameter of circle having an equivalent effective
area. The hooks shall be suitably encased to prevent any splitting of the concrete.
2.4 All the reinforcement bars shall be accurately placed in exact position shown on the
drawing and shall be securely held in position during, metal hangers, supporting wires or
other approved devices at sufficiently close intervals,. Bars shall not be allowed to sag
between supports nor displaced during concreting or any other operations of the work. All
devices used for positioning shall be of non-corrodible material. Wooden and metal
supports shall no extend to the surface of concrete, except where shown on drawings.
Placing of broken stone or brick and wooden blocks shall not be allowed. Pieces of broken
stone or brick and wooden blocks shall not be used. Layers of bars shall be separated by
spacer bars, precast mortar blocks or other approved devices. reinforcement after being
placed in position shall be maintained in a clean condition until completely embedded in
concrete. Special care shall be exercised to prevent any displacement of reinforcement in
concrete already placed. To prevent reinforcement from corrosion, concrete cover shall be
provided as indicated on drawings. All the bars producing from concrete and to which
other bars are to be spliced and which are likely to be exposed for a period exceeding
days shall be protected by a thick coast of neat cement grout.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.5 Bars crossing each other where required shall be secured by binding wires (annealed) of
size not less than 1 mm in such manner that they do not slip over each other at the time of
fixing and concreting.
2.6 As far as possible, bars of full length shall be used. In case this is not possible, overlapping
of bars shall be done directed. When practicable, overlapping bars shall not touch each
other, but be kept apart by 25 mm or 1.25 mm times the maximum size of the coarse
aggregate whichever is greater by concrete between them. Where not feasible, overlapping
bars shall be bound with annealed wires not less than 1 mm thick twisted tight. The
overlaps shall be staggered for different bears and located at points along the span where
neither shear nor bending movement is maximum.
2.7 Whenever indicated on the drawings or desired by the Engineer-in-charge, bars shall be
joined by couplings which shall have a cross-section sufficient to transpit the full stresses
of bars. The ends of the bars that are joined by coupling shall be upset for sufficient length
so that the effective cross section at the base of threads is not less than normal cross-section
of the bar. Threads shall be standard threads. Steel for coupling shall conform to I.S.
2.8 When permitted or specified on the drawings, joints of reinforcement bars shall be butt-
welded so as to transmit their full stresses. Welded joints shall preferably be located at
points when steel will not be subject to more than 75 percent of the maximum permissible
stresses and welds so staggered that at any one section not more than 20 percent of the rods
are welded. Only electric are welding using a process which excludes air from the molten
metal and conforms to any or all other special provisions for the work shall be accepted.
Suitable means shall be provided for holding bars securely in position during welding. It
shall be ensured that no voids are left in welding and when welding is done in two or three
stages, previous surface shall be cleaned properly. Ends of the bars shall be cleaned of all
loose scale, rust, grease, paint and other foreign matter before welding. Only competent
welders shall be employed on the work. the M.S. electrodes used for welding shall conform
to I.S. 814. Welded pieces of reinforcement shall be tested. Specimen shall be taken from
the actual site and their number and frequency of test shall be as directed.
3.0 Mode of measurement and payment :
3.1 For the purpose of calculation consumption , wastage shall bot be permitted beyond
percent . Excess consumption over 5 % will be charged at penal rate
3.3 Reinforcement shall be measured in length including overlaps, separately for different
diameters as actually used in the works. Where welding or coupling is resorted to in place
of lap joints such joints shall be measured for a pimento as equivalent length of overlap as
per design requirement. From the length so measured, the weight of reinforcement shall be
calculated in tones on the same basic of as per M-18 even though steel is supplied to the
contractor by the department on actual weight Length shall include hooks at the ends.
Wastage and annealed steel wire for binding shall not be measured and the cost of these
items shall be deemed to be included in the rate for reinforcement.
3.4 The rate shall be for a unit One Kg.
5.4.11 High yield deform bars steel reinforcement for R.C.C. work including bending binding
and placing in position complete up to floor two level.
1.0. Materials :
1.1. Cold twisted steel bars (high yield strength steel deformed bars)shall be conform to M-19
Mild steel binding wires shall conform to M-21
2.0. Workmanship :
2.1. The specifications of item No 5.4.10 shall be followed except that the cold twisted steel
bars shall be used with or without hooks and the ends. Deformed bars without hooks shall
however comply with however comply with relevant anchorage requirements.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
3.0. Mode of measurement and payment :
3.1 The relevant specifications of item No. 5.4.10 shall be followed
3.2 The rate shall be for a unit of One Kg.
5.4.12 Extra for additional life of concrete for all R.C.C. work above floor two level excluding
coast of reinforcement
1.0 Materials & Workmanship : The relevant specification of item No 5.4.1 shall be
followed for the work except that the R.C.C work shall be done for ground floor i.e. above
plinth level to first floor level.
2.0 Mode of measurement and payment:
2.1 The relevant specification of item no 5.4.1 shall be followed except that the rate shall be for
extra lift above plinth to floor two level, over and above the rate of concrete at floor two
2.2 The rate shall be for unit of one cubic meter.
5.4.13 (A) Extra for additional lift of reinforcement steel for all R.C.C. work above floor two
1.0 Materials & Workmanship:
1.1 The relevant specifications of item No. 5.4.10 or 5.4.11 as may be applicable, shall be
followed except that the work shall be carried out above floor two level for each floor.
2.0 Mode of measurement and payment:
2.1 The relevant specifications of item No. 5.4.10 or 5.4.11 as may be applicable shall be
followed except that the work shall be carried above floor two level.
2.2 The rate shall be for unit of one Kg. per floor.
5.6.2 Providing up to floor two level precast cement concrete jali or grill 1:2:4 (1 cement :
coarse sand : 4 graded stone aggregate 6 mm nominal size) reinforced with 1:6 mm dia
mild steel wire including roughening, cleaning, fixing and finishing in cement mortar
1:3 and curing complete.
(A) 50 mm thick (B) 40 mm thick (C) 25 mm thick (D) 75 mm thick (E) 100 mm thick.
1.0 Materials :
1.1 Water shall conform to M-1 (2) Cement shall conform to M-3 (3) Sand shall conform to M-
6 (4) Mortar shall conform to M-11 (5) Aggregate shall conform to M-12 (6) Mild steel
wire shall conform to M-21 (7) Shuttering shall conform to M-26.
2.0 Workmanship:
In shall be of cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
mm nominal size) reinforced with 1.6 mm dia mild steel wire unless other wise specified.
The thickness of jali shall be as specified in the item.
The jali shall be set in position true to line and level before the jambs sills and soffits of the
opening are plastered. It shall then be properly cemented with cement mortar 1:3: (1
cement : 3 sand) and rechecked for levels. Finally the jambs, sills and soffits shall be
plastered gripping the jali uniformly on all sides.
3.0 Mode of measurement and payment:
3.1 The item shall be measured in square meter.
3.2 The rate shall be for a unit of one square meter.
5.8.1 Providing and laying controlled concrete M-150 and curing complete excluding the cost
of form work and reinforcement for reinforced concrete work in :
(A) Foundations, footings, base of columns, and mass concrete. (B) Walls from top of
foundations/level up to floor two level. (C) Slabs, landing shelves, Balconies, lintels,
beams, girders, and cantilever, up to floor two level (D) Columns, pillars, posts, and
struts, up to floor two level (E) Staircase up to floor two level (F) Vertical and horizontal
fins up to floor two level.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
1.0 Materials :
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.
Grit shall conform to M-8. Coarse aggregate shall conform M-12 B.
2.1 The relevant specifications of item no. 5.4.1 of ordinary concrete shall be followed except
that the concrete mix shall be designed from preliminary tests, the proportioning of cement
and aggregates shall be done by weight and necessary precautions shall be taken in the
production to ensure that the required work cube strength is attained and maintained. The
controlled concrete shall be in grades of M-100, M-150, M-200, M-250, M-300, M-350,
M-400, with prefix controlled added to it. The letter ‘M’ refers to mix and numbers specify
28 days works cube compressive strength of 150 mm cubes of the mix expressed in Kg. /
2.2 The porportion of cement, sand and coarse aggregates shall be determined by weight. the
weight batch machine shall be used for maintaining proper control over the porportion of
aggregates as per mix design.
The strength requirements of different grades of concrete shall be as under:
Grade of Compressive strength of 15 cms cubes in Kg./Cmt. at
28 days conducted in with I.S. 516-1959
accordance Preliminary test
In all cases, the 28 days compressive strength specified in above table above be the criteria
for acceptance or rejection of the concrete.
Where the strength of a concrete mix as indicated by tests, lies in between the strength of
any two grades specified in the above table such concrete shall be classified in for all
purposes as concrete belonging to the lower of the two grades between which its strength
2.3 The proportions for ingredients chosen shall be such that concrete has adequate workability
for conditions prevailing on the work in question and can be properly compacted with
means available except where it can be shown to the satisfaction of the Engineer-in-charge,
that the supply of properly graded aggregate of uniform quality can be maintained till the
completion of work. Grading of aggregate shall be controlled by obtaining the coarse
aggregates, in different sizes and being in them in the right proportions as required.
Aggregate of different sizes shall be stocked in separate stock piles. The required quantity
of material shall be stock piled several hours, preferably a day before use. The grading of
coarse and fine aggregate shall be checked as frequently as possible, the frequency for a
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
given job being determined by the Engineer-in-charge to ensure that the suppliers are
maintaining the uniform grading as approved for samples used in the preliminary tests.
2.4 In proportioning concrete, the quantity of both cement and aggregate shall be determined
by weight. Where the weight of cement is determined by accepting the maker’s weight per
bag a reasonable number of bags shall be weighted separately to check the net weight.
Water shall either be measured by volume in calibrated tanks or weighed. All measuring
equipments shall be maintained in clean and serviceable condition. Their accuracy shall be
periodically checked.
2.5 In is most important to keep the specified water cement ratio constant and at its correct
value. To this end, moisture content in both fine and coarse aggregates shall be determined
by the Engineer-in-charge, according to the weather conditions. The amount of mixing
water shall then be adjusted to compensate for variations in the moisture content. For the
determination of moisture content in the aggregates, I.S. 2389(Part III) shall be referred to.
Suitable adjustments shall also be made in the weights of aggregates due to variation in
their moisture content. Minimum quantity of cement to be used in concrete shall not be less
than 220 Kgs./M 3 in plain concrete and not less than 250 Kg/M3 in reinforced concrete.
3.0 Mode of measurement and payment:
3.1 The relevant specifications item No. 5.4.1 shall be followed except that the controller
concrete R.C.C. work for work as specified in item shall be measured under this item. The
rate excludes cost of form work.
3.2 The rate shall be for a unit of one cubic meter.
5.8.2 Providing and laying controlled cement concrete M-200 and curing complete, excluding
the cost of form work and reinforcement for reinforced concrete work in:
(A) foundations, footings, base of columns and mass concrete. (B) Walls from top of
foundation up to floor two level (D) Columns pillars posts and struts up to floor two level
(E) Stair cases up to floor two level (K) Vertical and horizontal fins up to floor two level.
1.0 Materials & Workmanship:
The relevant specifications of item No. 5.8.1 shall be followed except that the grading of
concrete shall be controlled concrete M-200 grades for the work as specified in item.
2.0 Mode of measurement and payment:
2.1 The relevant specifications of item No. 5.8.1 shall be followed.
2.2 The rate shall be for one cubic meter.
5.8.3 Providing and laying controlled cement concrete M-250 and curing complete excluding
the cost of reinforcement for reinforced concrete work in:
(A) Foundations, footings, bases of columns and the like and mass concrete (B) Walls
from top of foundation level up to floor two level (C) Slabs, landings shelves, balconies,
beams, girders and cantilever up to floor two level (D) Columns, pillars, struts up to two
1.0 Materials & Workmanship :
1.1. The relevant specifications of item No. 5.8.1 shall be followed except that the grading of
concrete shall be controlled concrete M-250 grades for the works as specified in the item.
2.0 Mode of measurement and payment:
2.1 The relevant specifications of item No. 5.8.1 shall be followed.
2.2 The rate shall be for a unit of one cubic meter.
5.001 Providing and laying ordinary cement concrete 1:2:4 (1 cement : 2 coarse sand :
graded stone aggregates 20 mm nominal size) and finishing smooth with curing etc.,
complete including the cost of form work but excluding the cost of reinforcement of
R.C.C. work in :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
(I) Slabs up to 8 cms thickness (II) Slab having more than 8 cms and up to 10 cms
thickness (III) Slab having more than 10 cms and up to 13 cms thickness (IV) Slab
having more than 13 cms and up to 15 cms thickness.
1.0 Materials & Workmanship :
1.1 The relevant specifications of item No 5.4.1 shall be followed for concrete work and
relevant specifications of item No. 9.1 shall be followed for form work and centering work.
The concrete surface shall be smooth finished in cement mortar 1:3 (1 cement : 3 fine sand)
as per item No. 17.59 (1) The thickness of the slab shall be as specified in the item.
2.0 Mode of measurement and payment:
2.1 The relevant specifications of item 5.4.1 shall be followed except that the item includes
cost for providing form work and centering work as directed.
2.2 The rate shall be for a unit of one cubic meter.
5.002 Providing and laying controlled cement concrete M-150 and finishing smooth with
curring etc. complete including the cost of form work but excluding the cost of
reinforcement for R.C.C. work in:
(I) Slabs up to 8 cms thickness (II) Slabs more than 8 cms and up to 10 cms (III) Slabs
more than 10 cms and up to 13 cms (IV) Slabs more than 13 cms and up to 15 cms.
1.0 Materials & Workmanship:
1.1 The relevant specifications of item No. 5.8.1 shall be followed for concrete work and item
no 9.1 shall be followed for form work and centering. The concrete surface hall be smooth
finished with cement mortar 1:3 (1 cement : 3 fine sand) as per item No. 17.59 (1) The
thickness shall be as specified in the item
2.1 The relevant specification for item No. 5.8.1 shall be followed except that the item shall
include the cost and form work and centering.
2.2 The rate shall be for a unit of one cubic meter.
5.003 Providing and laying ordinary cement concrete 1:2:4 (1 cement : 2 coarse sand :
graded stone aggregates 20 mm nominal size exposed work with curing etc. complete
including the cost of form work but excluding the cost of reinforcement for R.C.C. work
in (I) Slab up to 8 cms thickness (II) Slabs having more than 8 cms and up to 10 cms
thickness (III) Slabs having more than 10 cms and up to 13 cms thickness (IV) Slabs
having more than 13 cms and up to 15 cms thickness.
1.0 Materials & Workmanship :
1.1 The relevant specifications of item No. 5.4.1 shall be followed for concrete work and that
of form work and centering work shall be followed as per item No. 9.1 and 9.7. The
thickness of the slab shall be as specified in the item.
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 5.4.1 shall be followed except that form work and
centering work shall be included in the item.
2.2 The rate shall be for a unit of one cubic meter.
5.004 Providing and laying controlled cement M-150 exposed work with curing etc. complete
including the cost of form work but excluding the cost of reinforcement for R.C.C. work
(I) Slabs up to 8 cms thickness (II) Slabs having more than 8 cms and up to 10 cms
thickness (III) slabs having more than 10 cms and up to 13 cms thickness (IV) Slabs
having more than 13 cms thickness.
1.0 Materials & Workmanship :
1.1 The relevant specifications of item No 5.4.1 shall be followed for controlled concrete and
the relevant specifications of item No 9.1 and 9.7 shall be followed for exposed concrete
form work and centering work. The thickness of the slab shall be as specified in the item.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 5.8.1 shall be followed except that the form work
and centering work shall be included in the item.
2.2 The rate shall be for a unit of one cubic meter.
5.005 Providing and laying ordinary cement concrete 1:2:4 (1 cement : 2 coarse sand :
graded stone aggregate 20 mm nominal size) for R.C.C. lintel including finishing smooth
with curring etc. complete including the cost of form work but excluding the cost of
1.0 Materials & Workmanship :
1.1 The relevant specifications of item No. 5.4.1 shall be followed for concrete work relevant
specifications of item No. 17.59 (I) for finishing work and relevant specifications of item
No. 9.1 shall be followed for form work and centering work. The concrete work shall be
followed for the form work and centering work for exposed concrete work.
2.0 Mode of measurement and payment:
2.1 The relevant specifications of item No. 5.8.1 shall be followed except that the item includes
the cost of form work and centering work for exposed concrete work.
2.2 The rate shall be for a unit of one cubic meter.
5.006 Providing and laying ordinary cement concrete 1:2:4 (1 cement : 2 coarse sand :
graded stone aggregate 20 mm nominal size) and finishing smooth with curing etc.
complete including the cost of form work but excluding reinforcement for R.C.C. work in
(A) Beams : (I) Having cross sectional area 0.05 to 0.08 Sq. meter (II) Having cross
sectional area more than 0.08 Sq. mt. up to 0.12 Sq. mt. (III) Having cross sectional area
more than 0.12 Sq. mt. up to 0.18 Sq. mt.
(B) Columns : (I) Having cross sectional area 0.05 to 0.08 Sq. mt. (II) Having cross sectional
area more than 0.08 Sq. mt. and up to 0.12 Sq. mt. (III) Having cross sectional area
more than 0.12 Sq. mt. and up to 0.18 Sq. mt.
1.0 Materials & Workmanship:
1.1 The relevant specification of item No. 5.4.1 shall be followed for concrete work and item
no. 9.1 shall be followed for form work and centering work. The finishing shall be done in
cement mortar 1:3 (1 cement : 3 fine sand) as per item No. 17.59 (I) The cross sectional
area of beam shall be specified in item.
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 5.4.1 shall be followed but the form work and
centering work shall be included in the item.
2.2 The rate shall be for a unit of one cubic meter.
5.007 Providing and laying controlled cement concrete M-150 exposed work with curing etc.
Complete including the cost of form work but excluding the cost of reinforcement for
R.C.C. work in:
(A) Beams : (I) Having cross sectional area 0.05 to 0.08 Sq. mt. (II) Having cross sectional
area more than 0.08 Sq. mt. up to 0.12 Sq. mt. (III) Having cross sectional area more
than 0.12 Sq. mt. and up to 0.18 Sq. mt.
(B) Columns: (I) Having cross sectional area of 0.05 Sq. mt. to 0.08 Sq. mt. (II) Having cross
sectional area more than 0.08 Sq. mt. and up to 0.12 Sq. mt. (III) Having cross sectional
are amore than 0.12 Sq. mt. and up to 0.18 Sq. mt.
1.0 Materials & Workmanship:
1.1 The relevant specifications of item No. 5.8.1 shall be followed for controlled concrete work
for work as specified in item for M-200 and relevant specifications of item 9.1 and 9.7 shall
be followed for the form work and centering work for exposed cement work.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 5.8.1 shall be followed excepted that the form work
and centering work shall be included in the item.
2.2 The rate shall be for a unit of one cubic meter.
5.008 Providing and laying controlled cement concrete M-200 exposed work with curing etc.
complete including the cost of form work but excluding the cost of reinforcement for
R.C.C. work in :
(A) Beams : (I) Having cross sectional area 0.05 Sq. mt. (II) Having cross sectional area
0.08 Sq. mt. up to 0.12 Sq. mt. (III) Having cross sectional are 0.12 Sq. mt. up to 0.18 Sq.
(B) Columns : (I) Having cross sectional area 0.05 Sq. mt. (II) Having cross sectional area
more than 0.08 Sq. mt. and up to 0.12 Sq. mt. (III) Having cross sectional area more
than 0.12 Sq. mt. and up to 0.18 Sq. mt.
1.0 Materials & Workmanship:
1.1 The relevant specifications of item No. 5.8.1 shall be followed for controlled concrete work
as specified in item for M-200 and relevant specifications of item 9.7 and 9.1 shall be
followed for the form work and centering work for exposed cement work.
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 5.8.1 shall be followed except that item includes the
cost of form work and centering work for exposed work.
2.2 The rate shall be for a unit of one cubic meter.
5.009 Providing and laying controlled cement concrete M-250 exposed work with curing etc.
complete including the cost of form work but excluding the cost of reinforcement for
R.C.C. work in -
(A) Beams : (I) Having cross sectional area 0.05 to 0.08 Sq. mt. (II) Having cross sectional
area more than 0.08 Sq. mt. and up to 0.12 Sq. mt. (III) Having cross sectional area
more than 0.12 Sq. mt. and up to 0.18 Sq. mt.
(B) Columns: (I) Having cross sectional area 0.05 to 0.08 Sq. mt. (II) Having cross sectional
area more than 0.08 Sq. mt. and up to 0.12 Sq. mt. (III) Having cross sectional area
more than 0.12 Sq. mt. and up to 0.18 Sq. mt.
1.0 Materials & Workmanship:
1.1 The relevant specifications of item No. 5.8.1 shall be followed for controlled concrete work
for the work as specified in the item for M-250 and the relevant R.C.C. lintels shall be
2.0 Mode of measurement and payment:
2.1 The relevant specifications of item no. 5.4.1 shall be followed except that the cost of form
work finishing and centering shall be included in the item.
2.2 The rate shall be for a unit of one cubic meter.
DETAILED SPECIFICATIONS – MASONARY WORK
6.12 (A) Brick work using common burnt clay building bricks having crushing strength not
less than 35 kg/Sq. cm. in foundations and plinth in cement mortar 1:5 (1 cement : 5 fine
sand) modular bricks.
1.0 Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform
to M-6. Brick shall conform to M-15 Cement mortar shall conform to M-11.
2.0 Workmanship:
2.1 Proportion:
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.1.1 The proportion of the cement mortar shall be 1:5 (1 cement : 5 fine sand) by volume.
2.2 Wetting of bricks:
2.2.1 The bricks required for masonry shall be thoroughly wetted with clean water for about two
hours before use or as directed. The cessation of bubbles, when the bricks are wetted with
water is an indication of through wetting of bricks.
2.3.1 Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not
be used except when necessary to complete to bond; closer in such case shall be cut to
required size and used near the ends of walls.
2.3.2 A layer of mortar shall be spread on full width for suitable length of the lower course. Each
brick shall first be properly bedded and set home by gently tapping with handle of trowel or
wooden mallet. It side face shall be flushed with mortar before the next brick is laid and
pressed against it. On copletion of course, the vertical joints shall be fully filled form the
top with mortar.
2.3.3 The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all
vertical joint shall be truly vertical. Vertical joints in alternate course shall generally be
directly one over the other. The thickness of brick course shall be kept uniform.
2.3.4 The brick shall be laid with frog upwards. A set of tools comprising of wooden straight
edges, mason’s sprit level, square half meter rub, and pins, string and plumb shall be kept
on the site of work for frequent checking during the progress of work.
2.3.5 Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All
the connected brick work shall be kept not more than one meter over the rest of the work.
Where this is not possible, the work shall be raked back according to bond (and not left
toothed) at an angle not steeper than 45 degrees.
2.3.6 All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are
required to be built in wall shall be embedded in cement mortar.
2.4.1 Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not
exceed 12 mm. The face joints shall be raked out as directed by taking tools daily during
the progress of work, when the mortar is still green so as to provide key for plaster or
pointing to done.
2.4.2 The face of brick shall be cleaned the very day on which the brick work is laid and all
mortar dropping removed.
2.5.1 Green work shall be protected from rain suitably. Masonry work shall be kept moist on all
the faces for a period seven days. The top of masonry work shall be kept well wetted at the
close of the day
2.6 Preparation of foundation bed:
2.6.1 If the foundation is to be laid directly on the excavated bed, the bed shall be leveled,
cleared of all loose materials, cleaned and wetted before starting masonry. If masonry is to
be laid on concrete footing, the top of concrete shall be cleaned and moistened. The
contractor shall obtain the engineer'’ approval for the foundation bed, before foundation
masonry is started. When puccas flooring is to be provided flush with the top to plinth, the
inside plinth offset shall be kept lower than the outside plinth top by the thickness of the
3.0 Mode of measurements and payment:
3.1 The measurements of this item shall be taken for the brick masonry fully completed in
foundation up to plinth. The limiting dimensions not exceeding those shown on the plans or
as directed shall be final. Battered, tapered and curved portions shall be measured net.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
3.2 No deduction shall be made from the quantity of brick work nor any extra payment made
for embedding in masonry or making holes in respect of following items:
(1) Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross
sectional area does not exceed 500 Sq. cm.
(2) Opening not exceeding 1000 Sq. cm.
(3) Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not
exceed 10 Cms. and the bearing does not extend to the full thickness of wall.
(4) Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors,
(5) Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry
and pipes etc. for concealed wiring.
(6) Forming chases of section not exceeding 350 Sq. Cm. in masonry.
3.3 Apertures for fire places shall not be deducted nor shall extra labour required to make
splaying of jambs, throating and making Arches over the aperture be paid for separately.
3.4 The rate shall be for a unit of one cubic meter.
6.12 (B) Brick work using common burnt clay building bricks having crushing strength not
less than 35 Kg/Sq. Cm. in foundations and plinth in cement mortar 1:5 (1 cement :
fine sand) conventional bricks,
1. Materials: Cement mortar of proportion 1:5 shall conform to M-11. Conventional bricks
shall conform to M-15
2. Workmanship: The relevant specifications of item No. 6.12(A) shall be followed except
tat the masonry work shall be carried out by using conventional bricks.
3.0 Mode of measurements and payment:
3.1 The relevant specifications of item No 6.12 shall be followed.
3.2 The rate shall be for a unit of one cubic meter.
6.13 (A) Brick work using common burnt clay building bricks having crushing strength
not less than 35 Kg/Sq. Cm. in foundation and plinth in cement mortar 1:6 (1 cement :
6 fine sand) with modular bricks.
1.0 Materials: Water shall conform to M-1. Cement mortar shall conform to M-11. Bricks
shall conform to M-15.
2.0 Workmanship:
2.1. The relevant specifications of item No. 6.12(A) shall be followed except that the bricks to
be used shall be conventional bricks and proportion of cement mortar shall in C.M. 1 :
3.0 Mode of measurements and payment:
3.1 The relevant specifications of item No. 6.12(A) shall be followed.
3.2 The rate shall be for a unit of one cubic meter
6.0.01 (A) Brick work using common burnt clay building bricks having crushing strength not
less than 35 Kg/Sq. Cm. in foundation and plinth in cement mortar 1:8(1 cement : 8 fine
sand) with Modular bricks.
1.0 Materials: Water shall conform to M-1, Cement mortar shall conform to M-11. Bricks
shall conform to M-15.
2.0 Workmanship:
2.2 The relevant specifications of item No. 6.12(A) shall be followed except that the proportion
of mortar shall be C.M. 1:8
3.0 Mode of measurements and payment:
3.1 The relevant specifications of item No. 6.12(A) shall be followed.
3.2 The rate shall be for a unit of one cubic meter.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
6.0.01 (B) Brick work using common burnt clay building bricks having crushing strength not
less than 35 Kg/Sq. Cm. in foundation and plinth in cement mortar 1:8 (1 cement : 8 fine
sand) with conventional bricks.
1.0 Materials: Water shall conform to M-1. Brick shall conform to M-15. Cement mortar shall
conform to M-11.
2.0 Workmanship:
2.1. The relevant specifications of item No. 6.12 (A) shall be followed except that the
proportion of cement mortar shall be 1: 8 and bricks used shall be conventional bricks.
3.0 Mode of measurements and payment:
3.1 The relevant specifications of item No. 6.12 (A) shall be followed.
3.2 The rate shall be for a unit of one cubic meter.
6.0.02 (A) Brick work using common burnt clay building bricks having crushing strength not
less than 35 Kg/Sq. Cm. in foundation and plinth in lime mortar 1:15(1 lime putty :
fine sand) modular bricks.
1.0 Materials: Lime mortar of proportion (1:1.5) shall conform to M-10. Bricks shall conform
2.0 Workmanship: The relevant specifications of item No. 6.12 (A) shall be followed except
the masonry work shall be carried out in lime mortar 1:1.5 (1 lime putty :1.5 fine sand) in
foundation and plinth.
3.0 Mode of measurements and payment:
3.1 The relevant specifications of item No. 6.12(A) shall be followed.
3.2 The rate shall be for a unit of one cubic meter.
6.0.02 (B) Brick work using common burnt clay building bricks having crushing strength not
less than 35 Kg./Sq. Cm. in foundation and plinth in lime mortar 1:1.5(1 lime putty :
fine sand) conventional bricks.
1.0 Materials & Workmanship: The relevant specifications of item No. 6.12(A) and
6.0.02(A) shall be followed except that the masonry work shall be carried out in lime
mortar 1:1.5 (1 lime putty : 1.5 fine sand) in foundation and plinth.
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 6.12 (A) shall be followed.
6.0.03 (A) Brick using common burnt clay building bricks having crushing strength not less
than 35 Kg/Sq. Cm. in foundation and plinth in lime mortar 1:2 (1 lime putty : 2 fine
sand) modular bricks.
1.0 Materials & Workmanship: The relevant specifications of item No. 6.12(A) and 6.00(A)
shall be followed except that the masonry work shall be carried out in lime mortar 1:2 (1
lime putty : 2 fine sand) in foundation and plinth.
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 6.12 (A) shall be followed.
2.2 The rate shall be for a unit of one cubic meter.
6.0.03 (B) Brick work using common burnt clay building bricks having crushing strength not
less than 35 Kg/Sq. Cm. in foundation and plinth in lime mortar 1:2 ( 1 lime putty :2 fine
sand) conventional bricks.
1.0 Materials & Workmanship: The relevant specifications of item No. 6.12 (A) and
6.0.03(A) shall be followed except that the masonry work shall be carried out in lime
mortar 1:2(1 lime : 2 fine sand) using conventional brick in foundation and plinth.
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 6.12 (A) shall be followed.
2.2 The rate shall be for a unit of one cubic meter
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
6.19 (A) Brick work using common burnt clay building bricks having crushing strength not
less than 35 Kg/Sq. Cm. for super structure above plinth level up to floor two level in
cement mortar 1:5 (1 cement : 5 fine sand) modular bricks.
1.0 Materials: Bricks shall conform to M-15. Cement mortar shall conform M-11.
2.0 Workmanship:
2.1 The relevant specifications of item No. 6.12(A) shall be followed except that the masonry
work shall be carried out above plinth level to floor two level i.e. for ground floor.
2.2 The frames of doors, windows, cupboards, etc. shall be housed into the brick work at the
correct location and level as directed. The heavy steel doors, window frames etc. shall be
built in with brick work but for ordinary steel doors and windows required opening for
frames, hold fasts etc. shall be left in the wall and frames embedded later on in order to
avoid damage to the frames.
2.3 Necessary scaffolding shall be provided. The supports of the scaffolding shall be sound and
strong tied together with horizontal pieces over which the scaffolding planks shall be fixed.
Simple scaffolding shall be allowed normally. In this case scaffolding hole shall rest in
hold header horizontal coarse only. Minimum number of holes shall be left in brick work
for supporting horizontal scaffolding holes.
The contractor is responsible for providing and maintaining sufficiently strong scaffolding
so as to withstand all loads likely to come upon it.
2.4 For the face of brick work where plastering is to be done joints shall be racked out to a
depth not less than thickness of joints. The face of brick work shall be cleaned and mortar
dropping removed on very same day that brick work is laid.
3.0 Mode of measurement:
3.1 The masonry work of G. F. i.e. above plinth level to floor two level shall be measured and
paid under this item.
3.2 Brick work in parapet shall be included in the corresponding masonry item of store
immediately below the floor above which the parapet is built.
3.3 No deduction shall be made from quantity of brick work. No extra payment shall be made
for embedding in masonry or making holes in respect of following items:
1. Ends of joints, beams, posts, girders, rafters, purlins trusses corbel, steps etc. where cross
sectional does not exceed 500 Sq. Cm.
2. Opening not exceeding 1000 Sq. Cm.
3. Wall plate, sand bed plates, bearing of slab, chhajas and like whose thickness does not
exceed 10 Cms. and the bearing does not extend the full thickness of wall.
4. Drainage holes and recesses for cement concrete blocks to embed hold fasts for doors,
5. Iron fixtures, pipes up to 300 mm dia hold fasts of doors, and windows built into masonry
and pipes etc. for concealed wiring.
6. Forming charges of section not exceeding 350 Sq. Cm. in masonry.
7. Apertures for fire places, shall not be deducted nor shall extra labour required to make
spaying of jambs, throating and making trenches over the aperture be paid for separately.
3.4 The rate shall be for a unit of one cubic meter
6.19 (B) Brick work using common burnt clay building bricks having crushing strength not
less than 35 Kg/Sq. Cm. for super structure above plinth up to floor two level in cement
mortar 1:5 (1 cement : 5 fine sand) conventional bricks.
1.0 Materials & Workmanship: The relevant specifications of item No 6.19 (A) shall be
followed except that brick masonry work shall be carried out with conventional bricks.
2.0 Mode of measurements and payment:
2.1 The relevant specifications of item No. 6.19(A) shall be followed.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender 03 vol 01 aanganvadi repairing_com.pdf
tender 03 vol 02 aanganvadi repairing.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .