Loading…
Loading…
Tender Value
₹12.5 L
EMD Value
₹14,900
Closing Date
30 Sept 2026, 6:00 pm3d left
Executive Engineer (C), Construction Division, Porbandar
M&R to Back Compound Wall of Admin Office Building at Port Porbandar
343108
3 OF 2026-27
Open
Civil Works - Others
Works
Porbandar
8 documents required · 7 mandatory · 1 optional
₹1,062
Executive Engineer (C), Construction Division, Porbandar
₹14,900
30 Sept 2026
9 Sept 2026
9 Oct 2026
9 Sept 2026
23 Sept 2026
9 Sept 2026
Quantity Unit Rate (₹) Amount (₹)
No. reference to book of specifications)
1 Demolition of brick work and stone masonry including
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift. (In
Cement Mortar).
2 Demolition of RCC work including stacking of
serviceable materials and disposal of unserviceable
materials with all lead and lift (using pneumatic
3 Dismantling doors, windows, ventilators etc. (wood or
steel) including shutters, chowkhats, holdfasts and all
attachments complete and stacking within all lead and
lift. (Exceeding 3 Sq.m. area).
4 Dismantling doors, windows, ventilators etc. (wood or
steel) including shutters, chowkhats, holdfasts and all
attachments complete and stacking within all lead and
lift. (Not Exceeding 3 Sq.m. area).
5 Labour charges for removing rolling shutters. 48.9 Sqmt. 485.5
6 Providing & Fixing 6 mm thick asbestos cement
corrugated sheets roofing fixed with galvanized iron J
or L hooks, bolts and nuts, 8 mm dia GI plain and 20.29 Sqmt. 373.1
bitumen washers complete (excluding purlins, rafters
7 Providing & Fixing galvanized mild steel tubes (medium
grade ISI marked) 50 mm nominal bore with fittings and 4.58 Mtr. 666.6
clamps including making good wall, ceiling and floor.
8 Providing & Fixing collapsible steel shutters with
vertical channels, flat iron diagonals, T-iron rails, steel
pulleys, locking arrangements, stoppers, handles
including one coat of red lead primer complete.
9 Providing & Fixing rolling steel shutters complete. 48.9 Sqmt. 8,038.80
10 Providing & Fixing fabricated M.S. work (Approved
Rate) complete.
11 Excavation for foundation up to 1.5 m depth including
sorting out and stacking of useful materials and
disposing of excavated earth up to 50 metre lead.
(Loose or Soft Soil).
12 Providing and Laying CC 1:3:6 (1 Cement : 3 Coarse
Sand : 6 Crushed Stone Aggregate 20 mm nominal
size) including formwork and curing in foundation/plinth
beams/wall caps/coping.
13 Mithikhan or Bhukhra stone (local soft stone) masonry
in C.M. 1:6 in superstructure up to floor two level 39.54 Cum. 5,874.80
including raking of joints complete.
14 Providing and Laying RCC 1:2:4 (1 Cement : 2 Coarse
Sand : 4 Crushed Stone Aggregate 20 mm nominal
size) excluding reinforcement but including formwork
15 20 mm cement plaster in two coats with underlayer
mm and top layer 8 mm in C.M. 1:3 finished rough with
sponge and curing complete (Exterior plaster up to
m height above G.L.).
16 Wall painting (Two Coats) with antifungus exterior
waterproof plastic emulsion paint (Ultima or equivalent) 216.09 Sqmt. 143.2
including surface preparation complete.
Sign of Contractor Executive Engineer (C),
Construction Division,
17 Providing and fixing 1.2 m high fencing with 40 mm ×
40 mm × 6 mm angle iron posts at 2.5 m spacing with
barbed wire, painting etc. complete (Excavation and
foundation concrete to be paid separately).
18 Supplying, bending, hooking and binding Thermo
Mechanically Treated (TMT) Fe-550D corrosion
resistant reinforcement bars including placing in
position complete up to floor two level.
Total (Amount Put to Tender)
Part-B Recovery of Materials
Item Description of Item (with brief specification and Rate
Quantity Unit Amount (₹)
No. reference to book of specifications) (₹)
Demolition of brick work and stone masonry including
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (In
Cement Mortar).
Demolition of RCC work including stacking of
serviceable materials and disposal of unserviceable
materials with all lead and lift (using pneumatic
Dismantling doors, windows, ventilators etc. (wood or
3 steel) including shutters, chowkhats, holdfasts and 0.55 Nos. 487.83
attachments complete (Not exceeding 3 Sq.m. area).
4 Collapsible steel shutters. 226.3 Kg. 31.22
5 Rolling steel shutters. 97.8 Kg. 31.22
Note:- (1) All Materials obtain from Dismantling, as mention above shall be property of contractor and as
against below mention cost will be recovered from first RA Bill of this week.
(2) An fixed amount of Rs. 20,500.00 shall be recovered from 1st RA bill for recovery of
Material Demolition of Existing Masonry Compound Wall, RCC Slab, Wooden Door&
Window, Collapsible Door & Steel Shutter.
I/Weam/are will in gto carryouttheworkat… .................... %above/belowpercent (Should
Bewritteninfiguresand words) of the estimated rate mentioned above.Amountofmy/our tender
works out as under.
Estimatedamountputtotender Estimatedamountputtotender
Deduct………%below Add………%Above
Inwords Inwords
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Sign of Contractor Executive Engineer (C),
Construction Division,
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsofbills
4 In all R.C.C. Items in Rate Analysis StandardCement Consumption hasbeen taken asper
Govt.G.R.: PRC-10/2017CementConsumption/16/CDate:11/05/2017asstatedin
S.O.R. therefore in R.C.C. items where thereis a change as per actual mix design the cost
ofdifferenceofcementconsumptionhavebeendeductedfromtherateoforiginalitem
Attherateofinputratementionedinallthetender.
Sign of Contractor Executive Engineer (C),
Construction Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
03 2026-27.pdf
BOQ Compound wall.pdf
Compound wall Tender Papers.pdf
Schedule B form.pdf
CORRIGENDUM
Corrigendum-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .