Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.5 LAccepted-AOC 50 1 56 13 SURYA TOWERS ASR NAGAR SEETHAMMADHARA VISAKHAPATNAM 530 013 | VISAKHAPATANAM | ANDHRA PRADESH | 530013 | L1 | Accepted-AOC Being Lowest Vendor | |
| 2 | L2₹97.7 L+₹3.2 L (3.35%)Rejected-Finance FLAT NO 304 SN TOWERS JAGANNADHAPURAM JUNCTION AKKAYYAPALEM VISAKHAPATNAM 530 016 | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹1.1 Cr+₹12.9 L (13.6%)Rejected-Finance DOOR NO 50 53 2 5 FLAT NO 504 SRI SAI VENKATESHWARA RESIDENCY NE LAYOUT SEETHAMMADHARA VISAKHAPATNAM 530 013 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530013 | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹1.1 Cr+₹19.5 L (20.6%)Rejected-Finance 66 6 410 1 MULAGANDA HOUSING COLONY GAJUWAKA DEPOT VISAKHAPATNAM 530026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹1.5 Cr+₹57.3 L (60.6%)Rejected-Finance MIG 2B 83 H NO 65 5 466 GULLAPALEM SRIHARIPURAM MALKAPURAM POST VISAKHAPATNAM 530 011 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530011 | L5 | Rejected-Finance Being not L1 |
| Sl No | Description | Qty | Unit | Mahamaruti Constructions L3 | MURALI KRISHNA ASSOCIATES L2 | SRI SURYA PROJECTS L5 | SAI KRISHNA ASSOCIATES L1 | GVR CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for dismatling of foundation PCC, taking out from pump house, carrying to dumping yard inside ND (V) and necessary cleaning of work site all as specified and directed. | 16 | CuM | 898 ₹14,368 | 1,350 ₹21,600 | 1,200 ₹19,200 | 900 ₹14,400 | 650 ₹10,400 Lowest |
| 2.00 | M&L for cement concrete type B1, (1:2:4) with 20mm graded agreegate in foundation, filling in and mass concrete all as specified and directed. | 16 | CuM | 7,234 ₹1,15,744 | 6,300 ₹1,00,800 | 9,000 ₹1,44,000 | 5,999 ₹95,984 | 4,850 ₹77,600 Lowest |
| 3.00 | Dismantling /taking out old MS/DI/CI pipe from MS structure in the gallery for replacement/relaying for bore of pipe 100 mm complete all as specified and directed. | 600 | RM | 262 ₹1,57,200 | 225 ₹1,35,000 | 500 ₹3,00,000 | 150 ₹90,000 | 104 ₹62,400 Lowest |
| 4.00 | Supplying,laying,fixing and testing of 100 mm dia DI pipe class K-09 flanged pipe on MS structure/PCC supports inside Jetty in the Gallery all as specified and directed. | 600 | RM | 2,688 ₹16,12,800 Lowest | 2,700 ₹16,20,000 | 4,600 ₹27,60,000 | 3,499 ₹20,99,400 | 3,850 ₹23,10,000 |
| 5.00 | Material and labour for flanged joint of size 100 mm including flanges ,rubber guskets Galvanized /cadmium coating MS nuts bolts DI specials complete laid on PCC support or MS structure of jetty in the gallery all as specified and directed. | 120 | Each | 224 ₹26,880 Lowest | 270 ₹32,400 | 350 ₹42,000 | 500 ₹60,000 | 2,000 ₹2,40,000 |
| 6.00 | Dismantling/ taking out old MS/DI/CI pipe from MS structure in the gallery for replacement/relaying for bore of pipe 150 mm complete all as specified and directed. | 240 | RM | 224 ₹53,760 | 270 ₹64,800 | 350 ₹84,000 | 150 ₹36,000 | 108 ₹25,920 Lowest |
| 7.00 | Supplying,laying,fixing and testing of 150 mm dia DI pipe class K-09 flanged pipe on MS structure/pcc supports inside Jetty in the Gallery all as specified and directed. | 240 | RM | 4,345 ₹10,42,800 | 3,880 ₹9,31,200 Lowest | 5,600 ₹13,44,000 | 4,699 ₹11,27,760 | 6,250 ₹15,00,000 |
| 8.00 | Material and labour for flanged joint of size 150 mm including flanges ,rubber guskets Galvanized /cadmium coating MS nuts bolts DI specials complete laid on PCC support or MS structure of jetty in the gallery all as specified and directed. | 48 | Each | 468 ₹22,464 | 360 ₹17,280 Lowest | 475 ₹22,800 | 500 ₹24,000 | 2,250 ₹1,08,000 |
| 9.00 | Dismantling /taking out old MS/DI/CI pipe from MS structure in the gallery for replacement/relaying for bore of pipe 300 mm complete all as specified and directed . | 450 | RM | 257 ₹1,15,650 | 360 ₹1,62,000 | 400 ₹1,80,000 | 200 ₹90,000 Lowest | 266 ₹1,19,700 |
| 10.00 | Supplying,laying,fixing and testing of 300 mm dia DI pipe class K-09 flanged pipe on MS structure/pcc supports inside Jetty in the Gallery all as specified and directed. | 450 | RM | 8,398 ₹37,79,100 | 8,100 ₹36,45,000 Lowest | 9,000 ₹40,50,000 | 9,500 ₹42,75,000 | 10,450 ₹47,02,500 |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
3 Apr 2026, 6:30 pmClosed
GE (I) DM Visakhapatnam
GE (I) DM Visakhapatnam
RENEWAL OF SEA WATER FIREFIGHTING PIPELINES WITH CONNECTED ACCESSORIES AND UNDERNEATH SUPPORT STRUCTURE FROM N-23 TO N-26 AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNAM
2026_MES_755394_1
8499/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Naval Dockyard Visakhapatnam
As per tender document
8 documents required · 8 mandatory
₹1,000
GE (I) DM VISAKHAPATNAM
₹2.2 L
Yes
29 Jun 2026
6 Mar 2026
6 Apr 2026
6 Mar 2026
3 Apr 2026
27 Mar 2026
7 Mar 2026 - 25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for dismatling of foundation PCC, taking out from pump house, carrying to dumping yard inside ND (V) and necessary cleaning of work site all as specified and directed. | 16 | CuM | - | - |
| 2 | M&L for cement concrete type B1, (1:2:4) with 20mm graded agreegate in foundation, filling in and mass concrete all as specified and directed. | 16 | CuM | - | - |
| 3 | Dismantling /taking out old MS/DI/CI pipe from MS structure in the gallery for replacement/relaying for bore of pipe 100 mm complete all as specified and directed. | 600 | RM | - | - |
| 4 | Supplying,laying,fixing and testing of 100 mm dia DI pipe class K-09 flanged pipe on MS structure/PCC supports inside Jetty in the Gallery all as specified and directed. | 600 | RM | - | - |
| 5 | Material and labour for flanged joint of size 100 mm including flanges ,rubber guskets Galvanized /cadmium coating MS nuts bolts DI specials complete laid on PCC support or MS structure of jetty in the gallery all as specified and directed. | 120 | Each | - | - |
| 6 | Dismantling/ taking out old MS/DI/CI pipe from MS structure in the gallery for replacement/relaying for bore of pipe 150 mm complete all as specified and directed. | 240 | RM | - | - |
| 7 | Supplying,laying,fixing and testing of 150 mm dia DI pipe class K-09 flanged pipe on MS structure/pcc supports inside Jetty in the Gallery all as specified and directed. | 240 | RM | - | - |
| 8 | Material and labour for flanged joint of size 150 mm including flanges ,rubber guskets Galvanized /cadmium coating MS nuts bolts DI specials complete laid on PCC support or MS structure of jetty in the gallery all as specified and directed. | 48 | Each | - | - |
| 9 | Dismantling /taking out old MS/DI/CI pipe from MS structure in the gallery for replacement/relaying for bore of pipe 300 mm complete all as specified and directed . | 450 | RM | - | - |
| 10 | Supplying,laying,fixing and testing of 300 mm dia DI pipe class K-09 flanged pipe on MS structure/pcc supports inside Jetty in the Gallery all as specified and directed. | 450 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_846096.xls
BOQ • 0.29 MB
8499Tender.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .