Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.5 L
EMD Value
₹11,197
Closing Date
27 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
GENERAL-AMC 2025-26 Kayanad, Maradi, and Kadathi-Fully Comprehensive Annual Maintenance of LIS Under Electrical Lift Irrigation Section Ramamangalam-General Electrical Work
2025_Irrig_811258_5
PWD/BLDG/10705/RLM/2025-2026
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
9 documents required · 9 mandatory
₹990
₹11,197
17 Oct 2025
17 Oct 2025
29 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
Work Name:GENERAL-AMC 2025-26 Kayanad, Maradi, and Kadathi-Fully Comprehensive Annual Maintenance of LIS Under Electrical Lift Irrigation Section Ramamangalam-General Electrical Work
board after dismantling the damaged one, L&T or equivalent make.¤OD58395/2025-2026:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.ÖOD58401/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump (50-125 HP) as per the direction of Departmental staff at site.ÜOD58399/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6314 , SKF / FAG or equivalent, suitable for 100 HP motor / pump set as per the direction of Departmental staff at site.ÛOD58392/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6316, SKF / FAG or equivalent, suitable for 125 HP motor / pump set as per the direction of Departmental staff at site. Motor AMCOD58425/2025-2026:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver nece
祲⠠硥汣摵湩敲楷摮湩⥧爠灥楡獲漠慶捣浵瀠灩楬敮瑳牡整Ⱳ瘠污敶汥捥牴捩污愠捣獥潳楲獥攠捴愠敲畱物摥挠浯汰瑥湩朠潯潷歲湩潣摮瑩潩湩汣摵湩慰湩楴杮琠敨洠瑯牯瀠浵獰瑥戠獡汰瑡污楴敭搠牵湩桴数楲摯漠潣瑮慲瑣愠摮琠敨映畡瑬桳畯摬戠敲瑣晩敩楷桴椠桴楴敭愠汬睯摥⠮潔慴″潍潴獲㈱洠湯桴潦慅档䴠瑯牯⸩䐀祡ӳ伀㕄㐸㈲㈯㈰ⴵ〲㘲›畆汬⁹潃灭敲敨獮癩湁畮污䴠楡瑮湥湡散漠〱‰偈猠畱物敲慣敧椠摮捵楴湯洠瑯牯眠瑩灳楬⁴慣敳⼠䔠摮猠捵楴湯瀠浵⁰敳⁴瑳牡整Ⱳ挠湯牴汯楬杮攠敬瑣楲慣捡散獳牯敩慰敮潢牡Ɽ瑥潣灭敬整映牯愠瀠牥潩景ㄠ′潭瑮獨椠据畬楤杮愠瑴湥楤杮愠汬爠灥楡獲Ⱐ癯牥慨汵湩愦灭※敲潣摮瑩潩楮杮漠瑳牡整敲汰捡湩景搠浡条摥挠湯慴瑣ⱳ渠潶瑬爠汥獥潣汩癯牥潬摡挠楯ⱬ爠捥湯楤楴湯湩湡敲楦楯ⱬ漠敶桲畡楬杮漠慰敮潢牡祢挠敨正湩桴楷敲挠湯敮瑣潩獮潣瑮潲楷楲杮敳癲捩湩景猠楷捴敧牡獥愠敲畱物摥敲汰捡湩桴畢湲畯⁴畦敳氠湩獫敲慰物琠敨搠浡条摥栠湩敧敲汰捡湩潷湲畯⁴敢摥湩獧椠据畬楤杮瀠楡瑮湩瑥爠灥慬楣杮琠敨搠浡条摥挠畯汰湩畢桳湡潣灵楬杮戠汯獴癏牥慨汵湩湡敲潣摮瑩潩楮杮琠敨瀠浵獰瑥戠⁹敲潣摮瑩潩楮杮琠敨搠浡条摥瀠牡獴Ⱐ爠灥慬楣杮猠慰敲楷桴漠楲楧慮慭敫愠数慳灭敬Ⱐ爠浥癯湩潦敲杩潢楤獥Ⱐ爠湥睥污漠汧湡慰正湩慧歳瑥瀠捡楫杮Ⱐ爠扵敢慰正湩牧慥楳杮琠敨戠慥楲杮攠捴愠湡桷湥爠煥極敲Ɽ瀠楡瑮湩桴瑳牡整Ⱳ戠獡慰瑬ⱥ瀠浵獰瑥愠摮洠楡瑮楡桴潭潴異灭猠瑥瑳牡整汥捥牴捩污愠捣獥潳楲獥攠捴挠浯汰瑥湩朠潯潷歲湩潣摮瑩潩污楴敭搠牵湩桴数楲摯漠潣瑮慲瑣愠摮琠敨映畡瑬桳畯摬戠敲瑣晩敩楷桴椠桴楴敭愠汬睯摥⸠吨瑯污㈠䴠瑯牯ⱳㄠ′潭瑮獨映牯䔠捡潍潴⥲മഊऊउउउӆ伀㕄㐸㜲㈯㈰ⴵ〲㘲›畆汬⁹潃灭敲敨獮癩湁畮污䴠楡瑮湥湡散漠ㄱ‰偈猠畱物敲慣敧椠摮捵楴湯洠瑯牯眠瑩灳楬⁴慣敳⼠䔠摮猠捵楴湯瀠浵⁰敳⁴瑳牡整Ⱳ挠湯牴汯楬杮攠敬瑣楲慣捡散獳牯敩慰敮潢牡Ɽ瑥潣灭敬整映牯愠瀠牥潩景ㄠ′潭瑮獨椠据畬楤杮愠瑴湥楤杮愠汬爠灥楡獲Ⱐ癯牥慨汵湩愦灭※敲潣摮瑩潩楮杮漠瑳牡整敲汰捡湩景搠浡条摥挠湯慴瑣ⱳ渠潶瑬爠汥獥潣汩癯牥潬摡挠楯ⱬ爠捥湯楤楴湯湩湡敲楦楯ⱬ漠敶桲畡楬杮漠慰敮潢牡祢挠敨正湩桴楷敲挠湯敮瑣潩獮潣瑮潲楷楲杮敳癲捩湩景猠楷捴敧牡獥愠敲畱物摥敲汰捡湩桴畢湲畯⁴畦敳氠湩獫敲慰物琠敨搠浡条摥栠湩敧敲汰捡湩潷湲畯⁴敢摥湩獧椠据畬楤杮瀠楡瑮湩瑥爠灥慬楣杮琠敨搠浡条摥挠畯汰湩畢桳湡潣灵楬杮戠汯獴癏牥慨汵湩湡敲潣摮瑩潩楮杮琠敨瀠浵獰瑥戠⁹敲潣摮瑩潩楮杮琠敨搠浡条摥瀠牡獴Ⱐ爠灥慬楣杮猠慰敲楷桴漠楲楧慮慭敫愠数慳灭敬Ⱐ爠浥癯湩潦敲杩潢楤獥Ⱐ爠湥睥污漠汧湡慰正湩慧歳瑥瀠捡楫杮Ⱐ爠扵敢慰正湩牧慥楳杮琠敨戠慥楲杮攠捴愠湡桷湥爠煥極敲Ɽ瀠楡瑮湩桴瑳牡整Ⱳ戠獡慰瑬ⱥ瀠浵獰瑥愠摮洠楡瑮楡桴潭潴異灭猠瑥瑳牡整汥捥牴捩污愠捣獥潳楲獥攠捴挠浯汰瑥湩朠潯潷歲湩潣摮瑩潩污楴敭搠牵湩桴数楲摯漠潣瑮慲瑣愠摮琠敨映畡瑬桳畯摬戠敲瑣晩敩楷桴椠桴楴敭愠汬睯摥⸠उउउഉ옊䑏㠵㈴⼴〲㔲㈭㈰㨶䘠汵祬䌠浯牰桥湥楳敶䄠湮慵慍湩整慮据景ㄠ㔲䠠⁐煳極牲汥挠条湩畤瑣潩潭潴楷桴猠汰瑩挠獡 湅畳瑣潩異灭猠瑥Ⱐ猠慴瑲牥潣瑮潲汬湩汥捥牴捩污愠捣獥潳楲獥Ⱐ瀠湡汥戠慯摲攬捴挠浯汰瑥潦数楲摯漠㈱洠湯桴湩汣摵湩瑡整摮湩污敲慰物漬敶桲畡楬杮☠浡㭰爠捥湯楤楴湯湩景猠慴瑲牥Ⱐ爠灥慬楣杮漠慤慭敧潣瑮捡獴潮瘠汯⁴敲敬敳挠楯ⱬ漠敶汲慯潣汩敲潣摮瑩潩楮杮愠摮爠晥汩漠汩癯牥慨汵湩景瀠湡汥戠慯摲戠⁹档捥楫杮琠敨眠物潣湮捥楴湯ⱳ挠湯牴汯眠物湩Ⱨ猠牥楶楣杮漠睳瑩档朠慥敲獡爠煥極敲Ɽ爠灥慬楣杮琠敨戠牵潮瑵映獵楬歮ⱳ爠灥楡桴慤慭敧楨杮獥爠灥慬楣杮眠牯潮瑵戠敥楤杮湩汣摵湩慰湩楴杮攠捴敲汰捡湩桴慤慭敧潣灵楬杮戠獵ⱨ愠摮挠畯汰湩潢瑬ⱳ传敶桲畡楬杮愠摮爠捥湯楤楴湯湩桴異灭敳⁴祢爠捥湯楤楴湯湩桴慤慭敧慰瑲敲汰捡湩灳牡獥眠瑩牯杩湩污洠歡獡瀠牥猠浡汰敲潭楶杮映牯楥湧戠摯敩敲敮慷景朠慬摮瀠捡楫杮Ⱐ朠獡敫⁴慰正湩畲扢牥瀠捡楫杮Ⱐ朠敲獡湩桴敢牡湩瑥獡愠摮眠敨敲畱物摥慰湩楴杮琠敨猠慴瑲牥慢敳瀠污整異灭敳⁴湡慭湩慴湩琠敨洠瑯牯瀠浵⁰敳獴猠慴瑲牥Ⱐ攠敬瑣楲慣捡散獳牯敩瑥潣灭敬整椠潧摯眠牯楫杮挠湯楤楴湯愠汬琠浩畤楲杮琠敨瀠牥潩景挠湯牴捡⁴湡桴慦汵獴猠潨汵敢爠捥楴楦摥眠瑩湩琠敨琠浩污潬敷മऊउउउӾ伀㕄㐸㌲㈯㈰ⴵ〲㘲›畆汬⁹潃灭敲敨獮癩湁畮污䴠楡瑮湥湡散漠〱‰偈匠楬⁰楲杮椠摮捵楴湯洠瑯牯†楷桴猠汰瑩挠獡 湅畳瑣潩異灭猠瑥Ⱐ猠慴瑲牥潣瑮潲汬湩汥捥牴捩污愠捣獥潳楲獥Ⱐ瀠湡汥戠慯摲攬捴挠浯汰瑥潦数楲摯漠㈱洠湯桴湩汣摵湩瑡整摮湩污敲慰物漬敶桲畡楬杮☠浡㭰爠捥湯楤楴湯湩景猠慴瑲牥Ⱐ爠灥慬楣杮漠慤慭敧潣瑮捡獴潮瘠汯⁴敲敬敳挠楯ⱬ漠敶汲慯潣汩敲潣摮瑩潩楮杮愠摮爠晥汩漠汩敲潣摮瑩潩楮杮琠敨猠楬牰湩湵瑩愠敲畱物摥漠敶桲畡楬杮漠慰敮潢牡祢挠敨正湩桴楷敲挠湯敮瑣潩獮潣瑮潲楷楲杮敳癲捩湩景猠楷捴敧牡獥愠敲畱物摥敲汰捡湩桴畢湲畯⁴畦敳氠湩獫敲慰物琠敨搠浡条摥栠湩敧敲汰捡湩潷湲畯⁴敢摥湩獧椠据畬楤杮瀠楡瑮湩瑥爠灥慬楣杮琠敨搠浡条摥挠畯汰湩畢桳慣扲湯戠畲桳愠摮挠畯汰湩潢瑬ⱳ传敶桲畡楬杮愠摮爠捥湯楤楴湯湩桴異灭敳⁴祢爠捥湯楤楴湯湩桴慤慭敧慰瑲敲汰捡湩灳牡獥眠瑩牯杩湩污洠歡獡瀠牥猠浡汰敲潭楶杮映牯楥湧戠摯敩敲敮慷景朠慬摮瀠捡楫杮Ⱐ朠獡敫⁴慰正湩畲扢牥瀠捡楫杮Ⱐ朠敲獡湩桴敢牡湩瑥獡愠摮眠敨敲畱物摥慰湩楴杮琠敨猠慴瑲牥慢敳瀠污整異灭敳⁴湡慭湩慴湩琠敨洠瑯牯瀠浵⁰敳獴猠慴瑲牥Ⱐ攠敬瑣楲慣捡散獳牯敩瑥潣灭敬整椠潧摯眠牯楫杮挠湯楤楴湯愠汬琠浩畤楲杮琠敨瀠牥潩景挠湯牴捡⁴湡桴慦汵獴猠潨汵敢爠捥楴楦摥眠瑩湩琠敨琠浩污潬敷മऊउउഉ*䑏㠵㈴⼶〲㔲㈭㈰㨶䘠汵祬䌠浯牰桥湥楳敶䄠湮慵慍湩整慮据景†㌱‵偈匠楬⁰楲杮椠摮捵楴湯洠瑯牯†楷桴猠汰瑩挠獡 湅畳瑣潩異灭猠瑥Ⱐ猠慴瑲牥潣瑮潲汬湩汥捥牴捩污愠捣獥潳楲獥Ⱐ瀠湡汥戠慯摲攬捴挠浯汰瑥潦数楲摯漠㈱洠湯桴湩汣摵湩瑡整摮湩污敲慰物漬敶桲畡楬杮☠浡㭰爠捥湯楤楴湯湩景猠慴瑲牥Ⱐ爠灥慬楣杮漠慤慭敧潣瑮捡獴潮瘠汯⁴敲敬敳挠楯ⱬ漠敶汲慯潣汩敲潣摮瑩潩楮杮愠摮爠晥汩漠汩敲潣摮瑩潩楮杮琠敨猠楬牰湩湵瑩愠敲畱物摥漠敶桲畡楬杮漠慰敮潢牡祢挠敨正湩桴楷敲挠湯敮瑣潩獮潣瑮潲楷楲杮敳癲捩湩景猠楷捴敧牡獥愠敲畱物摥敲汰捡湩桴畢湲畯⁴畦敳氠湩獫敲慰物琠敨搠浡条摥栠湩敧敲汰捡湩潷湲畯⁴敢摥湩獧椠据畬楤杮瀠楡瑮湩瑥爠灥慬楣杮琠敨搠浡条摥挠畯汰湩畢桳慣扲湯戠畲桳愠摮挠畯汰湩潢瑬ⱳ传敶桲畡楬杮愠摮爠捥湯楤楴湯湩桴異灭敳⁴祢爠捥湯楤楴湯湩桴慤慭敧慰瑲敲汰捡湩灳牡獥眠瑩牯杩湩污洠歡獡瀠牥猠浡汰敲潭楶杮映牯楥湧戠摯敩敲敮慷景朠慬摮瀠捡楫杮Ⱐ朠獡敫⁴慰正湩畲扢牥瀠捡楫杮Ⱐ朠敲獡湩桴敢牡湩瑥獡愠摮眠敨敲畱物摥慰湩楴杮琠敨猠慴瑲牥慢敳瀠污整異灭敳⁴湡慭湩慴湩琠敨洠瑯牯瀠浵⁰敳獴猠慴瑲牥Ⱐ攠敬瑣楲慣捡散獳牯敩瑥潣灭敬整椠潧摯眠牯楫杮挠湯楤楴湯愠汬琠浩畤楲杮琠敨瀠牥潩景挠湯牴捡⁴湡桴慦汵獴猠潨汵敢爠捥楴楦摥眠瑩湩琠敨琠浩污潬敷മऊउउഉጊ潍潴楌瑦湩潗歲ѳ䑏㠵〴⼸〲㔲㈭㈰㨶䰠晩楴杮琠敨†‵偈洠瑯牯愠瑦牥搠獩潣湮捥楴杮琠敨眠物潣湮捥
tion, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. OD58409/2025-2026:Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. OD58412/2025-2026:Lifting the 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. OD58410/2025-2026: Lifting the 125 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. OD58411/2025-2026: Lifting the 135 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. Rewinding of motorsãOD59647/2025-2026: Charges for rewinding the burnt rotor/stator - separate stator and rotor/stator, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enameled copper winding wires, closing the rotor/stator slots with fiber wedges, putting proper inter layer insulation, connecting the coil end connection, providing new rotor/stator lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running(Less scrap copper)kg¤OD59648/2025-2026: Disconnect all electric connections from the motor , decoupling the motor from pump and remove the base bolts from motor and base plate and kept the motor at safe place , checking and testing the stator and rotor winding, power above 120 HP, leading the motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without getting damages to the motor, including loading into the vehicle and unloading at workshop for repairs and to and fro Conveyance Charges, resetting the rewound motor, refitting the motor on the baseplate, coupling with pump in correct alignment, given wire connection , taking trial run on full loadöOD59649/2025-2026:Disconnect all electric connections from the motor , decoupling the motor from pump and remove the base bolts from motor and base plate and kept the motor at safe place , checking and testing the stator and rotor winding. power up to 10 HP, leading the motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without getting damages to the motor, including loading into the vehicle and unloading at workshop for repairs and to and fro conveyance.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.36 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 1.63 MB
MAKE.pdf
Tender Documents • 0.29 MB
BOQ_1354633.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .