Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.8 LAccepted-Finance | ₹24.8 L | 1 | Accepted-Finance accept |
| 2 | 2₹26.7 L+₹1.9 L (7.83%)Accepted-Finance 1ST FLOOR SIDHARTH TOWER BALTI KHARKHANA BYELNE S J ROAD ATHGAON GUWAHATI KAMRUP ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | ₹26.7 L+₹1.9 L (7.83%) | 2 | Accepted-Finance accept |
| 3 | 3₹31.4 L+₹6.6 L (26.8%)Accepted-Finance | ₹31.4 L+₹6.6 L (26.8%) | 3 | Accepted-Finance accept |
| Sl No | Description | Qty | Unit | M/S HINA ELECTRICALS L1 | Bharat Trading Corporation L2 | M/s S.S. Refregeration L3 |
|---|---|---|---|---|---|---|
| 1.00Part (A) - WORK SPECIFICATION FOR INCREASING CAPACITY OF 33/11 KV S/S FATEHGANJ EAST (BAREILLY) | ||||||
| 2.00 | Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 15 Mtr. Depth below G/L including welding etc. by boaring process at TF neutral and body earthing including cost of all required material as GI Pipe of size 40mm dia, round bar 32 mm dia, etc. | 2 | No. | 12,000 ₹24,000 | 10,000 ₹20,000 Lowest | 15,000 ₹30,000 |
| 3.00 | welding & laying of G.I. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures. All required material will be provided by firm. | 20 | RMT | 250 ₹5,000 Lowest | 500 ₹10,000 | 350 ₹7,000 |
| 4.00 | Shifting and dragging of 33/11 KV 5 MVA transformer from its plinth to safe site in switchyard at store centre substation alongwith proper disconnection of its HT, LV, control cable and earthing connection and doing connection of HT (33kv) and LT(11kv) side of 10MVA power transformer after installation of 10MVA power transformer. | 1 | Job | 25,000 ₹25,000 Lowest | 40,000 ₹40,000 | 35,000 ₹35,000 |
| 5.00 | Shifting and dragging of 33/11 KV 10 MVA transformer from road side to its plinth to alongwith its erection including fixing of all assessories and carriage & top up of T/F oil. | 1 | Job | 5,000 ₹5,000 | 10,000 ₹10,000 | 100 ₹100 Lowest |
| 6.00 | Repairing of complete switchyard fencing and its painting. | 1 | Job | 5,000 ₹5,000 | 1,000 ₹1,000 | 100 ₹100 Lowest |
| 7.00 | Hiring of D/G Set 63 KVA 3 Phase for Testing of T/F (as per site requirement) | 1 | Job | 100 ₹100 Lowest | 1,000 ₹1,000 | 2,000 ₹2,000 |
| 8.00Part (B) - WORK SPECIFICATION FOR INCREASING CAPACITY OF 33/11 KV S/S KATAI MILL (BAREILLY) | ||||||
| 9.00 | Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 15 Mtr. Depth below G/L including welding etc. by boaring process at TF neutral and body earthing including cost of all required material as GI Pipe of size 40mm dia, round bar 32 mm dia, etc. | 2 | No. | 12,000 ₹24,000 | 10,000 ₹20,000 Lowest | 15,000 ₹30,000 |
| 10.00 | welding & laying of G.I. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures. All required material will be provided by firm. | 20 | RMT | 250 ₹5,000 Lowest | 500 ₹10,000 | 350 ₹7,000 |
Tender Value
₹32.5 L
EMD Value
₹32,500
Closing Date
18 Jun 2026, 12:00 pmClosed
SE EWC
Bareilly
increasing capacity of 33/11 KV Sub-Stations Fatehganj East, katai mill, Baheri rural, Deorania, Aliganj ,Rahtuiya and other associates works under EDC Bareilly
2026_MVVNL_1155363_2
19/EWC(B)/2026-27
Open Tender
Electrical Works
Item Rate
30 days
Bareilly
as per tender from
3 documents required · 3 mandatory
₹3,540
SE EWC
₹32,500
1 Jul 2026
8 Jun 2026
18 Jun 2026
8 Jun 2026
18 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part (A) - WORK SPECIFICATION FOR INCREASING CAPACITY OF 33/11 KV S/S FATEHGANJ EAST (BAREILLY) | - | - | - | - |
| 2 | Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 15 Mtr. Depth below G/L including welding etc. by boaring process at TF neutral and body earthing including cost of all required material as GI Pipe of size 40mm dia, round bar 32 mm dia, etc. | 2 | No. | - | - |
| 3 | welding & laying of G.I. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures. All required material will be provided by firm. | 20 | RMT | - | - |
| 4 | Shifting and dragging of 33/11 KV 5 MVA transformer from its plinth to safe site in switchyard at store centre substation alongwith proper disconnection of its HT, LV, control cable and earthing connection and doing connection of HT (33kv) and LT(11kv) side of 10MVA power transformer after installation of 10MVA power transformer. | 1 | Job | - | - |
| 5 | Shifting and dragging of 33/11 KV 10 MVA transformer from road side to its plinth to alongwith its erection including fixing of all assessories and carriage & top up of T/F oil. | 1 | Job | - | - |
| 6 | Repairing of complete switchyard fencing and its painting. | 1 | Job | - | - |
| 7 | Hiring of D/G Set 63 KVA 3 Phase for Testing of T/F (as per site requirement) | 1 | Job | - | - |
| 8 | Part (B) - WORK SPECIFICATION FOR INCREASING CAPACITY OF 33/11 KV S/S KATAI MILL (BAREILLY) | - | - | - | - |
| 9 | Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 15 Mtr. Depth below G/L including welding etc. by boaring process at TF neutral and body earthing including cost of all required material as GI Pipe of size 40mm dia, round bar 32 mm dia, etc. | 2 | No. | - | - |
| 10 | welding & laying of G.I. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures. All required material will be provided by firm. | 20 | RMT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
tenderfrom19.pdf
Tender Documents • 1.26 MB
BOQ_2170494.xls
BOQ • 12.04 MB
DateExT19.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .