Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.6 LAccepted-AOC PANDEY BANK THE MALL ROAD RANIKHET DISTRICT ALMORA UTTARAKHAND 263645 | RANIKHET | ALMORA | UTTARAKHAND | 263645 | 1 | Accepted-AOC After deductio of Sch of Credit for Rs. 625.00 | |
| 2 | 2₹16.4 L+₹78,160 (4.99%)Rejected-Finance NEAR HAIDAKHAN MANDIR VILLAGE POST CHILIYANAULA RANIKHET DISTRICT ALMORA UTTARAKHAND PIN 263645 | ALMORA | UTTARAKHAND | 263645 | 2 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | SATISH KUMAR SINGH L1 | SS Construction Co L2 |
|---|---|---|---|---|---|
| 1.00 | Preparing black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc complete all as specified and directed. | 309 | 10 Sqm | 50 ₹15,450 Lowest | 60 ₹18,540 |
| 2.00 | M/L for applying evenly a priming/tack coat with bituminous primer (Paving bitumen)VG -10 @ 5 Kg per 10 Sqm on existing black top surface complete all as specified and directed. | 309 | 10 Sqm | 400 ₹1,23,600 Lowest | 430 ₹1,32,870 |
| 3.00 | M&L for bituminous premix asphaltic semi dense concrete 30mm consolidated thickness with 5.5% binder content of bitumen with viscosity grade VG-30 by weight of total mix, rolled and compacted to required camber and gradient complete with 8 to 12 tonnes power roller to required complete all as specified and directed. | 314 | 10 Sqm | 4,500 ₹14,13,000 Lowest | 4,700 ₹14,75,800 |
| 4.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exc 400 sqm Exc 50 mm and n exc 100 mm deep complete all as specified and as directed. | 5 | 10 Sqm | 100 ₹500 Lowest | 150 ₹750 |
| 5.00 | M & L for applying evenly a priming/tack coat with bituminous primer (Paving bitumen) VG -10 @ 10 Kg per 10 Sqm on unsurfaced water bound macadam including preparing surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and directed. | 5 | 10 Sqm | 200 ₹1,000 Lowest | 250 ₹1,250 |
| 6.00 | M&L for premix bituminous, macadam with binder content of 4% by weight of total mix using paving bitumen VG-30 grade, laid/ rolled and compacted to required gradient and camber in consolidated thickness 75 mm or less complete all as specified and directed.
Note :(i) Aggregates for Bituminous works shall confirm to clause No 20.B.2.5 of SSR 2009 Part- I
(ii) Based on job mix formula, in case the binder content (i.e. Bitumen) is less than the content specified under this item then a minus adjustment @ 60 per kg rate of bitumen (less consumption) shall be applied on the quoted rate of contractor against this item, hence the quoted rate of contractor shall be reduced based on less content of bitumen required as per job mix formula. However, no price adjustment on plus side shall be made for increase of quantity of bitumen in case of required as per job mix formula.
(iii) Design Mix for bituminous macadam shall be carried out through an authorised testing lab and the cost of testing shall be included in quoted rate. | 2.5 | Cum | 4,800 ₹12,000 Lowest | 5,800 ₹14,500 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
24 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (HILLS) PITHORAGARH
HQ CWE (HILLS) PITHORAGARH POST OFFICE - BHARKATIA DISTRICT - PITHORAGARH STATE - UTTARAKHAND PIN 262520
CA NO. CWE/HILLS/RKT/103 OF 2025-2026 REPAIR TO CERTAIN ROADS AT ALMORA MIL STN UNDER GE RANIKHET
2025_MES_734977_2
89291/25-26/E8
Open Tender
Civil Works - Roads
Item Rate
180 days
ALMORA
Class - E
8 documents required · 8 mandatory
₹500
GE (MES) RANIKHET
₹30,000
Yes
19 Mar 2026
10 Jan 2026
31 Jan 2026
10 Jan 2026
24 Jan 2026
17 Jan 2026
Preparing black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc complete all as specified and directed.
M/L for applying evenly a priming/tack coat with bituminous primer (Paving bitumen)VG -10 @ 5 Kg per 10 Sqm on existing black top surface complete all as specified and directed.
M&L for bituminous premix asphaltic semi dense concrete 30mm consolidated thickness with 5.5% binder content of bitumen with viscosity grade VG-30 by weight of total mix, rolled and compacted to required camber and gradient complete with 8 to 12 tonnes power roller to required complete all as specified and directed.
Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exc 400 sqm Exc 50 mm and n exc 100 mm deep complete all as specified and as directed.
M & L for applying evenly a priming/tack coat with bituminous primer (Paving bitumen) VG -10 @ 10 Kg per 10 Sqm on unsurfaced water bound macadam including preparing surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and directed.
M&L for premix bituminous, macadam with binder content of 4% by weight of total mix using paving bitumen VG-30 grade, laid/ rolled and compacted to required gradient and camber in consolidated thickness 75 mm or less complete all as specified and directed. Note :(i) Aggregates for Bituminous works shall confirm to clause No 20.B.2.5 of SSR 2009 Part- I (ii) Based on job mix formula, in case the binder content (i.e. Bitumen) is less than the content specified under this item then a minus adjustment @ 60 per kg rate of bitumen (less consumption) shall be applied on the quoted rate of contractor against this item, hence the quoted rate of contractor shall be reduced based on less content of bitumen required as per job mix formula. However, no price adjustment on plus side shall be made for increase of quantity of bitumen in case of required as per job mix formula. (iii) Design Mix for bituminous macadam shall be carried out through an authorised testing lab and the cost of testing shall be included in quoted rate.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
PS103RKTRetender.pdf
Tender Documents • 1.28 MB
BOQ_837647.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .