Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | ₹6.4 L | L1 | Accepted-AOC Agreement No 06/EE/2025-26 |
| 2 | L2₹6.6 L+₹15,237.71 (2.38%)Rejected-Finance | ₹6.6 L+₹15,237.71 (2.38%) | L2 | Rejected-Finance Financial Bid Open |
| 3 | L3₹6.7 L+₹26,763.48 (4.17%)Rejected-Finance | ₹6.7 L+₹26,763.48 (4.17%) | L3 | Rejected-Finance Financial Bid Open |
| Sl No | Description | Qty | Unit | SANDEEP KUMAR SINGHAL L3 | ZAHEERUDEEN L2 | VISHALA CIVIL CONTRACTORS AND MAINTENANCE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete. | 134.28 | M3 | 46 ₹6,176.88 | 46 ₹6,176.88 | 40 ₹5,371.2 Lowest |
| 2.00 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | 19.82 | M2 | 245 ₹4,855.9 | 240 ₹4,756.8 | 237 ₹4,697.34 Lowest |
| 3.00 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 14.37 | M3 | 5,944 ₹85,415.28 | 5,800 ₹83,346 | 5,700 ₹81,909 Lowest |
| 4.00 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 52.13 | M3 | 5,470 ₹2,85,151.1 | 5,400 ₹2,81,502 | 5,306 ₹2,76,601.78 Lowest |
| 5.00 | Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. | 15 | M2 | 685 ₹10,275 | 670 ₹10,050 | 664 ₹9,960 Lowest |
| 6.00 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. | 6.71 | M3 | 7,384 ₹49,546.64 | 7,500 ₹50,325 | 7,163 ₹48,063.73 Lowest |
| 7.00 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | 0.55 | MT | 97,230 ₹53,476.5 | 94,313 ₹51,872.15 | 90,000 ₹49,500 Lowest |
| 8.00 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 57.2 | M2 | 105 ₹6,006 | 102 ₹5,834.4 Lowest | 102 ₹5,834.4 Lowest |
| 9.00 | S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. | 1.66 | Rm | 240 ₹398.4 | 240 ₹398.4 | 232 ₹385.12 Lowest |
| 10.00 | S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete. | 4.16 | M2 | 261 ₹1,085.76 | 260 ₹1,081.6 | 250 ₹1,040 Lowest |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
18 Mar 2026, 12:00 pmClosed
e
MGCCD-3 Amroha
LOT 06CONSTRUCTION OF V.R.B AT KM 2.590 OF THIROULI MINOR OF MGC STAGE-II
2026_UPIDC_1120808_16
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹15,000
5 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
Earth work in cutting in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete.
Shuttering for P.C.C. including all cost of material, labour and T&P etc complete.
Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete.
M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete.
Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete.
R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete.
Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete
Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete.
S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete.
S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete.
S/Laying Tarfelt in 2- layers for Bearing slab. i/c all cost of material, labour and T&P etc complete.
Earth work in filling for making ramp in all type soil with all lead & lead i/c all cost of labours t&p etc. complete.
Providing & Laying 1st class Brick on edge soling 110 mm thick on Diversion & Ramp i/c all cost of material, labour and T&P etc complete.
Earth work in Removing diversion with all lead & lift i/c all labour,T&P etc complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.87 MB
TD06.pdf
Tender Documents • 2.98 MB
ReTenderLetter.pdf
Additional Documents • 0.40 MB
BOQ_2094908.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .