| 1 | L-1₹1.5 CrAccepted-AOC 5 A WEST REST CAMP DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.5 Cr Quoted ₹1.3 Cr | L-1 | Accepted-AOC rate quoted low |
| 2 | L-2₹1.3 Cr+₹61,805 (0.48%)Rejected-Finance 250 SARTHI VIHAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.3 Cr+₹61,805 (0.48%) | L-2 | Rejected-Finance rate quoted high |
| 3 | L-3₹1.3 Cr+₹3.5 L (2.75%)Rejected-Finance | ₹1.3 Cr+₹3.5 L (2.75%) | L-3 | Rejected-Finance rate quoted high |
| 4 | Rejected-Technical VILLAGE MANDOW TEHSIL JOSHIYARA DISTRICT UTTARKASHI | UTTAR KASHI | UTTARAKHAND | 249128 | - | - | Rejected-Technical technically not qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical technically not qualified |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
28 Feb 2023, 5:00 pmClosed
Superintending Engineer Project Circle Dehradun
Office of Superintending Engineer Project Circle Dehradun
RR WALL AND CC BLOCK APRON
2023_IRDCE_54988_1
07/SE/22 23
Open Tender
Civil Works
Item Wise
182 days
Near IT PARK
AS PER SBD
3 documents required · 3 mandatory
₹5,900
Executive Engineer investigation and planning divi
₹3.1 L
Office of Superintending Engineer Project Circle D
2 Sept 2023
14 Feb 2023
1 Mar 2023
14 Feb 2023
28 Feb 2023
14 Feb 2023
20 Feb 2023
Amount
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer in charge, as per drawing and techanical specifications.
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material,labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203
R.R.1:5 stone masonry of reating walls in cement mortar 1:5 as per drawings and technical specifications i.c. all cost of labour, material T&P etc. completed.
Hand packed stone filling i/c all cost of labour,material and T&P etc complete.
Providing concrete for plain/ reinforced concrete Nominal mix 1:2:4 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 for Coping
Providing cement concrete for nominal mix 1:3:6 in open foundation completed as per drawings and technical specifications i.c. all cost of labour,material T&P etc.
M/S HimalayanConstruction
TARA CHAND
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .