Loading…
Loading…
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
1 Sept 2026, 6:00 pm7d left
EXEN REW BARAMULLA
EXEN REW BARAMULLA
C/O SINGLE SEATED FLUSH POINT AT EACH MASJID UMAR AND GHS SHIVA B UNDER ADP PRI GRANTS FOR THE 2026-27 Block -Zaingeer
2026_RDPR_320676_26
197 Xen/Rew/Bla/2026-27 Dated 12/08/2026
Open Tender
Civil Works
Percentage
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹8,000
12 Aug 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
1 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundation (Not exceeding 1.5m in width), depth upto 1.5m incl. disposal of excavated earth upto 1m from cutting edge. (All Kinds of Soil) | 25.61 | cum | - | - |
| 2 | Providing & laying of dry solling hand packing, in foundation & Trecnhes incl all carraiges | 2.1 | cum | - | - |
| 3 | P/L in position cement conc. of grade 1:4:8 (1 cement : 4 fine sand : 8 Nallah graded stone agg 40 mm N/s) excl. cost of centering & shuttering in all work upto plinth level | 0.57 | cum | 1 | ₹0.57 |
| 4 | P/L in position cement conc. of grade 1:3:6 (1 cement : 3 fine sand : 6 stone agg 20 mm N/s) excl. cost of centering & shuttering in all work upto plinth level. | - | cum | - | - |
| 5 | P/L of D.P.C. 40mm thick with Cement Concrete 1:2:4 (20 mm N/S ) | 3.34 | sqm | 1 | ₹3.34 |
| 6 | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 Cement : 6 coarse sand) | 15.84 | cum | 1 | ₹15.82 |
| 7 | Extra for brick work above plinth level upto floor V level , vide qty X of item 7 | 12.49 | cum | - | - |
| 8 | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for roof. | 11.4 | sqm | - | - |
| 9 | Centering and Shuttring including removal of same Lintel beam & Runner beam& SLAB | 5.02 | sqm | - | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.67 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1067126.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].