| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | ₹3.4 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹3.7 L+₹28,810.19 (8.52%)Rejected-Finance | ₹3.7 L+₹28,810.19 (8.52%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹4.1 L+₹70,419.81 (20.8%)Rejected-Finance N A | NA | NA | 121004 | ₹4.1 L+₹70,419.81 (20.8%) | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹4.3 L+₹88,403.24 (26.1%)Rejected-Finance | ₹4.3 L+₹88,403.24 (26.1%) | L4 | Rejected-Finance Not L1 Bidder |
| 5 | L5₹4.4 L+₹97,578.46 (28.8%)Rejected-Finance | ₹4.4 L+₹97,578.46 (28.8%) | L5 | Rejected-Finance Not L1 Bidder |
Tender Value
₹4.6 L
EMD Value
₹9,175
Closing Date
17 Jul 2026, 11:00 amClosed
ASSISTANT ENGINEER, PWD, JANGIPUR SUB DIVISION
OFFICE OF THE ASSIATANT ENGINEER, JANGIPUR SUB-DIVISION, P.W.D., P.O. RAGHUNATHAGANJ, DISTRICT. MURSHIDABAD, PIN 742225
Urgent repairing ceiling and renovation work of Jangipur Electric Section-II Office Chamber within Jangipur Sub-Division Hospital under Berhampore Division No-I, P.W.D in the district of Murshidabad during the year 2026-27
2026_WBPWD_5016588_1
WBPWD/AE/JSD/PWD/eNIT-01/26-27
Open Tender
CIVIL WORKS
Percentage
45 days
Jangipur Sub-Divisional Hospital
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,175
Yes
24 Aug 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
17 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. (b) Extra rate for each addl floor over the rate of ground floor. For First Flor | 1 | m3 | 2,006 | ₹2,003.99 |
| 2 | Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. b) Extra for each addl. Floor over the rate of gournd floor | 1 | m2 | 56 | ₹55.94 |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work.
For First Floor | 1 | m2 | 383 | ₹382.62 |
| 4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety
For First Floor | 1 | m3 | 5,616.32 | ₹5,610.7 |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL
For First Floor | - | MT | 54,805.54 | - |
| 6 | Brick work with 1st class bricks in cement mortar (1:6)
(b) In superstructure, ground floor
For First Floor | 1 | m3 | 5,217.05 | ₹5,211.83 |
| 7 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
For First Floor | - | m2 | 681.53 | - |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:4 Cement mortar. (c) 10 mm. thick plaster
For First Floor | - | m2 | 128.55 | - |
| 8.01 | (i) With 1:6 cement mortar (c) 15 mm thick plaster
For First Floor | - | m2 | 143.55 | - |
| 8.02 | (i) With 1:6 cement mortar 20mm th (1 : 6) Internal
For First Floor | 1 | Sqm | 163.73 | ₹163.57 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
WBF2911.pdf
Tender Documents • 1.25 MB
BOQ_5086210.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .