Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC H N 131 GOPLAPUR NEW SHIVPURI GOPLAPUR GORAKHPUR UTTAR PRADESH 273016 | GORAKHPUR | UTTAR PRADESH | 273016 | L1 | Accepted-AOC LOWEST/NEGOTIATED | |
| 2 | L2₹4.6 L+₹7,935.80 (1.76%)Rejected-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | L2 | Rejected-Finance 2ND LOWEST | |
| 3 | L3₹4.8 L+₹29,930.80 (6.65%)Rejected-Finance GORAKHPUR UP 273001 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
12 Mar 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
Electricity Urban Distribution Circle, Banglow No 9, railway Station road, Gorakhpur
work against sanction package under deposit scheme Package No-D-95/2020-21 and D-145/2020-21
2021_PVVNV_562262_1
80/EUDC(G)/2020-21
Open Tender
Supply, Erection and Commissioning
Lump-sum
30 days
under EUDD-I, GKP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER EUDC
₹4,500
24 Jun 2021
2 Mar 2021
15 Mar 2021
2 Mar 2021
12 Mar 2021
2 Mar 2021
180 days
Amount
fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr tek ;kstuk ys[kk'kh"kZ esa Lohd`r iSdst la[;k 95@2020&21 ¼dkUgk xkS'kkyk@dkth gkml] egsok Qye.Mh ds ihNs fuekZ.k dk;Z] xksj[kiqj gsrq 40 fd0ok0 ds la;kstu@fo|qrhdj.k dk dk;Z½ ,oa iSdst la[;k 145@2020&21 ¼xksy?kj dkyh efUnj pkSjkgs ds foLrkjhdj.k esa ck/kd fo|qr iksy ,oa ykbu dks f'k¶V djus dk dk;Z½ ds dk;ksZ dks lseh VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
LT XLPE 3.5x400 Sq.mm.
63 KVA Transformer
S.T Pole 11 mtr. long
11 KV V Type Cross arm
F Bracket
ACSR Dog conductor
ACSR Weasel conductor
O/D Cable Jointing Kit for LT XLPE cable 3.5X400 Sq.mm.
11 KV pin insulator with pin
11 KV disc insulater with fitting
11 KV Dropper angle
11 KV top channel
11 KV S/S angle
LT AB Cable (3X120+1X95+1X16) Sq.mm.
LT PVC Cable 3.5X150/70 Sq.mm.
11 KV T-off Channel
Earthing complete
Stay Set Complete with 5 Kg. wire
Stone Pad
11 KV Fuse set
11 KV TPMO set
Supply of following material/fitting complete in all respect :-
HDPE Pipe 160 mm dia PN-6 PE-80
Aluminium Lugs
Copper Z clamps
Clamps for 11 KV V type X Arm
Clamps for F Barcket
Clamps for 11 KV Top & Dropper Angle, T off
LT Clamps for STP Pole
Dead end with Clamp
I hook for dead end
Suspension Clamp
I hook for suspension
Distribution box
Distribution box clamp
Nuts & Bolts of different size
The excavation of 2 nos. foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of ST 11 mtr. long Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/STP/LT clamp, F-Bracket, LT shacle insulator, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
Painting of Pole with Aluminium paint & Red oxide paint provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Laying of HDPE Pipe 150 mm Diameter for laying of LT XLPE 3.5x400 sq mm Cable by horizontal drilling method. The HDPE pipe shall be of PE 80 grade with pressure rating PN6 conforming to IS 4984/1995 and shall have wall thickness of 6.20 to 7.10 mm (HDPE pipe 150mm dia with elbow and socket will be supplied by contractor)
Laying and dressing of under ground LT XLPE 3.5x400 sq mm into HDPE Pipe by Horizontal drilling method as per RESPO norms. The Depth of horizontal drilling shall be between 2 to 3 meters or as per site required.
Errection of Cable Jointing Kit
Construction of T/F plinth of size 2x2x1.2 mtr with the help of first class brick & 9" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 Nos. ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor.
Shifting of existing 400 KVA T/F with fence & all accessories from its existing place to new place alongwith Fabrication, errection, commissioning & Testing and making its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), Nuts & Bolts will be supplied by the Contractor.
Fabrication, errection, commissioning & Testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor.
Disconnection and Re-connection of consumer service cable (Single/Three Phase)
Dismantling of existing STPs and HT/LT Lines and safe loading, unloading and carraige of dismantled material from work site to departmental store (As per site requirement)
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification
Errection of TPMO and Fuse set
M/s Anil kumar singh
M/s Arya Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .