| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | L1 | Accepted-AOC First | |
| 2 | L2₹16.6 L+₹1.3 L (8.70%)Rejected-AOC | L2 | Rejected-AOC Second |
Tender Value
Refer Docs
EMD Value
₹33,300
Closing Date
7 Jan 2021, 6:00 pmClosed
Assistant Executive Engineer
Inland Navigation Sub Division, Varkala, Kerala
CSIND Construction of Temporary Steel Foot Bridge across TS Canal at CH 44700m Arivalam at Varkala
2020_Irrig_402203_1
04/AEE/2020-21
Open Tender
Civil Works - Others
Item Rate
180 days
Arivalam
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,804
Yes
₹33,300
Yes
15 Mar 2021
23 Dec 2020
13 Jan 2021
23 Dec 2020
7 Jan 2021
23 Dec 2020
Amount
steel bridge
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc completed as per the direction of departmental Engineer-in-charge.
60.1.1 : RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc completed as per the direction of departmental Engineer-in-charge.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc completed as per the direction of departmental Engineer-in-charge.
60.64.1 : Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
60.64.4 : Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end etc completed as per the direction of departmental Engineer-in-charge.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) etc completed as per the direction of departmental Engineer-in-charge.
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) etc completed as per the direction of departmental Engineer-in-charge.
4.1.4 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) etc completed as per the direction of departmental Engineer-in-charge.
5.22.2 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Hard drawn steel wire.
7.2.1 : Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) etc completed as per the direction of departmental Engineer-in-charge.
od59292/2019_2020/IA : Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position all completeetc as per the direction of departmental Engineer-in-charge.
10.20 : Providing and fixing bolts including nuts and washers complete.
od59293/2019_2020/IA : Erection of newly fabricated steel bridge by lifting and leading to the riverbank,leading the one end of the steel bridge through the river by using pontoon,lifting the steel bridge to the pier in proper alignment including cost of labours,hire charges of heavy duty mobile crane etc completed as per the direction of departmental Engineer-in-charge.
10.26.3 : Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes etc completed as per the direction of departmental Engineer-in-charge.
11.20.3 : Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Dark shade pigment using ordinary cement etc completed as per the direction of departmental Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completed as per the direction of departmental Engineer-in-charge.
85.115 : Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc completed as per the direction of departmental Engineer-in-charge.
13.39.2 : Colour washing such as green, blue or buff to give an even shade:New work (two or more coats) with a base coat of whiting etc completed as per the direction of departmental Engineer-in-charge.
AKHIL SASIKUMAR
Bidder Name
KUNNATH CONSTRUCTIONS
AKHIL SASIKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_572003.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .